• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 1069
  • 814
  • 559
  • 227
  • 227
  • 32
  • 30
  • 22
  • 14
  • 13
  • 10
  • 9
  • 6
  • 6
  • 5
  • Tagged with
  • 3277
  • 914
  • 802
  • 732
  • 685
  • 393
  • 359
  • 338
  • 308
  • 308
  • 307
  • 272
  • 264
  • 228
  • 215
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
411

Lean manufacturing : optimização da produção numa célula de estampagem na ColepCCL

Guimarães, Pedro Adriano Araújo January 2011 (has links)
Tese de mestrado integrado. Engenharia Mecânica. Universidade do Porto. Faculdade de Engenharia. 2011
412

Estudo do layout do armazém e organização do fluxo de materiais na General Electric

Dias, Fábio Barbosa Pereira January 2010 (has links)
Estágio realizado na General Electric e orientado pelo Eng.º João Gonçalves / Tese de mestrado integrado. Engenharia Industrial e Gestão. Faculdade de Engenharia. Universidade do Porto. 2010
413

Lean construction aplicado a barragens : estudo de caso

Fevereiro, João Tiago Martins January 2011 (has links)
Tese de mestrado integrado. Engenharia Civil (Construções). Universidade do Porto. Faculdade de Engenharia. 2011
414

Implementação de células de produção

Sousa, Samuel João Teixeira de January 2010 (has links)
Estágio realizado na XC Consultores e orientado pelo Eng.º António Cruz / Tese de mestrado integrado. Engenharia Mecânica. Faculdade de Engenharia. Universidade do Porto. 2010
415

Aplicação de ferramentas Lean num Centro de Operações Logísticas na Luís Simões Logística Integrada S.A.

Almeida, Maria Inês Rodrigues January 2012 (has links)
Trabalho realizado na Luís Simões Logística Integrada S.A., orientado pelo Dr. António Lacerda / Tese de mestrado integrado. Engenharia Industrial e Gestão. Faculdade de Engenharia. Universidade do Porto. 2012
416

Definição do modelo de planeamento de produção de uma empresa de construção civil

Oliveira, Daniel Filipe Monteiro de January 2010 (has links)
Tese de mestrado integrado. Engenharia Mecânica. Faculdade de Engenharia. Universidade do Porto. 2010
417

Total flow management : dimensionamento de supermercados na indústria

Pinto, Miguel Borges Feijóo January 2008 (has links)
Estágio realizado no Kaizen Institute Consulting Group e orientado pelo Eng.º Tiago Sanchez / Tese de mestrado integrado. Engenharia Industrial e Gestão. Faculdade de Engenharia. Universidade do Porto. 2008
418

Eficiência do sistema de produção

Gonçalves, Rui Miguel de Sousa January 2008 (has links)
Estágio realizado na Martifer Alumínios e orientado pelo Eng.º António Fernandes / Tese de mestrado integrado. Engenharia Mecânica. Faculdade de Engenharia. Universidade do Porto. 2008
419

Reducción de costos generados por no conformidades de costura mediante la implementación de herramientas Lean Manufacturing

Guerrero Mateo, Anelli Maria January 2016 (has links)
La presente investigación expone los resultados de la implementación de un Proyecto Lean Manufacturing, por medio del cual se logró la reducción de los costos generados por no conformidades del proceso de costura. Mediante el análisis realizado se identificó como principales desperdicios: los defectos, evidenciados en el alto índice de reprocesos y los recursos mal utilizados, evidenciados en el estándar de personal que realiza inspección 100% al final de los módulos de costura y el personal destinado a realizar los reprocesos. Dichos desperdicios a su vez tenían como origen la falta de estandarización de métodos de trabajo para el personal de costura, un sistema de control de calidad sesgado al “control” y no al aseguramiento de la calidad en el proceso y a la falta de un espíritu de mejora continua. Es por ello que el proyecto propuso la implementación de la estandarización, técnicas de calidad y la creación de dispositivos Poka Yoke, todas herramientas Lean, que a su vez están sostenidas por Kaizen como parte de la mejora continua. A partir de la implementación de dichas herramientas se ha logrado mejorar los indicadores de %reprocesos, pasando de 17.5% a 4.4%; eficiencia, pasando de 65% a 70%, los costos por sobretiempos del personal de calidad de S/12,013 a S/5,082 y la eliminación de las concesiones. Cada uno de estos indicadores se ha valorizado teniendo como resultado final del proyecto un TIR de 50% y un VAN de $14,479, lo que evidencia la rentabilidad de la implementación. Palabras clave: Lean Manufacturing, No conformidades, desperdicios, estandarización, mejora continua, Poka Yoke, TIR, VAN. / --- This research presents the results of the implementation of a Lean Manufacturing Project, whereby reducing the costs generated by reprocessing the stitching process is achieved. Through the analysis was identified as the main waste: defects evident in the high level of rework and resources misused and reflected in the standard of personnel performing 100% inspection at the end of modules sewing and personnel for perform the rework. Those by-turn had its origin in the lack of standardization of working methods for personal stitching, a system of quality control biased "control" rather than the quality assurance in the process and the lack of a spirit of Continuous improvement. That is why the project proposed the implementation of standardization, quality techniques, creating Poka Yoke devices, all Lean tools, which in turn are supported by Kaizen as part of continuous improvement. Since the implementation of these tools has improved indicators rework%, from 17.5% to 4.4%; efficiency from 65% to 70%, the costs for staff overtimes quality S / 12,013 S / 5,082 and removing concessions. Each of these indicators has been recovered with the final result of a TIR project 50% and VAN of $ 14.479, which shows the profitability of implementation. Keyswords: Lean Manufacturing, Nonconformities, waste, standardization, continuous improvement, Poka Yoke, TIR, VAN. / Tesis
420

Gestión de riesgo en la línea de producción de polvos para suspensión oral a través de la aplicación de lean six sigma

Carranza Hueita, Leonardo, Teodoro Ronald, Quispe Espíritu January 2015 (has links)
En la actualidad, la gestión de riesgos de calidad es un tema de gran importancia en todas las organizaciones. Sus principios, que son eficazmente utilizados en diversos campos, también están siendo aplicados, de manera limitada, en la industria farmacéutica; a pesar de que la fabricación y la utilización de medicamentos implican algún tipo de riesgo. En la industria farmacéutica nacional es conocido que la tecnología utilizada para la fabricación de medicamentos está un poco desactualizado; por ende, los riesgos presentes, en sus distintas etapas de fabricación, pueden influir en directamente en los atributos críticos de calidad (CQA´s) y en la salud del paciente. Es por esta razón que nos propusimos gestionar los riesgos presentes en las etapas de secado de excipientes y envasado de polvos para suspensión oral a través de dos metodologías: Gestión de riesgos y Lean Six sigma (Lean manufacturing, metodología DMAIC) con el objetivo de identificar, mejorar, y controlar los factores que representen desperdicios o riesgos en los procesos de secado y envasado. Los resultados obtenidos en la siguiente investigación demuestran que la utilización de herramientas Lean Six-Sigma pueden ser utilizados para la reducción o eliminación de riesgos presentes en ambientes de producción farmacéutica, mejoran la eficiencia de los procesos incrementando la disponibilidad y rendimiento de los equipos; así como, aumentan la capacidad de proceso. Estas mejoras permiten reducir los riesgos asociados a estas operaciones obteniendo un proceso más seguro y eficiente. Palabras clave: Gestión de riesgo, Lean Manufacturing, Six-sigma, CQA´s, eficiencia, disponibilidad, capacidad / --- At present, the quality risk management is a major issue in all organizations. Its principles, which are effectively used in various fields are also being applied in a limited way, in the pharmaceutical industry; although the manufacturing and use of drugs involve some risk. In the domestic pharmaceutical industry it is known that the technology used for manufacturing drugs is a bit outdated; therefore, the risks involved, at various stages of production can influence directly critical quality attributes (CQA's) and patient health. It is for this reason that we set out to manage the risks in the drying stages of excipients and packaging of powder for oral suspension through two methodologies: Risk Management and Lean Six Sigma (Lean manufacturing, DMAIC methodology) with the aim of identifying, improve, and control the factors that represent waste or risks in drying and packaging. The results obtained in the following research showing that the use of Lean Six Sigma tools can be used to reduce or eliminate risks involved in pharmaceutical production environments, improve process efficiency by increasing the availability and performance of equipment; and increase the processing capacity. These improvements can reduce the risks associated with these operations to obtain a safer and more efficient process Keywords: risk management, Lean Manufacturing, Six Sigma, CQA´s, efficiency, availability, capacity / Tesis

Page generated in 0.0374 seconds