• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 638
  • 2
  • 1
  • 1
  • Tagged with
  • 642
  • 347
  • 289
  • 132
  • 119
  • 99
  • 92
  • 89
  • 84
  • 81
  • 79
  • 79
  • 75
  • 74
  • 74
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
291

Studie křižovatky na ulici Kníničské u Unihobby v Brně / Study of the junction on Kníničská street near Unihobby in Brno

Duda, Daniel January 2019 (has links)
The subject of the diploma thesis is the design of the intersection at the Kníničská street by Unihobby in Brno. The current arrangement is inconspicuous, capacitively inadequate and the intersection is a place of frequent traffic accidents. The solution includes a collision-free transit on the main road and the tram line. Traffic is linked to transport infrastructure, including pedestrian and bicycle transport. Part of the thesis is a road engineering assessment, an accident evaluation and an estimate of construction costs.
292

Strategie rozvoje území ve vazbě na stavební výrobu / Territory development strategy in relation to construction production

Mecová, Anna January 2019 (has links)
This diploma thesis deals with comparison of regions of the Czech Republic between national economy in terms of construction production and selection of region with the greatest potential for development of construction production. In the theoretical part is defined the term region, which is followed by regional economics and politics. Another topic addressed is regional development territorial development strategies and indicators that capture the differences between regions. The practical part deals with the characteristics of the national economy and construction in individual regions, which is folloved by a draft strategy dealing with problems in the field of construction. The last part of the thesis, regions are compared according to the given indicators and the regions with the greatest potential for the development of construction production are indentified.
293

Finanční plánování stavebního podniku / Financial Planning of the Construction Company

Karlíčková, Eva January 2017 (has links)
The thesis contains an evaluation of the economic situation of a building company using a financial analysis and establishes a financial plan for the following year. The theoretical part defines terms such as building company, asset structure and accounting statements used. The following part discusses the financial planning and various methods of financial analysis including its characteristics. The case study describes the economic situation of the building company in the period in question expressed by way of selected financial analysis methods. The aim of the thesis is to assess the company development within the specified six years and to prepare a financial plan for the following year.
294

Metodický postup koupě rodinného domu na hypoteční úvěr z pohledu kupujícího / Methodical Procedure for Buying a House with a Mortgage Loan from the Point of View of the Buyer

Olejník, Martin January 2019 (has links)
Master thesis focuses on selected real estate with mortgages. Opinions on displaying processes for buying a property for a mortgage loan in the created graphic process of the Czech Banking Association. Explaining legislation on mortgage banks or building societies.
295

Posouzení vlivů ÚP na cenu pozemků v městské části Brně – Soběšicích / Assessing the Impact of Planning on Land Prices in the district of Brno - Soběšice

Pokorná, Denisa January 2019 (has links)
This diploma thesis deals with the valuation of selected land in the city district of Brno – Soběšice. In the introductory part of the thesis there are mentioned important terms and methods related to real estate valuation, which are necessary to know for land valuation purposes. Furthermore, the thesis provides information on the valued land, which is currently applied for a territorial change in its use, this process and the whole process of territorial change in the city of Brno is briefly described in a separate chapter. Then the determined and market price is determined for the assessed land in three stages of land use in the land use plan. Individual stages, price effects and possible reasons for price differences are commented. The conclusion is devoted to the evaluation of results.
296

Režijní náklady ve stavebním podniku / Overhead Costs in the Contruction Company

Vondálová, Ludmila January 2020 (has links)
This thesis deals with overheads in the construction business. The theoretical part of the work is focused on costs and their types, on cost management in the con-struction business and its overheads. In the practical section, the management of the overhead costs of the surveyed company is analyzed, a different method of calculation is proposed, and a subsequent comparison of the method used by the company and the method proposed. In conclusion, the company's recommenda-tions are for more effective monitoring of overheads.
297

Multifunkční objekt / Multifunctional building

Amodio, Alessio January 2020 (has links)
Tato diplomová práce se zabývá návrhem multifunkční budovy, která slouží jako rozšíření haly dříve existující budovy. Areál se nachází v části Řečkovice v Brně. Práce si klade za cíl propojit budovy jak prostorově, tak vizuálně. Výrobní hala a sklad budou rozšířeny. Poslední patro bude sloužit jako administrativní část se sociálním zařízením a venkovní terasou. Proces návrhu byl plně podporován použitím technologie BIM.
298

Rekonstrukce multifunkčního sálu hudební školy s důrazem na akustiku / Reconstruction of the multifunctional room music school with an emphasis on acoustics

Sehnal, František January 2020 (has links)
The aim of the diploma thesis was to design the reconstruction of the music hall in the existing building of the private music school D-Music. The building is located in Kromeriz, cadastral area Kromeriz. I emphasize the design from the perspective of acoustics. The thesis also evaluated the noise load from the adjacent road II. class, for design hole fillings. It is a five-storey building with one underground and four above-ground floors. The music hall is located on the first floor and is designed multifunctionaly - for music with mobile acoustic absorbers for speech.
299

Modrá pyramida, stavební spořitelna, a.s. Financování výstavby rodinného domu / Blue Pyramid Building Society, Inc. Financing for the Construction of a Hous

Loučková, Pavla January 2010 (has links)
The object of main master´s thesis called Blue Pyramid Building Society, Inc. – Financing for the Construction of a House occupies by the credits provided from Blue Pyramid Building Society, Inc. The goal of this study is proposing of a Handbook that should help to financial consultants of Blue Pyramid Building Society, Inc. by the process of a loan for financing for the construction of a house (including acquisition of a lot). In the theoretical part I aim at the general principals of the functioning of the building savings and building savings loans. In the practical part I aim at the process of a loan provided from Blue Pyramid Building Society, Inc. There is processed a proposal of the Handwork. In the final part the Handwork is applied to the specific case from practice to assessment of its operation.
300

Zaměření části bývalého hostince Peklo v Tišnově / The Mapping Survey of a part of the former Peklo inn in Tišnov

Kryl, Marek January 2020 (has links)
The diploma thesis deals with measurement of former Peklo inn in Tišnov and creates a documentation of its building. Measurement is connected to the binding reference system – the S-JTSK coordinate sytem and Baltic Vertical Datum Bpv. The thesis countains a description of the place of interest and history of the building, preparatory work, choice of instruments and tools. In the next part measurement, processed of recorded data, requirements of creating documentation of the ground plan and vertical section, testing results of the work, are described. The thesis countains ground plan of the cellar, ground plan of the second floor and the vertical section of the building in scale of 1:50. Outcomes of thesis will serve as documentation of the current conditions of the building.

Page generated in 0.0371 seconds