• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 54
  • 18
  • 1
  • 1
  • Tagged with
  • 74
  • 74
  • 32
  • 20
  • 19
  • 17
  • 16
  • 16
  • 13
  • 13
  • 13
  • 12
  • 12
  • 11
  • 10
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
71

Proposta de modelo de decisão para avaliação de fornecedores baseado no ELECTRE TRI para categorização e na teoria dos conjuntos fuzzy para a modelagem da incerteza e hesitação de múltiplos tomadores de decisão / Proposal of decision model for supplier evaluation based on ELECTRE TRI for categorization and fuzzy sets theory for the modeling of uncertainty and hesitation of multiple decision makers

Nadya Regina Galo 19 April 2018 (has links)
A gestão eficaz dos processos que envolvem os fornecedores tem grande influência na melhoria do desempenho organizacional, sendo, portanto, fundamental para desenvolver capacidades das operações de produção que podem gerar vantagem competitiva, tais como qualidade, preço e tempo de entrega. A gestão de fornecedores inclui as atividades de qualificação, seleção, avaliação e desenvolvimento de fornecedores, além da alocação de pedido quando múltiplas fontes de fornecimento são selecionadas. A qualificação é um processo importante para assegurar que os fornecedores atendam requisitos mínimos de desempenho e, idealmente, deve ser realizada com métodos não compensatórios de categorização das alternativas. Entretanto, na literatura há poucos estudos que abordam a qualificação de fornecedores. Dentre aqueles que abordam, a maioria utiliza técnicas multicritério que são compensatórias e de ordenação. Outros aspectos importantes da gestão de fornecedores é a possível presença vários tomadores de decisão, caracterizando um processo de tomada de decisão em grupo, além da subjetividade de alguns critérios que gera incerteza nos julgamentos e hesitação. Ao se considerar essas questões na gestão de fornecedores, nenhuma pesquisa na literatura apresenta uma abordagem que contemple todos as características simultaneamente. Além disso, poucas pesquisas abordam os processos da gestão de fornecedores sob uma perspectiva integrada. Com vista a estas lacunas, esta pesquisa tem por objetivo a proposição de dois modelos de decisão que consideram os processos de qualificação, seleção e avaliação de fornecedores, em um cenário de tomada de decisão em grupo, considerando a incerteza e hesitação. Os modelos propostos têm por finalidade elicitar as preferências, agregar os julgamentos e categorizar os fornecedores. O primeiro modelo utiliza a representação linguística Triangular Hesitant Fuzzy Sets, para lidar com a hesitação nos julgamentos dos tomadores de decisão, além da técnica ELECTRE TRI para a categorização dos fornecedores. O segundo modelo se baseia na aplicação representação linguística Intuitionistic Fuzzy Sets para modelar a hesitação na parametrização das variáveis linguísticas e no ELECTRE TRI para a categorização. A elicitação é realizada com o uso do Fuzzy Delphi combinado com operadores de agregação do Triangular Hesitant Fuzzy Sets e Intuitionistic Fuzzy Sets. Os modelos de decisão foram detalhados e implementados no Matlab©. Após a proposição dos métodos, dois casos ilustrativos, obtidos a partir da coleta em campo, foram apresentados para analisar o desempenho dos modelos. Os casos ilustrativos mostraram resultados de categorização consistentes, especialmente para o procedimento pessimista do ELECTRE TRI. Testes com a hesitação nos julgamentos dos tomadores de decisão evidenciaram a importância da modelagem da hesitação, pois ela tem o potencial de alterar a categorização das alternativas. Testes com os parâmetros do ELECTRE TRI, confirmaram o efeito não compensatório da técnica e que a variação do nível de corte tem o potencial de tornar a categorização mais flexível. Assim, esta tese apresenta uma revisão de literatura sobre os processos de gestão de fornecedores e sobre tomada de decisão multicritério e em grupo, a proposição de métodos de apoio à tomada de decisão, casos ilustrativos para ilustrar o modelo, análises de sensibilidade dos métodos, além das conclusões e propostas para trabalhos futuros. / Effective management of the processes that involving suppliers has a major influence on improving organizational performance and is therefore fundamental to develop production operations capabilities that can generate competitive advantage, such as quality, price and delivery time. Supplier management includes qualification, selection, evaluation and development of suppliers, as well as allocation of orders when multiple sources of supply are selected. Qualification is an important process to ensure that suppliers meet minimum performance requirements and ideally must be performed with non-compensatory methods of categorization. However, in the literature there are few studies that consider the process of supplier qualification. Among the studies that consider the qualification, most use multicriteria techniques that are compensatory and for ranking. Other important aspects of supplier management are the possible presence of several decision makers, characterizing a process of group decision making, as well as the subjectivity of some criteria that generates uncertainty in judgments and hesitation. When considering these issues in supplier management, none of the studies found in the literature presents an approach that contemplates all features simultaneously. In addition, few researches deal with supplier management processes from an integrated perspective. In view of these gaps, this research aims to propose two decision models that consider the processes of qualification, selection and evaluation of suppliers, in a scenario of group decision making, considering the uncertainty and hesitation. The proposed models have the purpose the elicitation of the preferences, the aggregation of the judgments and the categorization of the suppliers. The first model uses the linguistic representation Triangular Hesitant Fuzzy Sets, to deal with the hesitation in the judgments of the decision makers, in addition to the ELECTRE TRI technique for the categorization of the suppliers. The second model is based on the application of the linguistic representation Intuitionistic Fuzzy Sets to model the hesitation in the parameterization of the linguistic variables and in the ELECTRE TRI for categorization. Elicitation is performed with the use of Fuzzy Delphi combined with aggregation operators of the Triangular Hesitant Fuzzy Sets and Intuitionistic Fuzzy Sets. The decision models were detailed and implemented in Matlab©. Two illustrative cases, obtained from the field collection, were presented to analyze the performance of the models. The illustrative cases showed consistent categorization results, especially for the pessimistic procedure of ELECTRE TRI. Tests with hesitation in the judgments of decision makers highlighted the importance of modeling hesitation, since it has the potential to change the categorization of alternatives. Tests with the ELECTRE TRI parameters confirmed the non-compensatory effect of the technique and that the variation of the cut level has the potential to make categorization more flexible. Thus, this thesis presents a review of the literature on supplier management processes and on multicriteria and group decision making, the proposition of methods to support decision making, illustrative cases to illustrate the model, method sensitivity analyzes, besides the conclusions and proposals for future works.
72

Aplicação de método de tomada de decisão multicritério para priorização de projetos Lean Six Sigma / Application of multi-criteria decision-making method for Lean Six Sigma projects prioritization

Rolando, Daniel Augusto Rainha [UNESP] 16 February 2018 (has links)
Submitted by DANIEL AUGUSTO RAINHA ROLANDO null (danielrolando@gmail.com) on 2018-04-05T16:00:00Z No. of bitstreams: 1 Dissertação_Rolando-DAR.pdf: 3156622 bytes, checksum: ac92904a2c656de7add0c53bd32f6e49 (MD5) / Approved for entry into archive by Pamella Benevides Gonçalves null (pamella@feg.unesp.br) on 2018-04-06T18:54:51Z (GMT) No. of bitstreams: 1 rolando_dar_me_guara.pdf: 3156622 bytes, checksum: ac92904a2c656de7add0c53bd32f6e49 (MD5) / Made available in DSpace on 2018-04-06T18:54:51Z (GMT). No. of bitstreams: 1 rolando_dar_me_guara.pdf: 3156622 bytes, checksum: ac92904a2c656de7add0c53bd32f6e49 (MD5) Previous issue date: 2018-02-16 / Para a delimitação de um processo de tomada de decisão na escolha de projetos Lean Six Sigma, é necessário definir os fatores críticos, tanto de sucesso (como por exemplo: envolvimento e comprometimento da gestão, entendimento das ferramentas e técnicas do Lean Six Sigma, ligação do projeto com a estratégia de negócios) quanto de fracasso (como por exemplo a falta do envolvimento da gestão, resistência à mudança cultural, inexistência de gestão de projetos). Desta forma, este trabalho foi conduzido por meio de modelagem com validação de dados reais, com o objetivo de propor uma adaptação de métodos de auxílio à tomada a decisão para seleção de projetos Lean Six Sigma baseado nos fatores críticos de sucesso e fracasso. Para tanto, com base na revisão da literatura, foram identificados os fatores críticos de sucesso e fracasso para seleção de projetos Lean Six Sigma. Em seguida, uma análise de dois métodos de tomada de decisão multicritério, PROMETHEE e ANP, foi realizada por meio da aplicação dos modelos em um portfólio de projetos de uma empresa multinacional de grande porte. Como resultado, houve assertividade de 95% na seleção dos melhores projetos do portfólio, comparado aos projetos executados pela empresa mostrando-se que os dois modelos são aderentes ao problema. Como resultado, é possível constatar que o PROMETHEE se mostrou mais assertivo, principalmente nas comparações quantitativas, tendo aplicabilidade tanto para decisões individuais quanto em grupos. O ANP, por fazer a análise de preferência dos critérios de forma pareada (utilizando a escala comparativa de Saaty) torna mais fácil seu em grupos grandes de decisores, porém a comparação utilizando a escala de Saaty dificulta a análise de critérios quantitativos, bem como para pequenos grupos ou em decisões individuais. / To define a decision-making process in the Lean Six Sigma projects’ choice, it is necessary to define the critical success factors (e. g., management involvement and commitment, understanding the tools and techniques of Lean Six Sigma methodologies), and critical failure factors (e. g., lack of management involvement, cultural change resistance, project management weakness, etc.). In this way, this work was conducted through the modeling method with the objective of proposing an adaptation of decision-making aid methods process to select Lean Six Sigma projects based on the critical success and critical failure factors. Therefore, based on the literature review, the critical success and critical failure factors for the selection of Lean Six Sigma projects were identified. An analysis of two multi-criteria decision-making methods, PROMETHEE and ANP, was performed through the application of the models in a project portfolio of a large multinational company, presenting 95% assertiveness in the selection of the best portfolio projects compared to the executed projects by the company, showing that the two models are adherent to the problem. In addition, PROMETHEE has been more assertive, mainly in quantitative comparisons, and the use of the method are applied for both individual and group decisions; the ANP, by doing the preference analysis of the criteria in pair-to-pair way, using the Saaty’s comparative scale, makes it easier in large groups of decision makers. However, the comparison using the Saaty scale makes it difficult to analyze quantitative criteria as well as small groups or in individual decisions
73

Estudo de localização de usina solar termoelétrica no estado de Pernambuco

AZEVÊDO, Verônica Wilma Bezerra 29 January 2016 (has links)
Submitted by Fabio Sobreira Campos da Costa (fabio.sobreira@ufpe.br) on 2016-08-19T12:20:36Z No. of bitstreams: 2 license_rdf: 1232 bytes, checksum: 66e71c371cc565284e70f40736c94386 (MD5) TESE N 127 - PROTEN DEN UFPE - VERONICA AZEVEDO.pdf: 11747677 bytes, checksum: a2779760a6f763a69e1f529900e5dfdf (MD5) / Made available in DSpace on 2016-08-19T12:20:36Z (GMT). No. of bitstreams: 2 license_rdf: 1232 bytes, checksum: 66e71c371cc565284e70f40736c94386 (MD5) TESE N 127 - PROTEN DEN UFPE - VERONICA AZEVEDO.pdf: 11747677 bytes, checksum: a2779760a6f763a69e1f529900e5dfdf (MD5) Previous issue date: 2016-01-29 / CAPEs / Notadamente nos últimos anos, a geração de eletricidade a partir de fontes renováveis de energia tem mostrado contínuo aumento que está relacionado, sobretudo, às preocupações com as variações climáticas, à dependência dos combustíveis fósseis e à necessidade de suprir a geração de energia elétrica com recursos que produzam menos impactos ao meio ambiente. A capacidade instalada da energia renovável no mundo, que foi de 800GW em 2004, alcançou 1.712GW em 2014 e a participação na matriz energética global também aumentou, atingindo o percentual de 22,8% em 2014. O Brasil possui uma matriz energética predominantemente renovável. Somente em 2014, aproximadamente 74,6% da eletricidade gerada procedeu das fontes renováveis de energia. O percentual restante (25,4%) proveio dos combustíveis fósseis e das fontes nucleares. Mas, muito embora o País possua uma matriz energética tipicamente renovável, nota-se que o principal sistema de geração é o aproveitamento hidráulico, que é bem vulnerável às variações climáticas globais e pode apresentar, em função disso, redução de sua capacidade instalada em longo prazo. Visando contribuir para a diversificação da matriz energética brasileira, esta pesquisa apresenta dois métodos distintos e macroespaciais para auxiliar a seleção de áreas potenciais para a inserção de usinas solares termoelétricas: o Método baseado no Processo Analítico Hierárquico, que trata o problema da localização sob uma organização hierárquica de critérios, como pressupõe os axiomas do Método AHP; e o Método do Custo de Produção de Eletricidade, que define os locais aptos em função do custo nivelado da eletricidade (LCOE – Levelised Cost of Electricity). Ambas as metodologias foram aplicadas para Pernambuco, localizado na região Nordeste do Brasil, e considerou a implantação de usinas de coletores parabólicos de 80MWe, tipo SEGS, operando somente em modo solar, sem armazenadores térmicos. Com base nas análises realizadas, confirmou-se que Pernambuco apresenta grande potencial para a implantação de usinas solares, principalmente no Sertão Pernambucano, onde foram encontrados os ambientes mais favoráveis à instalação. Na aplicação do Método AHP, por exemplo, o Sertão apresentou alto potencial de instalação em todos os cenários avaliados, inclusive no cenário Ponto de Partida, onde os pesos não foram considerados. No Método do Custo de Produção de Eletricidade, o Sertão também mostrou alto potencial de instalação uma vez que os custos de geração de energia elétrica encontrados foram os menores do estado (da ordem de R$ 337,16/MWh). Este custo é elevado quando comparado com o preço da eletricidade gerada pela fonte hidráulica no país (R$ 182,09/MWh), por exemplo, mas estão em conformidade quanto ao esperado para sua inserção no mercado brasileiro. De modo geral, as abordagens apresentadas se mostraram muito consistentes e revelaram um potencial bastante promissor para o desenvolvimento da tecnologia em Pernambuco. Este potencial deverá ser avaliado detalhadamente e incluir a medição local da radiação solar por pelo menos cinco anos. / Notably in recent years, the generation of electricity using energy from renewable resources has presented continuous increase, which is due to, especially, the concerns about climate changes, the dependency in fossil fuel and the necessity of production of electric energy with resources to decrease the negative impacts in the environmental. The global renewable power generation capacity, which presented 800GW on the beginning of 2004, reaching an estimated 1,712GW at year’s end 2014, and the renewable electricity global production in 2014 presented 22.8%. Brazil has a mainly renewable energy matrix. In 2014, 74.6% of the electricity produced came from renewable sources of energy. The remaining percentage comes from fossil fuels and nuclear sources (25.4%). Although it shows a remarkably renewable character, it is notable that the main source of generation of electricity is the water source, which is susceptible the climate changes, and should present the reduction in your capacity installed in a long term. As a way of contributing to diversify the energy matrix Brazilian, this work presents two different methodologies macro spatial for the selection of the best sites for insertion of solar thermal power plants: the methodologies based on analytic hierarchy process (AHP) where the selection the best site was based on means of the hierarchical organization of criteria according to axioms of the AHP method; and the method based on cost of electricity generation where the best site were selected according to Levelised Cost of Electricity (LCOE). Both studies were made in Pernambuco, located in Northeastern Region of Brazil and considered the implementation of a parabolic trough solar power plant, of 80MWe, operating exclusively in solar mode, without thermal stores. The analyzes performed confirmed that the Pernambuco presents great potential for the installation of solar thermal power plants, especially, in the Sertão Pernambucano where the best sites were located. In the methodologies AHP, for example, this region presented great potential for the installation in all scenarios analyzed, including the Ponto de Partida scenarios where weights are not used. In the method based on cost of electricity, the Sertão presented great potential also. In this region it is possible to find electric energy generation costs by MWh of the order of R$ 337.16. This costs are still high when comparing the cost of generation of the hydraulic source (R$ 182.09/MWh) in Brazil, although, they comply as to expected for its insertion in the Brazilian Market. The methodologies used demonstrated very consistent and identified a promising potential for solar thermal power generation in Pernambuco. This potential should be analyzed in details and include the local measurement of the incident direct normal solar irradiation for at least five years.
74

Modelo de seleção de fornecedores para compras públicas baseado em negociação multibilateral e multiaspecto

SCHRAMM, Fernando 21 May 2013 (has links)
Submitted by Caroline Falcao (caroline.rfalcao@ufpe.br) on 2017-06-01T18:14:47Z No. of bitstreams: 2 license_rdf: 811 bytes, checksum: e39d27027a6cc9cb039ad269a5db8e34 (MD5) Fernando TESE.pdf: 6232408 bytes, checksum: 2758b5fef89a3422ca1f59c9255a8e14 (MD5) / Made available in DSpace on 2017-06-01T18:14:47Z (GMT). No. of bitstreams: 2 license_rdf: 811 bytes, checksum: e39d27027a6cc9cb039ad269a5db8e34 (MD5) Fernando TESE.pdf: 6232408 bytes, checksum: 2758b5fef89a3422ca1f59c9255a8e14 (MD5) Previous issue date: 2013-05-21 / A complexidade de um processo licitatório, o princípio da isonomia e a tentativa de obter a proposta mais vantajosa têm induzido a administração pública a adotar uma abordagem de seleção de fornecedores, onde o preço é o único aspecto considerado. Com o objetivo de apoiar este processo, esta tese propõe um modelo de seleção de fornecedores, baseado na legislação brasileira de licitação, que contempla uma etapa de negociação sobre múltiplos aspectos. O modelo estrutura o processo de compras de bens na administração pública em um fluxo de atividades: (i) captação das propostas; (ii) etapa de negociação; e (iii) homologação e adjudicação das propostas. A etapa de negociação consiste de um modelo de apoio à negociação multibilateral e multiaspecto, cuja estratégia adotada garanta ganhos mútuos máximos para as partes envolvidas. O modelo proposto é ilustrado por meio de um processo licitatório já finalizado. Através desta ilustração é possível verificar que o modelo agrega maior dinâmica a lei de licitações, pois as ofertas dos fornecedores são intervalos de valores em diferentes aspectos ao invés de uma oferta fixa e única apenas no aspecto preço. Verificou-se também que a proposta pode ser utilizada para apoiar processos de seleção de fornecedores de empresas do setor privado. / The complexity of bidding process, the equality principle and the attempt to obtain the most advantageous bid have led the government to adopt a selection supplier approach, in which the price is the only issue considered. In order to support this process, this thesis proposes a supplier selection model based on the Brazilian bidding law, which includes a negotiation stage on multiple issues. The model organizes the public bidding process in a flow of activities: (i) bids reception; (ii) negotiation stage; and (iii) approval and award of bids. The negotiation stage is developed as a model to support multi-bilateral and multi-issue negotiations, whose adopted strategy ensures joint maximum gains for the parties involved. The proposed model is illustrated through its application for a bidding process already concluded. This illustration showed that the model aggregates more dynamic to the bidding law since the suppliers bids are ranges of values in different issues instead of a single bid in the price issue only. It was verified that the proposal can be used to support suppliers selection processes in private sector companies.

Page generated in 0.0512 seconds