Spelling suggestions: "subject:"bindustrial procurement"" "subject:"0industrial procurement""
161 |
Operational-cost optimisation and cost management in the sourcing and supply chain : a conceptual framework for a medium-sized service company without a central procurement functionVisser, Riaan 12 1900 (has links)
Thesis (MBA (Business Management))--Stellenbosch University, 2009. / ENGLISH ABSTRACT: A typical medium-sized service company in South Africa faces definite challenges and misses
opportunities in optimising and managing its operational expenses in its sourcing and supply
chain. Medium-sized companies generally do not have the benefit of sophisticated in-house
procurement divisions and extensive buying power but they still have to optimise their
expenses in order to ensure maximum profitability and business longevity.
The study addresses these challenges and opportunities by developing and proposing a
framework for a typical medium-sized service company that does not have a central
procurement function related to the cost optimisation and management of the identified
sourcing and supply-chain elements.
The research process entails the development of a conceptual framework developed from
literature analysis and a representational practical environment as well as the testing,
reviewing and validating of the test implementation of the framework. The results flowing
from the testing and implementation of the framework are excluded from the research project.
The results are displayed in the form of a summary of specific relevant information around
each framework element as well as a conceptual framework. Recommendations are made in
relation to the implementation and practical adaptation of the framework.
It is concluded that a medium-sized service company can successfully optimise and manage
its costs in the sourcing and supply-chain elements in the absence of a central procurement
function. This requires the effective implementation of the developed framework, which was
adapted from sophisticated larger companies. Implementation and the measurement process
need to be driven or, preferably, conducted by the medium-sized company owner or
management. Buy-in of the framework and the processes around it needs to be obtained from
employees, suppliers and other stakeholders. / AFRIKAANSE OPSOMMING: ’n Tipiese mediumgrootte diensverskaffingsonderneming in Suid-Afrika staar spesifieke
uitdagings in die gesig en ontbeer geleenthede met betrekking tot die optimalisering en
bestuur van die bedryfsuitgawes in sy aankoop- en verskaffingsketting. Mediumgrootte
ondernemings beskik in die algemeen nie oor die voordeel van ’n gesofistikeerde interne
aankoopafdeling en groot aankoopkrag nie, maar hierdie ondernemings moet nog steeds hulle
koste-uitgawes optimaliseer in die nastreef van maksimale wins en besigheidsukses.
Die navorsingstudie neem hierdie uitdagings en geleenthede onder die loep deur die
ontwikkeling en aanbeveling van ’n raamwerk vir ’n tipiese mediumgrootte
diensverskaffingsonderneming wat nie oor ’n sentrale interne aankoopafdeling beskik nie. Die
raamwerk is gebaseer op koste-optimalisering en -bestuur van die geïdentifiseerde aankoop- en verskaffingskettingelemente.
Die navorsingsproses behels die ontwikkeling van ’n konseptuele raamwerk deur
literatuuranalise en ’n verteenwoordigende praktiese omgewing, sowel as die toetsing,
hersiening en geldigverklaring van die raamwerk tydens die toets-implementering daarvan in
die praktiese omgewing. Die resultate van die toets en implementering van die raamwerk
vorm nie deel van hierdie studie nie.
Die navorsingsresultate word ten toon gestel in die vorm van ’n opsomming van die relevante
raamwerkelemente sowel as ’n ontwikkelde raamwerk. Aanbevelings ten opsigte van die
implementering en praktiese aanpassing van die raamwerk word dan gemaak.
Die gevolgtrekking word gemaak dat ’n mediumgrootte diensverskaffingsonderneming wel in
die afwesigheid van ’n sentrale interne aankoopafdeling sy kostes in die aankoop- en
verskaffingsketting suksesvol kan optimaliseer en bestuur. Dit kan gedoen word deur die
doeltreffende implementering en aanwending van die ontwikkelde raamwerk wat vanaf groter
ondernemings aangepas is. Die raamwerk se implementering- en metingsproses moet deur die
eienaar of bestuur van die mediumgrootte onderneming gelei, of verkieslik uitgevoer, word.
Die werknemers, verskaffers en ander belanghebbendes se ondersteuning vir die raamwerk en
gepaardgaande prosesse is baie belangrik vir die implementering en sukses van die raamwerk.
|
162 |
Supply contract management with information updates. / CUHK electronic theses & dissertations collectionJanuary 2002 (has links)
Huang Hongyan. / "February 2002." / Thesis (Ph.D.)--Chinese University of Hong Kong, 2002. / Includes bibliographical references (p. 134-142). / Electronic reproduction. Hong Kong : Chinese University of Hong Kong, [2012] System requirements: Adobe Acrobat Reader. Available via World Wide Web. / Mode of access: World Wide Web. / Abstracts in English and Chinese.
|
163 |
Governance challenges in combating supply chain management corruption in Ekurhuleni Metropolitan MunicipalityLegodi, Lesetja Freddy January 2017 (has links)
Research report presented in partial fulfilment of the requirements for the degree of Master of Management in Public Policy in the Faculty of Commerce, Law, and Management at the University of Witwatersrand
Degree of Confidentiality: A
Date: March 2017 / This dissertation is set out to investigate corruption-related challenges within the procurement and Supply Chain Management practices in the Ekurhuleni Metropolitan Municipality that hinder good practices and the promotion of good governance and offers insight on how those challenges could be addressed. A research design adopted is descriptive case study through a qualitative method approach which was influenced by the nature of the research problems understudy, in order to uncover trends in thought and opinions, and dive deeper into the problem, using in-depth interviews.
The findings of the study or the identified challenges that are associated with procurement and SCM processes in the Ekurhuleni Metropolitan Municipality are a lack of capacity (skilled), inconsistent Bid Committee processes, lack of appraisal systems, ineffective technologically advanced SCM systems (E-procurement), lack of SCM monitoring tools, and lack of training programs for personnel.
The study was meant to investigate corruption-related challenges within the procurement and Supply Chain Management practices in Ekurhuleni Metropolitan Municipality that hinder good practices and the promotion of good governance, with the focus being on issues of accountability, rule of law, ethics and integrity, and transparency as principles of good governance and elements of anti-corruption measures in curbing corruption.
The findings highlight the challenges that are likely to hinder good governance; and with a clear bigger picture of what the challenges are, then that would pave a way for what could to be done, especially in the procurement and Supply Chain Management Unit of the Municipality to abate corruption-related activities. / MT2017
|
164 |
The impact of implementation of supply chain management policy in the Department of Local Government and Housing in Limpopo ProvinceMarokana, Matsobane David January 2012 (has links)
Thesis (MPA.) --University of Limpopo (Turfloop Campus), 2012 / This study focused on the impact of implementation of Supply Chain Management Policy
(SCM) in Limpopo Department of Local Government and Housing (The Department of
Local Government and Housing is officially known as the Department of Co-operative
Governance, Human Settlements and Traditional affairs as from the 16 August 2011).The
study analyzed the impact of implementation of SCM policy including the implications of
non-compliance with this policy. The study also provides an analysis of the perceptions of
officials of the Department of Local Government and Housing with regard to the impact of
implementation of Supply Chain Management policy. The study also looked at Supply
Chain Management in a public sector context including mechanisms that can be employed
in order to improve implementation of Supply Chain Management policy.
Qualitative research methods were used in this study. This means that primary data was
collected using interviews and questionnaires. The findings from the study indicated that
the Department experienced challenges in implementing the SCM policy and that there was
a significant change in the behavioural patterns of the certain employees after the SCM
policy was implemented. The study also revealed that the implementation of SCM policy
had both positive and negative effects on the employees of the Department, service
providers as well as the public. Furthermore, the research revealed that violation of SCM
policy has a negative impact on service delivery. The study has provided answers to both
the main research question and sub-questions. From the findings made, the study concluded
that the implementation of Supply Chain Management policy has both the negative and
positive impact on the Department.
|
165 |
Supply quality management of leading manufacturing related companies in Hong KongYeung, Ho-wah, Alice., 楊皓華. January 2002 (has links)
published_or_final_version / abstract / toc / Industrial and Manufacturing Systems Engineering / Master / Master of Philosophy
|
166 |
Building relationships with India's suppliers exploring perceptions of U.S. apparel industry buyers /Singh, Kamlesh. January 1900 (has links)
Thesis (M.S.)--The University of North Carolina at Greensboro, 2008. / Directed by Nancy Hodges; submitted to the Dept. of Consumer Apparel and Retail Studies. Title from PDF t.p. (viewed Apr. 13, 2010). Includes bibliographical references (p. 131-139).
|
167 |
A proposed service quality framework for multi-national supply logistics providers in the South African automotive industryVan Aswegen, Dawid Titus January 2017 (has links)
Managing a sustainable service business rests on two critical customer perceptions: Firstly, the perceived sufficiency of the value of the service, and secondly the level of value differentiation between the current service provider other service providers in the market. (DeSarbo, Ebbs, Fong & Snow, 2010; Parasuraman & Grewal, 2000) The direction for this study was prompted by the limited research available around service quality for Supply Logistics within the global automotive industry. The study identified the key factors that logistics service providers need to focus on when aligning their perceptions of service quality to that of their customers. The service gaps between customer and service provider perceptions are uncovered. Particular focus was given to: The definition gaps in service quality, The perceived level of service quality, and The size of service quality differentiation between service providers. The key finding of the study is that service differentiation is influenced by the ability of the Logistics Service Provider (LSP) to deliver a quality of service in line with the level of importance the various elements hold to the customer. The causal relationships offered a step wise understanding of improving the perceptions of customers. This perception forming process is outlined as follows: Firstly, create a common understanding of the definition of service quality and establish the comparative importance of the various elements. Having an understanding of how customers’ value service quality is a critical first step in delivering superior service. A proposed Service Quality Framework for multi-national Supply Logistics providers in the South African automotive industry Secondly, align efforts to achieve in accordance to the level of importance of the service elements. If this is achieved, LSP’s will retain positive differentiation to its competitors irrespective of the actions of those competitors. Lastly, LSP’s need to regularly review if their own perception of the service level (per element) is in line with that of the customer. The study created a service quality framework of 22 different service elements grouped in four service factors. The relative importance of these elements were uncovered. This offered insight for organizing the business around key service elements. Within Supply Logistics the operational-management-tools, engineering-skills, processes-stability and management-structure are typical elements around which customers form their perceptions. The quality of the direct staff holds the key to sustained customer satisfaction, much more so than the commercial arrangements, industry innovations and the prestige of the brand behind the service. This study laid a foundation from which future research can deeper explore the unique slant that geographical, organisational designation or customer brand lines hold on the service quality perception.
|
168 |
An investigation on the impact of procurement quality management in a nuclear power stationGumede, Nomfusi Leticia January 2011 (has links)
Thesis (MTech (Quality))--Cape Peninsula University of Technology, 2011. / This research project in Procurement Quality Engineering was conducted at a
Nuclear Power Generation Company in the Western Cape, South Africa. During
the past decade, quality management has become increasingly recognised as
highly desirable for all organisations at all levels. All organisations, to varied
degrees, can benefit from the application of quality management skills in some
parts of their daily operations.
The research project will investigate the impact or effect of late deliveries of
spares on the operational cost of the organisation. The organisation is not aware
what impact the delivery of spares has on operating costs. Against the above
background, the problem to be researched within the ambit of this dissertation
reads as follows: "Poor product and / or service delivery from Vendors and / or
Suppliers have an adverse impact on the output of the Procurement Quality
Department" .The primary research objectives of this study are the following:
~ To emphasise the importance of quality within the supply chain.
~ To investigate the impact of non-conforming items delivered to a Nuclear
Power Plant.
~ To determine measures which can be put in place to improve
communication between suppliers, vendors, buyers and procurement quality
engineering.
~ To determine or investigate the cost of poor quality in the organisation.
~ To improve the quality of goods and services through the application of a
quality management system within the supply chain.
The research method used in this research project involved both qualitative and
quantitative research processes. Questionnaires and statistical techniques were
used to analyse the data, and to draw conclusions and recommend possible areas
for improvement. The research methodology falls within the ambit of a case
study.
|
169 |
Voorraadbestuur in die Helderberg MunisipaliteitMoelich, Gerrit Marius 12 1900 (has links)
Thesis (MPA)--Stellenbosch University, 2001. / ENGLISH ABSTRACT: Problems with stock control have arisen since the amalgamation of the four local
governments in the Helderberg Basin. Management and control of stock are important as
stock is considered as cash. It is therefore necessary that local governments pay attention to
the continuous upgrading of existing systems for the purchase and storage of stock as well
as the control of it and the facilities.
The purpose of stock control is to ensure that the existing stock levels are sufficient to enable
the local government to execute its functions effectively. This study points out that problems
experienced are minimised and could even be eliminated by applying the JIT (Just-in-Time)
principle. Statistics have shown that the JIT principle could be applied with great success
within the Helderberg Municipality and that approximately R4,36m could be available for
alternative application.
For the Helderberg Administration JIT could mean minimising excess stock in such a way that
mostly stock items with re-order times of eight weeks will have to be kept in stock.
* Since 5 December 2000 the Helderberg Municipality is included in the City of Cape Town
and is now known as Helderberg Administation. / AFRIKAANSE OPSOMMING: Ná amalgamasie van die vier munisipaliteite in die Helderbergkom word probleme met
voorraadbestuur ondervind. Voorraadbestuur is belangrik omdat voorraad as kontant
beskou word. Dit is daarom noodsaaklik dat munisipaliteite voortdurend aan die opknapping
van bestaande stelsels van voorraadaankope en opberging, asook aan voorraadbeheer en
fasiliteite aandag sal skenk.
Die doel van voorraadbestuur is om te verseker dat die beskikbare voorraad voldoende is om
die plaaslike owerheid in staat te stelom funksies effektief uit te voer. Hierdie navorsing dui
daarop dat probleme wat ondervind word, verminder en selfs uitgeskakel sal kan word deur
toepassing van die JIT(Just-in-Time)-beginsel. Statistiek dui daarop dat die JIT-beginsel met
groot sukses binne die Helderberg Munisipaliteit toegepas sal kan word en ook bykans
R4.36m. beskikbaar kan stel vir alternatiewe aanwending.
Vir die Helderberg Administrasie kan JIT beteken dat oorbodige voorraad so geminimaliseer
word dat meestal voorraaditems met herbesteltye van ag weke in voorraad gehou hoef te
word.
* Helderberg Munisipaliteit is vanaf 5 Desember 2000 deel van die Munisipaliteit van Stad
Kaapstad en staan tans bekend as Helderberg Administrasie.
|
170 |
Strategic supplier alliances in the Hong Kong electronics industryLee, Ka-chun, 李家駿 January 2004 (has links)
published_or_final_version / Industrial and Manufacturing Systems Engineering / Doctoral / Doctor of Philosophy
|
Page generated in 0.1029 seconds