• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 27
  • Tagged with
  • 27
  • 27
  • 16
  • 13
  • 9
  • 9
  • 8
  • 8
  • 4
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
21

Planeamiento estrategico y reestructuracion organizacional de una empresa constructora que ejecuta obras para el sector publico caso de estudio: empresa ABC Ingenieros s.a.c. / strategic planning and organizational restructuring of a construction company that executes works for the public sector Study Case: ABC Ingenieros S.A.C. Company

Flores Azañedo, Regina Del Carmen, Mendoza Caceres, Carol Yarmila, Mendoza Calla, Angela Estefania, Montalvo Casimiro, Miguel Elias, Salvador Rafael, Melenca Blanca 25 November 2019 (has links)
Debido a la necesidad de mejorar la economía de una familia, los profesionales con experiencia en el rubro de la construcción han decidido emprender su camino al éxito empresarial, mediante la creación de su propia empresa para lograr una independencia financiera y generar ganancias propias. En el camino de crecer como empresa, las organizaciones de tipo familiar han avanzado en desorden y con cierta informalidad dando como resultado empresas con problemas de estancamiento, no sostenibles en el tiempo y con probabilidades de desaparecer del mercado. El presente trabajo de investigación tiene como objetivo formular la propuesta del planeamiento estratégico y la mejora de la estructura organizacional de la empresa caso-estudio, la cual, por temas de confidencialidad, denominaremos ABC Ingenieros S.A.C., empresa que ejecuta obras para el sector público en sus tres niveles de gobierno. El trabajo consta de cinco capítulos: Capítulo I, se describen los aspectos generales tales como la formulación del problema y determinación de los objetivos. Capítulo II, se desarrolla el marco teórico de la investigación. Capítulo III, se define la hipótesis y metodología de la investigación. Capitulo IV, se describe la situación actual de la empresa y se realiza el análisis estratégico y el Capítulo V, se plantea la propuesta de valor para la empresa, proponiendo el plan estratégico en base a los objetivos organizacionales, reestructuración del organigrama y definición de procesos críticos del área de licitaciones y operaciones. / Due to the necessity to improve the family economy, professionals with experience in the construction field have decided to embark on their way to business success, by creating their own company to achieve financial independence and generate their own profits. In the way of growing as a company, family-type organizations have advanced in disorder and with some informality, and as a result, companies are with stagnation problems, not sustainable over time and with probabilities to disappear from the market. The objective of this research work is to formulate the proposal of a strategic improvement of the organizational structure of this case-study company, which, for confidentiality issues, we will call ABC INGENIEROS S.A.C, a company that executes works for the public sector in its three levels of government. This work consists in five chapters: Chapter I describes the general aspects such as the formulation of the problem and the determination of the objectives. Chapter II develops the theoretical framework of the investigation. Chapter III develops the hypothesis and the methodology of the investigation. Chapter IV defines the actual situation of the company and the strategic analysis. Chapter V propose the value proposition of the company, presenting the strategic planning based on the organizational objectives, organizational restructuring and the definition of the critics process of bidding and operations areas. / Tesis
22

Programa de viviendas para el sector socioeconómico C, caso de estudio en el distrito de San Martin de Porres, provincia y region Lima / Housing programme for the socio-economic sector C, case of study in the District of "San Martin de Porres", province and Lima.

Fabián Romero, Ángel David 21 March 2018 (has links)
En el presente trabajo de investigación, se muestra cómo una familia del Nivel Socioeconómico C puede acceder a la adquisición de una vivienda que se adapte a sus necesidades físicas, y además sea accesible a la capacidad de pago que tiene este sector. Comenzamos a trabajar en la propuesta de un Proyecto para estudiar un producto óptimo para este sector, el tipo de departamento que necesita, el costo del producto accesible para el sector socioeconómico C y la forma de financiamiento; se observó que en la actualidad un gran porcentaje de la población de este sector no reúne los requisitos para obtener un préstamo hipotecario, lo que dificulta y disminuye la velocidad de ventas de los departamentos y, por lo tanto, los plazos de venta se extienden, generando mayores costos para el proyecto. Po resta razón, se realizó un análisis financiero tomando en cuenra la velocidad de ventas de los departamentos que ofrece el mercado actual, generando como resultado los flujos de efectivo reales del proyecto propuesto. Como resultado del Estudio Económico del proyecto, obtenemos un VAN de S/. -4'184,936 y la TIR económica es 1.54% ; un VAN financiero de S /. - 2'448,981 y una TIR financiera de 3.13% ; por lo que se observa que este proyecto no es rentable dado que el COK esperado por los inversionistas es de 14% de rentabilidad. / In the present research work, it is shown how a family from Socioeconomic Level C can access the acquisition of a home that suits their physical needs, in addition that it is accessible to the capacity of payment that this sector has. With the aforementioned, we began to work on the proposal of a Project (Study Project) in order to show an optimal product for this sector, the type of department that this sector needs was proposed, the cost of the product accessible to the socioeconomic sector C and the form of financing; it was observed that at present a large percentage of the population of this sector does not qualify to obtain a mortgage loan, which hinders and decreases the sales speed of the departments and therefore the sale deadlines extend generating higher costs to the project. That is why a financial analysis had to be carried out according to the sales speed of the departments that the current market offers, generating as a result the actual cash flows of the proposed project. As a result of the VAN Economic Study Project of S /. -4’184,936 and the Economic IRR is 1.54% and a Financial NPV of S /. -2’448,981 and a Financial IRR of 3.13% ; so it is observed that this project is not profitable given that the COK expected by investors is 14% profitability. / Trabajo de investigación
23

Mejora de la gestión del plazo mediante la implementación de last planner system en pequeña empresa constructora caso de estudio obra: mejoramiento de transitabilidad vehicular av. Martinelly, Andahuaylas Apurimac 2018 / Improvement of term management through the implementation of the lps in a small construction company case study: improvement of vehicular transitability av. Martinelly, Andahuaylas Apurimac 2018

Chávez Reynaga, Wilfredo Ronald, Dalmiro Ramos, Enciso 17 November 2018 (has links)
El propósito del presente estudio de investigación nace por la necesidad de gestionar de manera eficiente el plazo en la ejecución de obras por parte de pequeñas empresas del rubro, mediante la aplicación de un sistema de protección eficiente y efectivo como el Sistema del Último Planificador, herramienta que forma parte de la filosofía “Construcción sin perdidas” o “Lean Construction que surgió en la década de 1990 y provenía de la adaptación de “Lean Production” y de los fundamentos para la dirección de proyectos. La aplicación del Sistema del Ultimo Planificador, se realizó en una obra de pavimentación ejecutada por una pequeña empresa con organigrama organizacional y de recursos, básica. Para ello se hizo primero una revisión de las bases teóricas de los conceptos como planificación maestra, planificación intermedia y planificación semanal y de los métodos, técnicas, herramientas y metodologías que se utilizan en el desarrollo de un proyecto de construcción y de la herramienta principal en la que centra este trabajo de investigación. La dinámica del estudio de investigación se basó en la determinación de indicadores de la herramienta del Ultimo Planificador y su medición durante las 6 semanas de estudio, de las cuales 2 se tomaron como medición de los indicadores sin la aplicación de la herramienta del Sistema del Ultimo Planificador para la creación de línea base de medición y de 4 semanas de medición de los indicadores con la aplicación de la herramienta del Sistema del Ultimo Planificador. En el proceso de aplicación se siguió los pasos establecidos por la herramienta de acuerdo a esta teoría. Durante el tiempo de estudio de la investigación se observaron las dificultades y las fortalezas de la empresa durante la aplicación de la herramienta del Ultimo Planificador y se realizó algunas recomendaciones para su aplicación e eliminación de las causas de no cumplimiento y así crear un círculo virtuoso de mejora continua. Producto de la aplicación se observaron mejoras en el cumplimiento de las tareas programadas y por ende de los plazos contractuales en un porcentaje razonable, esta mejora reforzó nuestra hipótesis y que esta se refleja en el ahorro de un monto económico que ayudaría a la empresa a mejorar sus utilidades, reducir el riesgo de incurrir en mayores gastos generales y tener mayores costos de oportunidad. También debemos indicar que a pesar de las dificultades producto de la implementación de un Sistema del Último Planificador como la resistencia al cambio, esta debería ser utilizada e implementada en las pequeñas y medianas empresas como algo cotidiano, pues los beneficios en costos son mayores a los gastos incurridos en su implementación. Finalmente el material y el proceso de implementación reflejado en el presente trabajo de investigación pueden servir como punto de partida para la aplicación de la herramienta de Sistema del Último Planificador en otros proyectos de construcción y otras empresas similares del rubro. / The purpose of this research study was born from the need to efficiently manage the term in the execution of works by small companies in the sector, through the application of an efficient and effective protection system such as the Last Planner System, a tool which is part of the philosophy "Construction without losses" or "Lean Construction" that emerged in the 1990s and came from the adaptation of "Lean Production" and the Project Management Body of Knowledge. The application of the Last Planner System was carried out in a paving work executed by a small company with an organizational and resource organization chart, basic. To this end, a review was first made of the theoretical bases of the concepts of methods, techniques, tools and methodologies used in the development of a construction project and of the main tool on which this research work is centered. The dynamics of the research study was based on the determination of indicators of the tool of the Last Planner and its measurement during the 6 weeks of study, of which 2 were taken as measurement of the indicators without the application of the Ultimate System tool Planner for the creation of baseline measurement and 4 weeks of measurement of the indicators with the application of the tool of the Ultimate Planner System. In the application process, the steps established by the tool were followed according to this theory. During the time of study of the research the difficulties and strengths of the company were observed during the application of the tool of the Last Planner and some recommendations were made for its application and elimination of the causes of non-compliance and thus create a virtuous circle of continuous improvement.       Product of the application improvements were observed in the fulfillment of the programmed tasks and therefore of the contractual terms in a reasonable percentage, this improvement reinforced our hypothesis and that this is reflected in the saving of an economic amount that would help the company to improve its profits, reduce the risk of incurring higher overhead costs and have higher opportunity costs. We must also indicate that despite the difficulties resulting from the implementation of a Last Planner System such as resistance to change, this should be used and implemented in small and medium-sized companies as an everyday matter, since the cost benefits are greater than expenses incurred in its implementation.      Finally, the material and the implementation process reflected in this research work can serve as a starting point for the application of the Last Planner System tool in other construction projects and other similar companies in the field. / Tesis
24

Propuesta de un sistema de gestión eficiente de costo, plazo y alcance en la micro y pequeña empresa constructora: caso de estudio en los departamentos de Arequipa y Moquegua

Torres Rodríguez, Alain Gustavo, Valdivieso Herrera, Jorge Horacio 28 February 2018 (has links)
Presentar una alternativa de sistema de gestión para la mejora de la productividad y eficiencia económica de la micro y pequeña empresa constructora. El punto de partida es la encuesta realizada a micro y pequeñas empresas constructoras de las ciudades de Arequipa y Moquegua que prestan servicios a empresas privadas y públicas; a través de la información obtenida se ha podido determinar las fortalezas, debilidades, expectativas y “forma de pensar” de las empresas objetivo. / Present an alternative management system for improving the productivity and economic efficiency of the micro and small construction companies. The starting point is the survey of micro and small construction companies in the cities of Arequipa and Moquegua that provide services to private and public companies; Through the information obtained it has been possible to determine the strengths, weaknesses, expectations and "way of thinking" of the target companies. / Trabajo de investigación
25

Planeamiento para el aseguramiento del flujo de construcción mediante la innovación con last planner system para proyectos de edificaciones de gran envergadura / Strategic planning for the asserunce of construction flow through innovation for large-scale projects

Herrera Pacheco, Moises Cesar Augusto 03 October 2021 (has links)
El presente trabajo de investigación plantea la implementación y desarrollo de un planeamiento para el aseguramiento del flujo de construcción mediante la innovación con last planner system aplicado como ejemplo en un proyecto de edificación de gran envergadura. Los proyectos en el sector de edificaciones tienen una premisa constante en ser más cortos en plazo y ajustado en presupuesto, esto genera que el riesgo aumente por esta condición contractual y de mercado teniendo como consecuencia el reto al equipo de construcción para poder optimizar y sincerar el planeamiento inicial con el cual fue adjudicado. En este trabajo de investigación se ha desarrollado soluciones como crítica al planeamiento inicial en el cual durante la ejecución se había perdido plazo poniendo en riesgo el proyecto. Es por ello que, se planteó como soluciones lo siguiente: Encofrado de vigas prearmado, desfase de núcleo de ascensor y optimización de torre grúa. Estas optimizaciones y cambios al planeamiento inicial se ejecutaron con éxito en el proyecto de manera que se obtuvo como resultado la recuperación del plazo y adelanto en la ejecución. / This research work proposes the implementation and development of a strategic planning for the assurance of the construction flow through innovation applied as an example in a large-scale building project. The projects in the building sector have a constant premise of being shorter in terms of time and tight in budget, this generates that the risk increases due to this contractual and market condition, resulting in the challenge to the construction team to be able to optimize and honest the initial planning with which it was awarded. In this research work, solutions have been developed as critical to the initial planning in which, during the execution, time had been lost, putting the project at risk. That is why the following solutions were proposed: pre-assembled beam formwork, elevator core offset and tower crane optimization. These optimizations and changes to the initial planning were successfully executed in the project, resulting in the recovery of the deadline and advancement in the execution. / Trabajo de investigación
26

Implementación de Gestión BIM para una constructora de Edificios Multifamiliares como soporte del área de planificación de una obra en ejecución

Briceño Ynfante, Maikol Giancarlo, Cabanillas Risco, Jhonatan Antonio, Campos Canchucaja , Jhon Wilfredo, Munayco Pineda, Hernando Luis 10 January 2020 (has links)
El tema de la presente tesis busca implementar la gestión BIM en una empresa constructora. La investigación busca conocer el impacto que hubiese generado el implementar al inicio de la ejecución una gestión BIM, nuestro proyecto en estudio no implementó esta herramienta, con esto se quiere conocer el impacto positivo que se hubiese generado en el tiempo del proyecto de haberse implementado esta herramienta. Para nuestra investigación se empleará el análisis cuantitativo y cualitativo. El primer capítulo corresponde al planteamiento metodológico el cual está conformado por la formulación del problema, objetivos, justificación del problema, delimitación y la metodología de estudio. El segundo capítulo corresponde al marco teórico el cual está conformado por los antecedentes de investigación, marco para la implementación de Gestión BIM, Last Planner System y contratos colaborativos. El tercer capítulo corresponde al desarrollo de la investigación el cual está conformado por antecedentes del proyecto, evaluación de los entregables, cronología de la obra, cronogramas, RFI’s y conclusiones. El cuarto capítulo corresponde a la propuesta de solución el cual está conformado por la Implementación PEB, análisis de RFI’s en sesiones ICE, modelamiento de RFI’s, modelamiento BIM, desarrollo 4D con naviswork, cronogramas finales con uso BIM, Análisis Impacto Costo y Análisis impacto pandemia covid-19. El quinto capítulo corresponde a las conclusiones. El sexto capítulo corresponde a las recomendaciones. / The subject of this thesis seeks to implement BIM MANAGEMENT in a construction company. The research seeks to know the impact that was generated by implementing the BIM MANAGEMENT at the beginning of the execution of our project, our project under study did not implement these tools, with this we want to know the positive impact that had been generated in the time of perform implemented these tools. Part of our research, quantitative and qualitative analysis will be used. The first chapter corresponding to the methodological approach which is made up of the formulation of the problem, objectives, justification of the problem, delimitation and the study methodology. The second chapter corresponding to the theoretical framework which is made up of the research background, framework for the implementation of BIM Management and collaborative contracts. The third chapter corresponds to the development of the research which is made up of the executive summary of the project, evaluation of the deliverables, chronology of the work, schedules and RFIs. The fourth chapter corresponds to the solution proposal which is made up of the PEB Implementation, RFI's analysis, RFI's modeling, 4D development, and final schedule. The fifth chapter corresponds to the conclusions. The sixth chapter corresponds to the recommendations. / Trabajo de investigación
27

Propuesta de un modelo de integración de la gestión de la cadena de abastecimiento en un proyecto de construcción

Condo Quispe, Samuel, Huamani Cotacallapa, Elvis Jhon, Peña Alvarez, Renzo Roberto 18 June 2020 (has links)
En este trabajo se ha realizado la investigación de la gestión de la cadena de abastecimiento en la industria de la construcción bajo el enfoque de la integración de participantes y de cómo lograrlo mediante la aplicación de un modelo de gestión. La cadena de abastecimiento de la industria de la construcción está llena de problemas y desperdicios en comparación con la industria manufacturera; una de las causas principales es la fragmentación existente esto se evidencia en la región Arequipa en proyectos culminados fuera del plazo programado e incremento de costos. La investigación pretende conocer la relación de la integración de la cadena de suministro con la planificación, logística, industrialización y las alianzas. El resultado del trabajo de investigación es el Modelo de Gestión para la Integración de la Cadena de Abastecimiento el cual se basa en la planificación, logística, industrialización y alianzas; se ha realizado la aplicación de este modelo en el proyecto de construcción de la planta de cemento, encontrando problemas en estas cuatro fases, que han generado incremento de plazos de ejecución y de presupuesto. Para concluir la cadena de abastecimiento en la industria de la construcción está fragmentada principalmente al tipo de contratación que propone el cliente con los participantes como el contratista principal, ingeniería y supervisión, los que realiza incluso en diferentes etapas propiciando en la cadena de abastecimiento incrementos en el plazo de ejecución y costos de ejecución que finalmente son asumidos por el cliente. / In this work, research on supply chain management in the construction industry has been carried out with the focus on the integration of participants and on how to achieve this through the application of a management model. The supply chain of the construction industry is full of problems and waste compared to the manufacturing industry; One of the main causes is the existing fragmentation. This is evidenced in the Arequipa region in projects completed outside the programmed term and increased costs. The research aims to find out the relationship of supply chain integration with planning, logistics, industrialization and alliances. The result of the research work is the Management Model for the Integration of the Supply Chain which is based on planning, logistics, industrialization and alliances; The application of this model has been carried out in the construction project of the cement plant, finding problems in these four phases, which have generated an increase in execution times and budget. To conclude the supply chain in the construction industry, it is mainly fragmented to the type of contracting that the client proposes with the participants as the main contractor, engineering and supervision, which is carried out even at different stages, promoting in the supply chain increases in the execution period and execution costs that are finally assumed by the client. / Trabajo de investigación

Page generated in 0.1303 seconds