• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 29
  • 25
  • 11
  • 10
  • 3
  • 2
  • 1
  • 1
  • 1
  • Tagged with
  • 92
  • 92
  • 24
  • 23
  • 23
  • 21
  • 17
  • 15
  • 12
  • 12
  • 11
  • 10
  • 10
  • 10
  • 10
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
21

Melhoria do pilar "manutenção planejada" da TPM através da utilização do RCM para nortear as estratégias de manutenção

Souza, Fábio Januário de January 2004 (has links)
O atual ambiente competitivo, onde baixo custo, alta qualidade e um grau crescente de customização são exigências para a sobrevivência das empresas, tem influenciado as ações dos profissionais de manutenção com vistas ao aprimoramento das políticas de manutenção. Como resultado, tem-se na área de manutenção industrial, uma grande quantidade de métodos, software, modelos e ferramentas de gestão disponíveis. Dentre eles, dois métodos se destacam: o RCM (Reliability Centered Maintenance ou Manutenção Centrada em Confiabilidade), de origem norte-americana, e a TPM (Total Productive Maintenance ou Manutenção Produtiva Total), de origem japonesa. A TPM promove a integração total entre homem, máquina e empresa, onde a manutenção dos meios de produção passa a constituir uma responsabilidade de todos. A utilização da TPM contempla a implementação de pilares de sustentação, sendo um deles, a manutenção planejada. Entretanto, a TPM não especifica a estratégia a ser adotada pela manutenção planejada. O RCM é uma metodologia lógica de procedimentos que objetiva estabelecer uma manutenção preditiva e preventiva para alcançar, de maneira efetiva e eficiente, os níveis de segurança e confiabilidade requeridas para cada equipamento. Considerando um ambiente com a TPM já implementada, o objetivo deste trabalho é a melhoria do pilar Manutenção Planejada da TPM através da utilização do RCM para nortear as estratégias de manutenção em empresas industriais. A sistemática proposta é ilustrada através de um estudo de caso na indústria de conformação de metais. / Today’s competitive business environment, in which low costs, high quality and an ever increasing degree of customization are essential for companies’ survival has influenced maintenance professionals’ courses of action, aiming at improving maintenance policies. As a result, in the industrial maintenance sector there is a great number of methods, software and management tools available. Among them, two stand out: the RCM (Reliability Centered Maintenance), a North American approach, and the TPM (Total productive Maintenance), a Japanese approach. TPM promotes total integration among manpower, machines and the company itself, and the maintenance of the means of production is everybody’s responsibility. The introduction of TPM demands the implementation of the so called sustaining pillars, and planned maintenance is one of them. However, TPM does not specify the strategy to be followed by planned maintenance. RCM is a set of logical procedures aiming at setting up predictive and preventive maintenance in order to effectively and efficiently achieve the security and reliability standards required for each equipment. Considering an environment where TPM has already been implemented, this paper aims at optimizing Planned Maintenance of the TPM by using RCM to guide maintenance strategies in industries. The system proposed is illustrated through a case study in a metal cold roll forming factory.
22

Análise crítica de experiências e discussão de estratégias para implantação de leis de inspeção de elementos de fachadas / Critical analysis on experiences and discussion of strategies for the implementation of façade element inspection laws

Oliveira, Cristiane Sardin Padilla de January 2013 (has links)
O presente trabalho faz uma avaliação do histórico de desenvolvimento e aplicação de leis de inspeções prediais em geral no Brasil, com foco particular nas leis especificas de inspeção de elementos de fachada. O mesmo busca discutir os papéis dessas leis como instrumentos de gestão de riscos na construção civil, destacando os avanços, limitações e tendências do processo de implantação desse tipo de legislação. A lógica e o conhecimento teórico acumulado na área indicam que a adoção de um sistema de inspeção adequado pode contribuir para a detecção precoce de problemas, que podem então ser corrigidos através de ações de manutenção preventiva, com menor custo e risco para os usuários. Essa é uma demanda fundamental em muitas cidades brasileiras, que apresentam um conjunto de edificações em idade avançada e com problemas de conservação. Sinistros repetidos, culminando na tragédia ocorrida no Rio de Janeiro em 2012, fizeram com que a edição de leis de inspeção entrasse na pauta política de várias administrações e do Congresso Nacional. Todavia, a análise de experiências práticas evidencia que existem dificuldades e obstáculos, culturais, técnicos e econômicos, que necessitam ser discutidos e superados para que uma estratégia de gestão de risco através de leis de inspeção possa ser adotada de forma eficaz. O trabalho busca colaborar com essa discussão, revisando criticamente a experiência de Porto Alegre, um dos primeiros municípios a implantar uma lei de inspeção específica de elementos de fachada, a Lei Municipal nº 6.323/88, regulamentada pelo Decreto 9425. Esses regramentos determinaram que os responsáveis pelas edificações apresentassem à Secretaria Municipal de Obras e Viação (SMOV), a cada 03 anos, um laudo de estabilidade estrutural das marquises localizadas sobre logradouros públicos. Essa lei, popularizada como “Lei das Marquises”, foi criada em resposta a 2 sinistros traumáticos envolvendo a queda de seções de marquises no centro da cidade, ocorridos no final dos anos 80, e teve um impacto importante no estado de conservação do estoque de marquises da cidade. Ao mesmo tempo, representou um marco significativo no histórico de implantação de leis de inspeção no Brasil, tendo influenciado vários outros municípios a adotar legislações semelhantes. Após 30 anos, considera-se importante avaliar seus efeitos e analisar as evoluções e dificuldades enfrentadas em sua aplicação, de forma a que seja possível orientar outras experiências. Essa é a motivação fundamental da pesquisa. Para complementar e enriquecer as análises, o trabalho buscou gerar um indicativo da eficiência e qualidade dos Laudos de Marquise que estão sendo entregues. Com esse intuito, a autora, auxiliada por outros pesquisadores do Grupo LEME/UFRGS, efetuou uma inspeção paralela de 135 estruturas, gerando dados usados para comparação com os constantes em laudos arquivados na Secretaria Municipal de Obras e Viação (SMOV). Em paralelo, se buscou uma forma de avaliar qual a percepção da população acerca dos conceitos associados à implantação de leis de inspeção e estratégias de manutenção preventiva, e estimar qual a aceitação dos custos associados a essas estratégias. Para tanto foi realizado um levantamento de dados, através de entrevistas e questionários, junto a usuários de 24 edificações da região metropolitana de Porto Alegre. Esse esforço evidenciou que existe um bom conhecimento dos riscos e uma aceitação da necessidade de inspeções, mas que o custo ainda é uma barreira. Visando aproveitar e consolidar todo o conhecimento adquirido nessas diversas análises, o trabalho finaliza apresentando uma proposta de diretrizes consideradas úteis para orientar a implantação de leis de inspeção de elementos de fachada. / This study evaluated the history of the development and application of building inspection laws in Brazil in general, with special focus on specific laws for the inspection of façade elements. The role of these laws as risk management tools in civil construction is discussed, stressing developments, limitations and trends of their implementation process. Logics and the theoretical knowledge accumulated on this subject suggest that the adoption of a proper system may allow the early detection of problems, which can then be corrected by preventive maintenance actions, and therefore are less costly and pose fewer risks to the users. This is a critical demand in many Brazilian cities that have many old buildings with conservation problems. Repeated accidents, which culminated in the tragedy in Rio de Janeiro in 2012, inserted the issuing of inspection laws in the political agenda of many local administrations and of the National Congress. However, the analysis of practical experiences shows that there are cultural, technical, and economic obstacles that need to be discussed and overcome to allow the adoption of an efficient risk management strategy based on inspection laws. This study aims at contributing for this discussion making a critical review of the experience of Porto Alegre, which was one of the first cities to implement a specific law for the inspection of façade elements (Municipal Act n. 6.323/88, regulated by Order 9425). These regulations established that those responsible for the building have to present to the local department of works (Secretaria Municipal de Obras e Viação – SMOV) a report on the structural stability of the marquees located on public areas every three years. This so-called “Marquee Act” was issued in response to two severe accidents that involved the fall of marquee sections downtown by the end of the 1980s and that had an important impact on the conservation status of the city’s marquee inventory. It was also a landmark in the history of the implementation of inspection laws in Brazil, as it influenced the adoption of similar legislation in other cities. After 30 years, it is important to evaluate its effects and to analyze the advances and obstacles to their application in order to guide other experiences. This is the main motivation of this research study. In order to complement and enrich the analyses, an indication of efficiency and quality of the marquee reports is pursued. Based on a parallel inspection of 135 structures, made by the author, with the aid of other researchers of the group LEME/UFRGS, data was collected to compare with those reported and filed at the local department of works (SMOV). Also, a survey of the public perception relative to the concepts associated with the implementation of inspection laws and preventive maintenance strategies was carried out, checking the acceptance of the costs associated with these strategies. This assessment was made using interviews and questionnaires applied to users of 24 buildings of the metropolitan region of Porto Alegre. The results showed that the population is aware of the risks and accepts the need for inspections, but that cost is still an obstacle. Aiming at using and consolidating the knowledge acquired through these analyses, the study ends proposing some guidelines considered useful for the implementation of façade element inspection laws.
23

Melhoria do pilar "manutenção planejada" da TPM através da utilização do RCM para nortear as estratégias de manutenção

Souza, Fábio Januário de January 2004 (has links)
O atual ambiente competitivo, onde baixo custo, alta qualidade e um grau crescente de customização são exigências para a sobrevivência das empresas, tem influenciado as ações dos profissionais de manutenção com vistas ao aprimoramento das políticas de manutenção. Como resultado, tem-se na área de manutenção industrial, uma grande quantidade de métodos, software, modelos e ferramentas de gestão disponíveis. Dentre eles, dois métodos se destacam: o RCM (Reliability Centered Maintenance ou Manutenção Centrada em Confiabilidade), de origem norte-americana, e a TPM (Total Productive Maintenance ou Manutenção Produtiva Total), de origem japonesa. A TPM promove a integração total entre homem, máquina e empresa, onde a manutenção dos meios de produção passa a constituir uma responsabilidade de todos. A utilização da TPM contempla a implementação de pilares de sustentação, sendo um deles, a manutenção planejada. Entretanto, a TPM não especifica a estratégia a ser adotada pela manutenção planejada. O RCM é uma metodologia lógica de procedimentos que objetiva estabelecer uma manutenção preditiva e preventiva para alcançar, de maneira efetiva e eficiente, os níveis de segurança e confiabilidade requeridas para cada equipamento. Considerando um ambiente com a TPM já implementada, o objetivo deste trabalho é a melhoria do pilar Manutenção Planejada da TPM através da utilização do RCM para nortear as estratégias de manutenção em empresas industriais. A sistemática proposta é ilustrada através de um estudo de caso na indústria de conformação de metais. / Today’s competitive business environment, in which low costs, high quality and an ever increasing degree of customization are essential for companies’ survival has influenced maintenance professionals’ courses of action, aiming at improving maintenance policies. As a result, in the industrial maintenance sector there is a great number of methods, software and management tools available. Among them, two stand out: the RCM (Reliability Centered Maintenance), a North American approach, and the TPM (Total productive Maintenance), a Japanese approach. TPM promotes total integration among manpower, machines and the company itself, and the maintenance of the means of production is everybody’s responsibility. The introduction of TPM demands the implementation of the so called sustaining pillars, and planned maintenance is one of them. However, TPM does not specify the strategy to be followed by planned maintenance. RCM is a set of logical procedures aiming at setting up predictive and preventive maintenance in order to effectively and efficiently achieve the security and reliability standards required for each equipment. Considering an environment where TPM has already been implemented, this paper aims at optimizing Planned Maintenance of the TPM by using RCM to guide maintenance strategies in industries. The system proposed is illustrated through a case study in a metal cold roll forming factory.
24

Avaliação imunológica de duas sistemáticas de atenção periodontal na fase de manutenção periódica preventiva : análise secundária de uma subamostra de um ensaio clínico randomizado / Immunological evaluation of two protocols of periodontal care during preventive periodic maintenance phase – a subsample secondary analysis of a randomized clinical trial

Stadler, Amanda Finger January 2015 (has links)
Introdução: A necessidade de pacientes serem inseridos em protocolos de manutenção periodontais (PMP) após tratamento periodontal é bem estabelecida na literatura. No entanto, ainda não é bem estabelecido quais procedimentos são necessários para manter a saúde periodontal. O objetivo do presente estudo foi identificar quais os biomarcadores relacionados com a doença periodontal e comparar o efeito de dois PMPs nos níveis destes biomarcadores pró e antiinflamatórios do fluido crevicular gengival (FCG) durante 1 ano. Materiais e Métodos: Após o tratamento periodontal não-cirúrgico, 34 sujeitos (14H/20M, idade média 54 anos) diagnosticados com periodontite crônica foram randomicamente alocados em um dos seguintes grupos: a) somente raspagem supragingival; b) raspagem supra e subgengival. Todos os participantes receberam instruções de higiene oral personalizados e polimento dos dentes. Os indivíduos foram vistos em intervalos de três meses para a realização de exames clínicos, coleta de FCG e procedimentos de manutenção periodontal. As principais citocinas pró- e anti-inflamatórias e quimiocina relacionadas com a doença periodontal foram identificadas por meio de uma revisão sistemática da literatura com metanálise. Em seguida, os níveis de FCG de 16 citocinas e quimiocinas dos 34 sujeitos incluídos no estudo foram medidos por meio de um imunoensaio múltiplo. Resultados: Não foram observadas diferenças significativas nos parâmetros clínicos ou imunológicos entre os dois PMPs. Os níveis médios de concentração no FCG da maioria das citocinas pró-inflamatórias foram geralmente baixos / moderados durante todo o período de estudo, com exceção da IL-1β. Os níveis das citocinas anti-inflamatórias IL-4 e IL-13 foram moderado / alto. Entre as quimiocinas, os níveis de MIP-1α e MCP-1 foram altos, e a concentração de IL-8 foi muito alta durante todo o estudo. Conclusões: Os resultados sugerem que um PMP baseado apenas no controle do biofilme supragengival é tão eficaz na manutenção de baixos níveis de inflamação periodontal e estabilidade clínica após o tratamento quanto um PMP baseado em controle supra e subgengival. / Introduction: The need for patients to be enrolled into periodontal maintenance protocols (PMP) after periodontal treatment is well established in the literature. However, it is still unknown which interventions are necessary to maintain periodontal health. The aim of the present study was to identify the biomarkers related to periodontal disease, and to compare the 1-year effect of two periodontal maintenance protocols (PMP) on gingival crevicular fluid (GCF) levels of pro- and anti-inflammatory biomarkers. Material and Methods: Following non-surgical periodontal treatment, 34 subjects (14M/20F, mean age: 54 years) diagnosed with chronic periodontitis were randomly assigned into one of the following study arms: a) supragingival scaling only; b) supra and subgingival scaling. All subjects received personalized oral hygiene instructions and tooth polishing. Subjects were seen at 3 months intervals for periodontal maintenance, clinical data and GCF collection. The major pro-and anti-inflammatory cytokines and chemokine related to periodontal disease were identified through a systematic review of the literature with metaanalysis. After that, GCF levels of 16 different cytokines and chemokines from the 34 subjects included in the study were measured using a multiplex immunoassay. Results: No significant differences between PMPs were observed for any clinical parameters or immunological biomarkers. Median GCF concentration levels for most pro-inflammatory cytokines were generally low/moderate throughout the study period, with the exception of IL-1β. GCF levels of anti-inflammatory cytokines IL-4 and IL-13 were moderate/high. For chemokines, GCF levels for MIP-1α and MCP-1 were high, and concentration for IL-8 was very high. Conclusion: Our findings suggest that a PMP based on supragingival biofilm control alone is as effective in maintaining low levels of periodontal inflammation and clinical stability after treatment as a PMP based on combined supra/subgingival biofilm control.
25

Avaliação imunológica de duas sistemáticas de atenção periodontal na fase de manutenção periódica preventiva : análise secundária de uma subamostra de um ensaio clínico randomizado / Immunological evaluation of two protocols of periodontal care during preventive periodic maintenance phase – a subsample secondary analysis of a randomized clinical trial

Stadler, Amanda Finger January 2015 (has links)
Introdução: A necessidade de pacientes serem inseridos em protocolos de manutenção periodontais (PMP) após tratamento periodontal é bem estabelecida na literatura. No entanto, ainda não é bem estabelecido quais procedimentos são necessários para manter a saúde periodontal. O objetivo do presente estudo foi identificar quais os biomarcadores relacionados com a doença periodontal e comparar o efeito de dois PMPs nos níveis destes biomarcadores pró e antiinflamatórios do fluido crevicular gengival (FCG) durante 1 ano. Materiais e Métodos: Após o tratamento periodontal não-cirúrgico, 34 sujeitos (14H/20M, idade média 54 anos) diagnosticados com periodontite crônica foram randomicamente alocados em um dos seguintes grupos: a) somente raspagem supragingival; b) raspagem supra e subgengival. Todos os participantes receberam instruções de higiene oral personalizados e polimento dos dentes. Os indivíduos foram vistos em intervalos de três meses para a realização de exames clínicos, coleta de FCG e procedimentos de manutenção periodontal. As principais citocinas pró- e anti-inflamatórias e quimiocina relacionadas com a doença periodontal foram identificadas por meio de uma revisão sistemática da literatura com metanálise. Em seguida, os níveis de FCG de 16 citocinas e quimiocinas dos 34 sujeitos incluídos no estudo foram medidos por meio de um imunoensaio múltiplo. Resultados: Não foram observadas diferenças significativas nos parâmetros clínicos ou imunológicos entre os dois PMPs. Os níveis médios de concentração no FCG da maioria das citocinas pró-inflamatórias foram geralmente baixos / moderados durante todo o período de estudo, com exceção da IL-1β. Os níveis das citocinas anti-inflamatórias IL-4 e IL-13 foram moderado / alto. Entre as quimiocinas, os níveis de MIP-1α e MCP-1 foram altos, e a concentração de IL-8 foi muito alta durante todo o estudo. Conclusões: Os resultados sugerem que um PMP baseado apenas no controle do biofilme supragengival é tão eficaz na manutenção de baixos níveis de inflamação periodontal e estabilidade clínica após o tratamento quanto um PMP baseado em controle supra e subgengival. / Introduction: The need for patients to be enrolled into periodontal maintenance protocols (PMP) after periodontal treatment is well established in the literature. However, it is still unknown which interventions are necessary to maintain periodontal health. The aim of the present study was to identify the biomarkers related to periodontal disease, and to compare the 1-year effect of two periodontal maintenance protocols (PMP) on gingival crevicular fluid (GCF) levels of pro- and anti-inflammatory biomarkers. Material and Methods: Following non-surgical periodontal treatment, 34 subjects (14M/20F, mean age: 54 years) diagnosed with chronic periodontitis were randomly assigned into one of the following study arms: a) supragingival scaling only; b) supra and subgingival scaling. All subjects received personalized oral hygiene instructions and tooth polishing. Subjects were seen at 3 months intervals for periodontal maintenance, clinical data and GCF collection. The major pro-and anti-inflammatory cytokines and chemokine related to periodontal disease were identified through a systematic review of the literature with metaanalysis. After that, GCF levels of 16 different cytokines and chemokines from the 34 subjects included in the study were measured using a multiplex immunoassay. Results: No significant differences between PMPs were observed for any clinical parameters or immunological biomarkers. Median GCF concentration levels for most pro-inflammatory cytokines were generally low/moderate throughout the study period, with the exception of IL-1β. GCF levels of anti-inflammatory cytokines IL-4 and IL-13 were moderate/high. For chemokines, GCF levels for MIP-1α and MCP-1 were high, and concentration for IL-8 was very high. Conclusion: Our findings suggest that a PMP based on supragingival biofilm control alone is as effective in maintaining low levels of periodontal inflammation and clinical stability after treatment as a PMP based on combined supra/subgingival biofilm control.
26

Análise crítica de experiências e discussão de estratégias para implantação de leis de inspeção de elementos de fachadas / Critical analysis on experiences and discussion of strategies for the implementation of façade element inspection laws

Oliveira, Cristiane Sardin Padilla de January 2013 (has links)
O presente trabalho faz uma avaliação do histórico de desenvolvimento e aplicação de leis de inspeções prediais em geral no Brasil, com foco particular nas leis especificas de inspeção de elementos de fachada. O mesmo busca discutir os papéis dessas leis como instrumentos de gestão de riscos na construção civil, destacando os avanços, limitações e tendências do processo de implantação desse tipo de legislação. A lógica e o conhecimento teórico acumulado na área indicam que a adoção de um sistema de inspeção adequado pode contribuir para a detecção precoce de problemas, que podem então ser corrigidos através de ações de manutenção preventiva, com menor custo e risco para os usuários. Essa é uma demanda fundamental em muitas cidades brasileiras, que apresentam um conjunto de edificações em idade avançada e com problemas de conservação. Sinistros repetidos, culminando na tragédia ocorrida no Rio de Janeiro em 2012, fizeram com que a edição de leis de inspeção entrasse na pauta política de várias administrações e do Congresso Nacional. Todavia, a análise de experiências práticas evidencia que existem dificuldades e obstáculos, culturais, técnicos e econômicos, que necessitam ser discutidos e superados para que uma estratégia de gestão de risco através de leis de inspeção possa ser adotada de forma eficaz. O trabalho busca colaborar com essa discussão, revisando criticamente a experiência de Porto Alegre, um dos primeiros municípios a implantar uma lei de inspeção específica de elementos de fachada, a Lei Municipal nº 6.323/88, regulamentada pelo Decreto 9425. Esses regramentos determinaram que os responsáveis pelas edificações apresentassem à Secretaria Municipal de Obras e Viação (SMOV), a cada 03 anos, um laudo de estabilidade estrutural das marquises localizadas sobre logradouros públicos. Essa lei, popularizada como “Lei das Marquises”, foi criada em resposta a 2 sinistros traumáticos envolvendo a queda de seções de marquises no centro da cidade, ocorridos no final dos anos 80, e teve um impacto importante no estado de conservação do estoque de marquises da cidade. Ao mesmo tempo, representou um marco significativo no histórico de implantação de leis de inspeção no Brasil, tendo influenciado vários outros municípios a adotar legislações semelhantes. Após 30 anos, considera-se importante avaliar seus efeitos e analisar as evoluções e dificuldades enfrentadas em sua aplicação, de forma a que seja possível orientar outras experiências. Essa é a motivação fundamental da pesquisa. Para complementar e enriquecer as análises, o trabalho buscou gerar um indicativo da eficiência e qualidade dos Laudos de Marquise que estão sendo entregues. Com esse intuito, a autora, auxiliada por outros pesquisadores do Grupo LEME/UFRGS, efetuou uma inspeção paralela de 135 estruturas, gerando dados usados para comparação com os constantes em laudos arquivados na Secretaria Municipal de Obras e Viação (SMOV). Em paralelo, se buscou uma forma de avaliar qual a percepção da população acerca dos conceitos associados à implantação de leis de inspeção e estratégias de manutenção preventiva, e estimar qual a aceitação dos custos associados a essas estratégias. Para tanto foi realizado um levantamento de dados, através de entrevistas e questionários, junto a usuários de 24 edificações da região metropolitana de Porto Alegre. Esse esforço evidenciou que existe um bom conhecimento dos riscos e uma aceitação da necessidade de inspeções, mas que o custo ainda é uma barreira. Visando aproveitar e consolidar todo o conhecimento adquirido nessas diversas análises, o trabalho finaliza apresentando uma proposta de diretrizes consideradas úteis para orientar a implantação de leis de inspeção de elementos de fachada. / This study evaluated the history of the development and application of building inspection laws in Brazil in general, with special focus on specific laws for the inspection of façade elements. The role of these laws as risk management tools in civil construction is discussed, stressing developments, limitations and trends of their implementation process. Logics and the theoretical knowledge accumulated on this subject suggest that the adoption of a proper system may allow the early detection of problems, which can then be corrected by preventive maintenance actions, and therefore are less costly and pose fewer risks to the users. This is a critical demand in many Brazilian cities that have many old buildings with conservation problems. Repeated accidents, which culminated in the tragedy in Rio de Janeiro in 2012, inserted the issuing of inspection laws in the political agenda of many local administrations and of the National Congress. However, the analysis of practical experiences shows that there are cultural, technical, and economic obstacles that need to be discussed and overcome to allow the adoption of an efficient risk management strategy based on inspection laws. This study aims at contributing for this discussion making a critical review of the experience of Porto Alegre, which was one of the first cities to implement a specific law for the inspection of façade elements (Municipal Act n. 6.323/88, regulated by Order 9425). These regulations established that those responsible for the building have to present to the local department of works (Secretaria Municipal de Obras e Viação – SMOV) a report on the structural stability of the marquees located on public areas every three years. This so-called “Marquee Act” was issued in response to two severe accidents that involved the fall of marquee sections downtown by the end of the 1980s and that had an important impact on the conservation status of the city’s marquee inventory. It was also a landmark in the history of the implementation of inspection laws in Brazil, as it influenced the adoption of similar legislation in other cities. After 30 years, it is important to evaluate its effects and to analyze the advances and obstacles to their application in order to guide other experiences. This is the main motivation of this research study. In order to complement and enrich the analyses, an indication of efficiency and quality of the marquee reports is pursued. Based on a parallel inspection of 135 structures, made by the author, with the aid of other researchers of the group LEME/UFRGS, data was collected to compare with those reported and filed at the local department of works (SMOV). Also, a survey of the public perception relative to the concepts associated with the implementation of inspection laws and preventive maintenance strategies was carried out, checking the acceptance of the costs associated with these strategies. This assessment was made using interviews and questionnaires applied to users of 24 buildings of the metropolitan region of Porto Alegre. The results showed that the population is aware of the risks and accepts the need for inspections, but that cost is still an obstacle. Aiming at using and consolidating the knowledge acquired through these analyses, the study ends proposing some guidelines considered useful for the implementation of façade element inspection laws.
27

Melhoria do pilar "manutenção planejada" da TPM através da utilização do RCM para nortear as estratégias de manutenção

Souza, Fábio Januário de January 2004 (has links)
O atual ambiente competitivo, onde baixo custo, alta qualidade e um grau crescente de customização são exigências para a sobrevivência das empresas, tem influenciado as ações dos profissionais de manutenção com vistas ao aprimoramento das políticas de manutenção. Como resultado, tem-se na área de manutenção industrial, uma grande quantidade de métodos, software, modelos e ferramentas de gestão disponíveis. Dentre eles, dois métodos se destacam: o RCM (Reliability Centered Maintenance ou Manutenção Centrada em Confiabilidade), de origem norte-americana, e a TPM (Total Productive Maintenance ou Manutenção Produtiva Total), de origem japonesa. A TPM promove a integração total entre homem, máquina e empresa, onde a manutenção dos meios de produção passa a constituir uma responsabilidade de todos. A utilização da TPM contempla a implementação de pilares de sustentação, sendo um deles, a manutenção planejada. Entretanto, a TPM não especifica a estratégia a ser adotada pela manutenção planejada. O RCM é uma metodologia lógica de procedimentos que objetiva estabelecer uma manutenção preditiva e preventiva para alcançar, de maneira efetiva e eficiente, os níveis de segurança e confiabilidade requeridas para cada equipamento. Considerando um ambiente com a TPM já implementada, o objetivo deste trabalho é a melhoria do pilar Manutenção Planejada da TPM através da utilização do RCM para nortear as estratégias de manutenção em empresas industriais. A sistemática proposta é ilustrada através de um estudo de caso na indústria de conformação de metais. / Today’s competitive business environment, in which low costs, high quality and an ever increasing degree of customization are essential for companies’ survival has influenced maintenance professionals’ courses of action, aiming at improving maintenance policies. As a result, in the industrial maintenance sector there is a great number of methods, software and management tools available. Among them, two stand out: the RCM (Reliability Centered Maintenance), a North American approach, and the TPM (Total productive Maintenance), a Japanese approach. TPM promotes total integration among manpower, machines and the company itself, and the maintenance of the means of production is everybody’s responsibility. The introduction of TPM demands the implementation of the so called sustaining pillars, and planned maintenance is one of them. However, TPM does not specify the strategy to be followed by planned maintenance. RCM is a set of logical procedures aiming at setting up predictive and preventive maintenance in order to effectively and efficiently achieve the security and reliability standards required for each equipment. Considering an environment where TPM has already been implemented, this paper aims at optimizing Planned Maintenance of the TPM by using RCM to guide maintenance strategies in industries. The system proposed is illustrated through a case study in a metal cold roll forming factory.
28

Estudo e análise de confiabilidade e manutenção em pavimentos asfálticos: uma abordagem delay time modelling

MUCHANGA, Armando 01 February 2016 (has links)
Submitted by Fabio Sobreira Campos da Costa (fabio.sobreira@ufpe.br) on 2016-08-05T13:16:00Z No. of bitstreams: 2 license_rdf: 1232 bytes, checksum: 66e71c371cc565284e70f40736c94386 (MD5) Dissertação Armando Muchanga.pdf certa.pdf: 9213756 bytes, checksum: e7f44528d62ad3cf348371353e3934a6 (MD5) / Made available in DSpace on 2016-08-05T13:16:00Z (GMT). No. of bitstreams: 2 license_rdf: 1232 bytes, checksum: 66e71c371cc565284e70f40736c94386 (MD5) Dissertação Armando Muchanga.pdf certa.pdf: 9213756 bytes, checksum: e7f44528d62ad3cf348371353e3934a6 (MD5) Previous issue date: 2016-02-01 / CNPq / O desenvolvimento urbano depende de vários setores, e o mais importante, além de mais caro nos custos de urbanização é o setor de infraestrutura de transporte, responsável pela pavimentação e manutenção das vias. Com o aumento acelerado de veículos que trafegam nas vias, para um departamento de transporte manter uma rede viária urbana sob os níveis de desempenho requeridos ao longo da vida útil do pavimento é necessário que haja um melhor gerenciamento das atividades de manutenção. De todos os tipos de defeitos dos pavimentos, os que mais preocupam os usuários das vias, gestor e os técnicos da manutenção são os buracos. Alinhada a este fato exposto, esta dissertação propõe um modelo Delay Time para determinar o período ótimo de inspeção e manutenção preventiva dos pavimentos asfálticos urbanos, em particular das vias da cidade de Recife, de modo a minimizar os custos de manutenção. Primeiro são exploradas as abordagem de modelo Delay Time, para analisar a que se adequa aos pavimentos asfáltico. E a abordagem proposta é Delay Time do sistema complexo, sujeito a várias falhas, com inspeção perfeita e taxa de chega de defeitos homogênea. Os pavimentos são sujeitos a vários tipos de defeitos, mas este trabalho considerou os buracos por serem os defeitos que mais gastam no custo de manutenção. Também é feita uma revisão dos trabalhos que contribuíram para investigação e aplicação do modelo Delay Time. Ainda neste trabalha é apresentado uma revisão das normas dos pavimentos asfáltico, bem como a politica de manutenção “Operação Tapa-Buraco” praticada atualmente nas vias da cidade de Recife para tapar os buracos. O modelo proposto mostra se viável e não é sensível quando variam os parâmetros de entra, os resultados obtidos são fáceis de aplicar se o setor de manutenção de pavimento da cidade de Recife incluir as hipóteses do modelo na “Operação Tapa-Buraco”. / The urban development depends on several sectors, the most important, beyond most expensive, comes from the transport infrastructure sector - that is responsible for paving and maintenance of roads. Due the rapid increase of vehicles on roads, for the transport department to keep an urban road network under the performance levels required it is necessary to invest in a better management of maintenance activities. Among all types of floors of defects, the primary concern to road users, managers and maintenance technicians are the holes. In sum to this stated fact, this dissertation proposes a Delay Time model to determine the optimal period of inspection and preventive maintenance of urban asphalt pavements, particularly for the roads of the city of Recife, in order to minimize maintenance costs. First it was explored the Delay Time model approach to analyse which applies to the asphalt pavements. The proposed approach is Delay Time of complex system, subject to several failures, with perfect inspection and a homogeneous rate of defects arrival. Besides the floors being subject to various types of defects, this work only considers holes as defects that cause more impact on the maintenance cost. It is also made a review of the works that contributed to research and application of Delay Time Models. Also in this work is presented a review of the standards of asphalt pavements, as well as the maintenance policy "Operação Tapa-Buraco", currently practiced in Recife city roads to slap the holes. The proposed model shows that it is viable and is not sensitive when varying input parameters, the results are easy to apply to the Recife city pavement maintenance industry including the model assumptions in "Operação Tapa-Buraco".
29

Metodologia de priorização de equipamentos medicos para programas de manutenção preventiva em hospitais

Ferreyra Ramirez, Ernesto Fernando 02 December 1996 (has links)
Orientador: Said Jorge Calil / Dissertação (mestrado) - Universidade Estadual de Campinas, Faculdade de Engenharia Eletrica e de Computação / Made available in DSpace on 2018-07-21T20:43:49Z (GMT). No. of bitstreams: 1 FerreyraRamirez_ErnestoFernando_M.pdf: 4191425 bytes, checksum: f333b450c6c2fa05078c8f9cc47d9f7c (MD5) Previous issue date: 1996 / Resumo: Atualmente, as pressões para aumento da segurança e disponibilidade dos equipamentos médicos, e a limitação de recursos humanos e financeiros têm mostrado a necessidade de implantação de programas de manutenção preventiva. O alto custo deste tipo de manutenção obriga o desenvolvimento de programas que priorizem os equipamentos nos hospitais brasileiros. Este trabalho propõe uma metodologia para suprir esta necessidade. A metodologia proposta considera os fatores: I)Risco para o paciente e usuário do equipamento; 2)Importância estratégica do equipamento e Recomendações do fabricante e órgãos fiscalizadores; 3)Análise da viabilidade de manutenção preventiva; e 4)Análise periódica do histórico de falhas e consertos dos equipamentos. A estes fatores são atribuídos pontos, de modo a formar um número de prioridade (PE). Os resultados encontrados em um estudo de caso efetuado mostram que a metodologia é condizente com a realidade nacional devido à sua facilidade de implementação mesmo para o caso em que não haja dados anteriores sobre o histórico / Abstract: Nowadays, the increasing need of improving the safety and the availability of medical equipment, and the restrictions of human and financial resources have shown the importance of implementation of preventive maintenance programs. The high costs of this type of maintenance lead to the development of equipment prioritizing programs in the Brazilian hospitaIs. This work suggests a methodology to fuifiII this need. The proposed methodology considers the factors: 1) Physical Risk to the patient and to the user; 2) Equipment strategic importance and manufacturers' and accreditation entities recommendations; 3) Viability analysis of the preventive maintenance; and 4)Periodic analysis of the equipment failures and repair history. These factors receive ponderation in order to achieve an equipment priority number (PE). The results found in a case study showed the proposed methodology agrees with the national reality because it's easy to implement though the equipment maintenance history data were limited. / Mestrado / Engenharia Biomedica / Mestre em Engenharia Elétrica
30

Do not let bad maintenance ruin your day : A case study of coordinating turnaround maintenance in a continuous flow process industry.

Hlebnikovs, Andrew, Kövamees, Axel January 2022 (has links)
The uptime of machinery in continuous flow process industries such as steel manufacturing plants puts pressure on the maintenance function. This in turn contributes to sustaining reliable physical assets. As absence of reliable physical assets highly affects the competitive advantage. Turnaround maintenance is a common practice in such production setups and requires top-of-the-line managerial attention to be planned,executed and assessed in an efficient manner. By applying an abductive approach and combining the qualitative and quantitative research approaches, this thesis aims to explore the managerial issue of coordinating turnaround maintenance within a continuous flow process industry. The research questions that guide this thesis consist of describing how turnaround maintenance can be coordinated and its associated challenges. By comparing publicly available literature and empirical evidence provided by performing a case study, it is confirmed that the main challenges for conducting efficient turnaround maintenance comes down to the management in all stages associated with the turnaround. To coordinate turnaround maintenance activities in the most efficient manner, several challenges must be overcome. Aligning organisational goals and generating management commitment is the first prerequisite before any improvements can be done. It is necessary to define a common scope that strives for creating reliable physical assets to enhance the competitive advantage. The defined challenges in coordination are related to before, during and after the turnaround execution. These relate to creating a cyclical process for the turnaround where previously acquired knowledge is used for improving future turnarounds. While detailed planning is necessary for each turnaround, a high level of contingency is also necessary. To achieve this and succeed, it is argued that a high level of visibility during the turnarounds and the use of standardised methods is required. / Drifttiden för maskiner i industrier med kontinuerligt flöde, såsom ståltillverkningsanläggningar, sätter press på underhållsverksamenheten. Detta för att i sin tur bidra till att upprätthålla tillförlitliga fysiska tillgångar. Eftersom avsaknad av tillförlitliga fysiska tillgångar påverkar konkurrensfördelen i hög grad. Storaunderhållstopp där den kontinuerliga produktionslinan stoppas, är en vanligt förekommande praxis i sådana produktionsanläggningar vilket kräver ledningens uppmärksamhet för att planera och utvärdera på ett effektivt sätt. Genom att tillämpa ett abduktivt tillvägagångssätt och kombinera kvalitativ och kvantitativ forskningsmetodik, syftar detta examensarbete till att utforska den ledarskapsrelaterade frågan om att koordinera underhållsaktiviteter för stora underhållstopp inom processindustrier med kontinuerligt flöde. Forskningsfrågorna som vägleder detta examensarbete består av att beskriva hur större underhållstopp kan koordineras och dess associerade utmaningar. Genom att jämföra offentligt tillgänglig litteratur och empiriska bevis från en fallstudie, bekräftas att de största utmaningarna för att genomföra ett effektivt underhållstopp beror på ledningen i alla steg som är förknippade med underhållstoppet. För att samordna underhållsaktiviteterna på ett så effektivt sätt som möjligt måste flera utmaningar övervinnas. Att anpassa organisationens mål och skapa engagemang hos ledningen är den första förutsättningen innan fler förbättringar kan utföras. Det är nödvändigt att definiera gemensamma mål som strävar efter att skapa tillförlitliga fysiska tillgångar för att i sin tur öka konkurrensfördelen. De definierademanagementutmaningarna sammankopplas till före, under och efter underhållsstoppet. Utmaningarnahandlar om att skapa en cyklisk process för underhållsstoppen där tidigare förvärvad kunskap nyttjas för att förbättra framtida stopp. Även om detaljerad planering är nödvändig för varje underhållstopp, är en hög nivå av beredskap också nödvändig. För att uppnå och lyckas med detta krävs en hög grad av visibilitet under underhållsstoppen och användning av standardiserade metoder.

Page generated in 0.049 seconds