• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 3
  • Tagged with
  • 3
  • 3
  • 3
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Förbättring av ett flöde för prototypmaterial : En studie i en verkstadsindustri / Improvements of a flow for prototype material : A study in a manufacturing industry

Olsson, Terése January 2020 (has links)
Detta projekt har genomförts under våren 2020 som ett examensarbete för högskoleingenjörsprogrammet i innovationsteknik och design vid Karlstads universitet. Examensarbetet gjordes i samarbete med ett högteknologiskt företag som är verksamt i hela världen. Syftet med arbetet var att hitta lämpliga metoder och verktyg, anpassade efter företaget, för att kunna föreslå förbättringar för att minska ledtiderna i stadie prototyp. För det genomfördes flertalet intervjuer med berörda parter på företaget, data samlades in och en omfattande litteraturstudie utfördes. Litteraturstudien låg till grund för det fortsatta arbetet och innefattade verktyg och metoder inom förbättringsprogrammen Lean och Sex Sigma. Arbetet resulterade i åtta identifierade problemområden. Dessa kan sammanfattas i tre områden som kräver fortsatt arbete av företaget. Dels krävs bättre data med högre kvalitet och mer detaljerad information, dels bör en förbättringsgrupp tillsättas där personalen är delaktig i förbättringsarbetet för flödet och underleverantörerna bör ses över. Antingen genom att ha särskilda leverantörer för prototypmateriel eller genom att återigen starta en egen prototypverkstad. / This project was implemented during the spring of 2020 as a bachelor thesis for the Bachelor Engineering Program in Innovation Technology and Design at Karlstad University. The bachelor thesis was made in collaboration with a high-tech company operating worldwide. The purpose of the project was to find suitable methods and tools, adapted to the company, in order to be able to purpose improvements to reduce the lead times in the prototype flow. To be able to fulfil the purpose, multiple interviews were conducted, data was collected, and a comprehensive literature study was made. The literature study included tools and methods within the improvement programs Lean and Six Sigma. The work resulted in eight identified problem areas. These can be summarized in three areas that requires continued word by the company. The first requires data with a higher quality and more detailed information, the second is that the company should include the coworkers in the improvement work and the subcontractors should be reviewed. Either the company should have special suppliers for prototype equipment or restarting their own prototype manufactory.
2

Förbättringsarbete inom eftermarknadsflödet i en verkstadsindustri : Identifiering, strukturering och prioritering av förbättringsförslag för kortare ledtider / Improvements in the aftermarket flow in a manufacturing industry : Identify, structure and prioritize improvement proposals for shorter lead times

Green, Linnéa January 2016 (has links)
Detta projekt har genomförts under våren 2016 som ett examensarbete för högskole- ingenjörsprogrammet i innovationsteknik och design vid fakulteten för hälsa, natur- och teknikvetenskap på Karlstads universitet. Den största delen av arbetet utfördes på BAE Systems Bofors ABs eftermarknads- avdelning i Karlskoga. Där gjordes intervjuer och observationer för att kartlägga det nuvarande flödet och tillämpa metoder kring ett förbättringsarbete som studerats under projektets förstudie. Förstudien omfattade en stor litteraturunder-sökning kring arbetssätt och metoder för förbättringsarbeten, som sammanfattades i rapportens teoretiska referensram. De metoder som användes under projektet grundades i arbetssätten Lean och Sex Sigma samt den produktutvecklingsprocess som studerats tidigare under utbildningen. Några exempel på metoder som utfördes under projektet var administrativt spagettidiagram, värdeflödesanalys, ABC-analys och brainstorming. Sammanlagt hittades tolv problemområden i eftermarknadsflödet som studerades närmre. Dessa sammanfattades slutligen i en manual tillsammans med en djupare analys varför de olika problemen uppstått, förslag på hur de skulle kunna lösas eller förbättras samt förslag på hur ett eventuellt utslag av ett infört förbättringsarbete skulle kunna mätas. Exempel på ett problemområde som hittades under arbetet och sammanställdes i manualen var att företaget inte arbetade integrerat och behövde prioritera sitt eftermarknadsflöde. I lösningsförslaget förklarades varför företaget skulle ha fördel till att satsa mer på sin eftermarknad och dess flöde, hur viktigt det är att sätta kunden i fokus och att motivera samtliga medarbetare i flödet att arbeta effektivt. Det måttförslag som presenterades tillsammans med detta problemområde var en medarbetarenkät. I slutet av manualen presenterades även en prioritetsordning på de tolv avsnitten, för att företaget skulle ha underlag till att enkelt föra en diskussion om hur ett förbättrings- arbete skulle kunna påbörjas. / The project has been implemented as a thesis of Bachelor of Science in Innovation and Design at the Faculty of Health, Science and Technology at Karlstad University in the spring of 2016. Most of the work has been performed at BAE Systems Bofors AB’s aftermarket section in Karlskoga. The work included interviews and observations to identify the current flow and to apply methods of improvement on it. The feasibility study involved a large literature study on the methods and techniques of improvement, as summarized in the report's theoretical chapter. The methods that were used in the project were found in Lean, Six Sigma and the product development process, all of which were studied earlier in the education. Some examples of methods that were applied in the project were administrative spaghetti diagrams, Value Stream Mapping-analysis, ABC-analysis and brainstorming. A lot of problems were found in the aftermarket flow and twelve of those were more closely studied. These twelve problems were then summarized in a manual along with an in-depth analysis on why the problem had occurred, suggestions on how they could be resolved or improved and proposals on how a possible alteration of an introduced improvement could be measured. One example of problems that were found and gathered in the manual was that the company doesn’t work in an integrated way and need to prioritize the aftermarket flow. The suggested solution was to explain to the company why they would have to spend more resources on the aftermarket flow and motivate all employees that are involved. The solution also explained how important it is to focus on the customer and get the employees in the flow to work more efficiently. At the end of the manual a priority list of the twelve problem areas is presented. This priority list was made so the company more easily could start a discussion about the improvement work and how it could begin.
3

Ställtidsreducering på multitaskingmaskinen Tretapparen : Effektivisering av omställning med SMED / Set-up time reduction on the multitasking machine Tretapparen : Streamlining of conversion with SMED

Sundbom, Lovisa January 2021 (has links)
Detta examensarbete utfördes inom högskoleingenjörsprogrammet i maskinteknik påKarlstads universitet. Projektet var i samarbete med PLS Produkter AB i Skövde där omställningen på en maskin med namnet Tretapparen analyserades. Maskinen klassas somen multitasking maskin där syftet är tappning av olika typer av flaskor. Problemet är att detsker omställningar ofta då maskinen är flexibel och kan producera många olika typer avprodukter. Omställningarna sker då en ny produkttyp ska tillverkas och är väldigttidskrävande då nya inställningar på maskinen behöver göras. Maskinen och verktygenbehöver dessutom rengöras noga för att inte kontaminera nästa batch. Examensarbetets syfteär att effektivisera omställningen genom att tydliggöra omställningstiderna för maskinensolika moment och bidra med kultur- och kunskapsbyggande till företaget. Målet är att hittamöjliga lösningar som minskar ställtiden på de moment som tar längst tid att ställa om ochdär det kan antas finnas förbättringsmöjligheter. Därmed kan flödet på maskinen förbättras iden mån att antalet tillverkade produkter ökar. Förbättringsarbetet började med förstudier, intervjuer, datainsamlingar och att analyseravideos. All viktig information sammanställdes i en A3-modell där SMED var grunden förstrategierna som gjordes för att ställtidsreducera. Resultatet innebär en konvertering från intern till extern ställtid för varje moment var för sigefter respektive färdig omställning, 26 förbättringsförslag och en ny ordning föromställningsarbetet som tillsammans effektiviserar, standardiserar och planerar upp omställningsprocessen. Efter förändringen minskade omställningstiden med totalt 30%, vilket leder till att flödet påmaskinen förbättras då maskinen kan producera ungefär 217 produkter mer än i dagsläget. Islutet av arbetet gjordes en avrapportering till företaget där samtliga produktionsteam varnärvarande. / This degree project was carried out within the university engineering program in mechanicalengineering at Karlstad University. The project was in collaboration with PLS Produkter AB in Skövde, where the conversion on a machine called Tretapparen was analyzed. The machineis classified as a multitasking machine where the purpose is bottling different types of bottles.The problem is that there are changes often as the machine is flexible and can produce manydifferent types of products. The adjustments take place when a new product type is to bemanufactured and are very time-consuming as new settings on the machine need to be made.The machine and tools also need to be cleaned thoroughly so they do not contaminate thenext batch. The purpose of the degree project is to streamline the adjustment by clarifying theadjustment times for the machine's various steps and contributing cultural and knowledgebuilding to the company. The goal is to find possible solutions that reduce the set-up time onthe steps that take the longest time to adjust and where it can be assumed that there areopportunities for improvement. Thus, the flow on the machine can be improved to the extentthat the number of manufactured products increases. The improvement work began with feasibility studies, interviews, data collection andanalyzing videos. All important information was compiled in an A3-model where SMED wasthe basis for the strategies made to reduce downtime. The result implies conversion from internal to external set-up time for each step separatelyafter each completed conversion, 26 improvement proposals and a new arrangement for theconversion work that together streamlines, standardizes and plans the conversion process. After these changes, the adjustment time decreased by a total of 30%, which leads to animprovement in the flow on the machine as the machine can produce approximately 217products more than at present. At the end of the work, a report was made to the companywhere all production teams were present.

Page generated in 0.0473 seconds