La gestión de los costos de calidad y su impacto financiero en el sector cervecero peruano, año 2017

Aldaves Quispe, Renzo Bruno, Noriega Sanez, Oscar 30 November 2018 (has links)
El presente trabajo de suficiencia profesional fue realizado con la finalidad de evaluar el impacto financiero de la gestión de costos de calidad en las empresas del sector cervecero peruano. Por lo tanto, está desarrollado de acuerdo a los conceptos de gestión de calidad y gestión de costos, tomando como base a los costos de calidad para la toma de decisiones de mejora y optimización de procesos. Este trabajo de investigación se centra en el estudio de las empresas del sector cervecero peruano, porque consideramos significativo que la Gerencia general, contable y financiera del sector, comprenda el impacto financiero de practicar y mantener una gestión de los costos de calidad. Por tal motivo, se espera que el presente trabajo de investigación sirva como base para lograr el entendimiento de la importancia de ejercer la gestión de costos de calidad. Para validar las hipótesis planteadas, se emplearon instrumentos de investigación cualitativos y cuantitativos. El insutrumento cualitativo utilizado fue entrevista a profundidad a expertos del sector y el instrumento cuantitativo fue la encuesta. Todo ello con la finalidad de obtener un consecuente análisis estadístico. Finalmente, se desarrollará un caso práctico en el que se plantearán dos escenarios que permitirán comparar el impacto financiero de aplicar la gestión de costos de calidad contra el escenario de no practicarla. / The present work of professional suffiency was realized with the purpose of evaluating the financial impact of the management of quality costs in the companies of the Peruvian beer sector. Therefore, it is developed according to the concepts of quality management and cost management, taking as a basis the quality costs for the decision making of process improvement and optimization. This research work focuses on the study of companies in the Peruvian beer sector, because we consider it significant that the general, accounting and financial management of the sector understand the financial impact of practicing and maintaining a management of quality costs. For this reason, it is expected that this research work will serve as a basis to achieve an understanding of the importance of exercising quality cost management. To validate the hypotheses, qualitative and quantitative research instruments were used. In-depth interviews were carried out, as a qualitative instrument, with experts from the sector and surveys were applied as a quantitative instrument for a consequent statistical analysis. Finally, a practical case will be developed where the financial impact of applying quality cost management will be compared against the case of not practicing it. / Tesis
12

Implementación de un sistema de gestión a través del método de resultado operativo en la obra: “Camino Vecinal Salitral – Huancabamba, tramo I: DV. R2A Salitral Bigote”

Avendaño Platero, Claudia Del Pilar, Dioses Avellaneda, David Eduardo January 2015 (has links)
Esta tesis presenta un enfoque cuantitativo, explicativo y descriptivo, aporta un sistema de gestión de costos mediante la metodología del Resultado Operativo y las diferentes bondades que presenta para incrementar los niveles de control y planificación de obra. En el desarrollo de una obra existen diferentes factores que afectan a la utilidad planificada, como atrasos en el cronograma, derroche de insumos, compras excesivas y otros que a la larga pueden terminar con dicha utilidad. Por este motivo contar con un sistema de control se vuelve vital para ejecutar una obra. El objetivo de esta tesis fue implementar el método del Resultado Operativo a una obra civil, que permita tener en cuenta aquellos factores que afectan a la utilidad y así incrementar el control de la misma, por ello se presentó una base conceptual y el desarrollo de su metodología. La metodología propuesta permitió planificar las partidas según el cronograma de obra, optimizar los insumos, proyectar la utilidad a final de obra según Fases y Grupos de Control establecidos, orientar a tomar decisiones anticipadas y mejorar el control de la utilidad en el transcurso de obra. This thesis present a quantitative, explanatory and descriptive approach, with the aim to provide a management costs system by operating income methodology and its various benefits presented to increasing control levels and planning work. In developing a work there are different factors that affect the planned utility, as delays in the schedule, wasted inputs, excessive shopping and others who may eventually end up with this utility. Therefore having a control system becomes vital to perform any work, either smaller or larger work, requires a control. The objective of this thesis is to implement the operating result method to a civil work, to take account factors that affect the utility, in order to increase control of it, so a conceptual base and develop methodology are discussed. The proposed methodology allows scheduling the work’s steps to optimize inputs, and project the utility at the end of work according to Control Groups and Established Phases, in order to make advance decisions and improve the control of the utility in the work’s development.
13

Control de obra del proyecto multifamiliar “Los Fresnos” a través de la gestión del valor ganado (EVM)

Gabriele Zevallos, Giselle Christin, Navarro Armas, Daniel Henry Nelson January 2015 (has links)
La presente investigación de carácter cuantitativo tiene el propósito de demostrar que el uso de la Metodología de Valor Ganado (Earned Value Management - EVM) para controlar los costos en una obra influye en la optimización de la rentabilidad de un proyecto inmobiliario; en este caso en la ejecución de la especialidad de estructuras de la obra: Proyecto Multifamiliar Los Fresnos. Para ello, se determinó el desempeño de la obra mediante los índices propuestos por el EVM, para conocer el estado del proyecto; se calculó el rendimiento y las variaciones de costo y tiempo de la ejecución de obra para estimar el rendimiento al cierre de la obra; y por último, se tomó acciones en obra para optimizar la gestión de costos. La investigación se aborda de acuerdo al tipo de estudio correlacional - transversal, ya que se midió el desempeño de costo y tiempo de la ejecución de la obra usando los índices de Rendimiento y Variación que ofrece la teoría del EVM tabulados en formatos de tablas y gráficos (validado por las ecuaciones propuestas en la Guía del PMBOK ® 5ta versión del PMI®) determinando el estado económico, la fidelidad del cronograma en el que se encontraba la obra para determinados periodos y la proyección de cómo terminaría la ejecución de la especialidad de estructuras, luego se tomaron acciones en función de los resultados obtenidos. Los resultados finales para el último periodo de aplicación del EVM en la especialidad de estructuras fue de un ahorro de hasta S/. 60 mil nuevos soles con un ligero retraso del 3% con respecto al cronograma planificado. Concluyéndose que la aplicación de la Metodología del Valor Ganado resultó efectiva para controlar las desviaciones que presentó la obra Los Fresnos, medir el progreso de la obra y actuar de forma correctiva en esta investigación. This quantitative research aims to demonstrate that the use of the Earned Value Management (EVM) to control costs in a job influences the optimization of the performance of a real estate project; in this case the execution of the specialty structures of the job: Multifamily Project Los Fresnos. To do this, the performance of the job was determined by the rates proposed by the EVM, to find out the status of the project; calculations were taken of the performance and changes in cost and time of the execution of work to estimate the performance at the end of the job; and finally, action was taken on the job to optimize cost management. The research is discussed according to the type of correlational study - transversely, as the performance of cost and time of execution of the job was measured using indexes of performance and variation offered by the theory of EVM tabulated formats charts and graphs (validated by the equations proposed in the PMBOK ® Guide 5th Version PMI®) determining the economic status, the fidelity of schedule in which the work was at for certain periods and projecting how to end the execution of the specialty structures, then actions were taken depending on the results obtained. The final results for the latest period of EVM implementation specializing in structures were savings of up 60,000 nuevos soles with a slight delay of 3% compared to the planned schedule. Concluding that the application of Earned Value Management was effective in controlling the deviations that the Los Fresnos job presented, measuring the progress of the job, and acting in the correct manner for this investigation.
14

Propuesta de un Sistema de costos basado en la gestión por proceso dentro de la cadena de suministros de los arándanos en Cañete, con la finalidad de incrementar la competitividad de las MYPES y mejorar la administración de sus costos / Proposal for a cost system based on process management within the blueberry supply chain in Cañete, in order to increase the competitiveness of MYPES and improve their cost management

Espinoza Callan, Elizabeth Jazmin 24 October 2020 (has links)
El arándano es un fruto que se está desarrollando en el Perú, con un gran incremento en las exportaciones, el presente trabajo se dirige a las empresas Mypes en Cañete. Estas empresas que están comenzando el negocio no saben cómo gestionar sus costos, haciendo que tengan gastos innecesarios y tomando malas decisiones, es por ello que a través de la siguiente investigación hemos desarrollado la metodología ABC, con el fin de que su gestión pueda mejorar, haciendo a las empresas más competitivas en el mercado. / The blueberry is a fruit that is being developed in Peru, with a great increase in exports, this work is aimed at Mypes companies in Cañete. These companies that are starting the business do not know how to manage their costs, causing them to have unnecessary expenses and make bad decisions, that is why through the following research we have developed the ABC methodology, in order that their management can improve, making most competitive companies in the market. / Tesis
15

Propuesta de gestión de proyecto basado en la guía PMBOK para mejorar la ejecución de carretera de acceso en proyecto minero, Antamina – 2021

Rodriguez Montañez, Patricia Jacqueline, Montalvo Soto, Yuler Yerry 16 January 2021 (has links)
La presente tesis, tiene como objetivo una propuesta de gestión de proyecto basado en la guía PMBOK para mejorar la ejecución de carretera de acceso de un proyecto minero en Ancash el 2021 mediante la planificación y control del alcance, cronograma y costo. El tipo de investigación fue de tipo cuantitativa, con un diseño de investigación no experimental explicativa, el cual buscó analizar las variables tanto dependiente como independiente y determinar si una afecta a la otra. La muestra de estudio está constituida por la gestión del proyecto de tres áreas (Gestión del alcance, Gestión del cronograma, Gestión del costo) en la obra en ejecución de la unidad minera Antamina durante el año 2021. La investigación utilizó la guía PMBOK lo cual brindó los lineamientos y guías para identificar las características y formatos necesarios para el proyecto. Asimismo, se realizó la estructura de composición de la investigación teniendo en cuenta las actividades involucradas, su secuencia, facilidad constructiva, el costo, disponibilidad y uso de los insumos (materiales, equipos, herramientas, mano de obra), así como la disponibilidad de mano de obra operativa y los rendimientos. Durante la metodología utilizada se utilizó la recolección de información durante las primeras 36 semanas iniciales del proyecto, obteniendo información vigente del alcance del proyecto, el desempeño del cronograma, del desempeño del costo y del avance de la ejecución de la obra. Es por ello, que se utilizó el reporte del control de rendimiento de horas máquinas, horas hombres y control de costos. Posteriormente, la información obtenida fue procesada empleando los softwares Microsoft Excel, Microsoft Project y AutoCAD e interpretada para obtener la medición de la eficiencia de la gestión y así lograr los resultados necesarios para proponer la aplicación de las guías del PMBOK en el proyecto. Finalmente, luego de analizar, interpretar, definir la información base e información procesada en base a la propuesta, se presentaron los resultados, conclusiones y recomendaciones de acuerdo a la información obtenida en la investigación. / The objective of this thesis is a project management proposal based on the PMBOK guide to improve the execution of the access road of a mining project in Ancash in 2021 through the planning and control of the scope, schedule, and cost. The type of research was quantitative, with an explanatory non-experimental research design, which sought to analyze both dependent and independent variables and determine if one affects the other. The study sample is constituted by the project management of three areas (Scope Management, Schedule Management, Cost Management) in the works in execution of the Antamina mining unit during the year 2021. The research improved the PMBOK guide, which provided the guidelines and guidelines to identify the characteristics and formats necessary for the project. Likewise, the composition structure of the research was carried out taking into account the activities involved, their sequence, constructive ease, the cost, availability, and use of inputs (materials, equipment, tools), as well as the availability of hand of operational work and yields. During the methodology used, the collection of during the first 36 initial weeks of the project was shown, the information was obtained current on the scope of the project, the performance of the schedule, the performance of the cost and the progress of the execution of the works. That is why the performance control report of machine hours, man hours and cost control was obtained. Subsequently, the information obtained was processed using Microsoft Excel, Microsoft Project and AutoCAD software and interpreted to obtain the measurement of management efficiency and thus achieve the necessary results to propose the application of the PMBOK guidelines in the project. Finally, after analyzing, interpreting, defining the base information and processed information based on the proposal, the results, conclusions, and recommendations were presented according to the information obtained in the investigation. / Tesis