• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 2
  • Tagged with
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Cyklisters situation på 2+1-vägar

Bergkvist, Martin January 2006 (has links)
In this report the situation for cyclists on 2+1-roads is analysed and studied. These roads are often the old 13-meter roads that have been changed into 2+1 to increase the security. Two road sections outside Motala in Sweden has been deep studied and analysed. The different parts in the planning process show how the progress goes. To begin with the change should be within the old 13 meters but after the pilot study was circulated for comments the result became a broadening to 13,75 and 14,00 meters. These new broadth gave a wider roadside and a safer situation for cyclists. The reconstruction outside Motala is an unusual solution since broadthening of the road area rarely is done. The biggest reason to this broadthening is probably the cycle races Vätternrundan and Tjejvättern and all the practice that takes place before these events. The township of Motala wants to promote cycling in their municipality. This whish where probably an important factor during the commenting period. The rapport also analyses different control documents used in the planning process. These are VGU (Vägar och Gator Utformning) and Inriktningsdokument för 13-metersvägar inom Vägverket Region Sydöst.
2

Cyklisters situation på 2+1-vägar

Bergkvist, Martin January 2006 (has links)
<p>In this report the situation for cyclists on 2+1-roads is analysed and studied. These</p><p>roads are often the old 13-meter roads that have been changed into 2+1 to increase</p><p>the security. Two road sections outside Motala in Sweden has been deep studied</p><p>and analysed. The different parts in the planning process show how the progress</p><p>goes. To begin with the change should be within the old 13 meters but after the</p><p>pilot study was circulated for comments the result became a broadening to 13,75</p><p>and 14,00 meters. These new broadth gave a wider roadside and a safer situation</p><p>for cyclists.</p><p>The reconstruction outside Motala is an unusual solution since broadthening of</p><p>the road area rarely is done. The biggest reason to this broadthening is probably</p><p>the cycle races Vätternrundan and Tjejvättern and all the practice that takes place</p><p>before these events. The township of Motala wants to promote cycling in their</p><p>municipality. This whish where probably an important factor during the</p><p>commenting period.</p><p>The rapport also analyses different control documents used in the planning</p><p>process. These are VGU (Vägar och Gator Utformning) and Inriktningsdokument</p><p>för 13-metersvägar inom Vägverket Region Sydöst.</p>

Page generated in 0.0562 seconds