• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 3
  • 3
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • Tagged with
  • 7
  • 5
  • 4
  • 4
  • 3
  • 3
  • 3
  • 3
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

La mobilisation politique des expropriés de Mirabel

Gagnon Poulin, Éric 12 1900 (has links)
En 1969, le gouvernement de Pierre Elliott-Trudeau réalisa la plus grande expropriation de l’histoire du pays au nom du développement, pour construire le plus grand aéroport au monde : Mirabel. Le projet fut un cuisant échec pour plusieurs raisons sociales, politiques et économiques. Ce mémoire se concentre surtout sur les impacts post-expropriation sur la population de Mirabel et le positionnement politique de ces-derniers. / In 1969, the government of Pierre Elliott-Trudeau made the biggest expropriation of all time in the history of the country. The project was a total failure for social, political and economic reasons. This study focuses on the post-expropriation impact on the population of Mirabel and their political positioning.
2

La mobilisation politique des expropriés de Mirabel

Gagnon Poulin, Éric 12 1900 (has links)
En 1969, le gouvernement de Pierre Elliott-Trudeau réalisa la plus grande expropriation de l’histoire du pays au nom du développement, pour construire le plus grand aéroport au monde : Mirabel. Le projet fut un cuisant échec pour plusieurs raisons sociales, politiques et économiques. Ce mémoire se concentre surtout sur les impacts post-expropriation sur la population de Mirabel et le positionnement politique de ces-derniers. / In 1969, the government of Pierre Elliott-Trudeau made the biggest expropriation of all time in the history of the country. The project was a total failure for social, political and economic reasons. This study focuses on the post-expropriation impact on the population of Mirabel and their political positioning.
3

Crash Landing: Citizens, The State and Protest Against Federal Airport Development, 1968-1976

Rowan, Michael January 2019 (has links)
Abstract During the 1960s both the federal and provincial governments continued to take on new and larger responsibilities. During this same time period citizens began to mobilize and challenge the state on a number of social issues including race, gender, labour, urban sprawl and the environment. Citizens believed that not only did they have the right to challenge the authority of government in planning public policy, but they also had a right to participate in the decision-making process as much as any bureaucrat, expert, or elected official. In planning airports in Pickering, Ste. Scholastique and Sea Island, the federal government was opposed by citizen groups in each of these three cases. Citizens believed their voices were not being heard and that government officials did not respect them. As a result, they disrupted the meticulously laid out plans of elected officials and policy planners by drawing on evidence and expert advice. The conflict over federal airport development is an example of the evolution of the consultation process with citizens, as citizens challenged the way public policy was planned. Governments now had to justify policies like expropriation for the public good since citizen groups would form over any intrusion into their private lives. The debates over airport planning highlights the role of citizens, bureaucrats, provincial and federal politicians as they all tried to navigate the complex shifting landscape of the Canadian state. By 1976 the Pickering Airport had been canceled, Mirabel was opened, and the Sea Island runway expansion would be delayed for 15 years. Although the citizen groups never had complete victories, citizen participation became more paramount to state planning after these events. Public policy planning in Canada had become far more inclusive than ever before. Whether the politicians, bureaucrats or citizens were aware of the consequences remain to be seen. / Thesis / Doctor of Philosophy (PhD) / Abstract During the 1960s both the federal and provincial governments continued to take on new and larger responsibilities. During this same time period citizens began to mobilize and challenge the state on a number of social issues including race, gender, labour, urban sprawl and the environment. Citizens believed that not only did they have the right to challenge the authority of government in planning public policy, but they also had a right to participate in the decision-making process as much as any bureaucrat, expert, or elected official. In planning airports in Pickering, Ste. Scholastique and Sea Island, the federal government was opposed by citizen groups in each of these three cases. Citizens believed their voices were not being heard and that government officials did not respect them. As a result, they disrupted the meticulously laid out plans of elected officials and policy planners by drawing on evidence and expert advice. The conflict over federal airport development is an example of the evolution of the consultation process with citizens, as citizens challenged the way public policy was planned. Governments now had to justify policies like expropriation for the public good since citizen groups would form over any intrusion into their private lives. The debates over airport planning highlights the role of citizens, bureaucrats, provincial and federal politicians as they all tried to navigate the complex shifting landscape of the Canadian state. By 1976 the Pickering Airport had been canceled, Mirabel was opened, and the Sea Island runway expansion would be delayed for 15 years. Although the citizen groups never had complete victories, citizen participation became more paramount to state planning after these events. Public policy planning in Canada had become far more inclusive than ever before. Whether the politicians, bureaucrats or citizens were aware of the consequences remain to be seen.
4

Les conséquences juridiques de l'implantation et de la gestion par l'Etat de l'aéroport international de Mirabel /

Roy, Jean-Denis, 1956- January 1979 (has links)
No description available.
5

Les conséquences juridiques de l'implantation et de la gestion par l'Etat de l'aéroport international de Mirabel /

Roy, Jean-Denis, 1956- January 1979 (has links)
No description available.
6

Highway Development Decision-Making Under Uncertainty: Analysis, Critique and Advancement

El-Khatib, Mayar January 2010 (has links)
While decision-making under uncertainty is a major universal problem, its implications in the field of transportation systems are especially enormous; where the benefits of right decisions are tremendous, the consequences of wrong ones are potentially disastrous. In the realm of highway systems, decisions related to the highway configuration (number of lanes, right of way, etc.) need to incorporate both the traffic demand and land price uncertainties. In the literature, these uncertainties have generally been modeled using the Geometric Brownian Motion (GBM) process, which has been used extensively in modeling many other real life phenomena. But few scholars, including those who used the GBM in highway configuration decisions, have offered any rigorous justification for the use of this model. This thesis attempts to offer a detailed analysis of various aspects of transportation systems in relation to decision-making. It reveals some general insights as well as a new concept that extends the notion of opportunity cost to situations where wrong decisions could be made. Claiming deficiency of the GBM model, it also introduces a new formulation that utilizes a large and flexible parametric family of jump models (i.e., Lévy processes). To validate this claim, data related to traffic demand and land prices were collected and analyzed to reveal that their distributions, heavy-tailed and asymmetric, do not match well with the GBM model. As a remedy, this research used the Merton, Kou, and negative inverse Gaussian Lévy processes as possible alternatives. Though the results show indifference in relation to final decisions among the models, mathematically, they improve the precision of uncertainty models and the decision-making process. This furthers the quest for optimality in highway projects and beyond.
7

Highway Development Decision-Making Under Uncertainty: Analysis, Critique and Advancement

El-Khatib, Mayar January 2010 (has links)
While decision-making under uncertainty is a major universal problem, its implications in the field of transportation systems are especially enormous; where the benefits of right decisions are tremendous, the consequences of wrong ones are potentially disastrous. In the realm of highway systems, decisions related to the highway configuration (number of lanes, right of way, etc.) need to incorporate both the traffic demand and land price uncertainties. In the literature, these uncertainties have generally been modeled using the Geometric Brownian Motion (GBM) process, which has been used extensively in modeling many other real life phenomena. But few scholars, including those who used the GBM in highway configuration decisions, have offered any rigorous justification for the use of this model. This thesis attempts to offer a detailed analysis of various aspects of transportation systems in relation to decision-making. It reveals some general insights as well as a new concept that extends the notion of opportunity cost to situations where wrong decisions could be made. Claiming deficiency of the GBM model, it also introduces a new formulation that utilizes a large and flexible parametric family of jump models (i.e., Lévy processes). To validate this claim, data related to traffic demand and land prices were collected and analyzed to reveal that their distributions, heavy-tailed and asymmetric, do not match well with the GBM model. As a remedy, this research used the Merton, Kou, and negative inverse Gaussian Lévy processes as possible alternatives. Though the results show indifference in relation to final decisions among the models, mathematically, they improve the precision of uncertainty models and the decision-making process. This furthers the quest for optimality in highway projects and beyond.

Page generated in 0.0401 seconds