• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 2
  • Tagged with
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

ÄTA - arbeten och dess ekonomiska konsekvenser : Studie av flerfamiljshus

Lundkvist, Olivia, Sachs, Ellen January 2023 (has links)
Purpose: The purpose of this study is to understand which aspects that alterations and additional work affect the end result financially and what consequences it has. This study also wants to find out if there are similarities between different projects, regarding why and how alternations and additional work arise, as well as how this can be counteracted. This is done through interviews with various operators, literature studie and document analysis, finally the answers will be compiled and compared. Method: The method consists of data collection in the form of interview studie and document analysis based on different operators and projects with the aime of obtaining different perspectives. A literature studie was implemented based on course literature and relevant web pages in order to obtain basic information before the own investigation. Results: From the result it appears that the planning is the most important aspect to highlight as it lays the foundation for the entire project. It is possible to prevent alternations and additional work by having well executed construction documents, planning for alternations and additional work in case they arise and implementing basic investigations to have all the information about the project before the production starts. Conclusions: The conclusion of this studie is that it fulfilled its purpose when it became clear how alterations and additional work arise and what consequences it has financially. Alternations and additional work always arise regardless of the size of the project, but how the alternations and additional work arise varies. Alternations and additional work are almost always based on the start of the project when the entire project is planned and prepared for the production. It is therefore very important that the construction documents and other foundation work are correct in order to reduce the alternation and additional work as much as possible. In the projects that the study has included they contain low percentage of the alternations and additional work which affect the final results as it cannot give an overall picture of how the construction industry looks in terms of alternations and additional work.  Keywords:  Alternations and additional work, Economy, Turnkey contract, Apartment building, Constructions documents, Project planning, Production
2

Hur kan en gammal industribyggnad med kulturhistoriskt värde göras om till bostäder? : En fallstudie av lokstallarna i Bollnäs

Albeman, William, Lif, Emma January 2022 (has links)
In Sweden there is a shortage of housing whilst old, abandoned industrial buildingstake up space on desirable land. These buildings generally do not live up to today’s standards regarding comfort and energy efficiency and are therefore not used today. If these buildings were to be renovated into housing, they could help remedy the housing shortage. However, many of these buildings are protected from distortion by law which makes renovation and remodeling difficult. The purpose of this work has been to provide solutions for how an old industrialbuilding with cultural-historical values can be remodeled into housing. The solutions consist of floor plans and drawings modeled in Autodesk Revit. The possibilities and difficulties with this kind of project as well as solutions to expected problems are also presented in the report. This work was executed as a case study on one of the old locomotive depots in Bollnäs. Since the building for this project is an old locomotive depot, it is positioned close to the railroad. Noise and ground pollution are therefore important to consider and demand certain measures, for example retaining walls, noise barriers and excavation of polluted soil. An energy simulation of the building was made using BV2 to determine the energy usage of the building. The walls, roof and slab were additionally insulated for the purpose of meeting the demands of energy efficiency and comfort defined by BBR 29. The insulation had to be internally constructed in order to avoid distortion of the facade. Additionally, all windows and doors had to be made energy efficient while remaining aesthetically preserved. Internal insulation is generally problematic due to problems with moisture. The solution to this problem was to insulate the walls with polyurethane foam and the slab with cellular plastic. In order to make the building energy efficient, the building should be heated using district heating in combination with photovoltaic panels. This building is well suited for solar panels due to the large, black metal sheet roof and shadow free placement. The study shows the complexity of refurbishing this type of building. The renovation is extensive, and the floor plans are characterized by compromises. It is possible to renovate the building without distorting it. A better alternative would be to use the building for other functions such as a store, restaurant or bar. / I Sverige råder det bostadsbrist samtidigt som gamla industribyggnader stårövergivna på attraktiv mark. En anledning till att dessa byggnader i nuläget inteanvänds är att de av byggnadstekniska skäl inte uppfyller dagens krav på komfort och energieffektivitet. Om dessa byggnader skulle kunna göras om till bostäder vore deten lösning för att minska bostadsbristen. Många av dessa byggnader omfattas dock av förvanskningsförbud och varsamhetskrav vilket försvårar renovering och ombyggnation. Syftet med arbetet har varit att ta fram ett ändringsförslag på hur en gammal industribyggnad med ett kulturhistoriskt värde kan göras om till bostäder. Arbetet har också gått ut på att undersöka vilka möjligheter och svårigheter som finns vid ett sådant ändringsarbete och ta fram lösningar till eventuella problem. Arbetet utfördes i form av en fallstudie på ett av lokstallen i Bollnäs. Då byggnaden i projektet är ett gammalt lokstall ligger denna nära tågspåren. Buller och markföroreningar är därför viktigt att ta hänsyn till och kräver åtgärder i formav uppförandet av bullerplank och schaktning. En energisimulering gjordes av byggnaden i BV2 för att få ett värde på byggnadensenergianvändning. För att byggnaden ska kunna hålla en god komfort och klarakraven i BBR 29 tilläggsisoleras klimatskalet. Varsamhetskravet gör att all tilläggsisolering måste ske på byggnadens insida. Alla fönster och dörrar byts ut till energismarta sådana under förutsättning att de är estetiskt likvärdiga mot de ursprungliga för att motverka förvanskning. Att tilläggsisolera en gammal byggnad invändigt är ur fuktsynpunkt negativt. Lösningen på detta var att isolera väggarna med polyuretanskum och betongplattan underifrån med cellplast. För energieffektiviseringen valdes också att byggnaden skulle värmas med fjärrvärme då den ligger centralt och i nära anslutning tillfjärrvärmenätet. Denna typ av byggnad är väl lämpad för användning av solenergi tack vare dess stora svarta plåttak och skuggfria placering. Därmed valdes fjärrvärmen att kombineras med solcellspaneler. Studien visar att ändringsarbeten på denna typ av byggnader är komplexa. Energirenoveringen är omfattande och arbetet med planlösningarna präglas av kompromisser. Det är fullt möjligt att energirenovera byggnaden utan att förvanska den. Byggnaden i det här projektet vore dock bättre lämpad för exempelvis butik, restaurang eller krog än för lägenheter.

Page generated in 0.0556 seconds