Utbildningscell med robotiserat produktionssystem

Kvistenberg, Mattias, Goitom, Meron January 2011 (has links)
No description available.
2

Reduktion av energiförbrukning Åtgärdsförslag hos verkstadsindustrin Cummins-Scania XPI Manufacturing / Reduction of Energy Consumption Proposed actions at Cummins-Scania XPI Manufacturing

Kaur, Kirandip, Soltaniha, Tina January 2022 (has links)
År 2020 formulerade lastbilsproducenten Scania CV AB ett mål kring att minska sin energi-förbrukning med 25% till år 2025, med energiförbrukningen för år 2020 som baslinje. Effektiviseringen är nödvändig för att lastbilsproducenten ska kunna fortsätta bedriva ett hållbart och ansvarsfullt företagande. Denna studie utförs hos produktionsenheten DI (drivline-injektor), enheten tillverkar bränsleinsprutningssystem för verksamheten Cummins-Scania XPI Manufacturing. Syftet med arbetet är att identifiera energibesparingsaktiviteter samt föreslå eventuella energibesparingsåtgärder för att kunna stödja produktionsenheten DI med att nå energireduceringsmålet på 25%. En implementationsplan formuleras i syfte att presentera tidslinjen för åtgärdsförslagen. Metoden som tillämpas för att identifiera aktiviteterna är främst litteraturstudier. Dessa kompletteras med empiriska studier som utförs i syfte att tillhandahålla information om produktionsanläggningen. Energikonsumtionen i ursprungsläget samt energikonsumtion efter implementerad åtgärd beräknas för samtliga åtgärdsförslag. Åtgärderna som föreslås för att produktionsenheten ska reducera sin energiförbrukning är följande: • Införa helg- och kvällsavstängningar på maskiner• Införa helg- och kvällsänkningar (viloläge) på maskiner• Byta belysning till LED• Sänka temperatur till följd av implementation av LED-lysrör• Byta till filter med lägre tryckfall• Åtgärda tryckluftsläckage med förebyggande underhåll Implementeringen av följande åtgärder resulterar till en total energibesparing på 228,8 MWh per år. / The year 2020 the truck manufacturer Scania CV AB established a goal of reducing its energy consumption by 25% by 2025, with the year 2020 as its starting point. Reduction of energy consumption is necessary for the truck manufacturer in order to continue to conduct both sustainable as well as responsible business. This study is performed at the production unit DI (driveline-injector), the unit manufactures fuel injection systems for the company Cummins-Scania XPI Manufacturing. The purpose of the report is to identify energy saving activities, and additionally propose energy saving actions to be able to support the production unit DI in achieving the energy reduction target of 25%. A supplementary implementation plan is formulated in order to display the timeline for the presented activities. The method applied to formulate the activities is mainly literature studies from digital scientific publishing systems. Furthermore, are empirical studies performed in order to provide information from the facility. Calculations are performed to identify and present the results of the current energy consumption as well as the energy calculations after the proposed activities. The measures the field study presents for the production unit to reduce its energy consumption result in the following: • Introduce weekend and evening shutdowns on machines• Introduce standby mode on machines• Replace lighting with LEDs• Lower the temperature as a result of implemented LEDs• Switch to filters with lower pressure drop• Implement preventative maintenance in order to reduce compressed air leakage The implementation of the following measures results in a total energy saving of 228.8 MWh per year.
3

Demand Response In The Engineering Industry

Norberg, Johan January 2017 (has links)
The power utilities in Sweden are planning to replace the major part of thenuclear power plants with renewable energy resource by the year 2030. Some ofthe renewable energy resources are intermittent, which may endanger the powersystem stability. A solution to this problem could be increased exibility in theend-users consumption, which is known as demand response. This is a usefultool that can be used to facilitate the large integration of renewable energyresource into the power grid. Therefore, several of the Swedish governmentauthorities have stated that the possibilities for demand response should befurther investigated.During this thesis, a case study is carried out at Volvo Group Truck OperationsPowertrain Productions in Koping, with the purpose of deriving theirtechnical possibilities for DR in the factory. Volvo in Koping mainly producesgearboxes to all trucks within the Volvo Group concern and belongs to the engineeringindustry sector. The engineering industry has previously not beeninvestigated for DR purposes in Sweden. The main goal of the thesis is to derivethe DR capacity of the factory and the associated time parameters. Onlydemand response by shifting the production in time is considered.One production group (Midiblock 2) in the factory is modelled using MixedInteger Linear Programming and the optimization problem is used to minimizethe electricity cost while fullling the production requirements. The optimizationproblem is done on daily basis and the result is binary operating pointsfor CNC-machines. The output from the Mixed Integer Linear Programmingproblem is sent to a discrete event model, which is used to validate the resultsand display the optimal energy consumption.The simulation results indicates that the modelled production group can performa load shift of 270 kWh/h during 4 hours by scheduling production. Duringthe reduction it should be possible to perform actions such as maintenance andchanging settings of machines. If the results are true for the entire factory, theresulting load reduction is 1.35 MWh/h during 4 hours. However, the nancialincentives to perform load reductions are low. Also, Volvo in Koping does nothave any routines to shut-o the CNC-machines and an extensive work is requiredto make a load reduction possible. Resulting in that DR at the factory isat the moment unrealistic. In addition to the possibilities for DR, the possibleeconomic savings by shutting o the CNC-machines when they are not producingunits are also approximated. Volvo in Koping can save a large amount ofenergy and yearly cut the cost by at least 5 000 000 SEK on these actions, whichis also the rst step towards enabling DR in the factory. / Elkraftsbolagen i Sverige planerar att ersätta kärnkraftverken med förnybaraenergikällor fram till och med år 2030. Några av de förnybara energikällornaär intermittenta i sin produktion och kan på grund av detta medföra en faraför stabilitet i kraftsystemet. En del av lösningen till detta problem kan varaefterfrågeflexibiltet, vilket innebär att el-användarna är mer flexibla i förbrukningenoch anpassar sig till viss del efter kraftsystemets tillstånd. Efterfrågeflexibiltetär ett användbart verktyg som kan underlätta integreringen av de förnybaraenergikällorna. På grund av detta har era svenska statliga företag sagtatt er undersökning bör genomföras inom området efterfrågeflexibiltet.Under detta arbeta har en fallstudie utförts hos Volvo Group Truck OperationPowertrain Production i Köping. Syftet av fallstudien har varit attundersöka möjligheterna för efterfrågeflexibilitet i fabriken. Volvo i Köping producerartill största dels växellådor till samtliga lastbilar inom Volvo Group koncernenoch de tillhör därför industrisektorn verkstadsindustrier.En produktionsgrupp i fabriken modelleras med hjälp av linjärprogrammeringoch modellen används för att för att minimera elkostnaderna genom att föryttalast i tid och samtidigt uppfylla produktionskraven. Optimeringsproblemetberäknas med elpriser för ett dygn och resultatet av problemet är binära tillståndför CNC-maskinerna i produktionsgruppen. De binära tillstånden skickas tillen diskret modell i Matlab som används för att verifiera produktionskraven ochvisa den resulterande energiförbrukningen för produktionsgruppen.Resultatet visar att det är teoretiskt möjligt att förytta 270 kWh/h underen period på 4 timmar genom att förskjuta produktion i tid. Under produktionsstoppenär det möjligt att genomföra underhåll och att förändring iinställningarna på CNC-maskinerna. Om resultaten skalas upp till hela fabrikenskulle den resulterande lastförflyttningen vara 1.35 MWh/h under 4 timmar.Dock så är de ekonomiska incitamenten låga och lastföryttningen är inteekonomiskt hållbar. Ett ytterligare problem är att Volvo i Köping förtillfälletinte har några rutiner för att stänga av maskinerna. Därför krävs det ett omfattandearbete innan det skulle vara möjligt att genomföra en lastförflyttning.Efterfrågeflexibiltet hos Volvo i Köping är därför orealistiskt. Utöver att undersöka möjligheterna för efterfrågeflexibiltet i fabriken, har en del av arbetetsom mål att undersöka de möjliga energi- och kostnadsbesparingar som skapasav att stänga av CNC-maskinerna när de inte producerar enheter. Arbetet harvisat att Volvo i Köping kan varje är spara 5 000 000 SEK på att stänga avmaskinerna, vilket också är ett första steg mot efterfrågeflexibilitet i fabriken.
4

Supply Chain Risk Management : - En kvalitativ studie kring Covid-19s påverkan på den svenska verkstadsindustrin.

Nyman, Johan, Kniif, Victor, Bico, Hamza January 2020 (has links)
Abstract Background and problem statement: Since December 2019 the world have been largely affected by the new corona virus (Covid-19). The corporate industry has experienced the consequences of whole nations isolating themselves to contain the virus. The complex networks of today’s supply chains further complicate this situation. This has challenged companies expertise and preparedness within areas of supply chain risk management and further within procurement. Purpose: This study aims to identify how companies within the Swedish manufacturing industry work with risk management in supply chains mainly targeting risk management within procurement. Furthermore, the study aims to identify how these companies have been affected by the pandemic outbreak and how they have handled the situation by using risk management strategies. Based on this purpose two research questions were constructed. Method: A qualitative study design with some contribution from the quantitative study design have been carried out through semi-structured interviews. By analysing secondary data such as literature and peer-reviewed articles a theoretical framework was constructed. Results: Supply chain risk management is not formalized as a term within the industry, although it is safe to say that companies work with activities and strategies within the area. Strategies that proved effective during the pandemic outbreak were safety stock, geographical placement of suppliers, risk identification and risk analysis. Flexibility within the supply chains also proved to be vital to the success of the companies during this time.