ÄTA-arbeten på Trafikverket / Changes, Supplementary and Retiring works in the Swedish Transport Administration

Magnusson, Carl January 2014 (has links)
“ÄTA-work” (Changes, Supplementary and Retiring works) is more or less common in all construction projects whether it is about houses, roads or railways, in the planning stage, or in the construction stage. For the Swedish Transport Administration, which is the largest purchaser of infrastructure in Sweden, ÄTA-work is a hotter topic than ever.Economists and managers want to draw conclusions on the projects share ÄTA-work, while the project manager is concerned about whether it is possible to draw any conclusions at all as each project is unique in itself and has its own merits. There is a big variation in the amount of ÄTA-work in different geographic districts in the Swedish Transport Administration.This study shows that the Swedish Transport Administration does not have a unanimous approach regarding the management of “ÄTA-work”. Forms and systems is not fully used and “ÄTA-works” are accounted wrong in many projects, sometimes because of the project managers’ hesitation about how to handle it. / ÄTA-arbeten(Ändrings-, Tilläggs- och Avgående arbeten) är mer eller mindre vanligt förekommande i alla byggprojekt vare sig det gäller hus, väg eller järnväg, i projekteringsskede, eller i byggskede. För Trafikverket, som är Sveriges största beställare av infrastruktur är ÄTA-arbeten ett hetare diskussionsämne än någonsin då andelen ÄTA-arbeten ökar.Ekonomer och chefer vill dra slutsatser på projekts andel ÄTA-arbeten, medan projektledare ställer sig frågande till om det går att dra några slutsatser överhuvudtaget då varje projekt är unikt i sig och har sina egna förutsättningar. Samtidigt har olika distrikt relativt skilda andelar ÄTA-arbeten vid uppsummeringar på distriktsnivå.Detta arbete visar att Trafikverket inte har ett enhälligt arbetssätt kring hanteringen av ÄTA-arbeten. Blanketter och system används inte fullt ut och ÄTA-arbeten konteras fel i många projekt, ibland på grund av att projektledare har svårt att veta hur de ska hantera ÄTA-arbeten.
2

ÄTA-arbeten : - En otillåten direktupphandling? / Variation orders : - An illegal direct award of contract?

Heinefeldt, Moa January 2016 (has links)
Huvudregeln när staten, landstinget eller kommunen vill få ett arbete utfört för deras räkning är att arbetet ska upphandlas i konkurrens mellan ett antal entreprenörer i enlighet med LOU:s regelverk. LOU och det nya upphandlingsdirektivet har dock vissa undantagsregler som medger att en direktupphandling av kompletterande byggentreprenader är tillåten under förutsättning att de i bestämmelserna stadgade rekvisiten är uppfyllda. Om ett tillkommande arbete som beställs av den upphandlande myndigheten inte faller in under dessa undantagsbestämmelser kan myndigheten gjort sig skyldig till en otillåten direktupphandling. Ett ÄTA-arbete är ett entreprenadrättsligt begrepp som dels ger entreprenören en rätt och skyldighet att utföra tillkommande arbeten, dels ger beställaren en vid ändringsbefogenhet i den bemärkelsen att denne kan göra ändringar från de ursprungliga kontraktshandlingarna. Just möjligheten att kunna göra ändringar från det ursprungliga kontraktet är en av de mest särskiljande egenskaperna hos entreprenadavtalet.    Det går följaktligen att urskilja att det å ena sidan föreligger ett regelverk, LOU, som verkar för att samtliga arbeten ska upphandlas och att ändringar av redan upphandlade byggentreprenader i största möjliga mån ska motverkas. Det föreligger å andra sidan ett annat regelverk, AB 04, enligt vilket det anses nödvändigt för parterna att kunna göra ändringar från redan ingånget avtalet varför BKK föreskrivit detta som en rättighet och skyldighet som är skadeståndssanktionerad. I den fortsatta framställningen redogörs närmare för innebörden av begreppen ÄTA-arbete och kompletterande byggentreprenader, vilka ändringar som åsyftas med regelverken samt hur kompatibla regelverken de facto är. Det kommer efter den företagna redogörelsen och analysen påvisas att det finns fler aspekter som visar att LOU:s undantagsregler om direktupphandling tar sikte på andra ändringar än ÄTA-arbeten. Det kommer också visa sig att om LOU är tillämplig i fråga om ÄTA-arbeten medför detta en rad olägenheter för parterna i entreprenadavtalet som kan leda till att entreprenaden aldrig färdigställs.
3

Hantering av ÄTA-arbeten enligt standardavtalet AB 04

Sager, Wisam January 2014 (has links)
Att det förekommer ändringar vid utförandet av ett byggprojekt är inte något nytt i byggbranschen, utan snarare något som alltid har funnits och förmodligen alltid kommer att finnas. Ändringar som uppstår vid utförandet av ett byggprojekt kan orsakas av en mängd olika anledningar. Men det ändringarna har gemensamt, är att de i regel resulterar i något som inom byggbranschen brukar benämnas ÄTA-arbeten. Begreppet ÄTA-arbeten står för Ändringsarbeten, Tilläggsarbeten samt Avgående arbeten och är ett resultat av ändringar i ett ursprungligt kontrakt.I utförandeentreprenader gäller i regel standardavtalet AB 04, vilket är ett avtal som innefattar bestämmelser som reglerar både beställares och entreprenörers förpliktelser gentemot varandra. Standardavtalet AB 04 reglerar i den meningen även hur ÄTA-arbeten ska hanteras, för att en entreprenör ska kunna erhålla ersättning för arbeten som inte omfattas av det ursprungliga kontraktet.Den här studien inleds med att beskriva hur ÄTA-arbeten ska hanteras enligt standardavtalet AB 04. För att i ett senare skede kunna avgöra vilka vardagliga hanteringssätt som strider mot bestämmelserna och av den anledningen medför rättsliga påföljder.För att kunna ta reda på hur ÄTA-arbeten hanteras i dagsläget, utfördes ett antal intervjuer med verksamma personer inom anläggningsbranschen. Intervjuerna resulterade i en slutsats som tyder att det vardagligt förekommer hanteringssätt som strider mot bestämmelserna i AB 04, vilket i sin tur är anledningen till att entreprenörer i en relativt vid utsträckning går miste om ersättning för utförda ÄTA-arbeten. Studien ger även förslag på hur parterna kan förbättra hanteringen av dessa arbeten samtidigt som samhällsnyttiga perspektiv tas i beaktande. / The fact that changes occur at the performance of a construction project is not a new phenomenon in the construction industry, it´s rather something that has always existed and will likely do so in the future. Changes that occur during the performance of a construction project can be caused by a variety of reasons, but what those changes have in common is that they in general result in amendments of the original contract.In Swedish performance contracts the standard agreement AB 04 is regularly used, which is an agreement that includes the both parties’ obligations in relation to each other. The standard agreement AB 04 regulates in that sense even the way in how the changes shall be dealt with, in order to let the contractor be able to obtain compensation for those additional implementations. This study begins by describing how changes should be handled according to the standard agreement AB 04, in order to determine which daily doings by the contractor is inconsistent with the provisions in AB 04 and consequently leads to legal sanctions.To find out how changes are handled in current construction projects, the study conducts a number of interviews with persons that are active in the construction industry.The study resulted in a finding that puts forward that it´s fairly common that changes are handled in a manner that is inconsistent with the provisions of AB 04.The study provides also a number of suggestions on how the parties can improve the management of these changes that also takes socially useful perspective into account.
4

Lösningen På ÄTA-Problematiken : En kvalitativ marknadsundersökning för B2B-applikationen DEMA

Ring, Rebecka, Sjöberg, Alicia January 2020 (has links)
Vi har i denna uppsats analyserat hur marknaden ser ut för Thnx Innovations nya produkt DEMA som har som syfte att förenkla ÄTA-hanteringen. Vi har gjort detta genom en kvalitativ marknadsundersökning där vi formulerat och utfört djupintervjuer med personer inom byggindustrin. Fokus i vår undersökning har legat på kunduppfattning kring Marknad, Behov, Värde samt Konkurrenter och Substitut. Syftet med denna uppsats är att använda och bygga vidare på befintlig teori inom området av marknadsanalys i R&D-fasen av ny teknologi inom B2B i industri. Vi har under uppsatsens gång använt oss utav utvald befintlig teori inom området för att kunna besvara vår centrala frågeställning ”Hur ser marknaden ut för DEMA?” på bästa sätt. Den snabba teknologiska utvecklingen har lett till att en stor mängd system och applikationer har ersatt och effektiviserat gamla arbetssätt i många branscher. Byggbranschen har länge legat efter andra branscher i denna utveckling men branschen har på senare år börjat integrera mer och mer teknologi. Vi har i uppsatsen analyserat bland annat: synsätt kring teknologisk utveckling både generellt och inom byggbranschen, åsikter och erfarenheter kring hantering och administrering av ÄTA-arbeten, kostnader och förbättringsområden kring ÄTA-arbeten samt inköps- och implementeringsprocessen av produkter/system inom byggindustrin. Vi har från våra djupintervjuer funnit att en försiktigt positiv inställning till teknologisk utveckling finns, men en bakgrund av tidigare misslyckande innovationer inom branschen har lett till krav om kvalitetsförsäkran innan implementering av innovationer. Vi identifierar i uppsatsen en underliggande konflikt mellan entreprenörsleden rörande ÄTA-hantering. Grundorsaken till denna konflikt härstammar från en avsaknad av tillit följt av otillräcklig kommunikation och dokumentation. De övre entreprenörerna här anser sig betala för mycket för ÄTA-arbeten medan underentreprenörerna ofta känner sig underkompenserade. Konkurrensverket (2014) benämner 80/20-regeln när det kommer till ÄTA-hantering; att 20% av den slutgiltiga entreprenadsumman består av ÄTA-arbeten. Detta visar på kostnaderna relaterade till ÄTA-arbeten och vidare även varför dess korrekta hantering är viktig. Via våra djupintervjuer kan vi konstatera att administreringen av ÄTA:or sker via allt från inköpta system, eget uppbyggda system, och inuti ekonomisystem till manuellt via exempelvis mejl/Excel. I uppsatsen identifieras vidare en efterfrågan på teknologiska hjälpmedel inom byggbranschen. Flera förbättringsområden kring ÄTA-hantering samt de viktigaste egenskaperna kring ÄTA-hantering identifieras från våra djupintervjuer och presenteras i uppsatsen. Dessa inkluderar en önskan om snabbhet, enkelhet, tydlighet, spårbarhet, korrekthet, och kontinuitet.
5

Hantering av ändrings- och tilläggsarbeten inom byggindustrin : En komparativ studie för en ökad produktivitet inom byggbranschen

Axell, Jonathan, Nilsson, Oscar January 2018 (has links)
With the housing shortage in Sweden today, effective solutions to the problems that arise are required. One of the issues in almost every construction project is change orders which often causes additional work and could negative impacts on the project such as reduced productivity; it could cause rework which could affect the working environment and increase the project cost. This report will review an alternative method of managing change work called “TvåTågsPrincipen” (TTP). What characterizes the method is that you produce in two teams, a production team that strives for continuous production, and a second team that comes in afterward as the production has passed from a moment or building component to carry out all changes and additions.  After several interviews with people within construction following conclusions were drawn: the method can bring both positive and negative effects to a project, and both are important to keep in mind. Examples of positive impacts could be accordingly: higher productivity, better working environment and lower costs. Incorrect use of the method could result in larger change orders, greater environmental impact and more material usage.
6

Brister i förfrågningsunderlag och dess påverkan på slutsumman vid en totalentreprenad / Flaws in contract documents and how it affects the total cost in a turnkey contract

Lindquist, Fredrik, Ristic, Neno January 2018 (has links)
Det är viktigt med väl utförd planering för att ett byggprojekt ska gå smidigt och stå färdigt inom utsatt tid. Det är också viktigt för att hålla utsatt budget, så att det inte tillkommer onödiga och oväntade kostnader. Ju senare ett fel upptäcks, desto dyrare är det att rätta till, många gånger dyrare än om det upptäcks i ett tidigt skede innan byggstart. Det är förarbetet och projekteringen som sätter alla förutsättningar för bygget.   Ett bristfälligt förfrågningsunderlag kan få stora konsekvenser för slutsumman i ett projekt, och detta examensarbete har som avsikt att undersöka förfrågningsunderlag och kartlägga vilka brister som är vanligast och vilka som har störst påverkan på slutsumman. Målet har varit att skapa en förståelse och översikt över bristerna i ett förfrågningsunderlag hos läsaren.  Med hjälp av en litteraturstudie kring ämnet har en intervju genomförts med väl genomtänkta frågor för att få så bra svar som möjligt på frågeställningen och kunna presentera ett bra resultat. I rapportens slut presenteras de vanligaste bristerna och vad de kan få för konsekvenser, och detta resultat diskuteras sedan och följs upp med en slutsats på hela arbetet.  Resultatet av intervjuerna visade att det finns bristande förfrågningsunderlag, vilket genererar i onödiga kostnader. Detta är främst på grund av tillkommande ÄTA-arbeten och tvister som uppstår mellan de olika parterna. Dessa brister i förfrågningsunderlaget kan bero på att det inte lagts ner tillräckligt med tid och arbete i det tidiga respektive sena skedet av ett projekt. Det vill säga både vid skapandet av förfrågningsunderlaget och vid granskningen av ett avslutat projekt. / It is important to have well-planned planning for a construction project to go smoothly and be completed within the deadline. It is also important to keep exposed budget, so that there are no unnecessary and unexpected costs. The later an error is discovered, the more expensive it is to adjust, many times more expensive than if it's discovered early in the process of a project. It's the preparation and the projecting that sets all the prerequisites for the building.   A lack of specifications in these contract documents may have major consequences for the total cost of a project, and this examination project aims to investigate the contract documents and identify the most common shortcomings and those that have the greatest impact on the total cost of a project. The aim has been to provide an understanding and overview of the shortcomings in these contract documents for the reader.  With the help of a literature study on the subject, an interview has been conducted with well thought-out questions to get the best answers possible on the issue for this report and to present a good result. At the end of the report, the most common shortcomings and their consequences are presented, and this result is then discussed and followed up with a conclusion on the whole work.  The results of the interviews showed that there is a lack of specifications in contract documents, which generates unnecessary costs. These are mainly additional contract changes and disputes that arise between the various parties. These shortcomings in the specifications may be due to the fact that no time has been spent in the early and late stages of a project. That is to say in the preparation of the contract documents and in the examination of a completed project.
7

Patientens nutritionsproblem och upplevelser av matsituationen efter stroke

Rodin, Elise, Gustafsson, Sandra January 2008 (has links)
No description available.
8

Patientens nutritionsproblem och upplevelser av matsituationen efter stroke

Rodin, Elise, Gustafsson, Sandra January 2008 (has links)
No description available.
9

Tillkommande kostnader i allmännyttigt bostadsbyggande / Additional costs in construction of public housing

Ivarsson, Emil January 2021 (has links)
With an increasing population and need of housing, Sweden needs more availible apartments and cost efficent solutions. The organisation for public housing in Sweden has responded to this situation a couple of years ago with predefined buildings called ”Kombohus” available to purchase for the companies that work within public housing. The approach for this study is to compare these to ordinary construction projects with focus on the extra costs and eventually use the full potential of these buildings with less extra costs. The casestudy is based on AB Gavlegårdarnas organisation and construction projects. Three Kombohus and two traditional projects are compared to see the difference in the final price, which project has the best prediction of the final cost, and how the work of improvement can be used to minimize the extra costs. The study shows that Kombohusen are the cheapest to build, but also have more space to reduce the cost even more. The traditional projects are completed within 1% of the offered and predicted cost. Kombohusen differ from plus 16% and 17% to minus 11% below the offered cost. As an improvement it is suggested that a more uniform documentation when the projects are finished is needed, as a way to see what has been included or not in the different posts. When more similar projects are completed, the knowledge of what made the major extra costs will prevent the same type of cost to appear. The knowledge and experience feedback is very important for future projects and the chance of making a correct estimated cost. / <p>Presentation på distans med videomöte.</p>
10

ÄTA-arbeten – Om ofullständighet i entreprenadavtal

Hakansson, Amanda, Kampe, Philippa January 2019 (has links)
Varje entreprenad är unik på så sätt att den i något eller i några avseenden skiljer sig från andra entreprenader. Det kan handla om att uppföra en byggnad snarlik en annan, det som skiljer entreprenaderna åt är att inblandade parter, avtal, utförande av arbetsuppdraget samt tillkommande ÄTA-arbeten kommer att, på ett eller annat sätt skilja sig åt mellan varandra. Då entreprenadrätten inte är lagstadgad i Sverige ges möjligheter att under ett kontrakterat arbete föreskriva förändringar i det ursprungliga avtalet, för att ett så tillfredsställande slutresultat som möjligt ska kunna uppnås. I nästan alla entreprenader uppkommer ÄTA-arbeten, som kan beskrivas som arbeten som utförs i anknytning till och är av samma natur som det ursprungliga kontrakterade arbetet. ÄTA-systematiken regleras i AB 04, som i allmänhet tolkas som branschpraxis och utges av byggandets kontraktskommitté. ÄTA-arbeten står för ändrings-, tilläggs- och avgående arbeten och utgör således en för beställaren, ändringsbefogenhet där rätten att beställa nödvändiga tilläggsarbeten, eller avbeställa ännu inte utförda kontraktsarbeten föreligger. Entreprenören blir med hänsyn till detta, både bunden och berättigad att utföra de ÄTA-arbeten som uppfyller formaliteterna. För att ett beställt ÄTA-arbete ska föreligga krävs en skrivelse angående detta av beställaren, samt att arbetet är av samma natur som det kontrakterade arbetet. Likställda ÄTA-arbeten har inget skriftlighetskrav, men då svårigheter att bevisa muntliga avtal föreligger borde entreprenören för att säkra rätten till betalning, ändå vänta med att påbörja ett likställt ÄTA-arbete till dess att en skrivelse om arbetet finns att tillgå. Denna utredning har visat att ändringsbefogenheten är anledningen till att tvister uppstår i entreprenadförhållanden och att tvister kan undvikas genom att precisera kontraktshandlingarna. Ett ÄTA-arbete berättigar till betalning om kraven för vad som utgör ett ÄTA-arbete är uppfyllda samt om arbetet har ett direkt samband med och är av samma natur som kontraktsarbetena. Formaliteterna för ett ÄTA-arbete måste vara uppfyllda för att ersättning ska utgå. Undantag från formaliteterna kan dock göras gällande, dessa är oskälighetsbedömningen och dolusregeln, vilket innebär att ersättning kan utgå även om formaliteterna inte är uppfyllda. Entreprenören kan bli berättigad till ersättning för faktisk mängd och inte det som föreskrivits i mängdregleringen om det finns bevis att faktisk mängd föreligger. Det är alltid entreprenörens skyldighet att bevisa att ett ÄTA-arbete föreligger för att ersättning skall utgå. / Each contract is unique because each project is different from other projects. What distinguishes the contracts is that the parties involved, agreements, execution of the work assignment and additional work will differ between each other. Since the contract law is not constitutional in Sweden, opportunities are given during a contracted work to prescribe changes to the original agreement, in order to achieve the best result as possible. In almost all contracts, additional work will arise. Additional work can be described as a work that are carried out in connection with and are of the same nature as the original contracted work. The additional work-system is regulated in AB 04, which is generally accepted as industry practice and is issued by the contract's contract committee. Additional work stands for changes-, additional- and resigning work. This constitutes a power of change for the purchaser where the right to order necessary additional work, or cancellation of contract work not yet performed. With this in mind, the contractor becomes both bound and entitled to carry out the additional work that meets the formalities. For an ordered additional work to exist, a written order is required by the purchaser, and the additional work needs to be of the same nature as the contracted work. Equal additional work has no written requirement, but when difficulties in proving verbal agreements exist, the contractor should, in order to secure the right to payment, still wait to start an equal additional work until received order in writing. This investigation has shown that the power of amendment is the reason why disputes arise in contractual relations and that disputes can be avoided by specifying the contract documents. An additional work entitles to payment if the requirements for what constitutes an additional work are fulfilled and that the work is directly related to and is of the same nature as the contract work. The formalities for an additional work must also be fulfilled for compensation to be paid. Exceptions to the formalities can, however, be made valid, these are the innocence assessment and the dolus rule, which means that compensation can be paid even if the formalities are not fulfilled. The contractor may be entitled to compensation for the actual quantity and not the amount prescribed in the quantity regulation, if there is evidence that the actual quantity exists. It is always the contractor's obligation to prove that an additional work exists for compensation to be paid.