• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 341
  • 1
  • Tagged with
  • 342
  • 342
  • 136
  • 97
  • 87
  • 75
  • 70
  • 63
  • 60
  • 57
  • 46
  • 41
  • 40
  • 39
  • 39
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
181

Propuesta para evaluar la viabilidad del desarrollo de un proyecto inmobiliario dirigido al sector socioeconómico C / Proposal to evaluate the viability of developing a real-estate project directed at socioeconomic sector C

Miranda Ramos, Jorge Luis, Vásquez Rodriguez, Brayan 17 January 2019 (has links)
Para el desarrollo de proyectos inmobiliarios, hay que ser cautos con las proyecciones, las expectativas de ventas, los precios de los materiales y abastecimiento de acabados, ya que pueden ser un problema largo plazo, es por ello por lo que se debe tomar precauciones antes y durante el proceso de desarrollo de un proyecto. Se buscará evaluar la viabilidad en un proyecto inmobiliario mediante los análisis técnico, comercial y económico financiero a fin de obtener una rentabilidad apropiada para nuestro proyecto en el distrito de Carabayllo que pertenece al sector socioeconómico C. Debido al déficit habitacional que existe en el distrito de Carabayllo se planteará un proyecto beneficie a los compradores y sea viable económicamente. Se desarrollará la investigación a través del estudio de mercado, un análisis comercial, técnico y financiero y posteriormente se aplicará la propuesta y presentará los resultados de la investigación, los análisis e interpretaciones de los resultados, indicando si el proyecto es rentable para el Distrito. / For the development of real estate projects, projections, expectations for sales, prices of materials and supply of finishes must be cautious, since they can be a long-term problem, precautions should be taken before and during the process of developing a project. The feasibility of a real estate project will be evaluated through technical, commercial, and economic financial analysis in order to obtain an appropriate profitability for the project in the district of Carabayllo that belongs to socioeconomic sector C. Due to the housing deficit that exists in the district of Carabayllo a project that benefits the buyer and is economically viable will be created. The research will be developed through a market study, commercial, technical and financial analysis and subsequently the proposal will be applied and present the results of the research, the analysis and interpretation of the results, indicating if the project is profitable for the district. / Tesis
182

Propuesta de sistema de gestión enfocado en los lineamientos del PMBOK 5ta edición, en el área de conocimiento de la gestión del alcance para proyectos de construcción por la microempresa: AYH Ingenieros SCRL en la ciudad del cusco

Llerena Torreblanca, Katherine Astrid, Villafuerte Condori, Henry Engels 26 May 2018 (has links)
La presente tesis busca implementar un sistema de gestión enfocado en los lineamientos del PMBOK 5ta edición en el área de conocimiento de la Gestión del Alcance del proyecto, el cual permita a la microempresa AYH INGENIEROS SCRL mejorar su eficiencia en la ejecución de sus proyectos, dado que el mundo de la construcción está cambiando, innovando y las microempresas en el sector construcción no efectúan una gestión a partir de una integración de procedimientos, desde la concepción hasta el cierre del proyecto, cabe destacar que las microempresas usan los procesos de gerencia de proyectos en estimaciones de recursos, en estimar la duración, determinar el presupuesto, controlar el cronograma de acuerdo a sus valorizaciones o término del contrato, el gestionar a los interesados, pero no es hecho desde un enfoque y esquema organizado y lógico, sino, actividades dispersas y puntuales en cada proyecto, teniendo así al finalizar los proyectos perdidas en sus utilidades y/o proyectos sin terminar, contratos resueltos; por tales razones la importancia de la aplicación del PMBOK en la gestión de los proyectos para que permita compatibilizar y adoptar las buenas prácticas de otras organizaciones con la cual se desarrolle un marco común para los siguiente proyectos de la empresa. Finalmente cabe señala que la presente tesis se desarrolló en un caso estudio, en la ejecución de la obra “Mantenimiento Periódico del Camino Vecinal: TRAMO: YANAOCA - PONGOÑA Y CHOSECANI – PAMPARQUI, LONG.=13.996 KM DEL DISTRITO DE YANAOCA-PROVINCIA CANAS”, se realizó la Gestión del Alcance de este proyecto realizando el Plan para la Gestión del Alcance, creado así el Proyect Charter, definiendo el Enunciado del Alcance, el cual tiene los alineamiento del proyecto, el desarrollo de la propuesta, el contexto del proyecto, para la Gestión del Alcance también se realizó la creación del EDT y su Diccionario del EDT, los cuales llevan las descripciones de los trabajos, referencias técnicas, requisitos y criterios de aceptación, los hitos, realizando su control y validación mediante las valorizaciones, informes mensuales, los cuales son medidos en base al contrato de obra contractual y a los precios unitarios realizados por la empresa con la cual se adquiere el costo real de la obra; teniendo como resultado una eficiente Gestión, reflejándose así en el desempeño del proyecto , terminando el proyecto en el plazo previsto sin observaciones al momento de suscribir el Acta de entrega de Obra, el cumplimiento del Alcance fue al 100%, teniendo una utilidad del 28.63% sobre el presupuesto de obra, dicha tesis busca ser una propuesta guía de la aplicación de los lineamientos del PMBOK para la gerencia de los proyectos de la empresa en la ejecución de sus proyectos garantizando así el éxito de estos y la satisfacción de todos los involucrados en ello. Demostrando así, que, un proyecto ejecutado por una microempresa tiene otros resultados, ejecutándolo de forma tradicional que ejecutándolo con una metodología de gestión que se aplique en orden, con los lineamientos y procesos propuestos por la Guía del PMBOK en el área de conocimientos de la Gestión del Alcance. / This thesis seeks to implement a management system focused on the guidelines of the PMBOK 5th edition in the area of knowledge of the Project Scope Management, which allows the microenterprise AYH INGENIEROS SCRL to improve its efficiency in the execution of its projects, given that the world of construction is changing, innovating and the microenterprises in the construction sector do not carry out a management based on an integration of procedures, from the conception to the closing of the project, it is worth noting that micro-companies use the processes of project management in estimates of resources, in estimating duration, determining the budget, controlling the schedule according to its valuations or term of the contract, managing the interested parties, but it is not done from an organized and logical approach and scheme, but rather, scattered activities and punctual in each project, thus having at the end of projects lost in their utilities and / or pro Unfinished projects, resolved contracts; for these reasons, the importance of the application of PMBOK in the management of the projects so that it makes compatible and adopts the good practices of other organizations with which a common framework for the following projects of the company is developed. Finally it should be noted that the present thesis was developed in a case study, in the execution of the work "Periodic Maintenance of the Neighborhood Road: SECTION: YANAOCA - PONGOÑA AND CHOSECANI - PAMPARQUI, LONG. = 13.996 KM OF THE YANAOCA-CANAS PROVINCE DISTRICT" , the Scope Management of this project was carried out making the Plan for the Management of the Scope, thus creating the Charter Project, defining the Scope Statement, which has the alignment of the project, the development of the proposal, the context of the project, for the Management of the Scope, the creation of the EDT and its EDT Dictionary were also created, which contain the descriptions of the works, technical references, requirements and acceptance criteria, the milestones, carrying out their control and validation through the appraisals, monthly reports , which are measured based on the contract of contract work and unit prices made by the company with which the cost is acquired real of the work; resulting in efficient management, thus reflecting the performance of the project, finishing the project within the deadline without observations at the time of signing the Act of delivery of work, compliance with the scope was 100%, having a utility of 28.63% on the work budget, this thesis seeks to be a guiding proposal for the application of the PMBOK guidelines for the management of the company's projects in the execution of their projects, this guaranteeing the success of these and the satisfaction of all those involved in the project. Demonstrating that, a project executed by a microenterprise has other results, executing it in a traditional way than executing it with a management methodology that is applied in order, with the guidelines and processes proposed by the PMBOK Guide in the knowledge area of the Scope Management / Tesis
183

Análisis y diseño de edificios de concreto armado considerando la rigidez efectiva de sus elementos estructurales

Sánchez Escudero, Victor Escudero, Vargas Sánchez, Romel Manuel 27 November 2018 (has links)
El objetivo de esta investigación es determinar en qué medida influye la consideración de la degradación de la rigidez causada por el agrietamiento cuando se realiza el análisis sísmico de edificaciones de Lima. Para ello, se definieron dos estructuras ficticias que reúnen características geométricas de edificios existentes en esta ciudad. Se modelaron las estructuras considerando la rigidez bajo 4 enfoques: Factores de reducción mostrados en ACI 318-14, ASCE 41-13, rigidez dependiente del refuerzo y secciones no agrietadas. Se analizaron estas edificaciones mediante los análisis estático y dinámico lineal descritos en la norma nacional E.030-2016. Los edificios fueron diseñados para todos los 8 casos de acuerdo a la norma nacional E.060-2009. Finalmente, se realizó el análisis estático no lineal definido por la norma ASCE 41-13 a los edificios con diseño resultantes de los análisis con secciones sin agrietar y secciones agrietadas considerando el refuerzo. Como resultado, las derivas incrementaron en hasta 95%, la fuerza cortante basal incrementó hasta un 40%, los periodos de vibración incrementaron hasta un 75%, entre otros. Se concluye que considerar la reducción de rigidez provocó la variación del diseño de vigas, lo que deriva en el encarecimiento de la construcción. Asimismo, se revela que no considerar la reducción genera subestimación del valor de junta sísmica requerida. / The aim of this research is to determine to what extent affects the consideration of the relationship of stiffness loss due to cracking when performing the seismic analysis of buildings in Lima. For this purpose, two fictitious structures were defined that meet the geometric characteristics of existing buildings in this city. The structures were modelled considering the stiffness under 4 approaches: Stiffness reduction factors shown in ACI 318-14, ASCE 41-13, rebar dependant stiffness and uncracked sections. These buildings were analysed through the linear static and dynamic analysis described in the national standard E.030-2016. These buildings were designed for all 8 cases according to the national standard E.060-2009. Finally, a nonlinear static analysis defined by the standard ASCE 41-13 was performed on the buildings with the designs resulting of the analysis with uncracked sections and cracked sections considering the rebar. As a result, the drifts increased by up to 95%, the basal shear force increased by up to 40%, the vibration periods increased by up to 75%, among others. It is concluded that considering the reduction of stiffness caused variation in the design of beams, therefore the increase of the construction cost. Likewise, it is revealed that not considering the reduction generates underestimation of the required seismic joint. / Tesis
184

Análisis de flujo de saturación real en la intersección de Av. Primavera con Av. Encalada en la ciudad de Lima

Torres Senmache, Abraham David, Alvarado De La Cruz, Ricardo Jesús 19 February 2018 (has links)
Analyze the real saturation flow and the proposal for the saturation flow closest to the baseline of the intersection, Av. Primavera with Av. Encalada in the city of Lima. The saturation flow analysis can be done through recommendations of the Highway Capacity Manual 2010. / Tesis
185

Propuesta de guía constructiva para la construcción de defensas ribereñas utilizando el sistema de muro enrocado en la planta de CPPQ S.A. en Naña

Alvites Barragán, Jaime Daniel, Parco Huaringa, David Alejandro 01 August 2018 (has links)
El presente trabajo de tesis muestra el procedimiento constructivo del tipo de defensa ribereña de muro enrocado. El empleo de este tipo de estructuras ayuda a prevenir problemas naturales como erosión, socavación e inundación, originados ante la crecida del río. También sirven como estructura de protección ante la ocurrencia de huaicos generadas también por las constantes lluvias. En nuestro país, la aplicación de estos sistemas ha ido en aumento; sin embargo, sigue siendo una interrogante un adecuado proceso constructivo. Se realiza una breve descripción de la problemática generada en la planta de la empresa Corporación Peruana de Productos Químicos SA (CPPQ) ubicada en el margen izquierdo del río Rímac, altura del kilómetro 18 de la Carretera Central, en la localidad de Ñaña, distrito Chaclacayo. En la cual, se presentaron problemas de inundación, derrumbe de muros perimetrales, socavación de ambientes internos y filtraciones que afectaron cimientos de estructuras. La finalidad de esta tesis es definir el proceso constructivo del muro enrocado, indicando la cantidad de recursos utilizados y las diferentes alternativas que puedan considerarse para cada partida. Esta guía de procesos constructivos será de mucha utilidad en caso se realicen proyectos de este tipo. / The present thesis shows the constructive procedure of the riparian defense type, rock wall. The use of this structure helps to prevent natural problems such as erosion, scour and flood, caused by the flooding of river. They also serve as a protection structure in the event of the occurrence of waste generated by the constant rains. In our country, the application of these systems has been increasing; however, an adequate constructive process remains a question. It is made a brief description of the problems generated in the plant of the company Corporación Peruana de Productos Químicos SA (CPPQ) located on the left bank of the Rímac River, at kilometer 18 of the Carretera Central, in the town of Ñaña, Chaclacayo district. In which, there were problems of flooding, collapse of perimeter walls, undermining of internal environments and leaks that affected the foundations of structures. The purpose of this thesis is to define the constructive process of rock wall, indicating the amount of resources used and the different alternatives that can be considered for each project. This construction process guide will be very useful in case projects of this type are carried out. / Tesis
186

Estudio y evaluación del agua tratada proveniente de las plantas de tratamiento de Surco y San Borja para la elaboración de concreto en Lima metropolitana. Concreto hidráulico / “Study and evaluation of treated water from Surco and San Borja treatment plants for the preparation of concrete in metropolitan lima. Hydraulic concrete”

Chumpitaz Diaz, Luis Mauricio, Morales Hilario, Robert Alonso 29 January 2019 (has links)
Esta investigación está orientada principalmente a brindar opciones sustentables y medio ambientales en la elaboración del concreto. Para ello esta investigación propone que se elabore concreto convencional simple con agua tratada proveniente de plantas de tratamiento con tecnologías Físico – Químicas, Físico – Químico – Biológicas de primer y segundo grado, ubicadas en los distritos de San Borja y Santiago de Surco, en el primer capítulo se presentará la problemática y la hipótesis, definimos los objetivos, en el segundo capítulo se contará con un análisis de todos los conceptos básicos que servirán para entender qué tipo de tratamiento recibe el agua residual, y su influencia en el concreto, en el capítulo tres haremos un pequeño estudio del impacto ambiental para dar a conocer su importancia en términos sostenibles, en el capítulo cuatro se presentará las normativas que usaremos para la elaboración de las probetas de concreto, en el capítulo cinco se realizarán análisis a los materiales que emplearemos, después se elaborarán las probetas de concreto para evaluar su estado en fresco y endurecido, en el capítulo final presentaremos un análisis económico financiero. Finalmente queremos verificar con esta tesis que el concreto elaborado con agua tratada proveniente de plantas de tratamiento de aguas residuales en los distritos de Surco y San Borja, sea una alternativa para el agua potable en la elaboración de concreto y de este modo brinde una opción sustentable, medio ambiental con una calidad similar a la de un concreto convencional bajo las normativas NTP, ACI, ASTM. / This research is mainly oriented to provide sustainable and environmental options in the manufacture of concrete. To this end, this research proposes that simple conventional concrete be elaborated with treated water coming from treatment plants with Physical - Chemical, Physical - Chemical - Biological technologies of first and second degree, located in the districts of San Borja and Santiago de Surco, in the first chapter the problem and the hypothesis will be presented, we define the objectives, in the second chapter we will have an analysis of all the basic concepts that will serve to understand what type of treatment the wastewater receives, and its influence in the concrete, in the chapter three we will make a small environmental impact study to publicize its importance in sustainable terms, chapter four will present the regulations that we will use for the preparation of concrete specimens, in chapter five we will analyze the materials that we will use , then the concrete specimens will be prepared to evaluate their condition in fres co and hardened, in the final chapter we will present a financial economic analysis, finally we want to verify with this thesis that the concrete made with treated water coming from wastewater treatment plants in the districts of Surco and San Borja, is an alternative for water potable in the concrete production and thus provide a sustainable option, environmental with quality similar to that of a conventional concrete under the regulations NTP, ACI, ASTM. / Tesis
187

Propuesta de mejora en el nivel de servicio peatonal para la intersección de la av. Angamos con la av. Tomás Marsano ubicado en el distrito de Surquillo-Lima

Daga Guillén, Karen 29 November 2018 (has links)
En la actualidad, la cantidad de autos y peatones que transitan en las principales avenidas de Lima sobrepasa las capacidades iniciales por las que fueron diseñadas. En el caso de los peatones, estos circulan en espacios reducidos y emplean más tiempo de lo usual. Por ello, se eligió la intersección Av. Angamos con Av. Tomás Marsano, ya que según la Policía Nacional de Tránsito (2014), esta intersección se encuentra dentro de los principales puntos críticos del distrito de Surquillo. Mediante observaciones in situ, también se percibió un mal diseño geométrico por lo que los peatones transitaban corriendo, en espacios reducidos y empleaban varios minutos al cruzar una calzada. Es así que se realizaron los aforos pertinentes para determinar la cantidad actual de peatones que transitan por estas avenidas, luego se emplearon 3 métodos para hallar el nivel de servicio peatonal según el HCM 2010, el Nivel de Servicio Multimodal del NCHRP 616 y la Evaluación de Cruces del NCHRP 562. Con ello, se obtuvieron los niveles de servicio se compararon y se identificaron las posibles propuestas de mejora. Debido a que efectivamente el nivel de servicio no era el óptimo, se propuso rediseñar geométricamente la intersección con ampliaciones de bermas, veredas, entre otros. Finalmente, se validaron los niveles de servicio con las propuestas de mejora, y el nivel de servicio salió óptimo. Actually, the number of cars and pedestrians that are passing on the main avenues of Lima exceed the initial capacity for which they were designed. In the case of pedestrians, they are circulating in small spaces and are spending more time than usual. Therefore, the Ave. Angamos was elected intersection with Ave. Tomas Marsano by the Traffic National Police of Peru (2014), this intersection is located in the main critical points of Surquillo. By in situ observations, also it is looked a bad geometric design so pedestrians transited running in small spaces and employed several minutes to cross a road. So that relevant traffic counts were performed to determine the current number of pedestrians passing through these avenues, then 3 methods are used to find the level of pedestrian service by the HCM 2010, the level of Multimodal Service by the NCHRP 616 and Appraise of crosses by the NCHRP562. As a result, service levels obtained were compared and possible proposals for improvement were identified. Because effectively the level of service was not optimal, it was proposed to redesign the intersection geometrically as extensions of berms, sidewalks, among others. Finally, service levels were validated with proposals for improvement, and the level of service was optimum. / Tesis
188

Análisis del uso de la tecnología BIM en la construcción de la Central Hidroeléctrica Carhuac, generación de modelos y gestión de la información / Analysis of the used of BIM technology in the construction of the Carhuac Hydroelectric Power Plant, model generation and information management

Ricalde Lizarzaburu, Renzo Nicola 06 1900 (has links)
Esta investigación surge como una necesidad de adaptación a los estándares globales de gestión de proyectos, así como la necesidad continua de mejorar los estándares haciendo que los procesos constructivos sean más eficientes, colaborativos e interdisciplinarios. El objetivo principal de este proyecto de tesina es mostrar la viabilidad uso de la Tecnología BIM en la construcción de centrales, generación de modelos y gestión de la información con el fin de implementar la tecnología a partir de una metodología sencilla y fácil de aplicar. Para sustentar la investigación se ha realizado el levantamiento de la información aplicando la tecnología BIM. De esta manera hemos llegado a realizar un análisis cualitativo del uso de la tecnología, identificando problemas, conflictos e interferencias, de la misma manera el nivel impacto de cada problema, el área donde sucedieron la mayoría de problemas, probabilidad de ocurrencia. Posteriormente se determinó los problemas que generaron mayor impacto con las de mayor probabilidad de ocurrencia generando mayor riesgo. El análisis cuantitativo de la información muestra los problemas dados la ubicación geografía, extensión del área de trabajo, distribución de sus componentes y complejidad de la central hidroeléctrica. El análisis del beneficio de la tecnología BIM no será materia de análisis e investigación. Por otro lado, con el desarrollo de la investigación queremos promover el interés de otras investigaciones con el fin que se defina la plataforma que permitan cambiar el paradigma con respecto a métodos actuales y den paso a sistemas de gestión más colaborativos, tecnología BIM. / This research project arises as a need to adapt to global project management standards, as well as the continuous need to improve standards by making constructive processes more efficient, collaborative and interdisciplinary. The main objective of this thesis project is to show the feasibility of using BIM Technology in the construction of power plants, model generation and information management in order to implement the technology based on a simple and easy to apply methodology. To support the research, the information was collected by applying BIM technology, generating the models and managing the information applied to the works and / or components of the Carhuac hydroelectric power plant. In this way we have made a qualitative analysis of the use of technology, identifying problems, conflicts and interference, in the same way the level of impact of each problem, the area where most problems occurred, probability of occurrence. Subsequently, the problems that generated the greatest impact with those with the highest probability of occurrence were determined, generating greater risk. The quantitative analysis of the information shows the problems given the geographical location, extension of the work area, distribution of its components and complexity of the hydroelectric power plant. On the other hand, with the development of this research we want to promote the interest of other researches in order to define the platform that allows to change the paradigm with respect to current methods and give way to more collaborative management systems, BIM technology. / Tesis
189

Comportamiento de materiales granulares gruesos. Efecto de la succión

Ortega Iturralde, Enrique Francisco 08 July 2008 (has links)
Las grandes deformaciones de colapso y deferidas en el tiempo originadas por el humedecimiento parcial o total de la roca están íntimamente relacionadas con el fenómeno de rotura de partículas. La humedad inicial del material es el factor que más influye sobre la deformación de colapso por inundación.Esta tesis estudia y caracteriza el comportamiento de un material de granular calizo, de alta resistencia, baja porosidad en condiciones triaxiales y edómetricas. Se determina la influencia de diferentes factores que afectan la compresibilidad y la resistencia al corte del material granular como: granulometría, densidad, velocidad de deformación de corte, trayectorias de tensiones y ciclos de tensión desviadora. Los resultados experimentales edométricos muestran la influencia de la succión en la compresibilidad de un material a humedades relativas de HR100%, HR50%, HR40% y HR10%; así como en las deformaciones de colapso obtenidas mediante humedecimiento mediante vapor de agua o por inundación de la probeta. Los resultados experimentales triaxiales muestran la influencia de la succión en la resistencia al corte en las trayectorias de tensiones desarrollas a HR100%, HR50%, y HR10%. El ángulo de fricción interna del material depende de la tensión de confinamiento y de la succión aplicada en las probetas. La dilatancia es sensiblemente afectada por la succión aplicada. Debido a los altos índices medidos al final de los ensayos no fue encontrado un estado crítico estable. Los vectores de los incrementos de deformación plástica muestran un flujo plástico no asociado del material. Las velocidades de las deformaciones de corte tienen particular influencia en la resistencia y la compresibilidad de los materiales granulares a bajas y altas tensiones de confinamiento.Se encontró que la superficie de fluencia para la etapa no saturada (HR50%) tiene una homotética de menor dimensión en HR100%. Su forma es similar a una elipse rotada con respecto a las trayectorias de cargas. La forma depende de la proporcionalidad de la historia de las trayectorias de cargas. El proceso de compactación induce anisotropía en la dirección vertical.La compresibilidad y la resistencia al corte del material calizo dependen de la uniformidad de las partículas, su densidad, el nivel de tensiones aplicados y principalmente de los cambios de succión en los poros de las partículas. La compresibilidad del material es mayor conforme se incrementa los tamaños de las partículas en las granulometrías. Las líneas de compresión virgen para las granulometrías ensayadas dependen de los tamaños de las partículas y de la succión total aplicada. La resistencia al corte esta afectada por la uniformidad de las partículas, la densidad y los cambios de succión. La tensión desviadora disminuye con el incremento del tamaño de las partículas y aumenta con la disminución del tamaño de las partículas para las condiciones no saturadas y saturadas. La dilatancia se ve fuertemente reducida por la uniformidad en las partículas y la succión. Analizando los vectores de los incrementos de deformación plástica el material muestra un comportamiento de flujo plástico no asociado. La rotura de partículas está fuertemente afectado por el nivel de tensiones aplicado, la densidad de las probetas, la uniformidad de las partículas y los cambios de succión.El módulo de resiliencia se incrementa con la tensión de confinamiento, las tensiones desviadoras y la succión aplicada. Al saturar las muestras existe una disminución del módulo de resiliencia debido a la reducción de la succión.Los resultados triaxiales desarrollados para granulometrías uniformes y no uniformes se simularon con el modelo constitutivo de escolleras, el cual tiene en cuenta el análisis acoplado de flujo y deformación. La succión es una variable fundamental que explica el comportamiento tensión-deformación de los materiales granulares.La dilatancia desarrollada en el material estuvo activa hasta el final de los ensayos. Las condiciones del estado crítico no pudieron ser encontradas. El análisis de la dilatancia como una función de las relaciones de tensiones actuales y las relaciones de tensiones límite no es apropiada para describir el comportamiento de los agregados ensayados.El trabajo plástico de entrada describe las medidas de dilatancia para el rango de la relación de tensiones y las presiones de confinamiento aplicadas. El trabajo plástico explica la cantidad de rotura de los contactos y partículas. La dilatancia es descrita mediante una variable que combina la relación de tensiones, el trabajo plástico y las tensiones medias. / The long collapse strains and time-dependent strains caused by the partial or total wetting of rocks are in front relationship with the particles breakage phenomenon. The initial humidity of material is the main factor on the collapse strain by flooding.This thesis study and characterizes the behaviour of limestone gravel with high resistance, low porosity under triaxial and oedometer conditions. The main topics of analysis are the determination of the influence of different factors which affect the compressibility and the shear strength of the granular material like: grain size distribution, density, rate of shear strain velocity, stress path and stress deviatory cycles.The oedometer experimental results show the suction influence in the compressibility of the material at different values of relative humidity (RH 100%, RH50%, RH40% and RH10%); as well as the influence on the collapse deformations obtained by water vapour wetting or by flooding of the sample. The triaxial experimental results show the suction influence on the strength shear in the stress paths developed to RH100%, RH50% and RH10%. The material internal friction angle depends on the confining stress and the suction applied to the samples. The dilation is affected in a sensible manner by the suction applied. Due to the high rates of dilation measured at the end of the tests, the critical steady state was not reached. The increment plastic vectors show no associate plastic flow on the material. The rate of shear strain velocity has particular influence on the compressibility and strength of the granular materials under low and high confining stress.It was found that the yielding surface on unsaturated conditions (RH50%) have a homothetic smaller yielding surface at RH100%. Its form is similar to a rotated ellipse with respect to the loading paths. Also its form depends of the proportionality of the loading history paths. The compaction process induces anisotropy in the vertical direction.The compressibility and shear strength of the limestone material depends of the particle uniformity, density, stress level and mainly of the suction changes in the voids of the particles. The compressibility of the material increase when the size of the particles increases for the whole range of grading curves. The virgin compression lines for the grading curves tested depend of the sizes of the particles and the total suction applied.The shear strength is affected by the uniformity of the particles and suction changes.The deviatoric stress reduces with the increment of the size particles and increase with the reduction of particle size on unsaturated and saturated conditions. The dilation is strongly affected (reduction) by the uniformity of the particles and suction. From the increment of plastic deformation vectors analysis, it was observed that the material shows a no associated flow. The particle breakage is strongly affected by the stress level, sample density, particle uniformity and suction changes. The resilient modulus increase with the confining stress, deviatoric stress and the applied suction. When the material is wetted there is a reduction of the resilient modulus due to the suction reduction.Triaxial results tests for uniform and no uniform grading curves were simulated by Rockfill model implemented in Code_Bright. This model has into account the coupled analysis of flow and strains. The suction is a fundamental variable which explains the - stress-strain behaviour of the granular materials. The dilation experienced by the materials was active until the end of the tests. The critical state conditions were not reached. The dilation analysis as a function of the current stress level and the limit stress is not correct for describing the behaviour of the tested materials. The introduced plastic work describes the dilation measurements for the range between the stress ratio and the confining stress applied. The plastic work explains the quantity of contacts and particles breakage. The dilation is described through a variable which combines the stress ratio, the plastic work and the intermediate stress.
190

Creación de superficies con curvas de nivel

Garfias, Xavier 28 June 2006 (has links)
Creación de superficie utilizando curvas de nivel en Autodesk Civil 3D 2006.

Page generated in 0.0592 seconds