Spelling suggestions: "subject:"construção civil estimativa"" "subject:"onstrução civil estimativa""
1 |
Analise comparativa de custos entre edificios residenciais de quatro pavimentos utilizando alvenaria estrutural e estrutura mista de concreto e açoBraz, João Carlos Rocha, 1962- 01 August 2018 (has links)
Orientador : Andre Munhoz de Argollo Ferrão / Dissertação (mestrado) - Universidade Estadual de Campinas, Faculdade de Engenharia Civil / Made available in DSpace on 2018-08-01T13:23:53Z (GMT). No. of bitstreams: 1
Braz_JoaoCarlosRocha_M.pdf: 4496215 bytes, checksum: ebb976510a83aa1b2fa167cff13b90d3 (MD5)
Previous issue date: 2001 / Mestrado
|
2 |
Modelo de custo mínimo para a construção civilRea, Antonio Carlos 02 April 2002 (has links)
Made available in DSpace on 2010-04-20T20:17:37Z (GMT). No. of bitstreams: 0
Previous issue date: 2002-04-02T00:00:00Z / Trata de estabelecer parâmetros científico para análise de preço de obras de Construção Civil realizadas pelo poder público, apontando caminhos para se economizar e dar mais eficiência aos gastos no setor
|
3 |
Desenvolvimento de sistema de informações para controle de custos de obras de construção civil [manuscrito]Peyerl, Fabio Vinicius 30 April 2010 (has links)
No description available.
|
4 |
Indicadores paramétricos de custos aplicados a edifícios multifamiliaresCoimbra, Carolene Martins 29 October 2012 (has links)
Resumo
|
5 |
O reajuste de preços na contratação de obras de construção civilPereira Junior, Decio Germano January 1977 (has links)
Submitted by Cristiana Ramos Barboza Cuencas (cristiana.cuencas@fgv.br) on 2014-04-10T14:02:38Z
No. of bitstreams: 1
1197800113.pdf: 8609562 bytes, checksum: 341ca972c1df8eb487366eb57da35692 (MD5) / Approved for entry into archive by PAMELA BELTRAN TONSA (pamela.tonsa@fgv.br) on 2014-04-10T14:07:04Z (GMT) No. of bitstreams: 1
1197800113.pdf: 8609562 bytes, checksum: 341ca972c1df8eb487366eb57da35692 (MD5) / Made available in DSpace on 2014-04-10T15:02:18Z (GMT). No. of bitstreams: 1
1197800113.pdf: 8609562 bytes, checksum: 341ca972c1df8eb487366eb57da35692 (MD5)
Previous issue date: 1978 / A análise feita pelo autor procura alertar que mediante maiores cuidados nos procedimentos administrativos, contratuais, utilizando-se uma metodologia de reajustamentos consoante a realidade econômica, bem como objetivando maior atenção na elaboração dos contratos, adequando-os à espécie de obra, estrutura interna da empresa e conjuntura econômica vigente, grande parte das consequências danosas das dificuldades atuais poderiam ter sido neutralizadas e eventualmente evitadas.
|
6 |
Análise comparativa de custos de alternativas tecnológicas para construção de habitações popularesAngela Cristina Alves Guimarães de Souza 00 December 2009 (has links)
O déficit habitacional brasileiro atual é estimado em cerca 7,2 milhões de moradias que corresponde a 12,8% do total de domicílios do país, de acordo com dados da última Pesquisa Nacional de Amostragem de Domicílios (PNAD) realizada pelo IBGE em 2007. Não obstante a situação do déficit habitacional apresentada seja preocupante, os dados da última PNAD mostram avanços, principalmente na linha da redução absoluta do déficit. Considerando uma comparação em termos
relativos, um bom indicativo da redução deste déficit se obtém quando são cotejados os anos de 2001 e 2007 onde foi constatado que o déficit recuou de 15,7% para 12,8% do total de domicílios no país. A manutenção desta trajetória de queda é um desafio que precisa ser vencido e a construção
civil tem um papel importante a desempenhar neste processo. Este papel tem impactos no curto prazo, com a geração de empregos, e no longo prazo, contribuindo para a melhoria da qualidade de vida da população. Nesta particular, a discussão sobre processos construtivos que possibilitem a redução gradual do déficit habitacional com estratégias tecnológicas sustentáveis tanto do ponto de vista econômico quanto ambiental tem ganhado importante espaço na discussão técnico-científica no país. O presente trabalho promoveu o estudo comparativo de três alternativas tecnológicas para a
construção de habitações de interesse social, a saber: Sistema Construtivo em Alvenaria Estrutural (Blocos cerâmicos e de concreto), Sistema Construtivo com Paredes de Gesso e Sistema Construtivo com Painéis Monolíticos de Poliestireno Expandido (EPS). Foi eleita uma geometria típica de edificação com 42,3 m2 que é usualmente utilizada em programas governamentais de redução do déficit habitacional, sobre a qual foram identificados os custos de construção específicos
de cada sistema estudado. Foram examinadas as características de cada um dos sistemas, ressaltando suas potencialidades, vantagens e desvantagens e foram também apropriados os custos de construção com levantamento detalhado dos insumos necessários à execução dos mesmos. Os resultados obtidos apontam que, do ponto de vista do custo de implantação, o Sistema Construtivo em Alvenaria de Blocos Cerâmicos apresentou os melhores resultados / The current Brazilian housings deficit is about 7,2 million of housings which is equivalent to 12,8% of the total of domiciles of the country, in accordance with the last National Research of Sampling of Domiciles (PNAD) carried through by the IBGE in 2008. Although Brazilian housing deficit should be considered an important problem to deal with, data from last PNAD indicates advances, mainly in the direction of the absolute reduction of the deficit. If one considers a comparison in relative bases, a good indicator of the reduction of this deficit can be obtained analyzing data from 2001 and 2007 years, where it was verified a fall trend from 15,7% for 12,8% of the total of domiciles in the country. To keep this fall trajectory means a difficult challenge that must be overcome and building industry plays an important role in this process. Its action provides short
term impacts, with the generation of several jobs, and long term impacts, contributing to improve quality of life of the people. In this context, the discussion about building processes that can be used to obtain gradual reduction of the housings deficit associated with economical and environmental sustainable strategies has become an important and attractive subject to scientific studies in the country. The present work performed a comparative study of three technological alternatives for building social interest houses (low cost house), namely: Building system using structural masonry walls with concrete or ceramic units, Building system with gypsum walls and Building System with expanded polystyrene panel walls. An usual geometry, of the building with 42,3 m2 in area was
chose because it represents the typology often used in government programs to reduce housings deficit in Brazil. Using this archetype buildings cost were identified and analyzed for each one of the building systems studied. The features of each system were examined, standing out its
potentialities, advantages and disadvantages and a detailed budget (quantities and prices) was elaborated. Obtained results showed that from the point of view of building costs alone the Building system made with structural ceramic units presented lowest costs
|
7 |
Levantamento de quantitativos em projetoWiticovski, Lilian Cristine 08 May 2012 (has links)
Resumo: Dentre as competências necessárias para a realização do orçamento verifica-se a relevância do levantamento de quantitativos em projetos e as consequências da qualidade da informação. O mapeamento do fluxo de informações, focado no levantamento de quantitativos, fundamentou-se nas identificações do processo orçamentário, das informações de entrada e saída geradas entre os usuários e participantes do processo, os canais de informação utilizados, o valor e a qualidade da informação. Com seis estudos de casos múltiplos, realizado em dois ciclos da pesquisa, os resultados permitiram entender mais claramente a importância da qualidade das informações contidas em projetos e a sua relação com a gestão do empreendimento durante o seu ciclo de vida. As principais falhas existentes no levantamento de quantitativos e sua relação com as etapas de projeto apresentadas por dois casos que utilizam as representações em 2D, Ciclo 1, foram solucionados a partir das evidências do levantamento de quantitativos automatizado por quatro casos que utilizam BIM, Ciclo 2. Como contribuição, foi possível comparar as várias realidades das construtoras nacionais e analisar o nível de desenvolvimento dos procedimentos de aplicabilidade do BIM. Ideologicamente, pautada nos bons argumentos do referencial teórico sobre temas relacionados ao Fluxo de Informações, CAD, projetos, orçamentos e BIM, além dos pontos positivos apresentados pelos seis casos, foi proposto um fluxo de informações do processo de levantamento de quantitativos em projetos de construção civil com as melhores práticas apresentadas.
|
8 |
BIM e DFMA visando a redução da quantidade de partes da construçãoMalewschik, Fernando Henrique January 2016 (has links)
Orientador : Prof. Dr. Sergio Scheer / Acompanha CD-ROM / Dissertação (mestrado) - Universidade Federal do Paraná, Setor de Tecnologia, Programa de Pós-Graduação em Construção Civil. Defesa: Curitiba, 2016 / Inclui referências : f. 104-108 / Area de concentração : Ambiente construído e gestão / Resumo: A construção civil tem apresentado produtividade baixa nos últimos anos e que não melhorou na mesma proporção que outros setores da economia, como o automobilístico ou de manufatura. Algumas alternativas vêm sendo pensadas e implantadas para melhorar esse quadro enfrentado pela indústria da construção civil (ICC). Dentre elas, a Modelagem da Informação da Construção (BIM). Entretanto, salienta-se que o que chama a atenção nos setores cuja produtividade é crescente, refere-se à alta industrialização e automatização da fabricação de produtos. Sabe-se que um dos processos responsáveis por esse aumento de produtividade é a possibilidade de reduzir o número de partes de um projeto por intermédio do projeto para fabricação e montagem (DFMA), atualmente adotado pelo setor aeroespacial, automobilístico e de manufatura. A hipótese levantada foi a de que a aplicação de BIM e DFMA em conjunto no processo de projeto pode diminuir a quantidade de "partes da construção" e, consequentemente, trazer diversos benefícios para os projetos. Nesse sentido, esta dissertação teve como objetivo utilizar o processo BIM aliado com DFMA para o desenvolvimento de um projeto visando a redução do número de "partes da construção". O método utilizado foi o Design Science Research e contemplou uma revisão bibliográfica de fontes primárias e de artigos publicados em periódicos de alto impacto e a elaboração de um artefato utilizando BIM e DFMA em conjunto. Foi desenvolvida uma modelagem de um projeto residencial, a partir de projetos convencionais. Esse modelo foi desenvolvido posteriormente através da metodologia DFMA com o objetivo de reduzir a quantidade de partes da construção utilizando outras soluções alternativas pré-fabricadas ou industrializadas. Após análise do artefato entende-se que foi possível reduzir a quantidade de partes do projeto e que nesse caso específico houve expressiva redução da quantidade de partes (98,35%). A partir da revisão bibliográfica, pode-se afirmar que a diminuição da quantidade de partes de um produto gera uma melhora na análise do projeto. Pode-se afirmar também que a redução da quantidade de partes pode gerar muitos benefícios ao projeto, como maior controle do projeto, maior velocidade de execução e montagem, possuir menos informação a ser trocada durante a montagem e execução do produto, gerar redução de custos, dentre outros benefícios possíveis. Também, constatou-se que se o projeto utiliza soluções prémoldadas e modulares, BIM se torna uma ferramenta poderosa para o levantamento da quantidade de partes da construção. Palavras chave: BIM, DFMA, ICC, partes da construção. / Abstract: The productivity of the Architecture, Engineering and Construction (AEC) industry in recent years has not grown in the same proportion as it has in other sectors, such as automotive or manufacturing. Some alternatives are emerging to improve this situation faced by the AEC industry, among them, the Building Information Modeling (BIM). However, one important aspect observed in those sectors whose productivity is growing, refers to the high industrialization and automation of the manufacturing products. It is known that one of the processes responsible for this increased productivity is the possibility of reducing the number of parts of a building design through the Design for Manufacturing and Assembly (DFMA), currently adopted by the aerospace, manufacturing and automotive areas. The hypothesis was that the application of BIM and DFMA together in the design process may decrease the amount of "construction parts" and therefore have various benefits for the projects. In this sense, this work aimed to use the BIM process combined with DFMA to develop a project aimed at reducing the number of "construction parts." The method used was the Design Science Research and included a literature review of primary sources and articles published in high impact journals on the subject and the development of an artifact using BIM and DFMA together. A residential project model was developed from conventional designs. This model was developed by DFMA method to reduce the number of construction parts using prefabricated or industrialized solutions. After artifact analysis was possible to reduce the number of parts and in this particular case there was a significant reduction in the construction parts (98,35%). From the literature review, it can be said that the decrease in number of parts generates an improvement in project analysis. One can also say that reducing the number of parts can generate many benefits to the project as greater control of the project, greater speed of execution and assembly, less information to be exchanged during assembly, cost reduction, among other possible benefits. Also, it was found that if the design utilizes modular or industrialized solutions, BIM becomes a powerful tool for quantify construction parts. Keywords: BIM, DFMA, AEC, construction parts.
|
9 |
Modelo para incorporação do custeio-meta ao processo de desenvolvimento de produtos em edificações / A model to incorporate target costing to the product development process of buildingsJacomit, Ana Mitsuko 16 August 2018 (has links)
Orientador: Ariovaldo Denis Granja / Dissertação (mestrado) - Universidade Estadual de Campinas, Faculdade de Engenharia Civil, Arquitetura e Urbanismo / Made available in DSpace on 2018-08-16T18:54:05Z (GMT). No. of bitstreams: 1
Jacomit_AnaMitsuko_M.pdf: 4974584 bytes, checksum: d46b1201e1454c94bf14054771830ca7 (MD5)
Previous issue date: 2007 / Resumo: Proposta: O setor da construção civil está associado, mundialmente, a elevados índices de desperdício - das mais diversas naturezas - ou de custos desnecessários, ou seja, custos que não estão associados a nenhuma função que represente valor para o cliente ou para o processo produtivo. A eliminação destes custos é o principal objetivo da engenharia de valor e da mentalidade enxuta, que formam a base do custeio-meta. O custeio-meta, um sistema que auxilia o gerenciamento de lucros através do gerenciamento proativo dos custos, atua de forma integrada ao Processo de Desenvolvimento de Produtos (PDP), determinando metas (de custo, funcionalidade e qualidade) que irão nortear o processo de projeto. Ele é amplamente utilizado na manufatura, entretanto, a sua aplicação na construção, especificamente no sub-setor de edificações, ainda levanta controvérsias e carece de um método que auxilie a sua implementação. Desta forma, o objetivo deste trabalho é desenvolver um modelo de processos para incorporação do custeio-meta ao PDP em edificações. Método de pesquisa/Abordagens: Esta pesquisa é composta de duas fases. A primeira delas é constituída por dois estudos de caso exploratórios conduzidos no ambiente da manufatura e de um estudo de caso exploratório no sub-setor de edificações. A segunda parte é composta por outros três estudos, ainda exploratórios, no contexto de edificações. Resultados: O principal produto da pesquisa é um modelo que permite a visualização dos processos, atividades e ferramentas auxiliares necessários para a incorporação do custeio-meta ao PDP em edificações. Adicionalmente, são identificadas características intervenientes que aumentam a aplicabilidade do custeio-meta, a diminuem e que direcionam a forma como ele é aplicado. Desta forma, elas possibilitam o prognóstico de oportunidades e barreiras para a aplicação do custeio-meta em cada contexto. Contribuições/Originalidade: O trabalho contribui para o fomento de discussões sobre formas alternativas de se desenvolver produtos e gerenciar custos na construção civil / Abstract: Proposal: The construction industry is associated worldwide with high rates of waste - of diverse natures - or unnecessary costs, i.e. costs that are not associated with any function that represents value to the customers or the production process. The elimination of these costs is the main goal of value engineering and lean thinking, which are key concepts behind target costing. Target costing, a system that helps companies to manage costs through proactive cost management, works in parallel to the Product Development Process (PDP), introducing cost, functionality and quality goals to the project. It is widely applied in manufacturing; meanwhile, its application in construction, specifically in the buildings sector, is still raising controversy and lacks a specific method to assist its implementation. Thus, the objective of this work is to develop a model to assist target costing implementation in the building sector. Research Method/Approach: This research consists of two phases. The first consists of two exploratory case studies conducted in the manufacturing environment and of an exploratory case study in the buildings sector. The second phase consists of three other case studies in the buildings sector, still exploratory. Results: The main product of this work is a tentative model that provides a graphic display of the main activities, processes and tools necessary to implement target costing. Additionally, it was identified characteristics that increase the applicability of target costing, decrease it and that direct how it is applied. Thus, they allow the prediction of opportunities and barriers for target costing implementation in the analyzed contexts. Contributions/Originality: The work contributes to the promotion of discussion about alternative ways of developing products and managing costs in construction / Mestrado / Arquitetura e Construção / Mestre em Engenharia Civil
|
10 |
MODELAGEM DE CRONOGRAMA DE PROJETO PELA FERRAMENTA DSM COM APOIO AO GERENCIAMENTO E TOMADA DE DECISÕES PELA SIMULAÇÃO DE MONTE CARLOCenteno, Hugo Alexandre do Carmo 04 April 2018 (has links)
Submitted by admin tede (tede@pucgoias.edu.br) on 2018-05-14T19:00:50Z
No. of bitstreams: 1
HUGO ALEXANDRE DO CARMO CENTENO.pdf: 1058068 bytes, checksum: 733a3144c0c1d4e70087e3a321855b0b (MD5) / Made available in DSpace on 2018-05-14T19:00:50Z (GMT). No. of bitstreams: 1
HUGO ALEXANDRE DO CARMO CENTENO.pdf: 1058068 bytes, checksum: 733a3144c0c1d4e70087e3a321855b0b (MD5)
Previous issue date: 2018-04-04 / Delays in construction projects are a recurrent fact in several countries and regions for
the most varied types of works. These delays, in addition to negatively impacting the
image of companies contracted in the provision of construction services, cause several
financial losses to interested parties: contractor and hired. Several researches that address
the factors that lead to delays in the work schedule indicate the variation in the duration
of the activities and, or the lack of an inadequate estimate for the duration of the activities,
among the ten major delay factors in the projects. They contribute to the inadequate
estimation of production of the activities, the lack of knowledge of the complexity of the
activities, and also the lack or insufficiency of historical data that allow a safe estimate of
the duration of the activities. Thus, this study aims to describe the behavior of variability
in the duration of activities in an environment with little activity productivity data. The
productivity data analyzed were taken from three similar construction projects carried out
by the same company and which were provided as case studies of this work. For the
analysis of the variability and description of the behavior of the activities, after the data
collection of productivity of the project activities, the non-parametric Bootstrap data
resampling associated with Monte Carlo Simulation (MCS) was used as techniques.
Later, in order to verify the reliability of the results of variation in the duration of the
activities, the schedule of the case studies was modeled using the Critical Path Method
(CPM) and the Dependency Structure Matrix (DSM); and submitted to MCS. The
simulated results of the total duration of the projects were adequate for the actual
completion period of the projects studied, leading to the conclusion that the results of
variation in the duration of the activities obtained by the cited technique are reliable. / Os atrasos em projetos de construção civil são um fato recorrente em diversos países e
regiões para os mais variados tipos de obras. Esses atrasos, além de impactar
negativamente a imagem das empresas contratadas na prestação de serviços de
construção, acarretam diversos prejuízos financeiros às partes interessadas: contratante e
contratado. Diversas pesquisas que abordam os fatores que acarretam em atrasos no
cronograma de obras elencam a variação na duração das atividades e, ou, a falta de
estimativa inadequada para duração das atividades, dentre os dez maiores fatores de atraso
nos projetos. Contribuem para a inadequada estimativa de produção das atividades o
desconhecimento da complexidade das mesmas e, também, a falta ou insuficiência de
dados históricos que permitam estimar com segurança a duração das atividades. Assim,
este trabalho visa descrever o comportamento de variabilidade na duração das atividades
em um ambiente com poucos dados de produtividade das atividades. Os dados de
produtividade analisados foram tomados de três projetos de construção civil semelhantes
executados pela mesma empresa e que se prestaram como estudos de caso deste trabalho.
Para análise da variabilidade e descrição do comportamento das atividades, após a coleta
de dados de produtividade das atividades dos projetos, foram utilizadas como técnicas a
reamostragem Bootstrap não paramétrica dos dados associada a Simulação de Monte
Carlo (SMC). Posteriormente, para verificar a confiabilidade dos resultados de variação
na duração das atividades, o cronograma dos estudos de caso foi modelado utilizando o
Método do Caminho Crítico (CPM) e a Matriz de Estrutura de Dependência (DSM); e
submetido a SMC. Os resultados simulados de duração total dos projetos mostraram-se
adequados ao prazo real de conclusão dos projetos estudados, conduzindo à conclusão de
que os resultados de variação na duração das atividades, obtidos pela técnica citada, são
confiáveis.
|