• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 336
  • 1
  • Tagged with
  • 337
  • 337
  • 134
  • 97
  • 87
  • 75
  • 69
  • 62
  • 60
  • 57
  • 46
  • 41
  • 39
  • 38
  • 38
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
241

Análisis de riesgo cualitativo de un proyecto de construcción. Aplicativo en una tienda de conveniencia “Listo!” – Primax María Luisa Ospino Ibarra

Sabogal Valdez, Javier Eduardo, Ospino Ibarra, María Luisa 2013 March 1919 (has links)
Es común en nuestro medio que las empresas constructoras no tengan un adecuado manejo de los riesgos que afectan sus obras. Las incompatibilidades en los planos, la falta de constructabilidad, el uso de tecnologías nuevas, la falta de seguridad en obra, la ausencia de una adecuada logística de materiales y la falta de comunicación y coordinación entre los involucrados son algunas causas de riesgo que amenazan el logro de los objetivos de todo proyecto: satisfacer los criterios de valor del cliente y usuarios, que normalmente son el costo, plazo y calidad. Pese a todo ello, no es común ver que se aplique un proceso formal del Análisis de Riesgos en las organizaciones. Revertir esta situación es el objetivo primordial a cumplir de mediano a largo plazo en nuestro país para que los proyectos sean más rentables, para que se aprovechen mejor los recursos y se aumente la probabilidad de éxito de los mismos. Este trabajo pretende evidenciar la importancia de definir y establecer la Gestión de Riesgos como un sistema estratégico de técnicas y herramientas útiles para la Gestión de Proyectos, con el objetivo final de asegurar los criterios de valor antes mencionados, tanto del cliente como de la misma organización. El proceso del Análisis de Riesgos comienza por la identificación de riesgos, seguida por el análisis de riesgos, que puede ser cualitativa o cuantitativa. Posteriormente, una vez definidas la probabilidad y el impacto, se procede a evidenciar la respuesta a los riesgos. Finalmente, lo obtenido en la respuesta a los riesgos debe ser parte de las lecciones aprendidas y servir como un proceso de retroalimentación para la organización. / Tesis
242

Propuesta alternativa para la distribución racional del presupuesto anual municipal para el mantenimiento y rehabilitación de pavimentos (aplicación: Municipio de La Molina)

Llosa Grau, Joaquín 2013 March 1919 (has links)
El mantener las pistas pavimentadas en un estado adecuado de servicio es cada vez un problema serio e inevitable para los municipios; en ellos se observa la ausencia de un sistema de gestión vial. No se conoce en detalle un inventarío de la infraestructura disponible y los proyectos de inversiones a realizar. Esto ha motivado el desarrollo de una serie de procedimientos de evaluación, gestión y rehabilitación de pavimentos que permitan un desarrollo técnico y económico integrado para el municipio. El presente trabajo tiene por objeto desarrollar la evaluación superficial de los pavimentos flexibles en el municipio de La Molina, sugiriendo una metodología racional que permita evaluar las vías periódicamente y de esta manera estructurar un plan de desarrollo técnico y económico para su rehabilitación o mantenimiento. / Tesis
243

Evaluación y reforzamiento de dos edificios contiguos construidos en la década del 60 en el centro de Lima

Vega Pereda, Carlos Enrique 2013 March 1919 (has links)
En la actualidad, existen diversos edificios ubicados en el centro de Lima, con una antigüedad mayor a los 50 años aproximadamente. Varios de estos edificios están siendo remodelados para los proyectos del programa MI VIVIENDA. Sin embargo, en la mayoría de los casos no se está realizando un análisis que permita verificar si la estructura cumple con las normas actuales y si necesita ser reforzado. El tema de tesis que se desarrollará consiste en la evaluación y reforzamiento de dos edificios contiguos de 11 pisos construidos en la década del 60 en el centro de Lima; utilizando solo los planos de arquitectura, el cual contiene el levantamiento de las dimensiones estructurales. Se utilizarán los planos de Arquitectura pues al igual que la mayoría de edificaciones del centro de Lima, no se cuenta con los planos estructurales en la Municipalidad. Se utilizará planos de proyectos similares de la época, para evaluar el desarrollo de los proyectos en ese tiempo y deducir el tipo de refuerzo con el que cuenta la estructura que analizaremos. Posteriormente, se plantearán distintas alternativas de reforzamiento haciendo uso de elementos nuevos de concreto como la inclusión de placas, ensanchamiento de los elementos estructurales como vigas y columnas, elementos nuevos de acero como arriostres, así como el reforzamiento con fibra de carbono con mayor énfasis en el cortante de las vigas. Para el análisis de las distintas alternativas se utilizará el software ETABS8 Nonlinear el cual nos ayudará a determinar las ventajas y desventajas de las alternativas propuestas así como el cumplimiento de lo exigido por la norma sismorresistente en cuanto al análisis estático, análisis dinámico, los desplazamientos laterales de entrepisos, cálculo de la junta, etc. Una vez evaluadas las distintas alternativas se procederá a diseñar la más adecuada desde el punto de vista económico, su funcionalidad y seguridad, cumpliendo con todos los parámetros exigidos en la Norma de concreto armado y la Norma de diseño y sismorresistente. Por último, en función a los resultados de la investigación se concluirá en el desarrollo de una propuesta de guía metodológica para las edificaciones construi / Tesis
244

Propuestas correctivas de seguridad vial en uno de los puntos negros del distrito de San Borja

Cantorin Iturriaga, Edgardo Josue, Barrena Sierra, Leonardo 28 February 2018 (has links)
Explicar los factores que estén implicados en los accidentes del tránsito, así como las metodologías de análisis actuales que son utilizadas en seguridad vial. Además, se detallarán las herramientas que se utilizarán, como por ejemplo los diagramas de conflicto, los cuales grafican todas las maniobras y conflictos posibles de los usuarios de la vía; las listas de chequeo, las cuales consisten en una serie de preguntas que permiten valorar el lugar de estudio con posibles factores encontrados anteriormente en otros lugares y las encuestas del lugar, las cuales complementan la información obtenida anteriormente. / Explain the factors that are involved in traffic accidents, as well as the current analysis methodologies that are used in road safety. In addition, the tools that will be used will be detailed, such as the conflict diagrams, which plot all the maneuvers and possible conflicts of the users of the road; the checklists, which consist of a series of questions that allow to assess the place of study with possible factors found previously in other places and the surveys of the place, which complement the information obtained previously.
245

Reconstrucción del equivalente en agua de la cobertura nival en la cuenca alta del río Aconcagua. Empleo de imágenes Modis

Martínez Ponce, Nivaldo Fabián January 2010 (has links)
La escorrentía generada por el derretimiento de nieves constituye una de las principales fuentes de agua para sus diferentes usos. Es por eso que en Chile, la hidrología de nieves constituye un área de investigación que se encuentra en constante crecimiento. El principal objetivo de esta investigación es reconstruir el equivalente en agua en la cuenca alta del río Aconcagua para dos ciclos de deshielo (septiembre 2007-febrero 2008 y septiembre 2008-febrero 2009). Para ello, se implementó un modelo distribuido de base física en la cuenca de estudio. Dicho modelo, con el apoyo de la información adicional del tipo meteorológica, permitió reconstruir el equivalente en agua a escala temporal diaria y a una resolución espacial de 500 m. Como objetivos secundarios, se aplicó el modelo en una cuenca vecina para así establecer comparaciones en las variables predominantes del modelo, además de determinar la respuesta de escorrentía de deshielo asociada a la reconstrucción del equivalente en agua. Los resultados indican que la metodología utilizada es apropiada para la reconstrucción espacial y temporal del equivalente en agua. Por otra parte, se obtuvo una adecuada modelación en una cuenca vecina; determinándose de que existe una importante influencia de la orientación de la cuenca (norte-sur o este-oeste) en el balance radiativo del manto nival. De los resultados obtenidos, se lograron establecer 3 principales conclusiones: (i) se estimó que el 32% del volumen de agua potencialmente disponible para el derretimiento no se refleja necesariamente como escorrentía superficial de deshielo; (ii) la pérdida de información debido a la cobertura nubosa sobre la cuenca puede alcanzar el 12%, por lo que se debe idear una metodología adecuada que sea capaz de reemplazar tal información; y (iii) el balance radiativo es una de las variables más importantes en la modelación por lo que debe existir una estimación adecuada para la modelación. Finalmente, la dinámica de la serie de procesos que ocurren continuamente sobre el manto nival generalmente se caracteriza por ser de difícil parametrización por lo que la modelación obtenida se considera una adecuada aproximación, y se cuentan con grandes expectativas para cuando efectivamente sea validado.
246

Propuesta de mejora para la gestión de procura de materiales en las etapas de planificación, ejecución, seguimiento y control y cierre en proyectos de edificación de Lima Metropolitana

Chávez Chacaliaza, José Daniel, Cavero Barreto, Renzo David 01 August 2017 (has links)
Propuesta para mejorar la Gestión de la Procura de Materiales, en las etapas de Planificación, Ejecución, Seguimiento y Control y Cierre, enfocada a proyectos de edificación del tipo residencial, institucional, comercial e industrial. En la actualidad, la procura de materiales es un tema descuidado, lo cual genera mayores costos y retrasos en las obras; por lo que, se plantearán procedimientos, técnicas y herramientas, estos serán de mucha utilidad a las empresas constructoras. El objetivo es proponer procedimientos, técnicas y herramientas para mejorar la Gestión de la Procura de Materiales en las etapas de Planificación, Ejecución, Seguimiento y Control y Cierre enfocado a Proyectos de Edificación de Lima Metropolitana; definir procura en la construcción, los tipos de materiales, el enfoque de Project Management Institute, Lean Construction, Teoría de Decisiones, Gestión de Inventarios y Gestión de Materiales, el nicho de empresas a investigar. Formular un documento auditoría de gestión de procura de materiales. Realizar auditorías a dos empresas constructoras y obtener un diagnóstico para determinar cómo se realiza la gestión de procura de materiales, definir los indicadores en base a los resultados de la auditoría. Plantear procedimiento, técnicas y herramientas para mejorar la gestión de procura de materiales en las empresas constructoras
247

Mejoramiento de la productividad en acero y encofrado de placas, mediante la aplicación de diseño de planta y líneas balance bajo un enfoque Lean para optimizar los costos y plazo del “Conjunto residencial Panoramic” – Lima

Mendoza Jesus, Katherine, Martinez Palacios, Jonathan Manuel 01 June 2017 (has links)
La presente tesis estará basada en la aplicación de herramientas de gestión para controlar la productividad del proyecto llamado “Conjunto Residencial Panoramic”, comprendido por 6 torres de 16 pisos, ubicado en la intersección de la Av. Costanera y la Calle Aviación en el distrito de San Miguel en la ciudad de Lima. En esta oportunidad dicha tesis estará sustentado bajo el enfoque de la Filosofía Lean Construction, utilizando algunas herramientas que propone el Institute Lean Construction. Se empezará analizando la obra en general mediante algunos datos brindados por la constructora AESA SAC para verificar y localizar el problema principal que existe. Una vez ubicado el problema, se tomarán y analizarán ratios de productividad de la torre “C” correspondiente al frente 1. Luego del análisis, se buscará mejorar el sistema, lo cual implica mejorar el proceso productivo, dividido por planta y trabajo. Por ello, mediante la herramienta de diseño de planta bajo un enfoque lean se mejorará, valga la redundancia, la planta permitiendo principalmente tener un flujo continuo y optimizando los espacios de trabajo; y con la herramienta de líneas de balance se optimizará el trabajo, midiendo los ritmos de las cuadrillas. Ambas herramientas serán aplicadas a la torre “B” del frente 3 por un periodo de 5 semanas. Finalmente, se compararán los índices de productividad obtenidos en ambas torres, y de esa manera, demostrar la importancia del compromiso del equipo de obra, y que desarrollando un diseño de planta eficiente y mediante un control adecuado con líneas de balance, se logra optimizar los costos, mostrando además el ahorro generado; y el plazo del proyecto, comparando los plazos de ejecución de las torres C y B. / The present thesis will be based on the application of management tools to control the productivity of the project called ""Conjunto Residencial Panoramic"", comprised of 6 towers of 16 floors, located at the intersection of Av. Costanera and Calle Aviación in the district of San Miguel in the city of Lima. On this occasion, this thesis will be based on the philosophy of Lean Construction, using some tools proposed by the Institute Lean Construction. It will begin analyzing the work in general through some data provided by the construction company AESA SAC to verify and locate the main problem that exists. Once the problem is located, productivity ratios of the ""C"" tower corresponding to the front will be taken and analyzed. After the analysis, the system will be improved, which implies improving the productive process, divided by plant and work. Therefore, using the plant design tool under a lean approach will improve, or redundancy, the plant allowing mainly to have a continuous flow and optimizing workspaces; And with the balance line tool will optimize the work, measuring the rhythms of the crews. Both tools will be applied to tower ""B"" front 3 for a period of 5 weeks. Finally, the productivity indexes obtained in both towers will be compared, thus demonstrating the importance of the work team commitment, and that by developing an efficient plant design and by appropriate control with balance lines, Costs, also showing the savings generated; And the term of the project, comparing the execution times of towers C and B.
248

Distribución óptima de los esfuerzos requeridos para la gestión de proyectos en el sector de la construcción en Lima

Nuñez Vicente, Victor Jesus, Vitteri Buchelli, Gabriela Ines 01 August 2017 (has links)
Para evitar desperdiciar recursos y aumentar la probabilidad de éxito de un proyecto se propone una herramienta que estructure los esfuerzos e incremente la eficiencia del equipo de profesionales y así evitar pérdidas como en la construcción del Westin, Fiscalía Villa María del Triunfo, etc. Para ello, se estudiaron conceptos vinculados a la gestión de proyectos, balance de carga laboral y metodologías de diseño de equipos de trabajo. Además, se realizó levantamiento de información con datos reales de obras de construcción en Lima Metropolitana. Con la información se procedió a un análisis detallado que permitió evaluar y relacionar el impacto que implica la ineficiencia en la realización de actividades de los procesos de gestión por parte del equipo de proyecto para el resultado final del mismo. Finalmente, se propuso una herramienta de auto-análisis para la distribución óptima de actividades de un equipo de proyectos de edificaciones. / Project-success and lack of efficiency during the management of processes in Lima is poorly assessed causing losses within the project and its development, such as the construction of the Westin, Villa Maria del Triunfo Prosecutor's Office, etc. So an adequate assignment and knowledge of responsibilities is conclusively proposed. For this, concepts related to project management, workload balance and work teams design methodologies were studied. Then, information was collected with real data of construction works in Metropolitan Lima. An analysis was required to evaluate and relate the impact that implies the inefficiency of management activities for the final result of the proyect. Finally, a self-analysis tool was proposed to restructure management activities and maximize project success.
249

Impacto vial por la construcción del Centro Comercial Open Plaza en la ciudad de Huancayo

Ramos Condori, Máximo 31 March 2016 (has links)
El presente trabajo de tesis titulado “IMPACTO VIAL POR LA CONSTRUCCIÓN DEL CENTRO COMERCIAL OPEN PLAZA EN LA CIUDAD DE HUANCAYO” consiste en determinar, analizar y dar solución al impacto vial que se va a generar con la inclusión del Centro Comercial Open Plaza Huancayo en la ciudad de Huancayo; esto se va a dar debido a la gran atracción de demanda vehicular, que genera la construcción. Las intersecciones que se van a estudiar en el proyecto son 4: Av. Ferrocarril con Av. San Carlos (X1), Av. Ferrocarril con Jr. Alejandro Deustua y con Av. Manchego Muñoz (X2), Jr. Alejandro Deustua con Jr. Santa Isabel (X3) y Jr. Amazonas con Prol. San Carlos (X4). Sin embargo, debido a que las intersecciones X3 y X4 no están directamente influenciados por el proyecto, en esta tesis, se analizará con detalle la X1 y X2. La tesis describe la situación actual de la investigación, su ubicación y accesibilidad, asimismo, como parte del trabajo de campo, se realizó un aforo de 9 horas por día durante 7 días de la misma semana para la intersección X1 por ser la principal intersección afectada por la construcción del Centro Comercial Open Plaza Huancayo, y para las demás intersecciones se realizó un aforo de 9 horas por tres días a la semana (lunes, viernes y sábado), esta medición se realizó durante el mes de setiembre del año 2015. Junto a ello, se hizo un levantamiento de campo para describir la geometría del lugar de estudio, enfocándose en dimensiones de vías, ciclos de semáforos, señalización, tipos de vehículos y el tipo de zona donde está ubicada el Centro Comercial Open Plaza Huancayo. Luego, se hace un análisis de la situación actual y futura del proyecto mediante la Metodología HCM 2000 y el programa Synchro 8.0. En primer lugar, se hizo una evaluación de la zona sin el proyecto para determinar el Nivel de Servicio (Level of Service-LOS), actual de la zona, donde se determinó una categoría “C” para X1 y “F” para X2. En segundo lugar, se hace una proyección a 10 años, sin proyecto, para medir el crecimiento y confort vehicular y resultó una categoría “F” para X1 y X2. En tercer lugar, y como uno de los objetivos de la tesis, se hace una proyección a 10 años con el Centro Comercial Open Plaza Huancayo funcionando al 100 %. Para ello, se usa la generación de viajes, mediante el “Trip Generation” del Institute of Transportation Engineers (ITE) se calculó el número de viajes que genera el Centro Comercial Open Plaza Huancayo. Asimismo, se realizó, cálculos en el programa Synchro 8.0 para cada una de las intersecciones en cada uno de los escenarios planteados X1, X2, X3 y X4. Finalmente, para X1 se propuso como solución principal la construcción de un by pass o paso a desnivel, y como solución secundaria es modificar plan de rutas de los vehículos que se dirigen al centro de Huancayo, dirigiéndolos por el ingreso del Jr. Santa Isabel y saliendo por el Jr. Amazonas, así darle más uso al puente Amazonas, así aliviar el flujo de descarga a la intersección. Con ello, se logró bajar el Nivel de Servicio de X1 de “F” a “C”. En X2 de la misma manera se propuso la construcción de un by pass, donde los vehículos provenientes del sur por la Av. Ferrocarril y del Este de la Av. Manchego, pasen en forma fluida por la nueva construcción al Jr. Trujillo para continuar su recorrido. Se logró mitigar a un Nivel de Servicio de “F” a “E”. Con las propuestas mencionadas para ambas intersecciones X1 y X2 se logra mejorar el confort vehicular del proyecto. / Tesis
250

Importancia en la selección de criterios de diseño en el desempeño de micropavimentos aplicado al proyecto vial Conococha – Recuay

Palomino Díaz, Michel Víctor, Rodríguez Balbín, Erika Fiorella 01 July 2017 (has links)
El Ministerio de Transportes y Comunicaciones para la fecha del 21 de mayo del 2015 suscribe el Contrato Complementario para el “Servicio de Gestión y Conservación Vial de la Carretera Emp.1N – Conococha – Huaraz – Caraz – Molinopampa – y Emp. 3N – Chiquián – Aquia – Emp. 3N”, cuya culminación será el día 22 de mayo del 2016. La carretera está dividida en cinco tramos, donde se verificó, que tanto superficial como estructuralmente, el pavimento a lo largo de todos los tramos presenta condiciones aceptables para la continuidad de la puesta en servicio por un periodo de un año más, en tanto a la evaluación funcional de acuerdo al índice de irregularidad medido y, por la alta frecuencia de vehículos desde Huaraz hacia Pativilca, se encuentra que los tramos Conococha-Huaraz, requieren una intervención con fines de mejorar la funcionalidad de la vía. El mejoramiento en la condición funcional en pavimentos ha ido desarrollándose de manera gradual, de manera que existen formas de mejorar eficientemente el desempeño del micropavimento y prolongar la vida útil del pavimento. Es por ello, que surge la siguiente pregunta: ¿Es importante la selección de criterios de diseño en el desempeño de micropavimentos aplicado al proyecto vial Conococha – Recuay? Ante esta situación, se propone una evaluación de criterios de diseño de micropavimentos, el método de la intersección de curvas y el de áreas equivalentes, donde se compare mediante los ensayos de desempeño y se compruebe cuál es el conveniente para desarrollar un mejor desempeño óptimo. Cabe resaltar que el éxito del micropavimento se garantiza cumpliendo los siguientes principios: materiales de alta calidad, diseño competente y procedimientos constructivos. La metodología empleada inicia con la toma de muestra en campo perteneciente a la cantera Acaray, para luego proceder a la caracterización de agregados, donde se realizarán los siguientes ensayos: granulometría, equivalente de arena, azul de metileno y peso unitario. Posteriormente, se inician las pruebas de laboratorio para el diseño de mezcla de micropavimento. Se utiliza la metodología de las Áreas Superficiales para obtener un porcentaje teórico emulsión y en base a este resultado se inicia con la iteración de encontrar las cantidades necesarias de cada componente del micropavimento y realizar las siguientes pruebas: tiempo de mezclado, cohesión, abrasión en húmedo y rueda cargada. Con los resultados obtenidos se procede a graficar las curvas por ambas versiones de diseño para obtener el porcentaje de contenido óptimo de asfalto, con este resultado se realizarán la comparación mediante las pruebas de desempeño (abrasión en húmedo y rueda cargada), verificando así cuál es la que presenta un mejor resultado; como paso final se realiza la prueba diferencial con la que se verificará la compatibilidad de los componentes, el Schulze Breuer and Ruck. Una vez comprobada esta prueba se finaliza con el diseño. Finalmente, a través de la comparación de los resultados se puede comprobar que para este caso, el mejor criterio es el de las áreas equivalentes, pues permitirá una mayor durabilidad, evitar problemas de exudación, una superficie más resistente al desgaste, antiderrapante, impermeable, además que se logró mantener el IRI por debajo de 2.5 m/km como aporte adicional. / The Ministry of Transport and Communications on May 21th, 2015 approved the Supplemental Indenture to the "Management and Conservation Service Road off Highway Emp.1N - Conococha - Huaraz - Caraz - Molinopampa - and Emp. 3N - Chiquián - Aquia - Emp. 3N ", that will culminate on May 22 th, 2016. The road divided into five sections, where it verified that both superficially and structurally, the pavement along all sections presents acceptable conditions for the continuity of commissioning for a period of one year, while the functional evaluation according to the Index measured irregularity and the high frequency of vehicles from Huaraz to Pativilca, is that Conococha-Huaraz, sections require intervention purposes of improving pathway functionality. The improvement in functional status in pavements has been developing gradually, so that there are ways to improve efficiently the microsurfacing performance and extend the life of the pavement. That is why the next question arises : Is it important the selection of design criteria in the performance of microsurfacing applied to the road project Conococha - Recuay ? In this situation, an assessment of design criteria microsurfacing, method of intersection of curves and equivalent areas where it is compared with performance tests and check which is suitable to develop a better optimal performance is proposed. Significantly, the success of microsurfacing are guaranteed to meet the following mains : high quality materials, competent design and construction procedures. The methodology stars with field sampling, belonging to the Acaray quarry, and then proceed to the characterization of aggregates, where the following tests were performed : Granulometry, Sand Equivalent Test, Methylene Blue Test and Unit Weight. Subsequently, laboratory tests stars for mix design microsurfacing. A theoretical percentage emulsion obtains by the Surface Area Method and based on this result it starts with the iteration to find the required amounts of each component of microsurfacing and perform the following tests : Mix time, Wet Cohesion, Wet-Track Abrasion Loss and Loaded wheel Test. With the results obtained proceeds to plot curves for both versions of design for the percentage of optimum asphalt content with this result comparison is made by performance tests (Wet-Track Abrasion Loss and Loaded wheel Test), verifying what the that presents a better result ; Finally, the differential test with which the compatibility of the components is verified, the Schulze Breuer and Ruck. Once checked this test is finished with design. Finally, the result of research by comparing the results, it can be seen that in this case the best criteria is equivalent areas, then it will allow greater durability, avoid the problems of exudation, a wear resistant surface, anti-slip, waterproof, the same way the IRI remained below 2.5 m/km as additional contribution.

Page generated in 0.054 seconds