• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 20
  • 7
  • 2
  • 2
  • 2
  • 2
  • 1
  • Tagged with
  • 36
  • 23
  • 22
  • 17
  • 14
  • 12
  • 11
  • 10
  • 10
  • 6
  • 5
  • 5
  • 5
  • 5
  • 5
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
11

Conceitos de outsourcing aplicados à operação de escritório de gerenciamento de projetos. / Outsourcing applied to operation of project management office.

Martins, Vergilio Antonio 30 March 2007 (has links)
A implementação e operação de um Escritório de Gerenciamento de Projetos (Project Management Office - PMO) requerem mudanças organizacionais, em especial quanto ao modo como a empresa planeja, executa e controla seus projetos. As empresas modernas, inseridas em um mercado de grandes transformações e de competição, não conseguem dominar toda a cadeia de suprimento das competências necessárias ao desenvolvimento de seus projetos, por conseguinte dos produtos entregue aos seus clientes. Diante disso, há uma importante constatação quanto ao crescimento da utilização de recursos externos, mesmo em áreas consideradas estratégicas. Este projeto de pesquisa busca compreender os mecanismos que influenciam na tomada de decisão para adoção de conceitos de serviços de outsourcing em atividades relacionadas às competências organizacionais, em especial na operação dos PMO. A pesquisa é um misto de confirmatória e exploratória, tendo o survey como método utilizado, pela coleta de dados através de um questionário auto-administrado pelos respondentes, hospedado na internet (web-based). A população da pesquisa são empresas industriais e de serviços que atuam no mercado brasileiro. Para análise dos dados foi utilizado o tratamento estatístico não-paramétrico e aplicados testes de independência em tabelas de contingência. O resultado do trabalho, com 78 casos válidos do survey, indica que apesar de não poder-se estabelecer uma relação entre o posicionamento das competências do PMO, em ser realizada por fornecedores externos, com a percepção dos clientes, os casos empíricos demonstram uma forte tendência de que as competências do PMO sejam realizadas por recursos internos da organização. Na mesma linha, não se pode estabelecer uma relação positiva entre a cultura de serviços externos praticada pela organização e a possibilidade de utilização desse modelo (outsourcing) para a operação do PMO. A despeito das limitações do projeto de pesquisa, fica claro que a realidade das organizações é um tanto complexa e, portanto, reafirma-se a necessidade de imprimir um desenvolvimento constante à área de conhecimento e de recursos relacionados às competências organizacionais em gerenciamento de projetos, e de seu modo estruturado, através de seus PMO. A conquista dessas competências, ao tempo desejável para o posicionamento da organização na luta por seu espaço e sobrevivência, por certo que passa pela utilização de recursos externos, para que seus preciosos recursos especializados se dediquem àquilo que é o seu núcleo de competências, que está ligada a sua identidade. Assim, cabe indicar as crenças no desenvolvimento e aperfeiçoamento de teorias que contribuam para a compreensão e devida intervenção sobre a realidade das organizações, indicando possíveis cenários e meios para superação de desafios presentes. A contribuição do desenvolvimento deste trabalho de pesquisa é oferecer uma abordagem teórica para a compreensão do processo de identificação do posicionamento do PMO em termos das competências organizacionais pela aplicação de outsourcing, como uma alternativa viável para a operação de PMO. / The implementation and the operation of Project Management Office (PMO) involves organizational changes, in the way how the enterprise plans, executes and control its projects. The modern enterprises, which were put in a market of big transformations and competition, cannot dominate the whole chain of supplies for its costumer products and services. Considering all that it is possible to observe a important growth in the use of services executed from external resources, even in areas considered strategic. This research project intends to understand the mechanism which can influence the decision to take on services of outsourcing in activities related to organizational competences. The type of research is a combination of confirmatory e exploratory, and uses a web based survey for the collection of data. The project is designed to enterprises which work in the brazilian market. It was used the practical nonparametric statistic of data, by independence test in the r x c contingence table. The research showed that, in 78 of the survey valid cases, the utilization of PMO in organizational competences comes from the organization\'s internal resources. In the same line, still based on the research, it is possible to conclude that it is unlikable to establish a positive relation between the culture of external services used by the organization and the possibility of utilization of the outsourcing model to the operation of PMO. In spite of the limits that appeared in the research project, it is clear that the reality of the organization is very complex, and therefore, confirm the need of showing a constant development of the knowledge area and the resources related to the organization\'s abilities in project management, and of its structured mode, using its PMO. The achievement of these abilities, at the desired time for the organization\'s positioning in the fighting for its survival in the market, definitely make use of external resources to dedicate its precious specialized resources to its core competence, which is connected to its identity. In this way, it is possible to indicate the belief in the development and the improvement of theories that can contribute to the understanding and the necessary interventions in the reality of the organizations, showing possible situations and ways to solve the present problems. The contribution of this research assignment is a theoretical approach to a better comprehension of the identification process of PMO positioning in terms of organizational competencies by the application of outsourcing as a possible alternative to the operation of PMO.
12

Conceitos de outsourcing aplicados à operação de escritório de gerenciamento de projetos. / Outsourcing applied to operation of project management office.

Vergilio Antonio Martins 30 March 2007 (has links)
A implementação e operação de um Escritório de Gerenciamento de Projetos (Project Management Office - PMO) requerem mudanças organizacionais, em especial quanto ao modo como a empresa planeja, executa e controla seus projetos. As empresas modernas, inseridas em um mercado de grandes transformações e de competição, não conseguem dominar toda a cadeia de suprimento das competências necessárias ao desenvolvimento de seus projetos, por conseguinte dos produtos entregue aos seus clientes. Diante disso, há uma importante constatação quanto ao crescimento da utilização de recursos externos, mesmo em áreas consideradas estratégicas. Este projeto de pesquisa busca compreender os mecanismos que influenciam na tomada de decisão para adoção de conceitos de serviços de outsourcing em atividades relacionadas às competências organizacionais, em especial na operação dos PMO. A pesquisa é um misto de confirmatória e exploratória, tendo o survey como método utilizado, pela coleta de dados através de um questionário auto-administrado pelos respondentes, hospedado na internet (web-based). A população da pesquisa são empresas industriais e de serviços que atuam no mercado brasileiro. Para análise dos dados foi utilizado o tratamento estatístico não-paramétrico e aplicados testes de independência em tabelas de contingência. O resultado do trabalho, com 78 casos válidos do survey, indica que apesar de não poder-se estabelecer uma relação entre o posicionamento das competências do PMO, em ser realizada por fornecedores externos, com a percepção dos clientes, os casos empíricos demonstram uma forte tendência de que as competências do PMO sejam realizadas por recursos internos da organização. Na mesma linha, não se pode estabelecer uma relação positiva entre a cultura de serviços externos praticada pela organização e a possibilidade de utilização desse modelo (outsourcing) para a operação do PMO. A despeito das limitações do projeto de pesquisa, fica claro que a realidade das organizações é um tanto complexa e, portanto, reafirma-se a necessidade de imprimir um desenvolvimento constante à área de conhecimento e de recursos relacionados às competências organizacionais em gerenciamento de projetos, e de seu modo estruturado, através de seus PMO. A conquista dessas competências, ao tempo desejável para o posicionamento da organização na luta por seu espaço e sobrevivência, por certo que passa pela utilização de recursos externos, para que seus preciosos recursos especializados se dediquem àquilo que é o seu núcleo de competências, que está ligada a sua identidade. Assim, cabe indicar as crenças no desenvolvimento e aperfeiçoamento de teorias que contribuam para a compreensão e devida intervenção sobre a realidade das organizações, indicando possíveis cenários e meios para superação de desafios presentes. A contribuição do desenvolvimento deste trabalho de pesquisa é oferecer uma abordagem teórica para a compreensão do processo de identificação do posicionamento do PMO em termos das competências organizacionais pela aplicação de outsourcing, como uma alternativa viável para a operação de PMO. / The implementation and the operation of Project Management Office (PMO) involves organizational changes, in the way how the enterprise plans, executes and control its projects. The modern enterprises, which were put in a market of big transformations and competition, cannot dominate the whole chain of supplies for its costumer products and services. Considering all that it is possible to observe a important growth in the use of services executed from external resources, even in areas considered strategic. This research project intends to understand the mechanism which can influence the decision to take on services of outsourcing in activities related to organizational competences. The type of research is a combination of confirmatory e exploratory, and uses a web based survey for the collection of data. The project is designed to enterprises which work in the brazilian market. It was used the practical nonparametric statistic of data, by independence test in the r x c contingence table. The research showed that, in 78 of the survey valid cases, the utilization of PMO in organizational competences comes from the organization\'s internal resources. In the same line, still based on the research, it is possible to conclude that it is unlikable to establish a positive relation between the culture of external services used by the organization and the possibility of utilization of the outsourcing model to the operation of PMO. In spite of the limits that appeared in the research project, it is clear that the reality of the organization is very complex, and therefore, confirm the need of showing a constant development of the knowledge area and the resources related to the organization\'s abilities in project management, and of its structured mode, using its PMO. The achievement of these abilities, at the desired time for the organization\'s positioning in the fighting for its survival in the market, definitely make use of external resources to dedicate its precious specialized resources to its core competence, which is connected to its identity. In this way, it is possible to indicate the belief in the development and the improvement of theories that can contribute to the understanding and the necessary interventions in the reality of the organizations, showing possible situations and ways to solve the present problems. The contribution of this research assignment is a theoretical approach to a better comprehension of the identification process of PMO positioning in terms of organizational competencies by the application of outsourcing as a possible alternative to the operation of PMO.
13

Projektkontor för interna utvecklingsprojekt : En komparativ fallstudie / Project Management Office for internal dveleopement projects : A comparative case study

Hoas, Sophie January 2019 (has links)
Syftet med studien är att bidra med kunskap om hur olika intressentgrupper upplever projektkontoret i sin organisation. Använd metod är semistrukturerade kvalitativa intervjuer med fysiska möten. Totalt nio intervjuer genomfördes på två projektkontor med interna intressenter. Till intervjudata användes sedan tematisk analys som metod. Metoden är uppbyggd på tematisering av den kodade intervjudata vilket resulterade i sex olika teman. Dessa teman är jämt fördelade på de två projektkontoren. Resultatet skildrar två helt olika projektkontor. På det första projektkontoret upplevde de interna intressenterna kontroll och styrning av projektkontoret genom ett tydligt arbetssätt med coachning och stöd i det dagliga arbetet med projekt. Projektkontoret strävade efter att ständigt förbättra sig och utvecklas och ett av deras utvecklingsområden var resursallokering i sin produktportfölj med styrning. På det andra projektkontoret fanns också kontroll och styrning men i mindre utsträckning och med en oenighet i ledningen om projekt begreppet och hur det skulle användas. De interna intressenterna var en mer blandad grupp med olika kompetenser och hade olika behov av stöd och coachning från sitt projektkontor och det rådde ständig personalbrist. Projektkontoret var inte helt etablerat och hela organisationen var ovan med de nya arbetssätten som projektkontoret innebar och därför saknades rapportering och etablerade projektverktyg.  Slutsatsen är att för att ett projektkontor ska ha kontroll och något att säga till om behöver det vara implementerat och accepterat i sin organisation och behöver ha befogenheter som medel för att utöva makt och driva igenom saker. / The purpose of the study is to contribute with knowledge of how different stakeholder groups experience the Project Management Office in their organization. The method used is semi-structured qualitative interviews with physical meetings and a total of nine interviews were conducted at two project management offices with internal stakeholders. Thematic analysis was then used as the method for the interview. The method is based on the thematization of the coded interview data, which resulted in six different themes in total. These themes are distributed among the two project management offices and became three themes at each Project Management Office. These themes depict two completely different project offices. At the first Project Management Office, the internal stakeholders experienced that there was control and management of the project management office by using a clear working method with coaching and support in the daily work of the project. The Project Management Office constantly strived to improve and develop and one of their development areas was resource allocation in its product portfolio with control. At the second Project Management Office there was also control and management but to a lesser extent and with a disagreement in the management about the project concept and how it would be used. The internal stakeholders were a more mixed group of different competencies and had different needs for support and coaching from their project management office and there was a constant lack of staff. The Project Management Office was not fully established, and the entire organization was not used to the new working methods that the Project Management Office stood for and therefore reporting and established project tools were missing. The conclusion is that in order for a Project Management Office to have control and something to say about, it needs to be implemented and accepted in its organization and needs to have powers as a means of exercising power and pushing things through.
14

Vetor de sucesso: abordagem de um pmo no sistema eletrobras

Arduino, Eduardo Gurgel do Amaral 24 August 2015 (has links)
Submitted by Marcia Silva (marcia@latec.uff.br) on 2016-07-15T20:54:28Z No. of bitstreams: 1 DISSERT EDUARDO GURGEL DO AMARAL ARDUINO.pdf: 2065093 bytes, checksum: cff22b2b72c45eeee85f4facfd01289c (MD5) / Made available in DSpace on 2016-07-15T20:54:28Z (GMT). No. of bitstreams: 1 DISSERT EDUARDO GURGEL DO AMARAL ARDUINO.pdf: 2065093 bytes, checksum: cff22b2b72c45eeee85f4facfd01289c (MD5) Previous issue date: 2015-08-24 / O objeto do estudo foi elaborar uma modelo estrutural completo dos fatores que influenciam o sucesso da atuação do PMO e que benefícios essa atuação positiva traria para a gestão de projetos no Sistema Eletrobras e a partir disso, realizar um aperfeiçoamento do modelo estrutural por meio de métodos estatísticos. Para isso foi realizado uma pesquisa de campo (survey) no intuito de levantar dados junto aos profissionais envolvidos em Gestão de Projetos dentro do Sistema Eletrobras, a partir do modelo proposto e foram evidenciados os fatores de sucesso na atuação do PMO (Project Management Office) que possibilitam o escritório de gerenciamento de projetos tornar-se um vetor de gestão por excelência na empresa. Para alcançar o objetivo idealizado, realizou-se (a) Levantamento bibliográfico para conceituar gerenciamento de projetos e PMOs, (b) identificou-se os fatores que influenciam o sucesso de atuação do PMO, (c) identificou-se as abordagens teóricas dos fatores diretos que mais contribuem para que o PMO da Eletrobras possa atuar como um vetor de gestão por excelência, otimizando o aumento da eficiência da sua atuação e o sucesso na gestão de projetos. Averiguou-se quais abordagens teóricas, a partir do sucesso de atuação do PMO, traziam benefícios para a gestão de Projetos no Sistema Eletrobras. Assim, para realizar os trabalhos estatísticos para a avaliação de adequação do modelo, foi utilizado o software SPSS Statistics, para a execução da AFE (Análise Fatorial Exploratória), em busca de testar o modelo baseado na teoria previamente apresentada. Foram obtidas 116 respostas válidas preenchidas por colaboradores com envolvimento em gerenciamento de projetos no sistema Eletrobras. No início o modelo teórico era composto por vinte abordagens teóricas e três fatores independentes. Após as etapas do SEM, obteve-se dezessete abordagens e dois fatores independentes, diferentes do modelo proposto. Com isso, a hipóteses H1 e H2 não foram rejeitadas, pois apresentaram fator significante com (P < 0,05). A hipótese H3 teve que ser excluída, pois na AFE suas abordagens teóricas compuseram um único conjunto com a hipótese H2, visto que a Matriz da Variância Total Explicada demonstrou ser o modelo mais ajustado com somente dois fatores. Todas as análises foram validadas pelo alpha de cronbach. / The object of study was preparing a full structural model of the factors that influence the success of the PMO acting and that this positive performance would bring benefits for project management in the Eletrobras System and from this, carry out an improvement of the structural model through methods Statistical. For it was conducted a field survey (survey) in order to collect data with professionals involved in Project Management within the Eletrobras System, from the proposed model and were shown the success factors in the performance of the PMO (Project Management Office) which enable the project management office become a vector of management excellence by the company. To achieve the idealized goal, there was (a) Bibliographic survey to conceptualize project management and PMOs, (b) identified the factors that influence the PMO acting success, (c) identify the theoretical approaches of the factors direct that contribute most to the PMO Eletrobras can act as a vector management par excellence, optimizing the increased efficiency of its operations and success in project management. It was found that theoretical approaches, from the PMO acting success, bringing benefits to the Project management in the Eletrobras System. Thus, to perform statistical work for the evaluation of the adequacy of the model, SPSS Statistics software was used, for the implementation of EFA (Exploratory Factor Analysis), seeking to test the model based on the theory presented previously. 116 valid responses were obtained filled by employees with involvement in project management in the Eletrobras System. Earlier the theoretical model was composed of twenty theoretical approaches and three independent factors. After the stages of SEM, seventeen approaches was obtained and two independent factors, other than this model. With this, the H1 and H2 hypotheses were not rejected because they presented with significant factor (P <0.05). The hypothesis H3 had to be excluded, as their theoretical approaches the AFE comprised a single set with the hypothesis H2, whereas Matrix Total Variance Explained proved to be the most adjusted model with only two factors. All analyzes were validated by Cronbach's alpha.
15

Silices fonctionnalisées contenant des espèces ioniques pour la catalyse hétérogène / Functional silica bearing ionic species for heterogeneous catalysis

Motos, Blanca 13 December 2011 (has links)
La catalyse hétérogène est en plein développement pour des raisons économiques, de santé et de protection environnementale. Les travaux de cette thèse s'intéressent à la préparation des silices fonctionnalisées par des sous-structures ioniques pour leur application en catalyse hétérogène. D'abord, des matériaux mésoporeux fonctionnalisés par des entités di-aryl imidazoliums ont été préparés par des réactions de post-greffage. En plus, films de type PMO contenant des entités di-aryl imidazoliums ont été synthétisés en présence d'un surfactant anionique. Ensuite, complexes carbéniques N-hétérocycliques du cuivre et du palladium supportés ont été préparés et appliqués en tant que catalyseurs organométalliques dans des réactions A3 (Cu-NHC) et de couplage de Suzuki (Pd-NHC). Les silices fonctionnalisées avec des entités imidazoliums ont également été utilisées en tant qu'organocatalyseurs des réactions de Henry et dans de cycloaddition du dioxyde de carbone aux époxydes. Des matériaux de type ‘PMO' contenant des entités amines/ammoniums ainsi que des sous-structures zwitterioniques ont été utilisés en réactions organocatalysées de Henry et Biginelli. / Heterogenous catalysis is an area in continuous development due to economical, health and environmental issues. This thesis deals with the preparation of i-silica materials for the posterior application in heterogeneous catalysis. First, di-aryl imidazolium containing silica materials were synthesized by post-grafting reactions on mesoporous SBA-15. Moreover, di-alkyl imidazolium containing PMO films were prepared in presence of an anionic surfactant. Then, supported copper and palladium N-heterocyclic carbenes were synthesized from di-aryl imidazolium silica and applied to A3 reactions (Cu-NHC) and Suzuki cross-coupling reactions (Pd-NHC). Imidazolium functionalized silicas were also utilized as heterogeneous organocatalysts in Henry reactions and in reactions of cycloaddition of carbon dioxide to epoxides. Finally, PMO type materials containing amine/ammonium and zwitterionic substructures were applied to Henry and Biginelli organocatalysed reactions, respectively.
16

Análise crítica do processo de planejamento da implantação de um escritório de gerenciamento de projetos. / Critical analyses of planning process of implantation of a project management office.

Lima, Murilo Paes 15 May 2008 (has links)
A implantação de estruturas como o Escritório de Gerenciamento de Projetos (EGP) é uma ação que tem sido muito utilizada recentemente visando desenvolver e aprimorar a gestão de projetos nas organizações. Num momento em que cada vez mais as empresas estão utilizando projetos para implantar o seu planejamento estratégico, torna-se fundamental garantir a maior eficiência e eficácia possível na gestão de seus projetos. A utilização de um EGP pode trazer uma série de benefícios à gestão de projetos de uma organização; entretanto, sua implantação é um processo complexo que deve ser planejado com cuidado. O objetivo desta dissertação é identificar os fatores que influenciam o processo de planejamento da implantação de um EGP e analisá-los quanto à forma que sua influência é exercida, de tal modo que propicie uma implantação de sucesso. Este objetivo é alcançado através da análise do processo de constituição de um EGP, do processo de planejamento estratégico do EGP e do processo de planejamento de suas fases. Dentro do processo de planejamento estratégico do EGP, são detalhadas as análises que envolvem o diagnóstico da situação atual da empresa, os benefícios esperados, as condições de viabilidade para implantação, a definição dos objetivos estratégicos, os tipos de EGP, suas funções e a influência da estrutura organizacional. São ainda analisadas a influência da cultura organizacional, da maturidade em gestão de projetos, dos fatores críticos de sucesso e os recursos e custos envolvidos na implantação. A dissertação ainda contempla um estudo de caso da implantação de um EGP em uma grande empresa brasileira, líder em seu setor. Neste estudo de caso buscou-se confrontar as conclusões das análises realizadas com as condições e resultados verificados no caso específico. Como conclusão do estudo, fica claro que não existe uma \"receita de bolo\" para a implantação de um EGP. Os responsáveis pela implantação devem entender quais fatores afetam o planejamento de um EGP e trabalhar no intuito de melhor adaptar estes fatores à implantação do EGP de sua organização. Deste modo, esta dissertação atinge seu objetivo e oferece ao leitor uma visão de quais são estes fatores, como eles afetam o planejamento e quais os possíveis caminhos que podem ser tomados para se implantar com sucesso um EGP. / The implantation of structures such as the Project Management Office (PMO) is an action that has been used much recently seeking the development and improves the project management in the organizations. At a moment in that each time more and more companies are using projects to establish their strategic planning, it becomes fundamental to assure the greater efficiency and efficacy possible in the management of their projects. The use of a PMO may bring many benefits to the project management of an organization; however, its implantation is a complex process that needs to be planed with care. The objective of this dissertation is to identify the factors that influence the process of planning the implantation of a PMO and to analyze them as the form that its influence is exercised, in such a way that propitiates a successful implantation. This objective is obtained through analyzes of the process of constitution of a PMO, the process of strategic planning of the PMO and the planning process of its phases. Within the process of strategic planning of the PMO, are detailed analyzes that involve the diagnosis of the present situation of the company, the benefits expected, the conditions of viability of implantation, the definition of strategic objectives, the types of PMO, its functions and the influence of the organizational structure. The influence of organizational culture, the maturity of project management, the critical factors of success and the resources and costs involved in the implantation are still being analyzed. This dissertation still contemplates a case study of implantation of a PMO in a large Brazilian company, leader in its sector. This case study aims to compare the conclusions of analyzes done with the conditions and results verified in the specific case. As conclusion of this study, it has become evident that there is no simple solution for implanting a PMO. The people responsible for the implantation must understand which factors affect the planning of the PMO and work to better adapt this factors for implantation of their organization. In this way, this dissertation reach\'s its objective and offers to reader a vision of these factors, how they affect the planning and which are the possible ways that could be taken to implant with success a PMO.
17

Studies of cyclodextrin functionalised silica materials

Mahmud, Sarker Tarek 19 September 2007
Mesoporous silica materials containing microporous cavities provided by covalently bound ¦Â-cyclodextrin (CD ICS) were synthesized by co-condensation of a ¦Â-CD functionalized triethoxy silane (CD ICL) with tetraethyl orthosilicate (TEOS) by using neutral amine surfactants as structure directing agents (SDA). CD ICL was prepared by reacting ¦Â-CD with 3-isocyanatopropyltriethoxysilane. IR spectroscopy of CD ICL showed complete disappearance of isocyanato group at 2270 cm-1. 1H NMR results indicate an average of four isocyanate linkers covalently attached to random hydroxyl substituents of each molecule of ¦Â-CD. <p> Nine different CD ICS materials were synthesized using dodecylamine, tetradecylamine or hexadecylamine with ¦Â-CD (2, 4, and 6 mol %) with respect to TEOS. The incorporation of ¦Â-CD within the mesoporous framework was supported by IR, Raman, MALDI TOF MS, solid state 13C NMR CP-MAS and TGA results. Small angle X-ray diffraction results showed a peak at 2¦È ¡Ö 2.20, supporting the presence of an ordered silica mesostructure framework. For materials with same CD loading, the surface area and pore volume doubled as the surfactant from dodecylamine to hexadecylamine. However, as the CD loading increased from 2% to 6%, the surface area decreases by a factor of ~ 1.5. <p>MALDI TOF mass spectrometry showed two peaks at m/z 1157 a.m.u. and 1173 a.m.u. for [¦Â-CD + Na]+ and [¦Â-CD + K]+ respectively due to desorption of ¦Â-CD from the walls of the silica matrix. The 13C NMR CP MAS results showed 13C signals in the region ¦Ä=60-110 ppm due to the nuclei of ¦Â-CD. CD ICS materials were found to be effective as a sorbent in both gas and aqueous phases, respectively. The sorption capacity (mmol/g) of p-nitrophenol increased from 61% to 84% with an increase of CD loading from 2% to 6% and as the alkyl chain length of the SDA increases from dodecylamine to hexadecylamine. The adsorption isotherm of CH3Cl in the gas phase and that of p-nitrophenol in the aqueous phase at ambient temperature adopts a multilayer model of adsorption.
18

Studies of cyclodextrin functionalised silica materials

Mahmud, Sarker Tarek 19 September 2007 (has links)
Mesoporous silica materials containing microporous cavities provided by covalently bound ¦Â-cyclodextrin (CD ICS) were synthesized by co-condensation of a ¦Â-CD functionalized triethoxy silane (CD ICL) with tetraethyl orthosilicate (TEOS) by using neutral amine surfactants as structure directing agents (SDA). CD ICL was prepared by reacting ¦Â-CD with 3-isocyanatopropyltriethoxysilane. IR spectroscopy of CD ICL showed complete disappearance of isocyanato group at 2270 cm-1. 1H NMR results indicate an average of four isocyanate linkers covalently attached to random hydroxyl substituents of each molecule of ¦Â-CD. <p> Nine different CD ICS materials were synthesized using dodecylamine, tetradecylamine or hexadecylamine with ¦Â-CD (2, 4, and 6 mol %) with respect to TEOS. The incorporation of ¦Â-CD within the mesoporous framework was supported by IR, Raman, MALDI TOF MS, solid state 13C NMR CP-MAS and TGA results. Small angle X-ray diffraction results showed a peak at 2¦È ¡Ö 2.20, supporting the presence of an ordered silica mesostructure framework. For materials with same CD loading, the surface area and pore volume doubled as the surfactant from dodecylamine to hexadecylamine. However, as the CD loading increased from 2% to 6%, the surface area decreases by a factor of ~ 1.5. <p>MALDI TOF mass spectrometry showed two peaks at m/z 1157 a.m.u. and 1173 a.m.u. for [¦Â-CD + Na]+ and [¦Â-CD + K]+ respectively due to desorption of ¦Â-CD from the walls of the silica matrix. The 13C NMR CP MAS results showed 13C signals in the region ¦Ä=60-110 ppm due to the nuclei of ¦Â-CD. CD ICS materials were found to be effective as a sorbent in both gas and aqueous phases, respectively. The sorption capacity (mmol/g) of p-nitrophenol increased from 61% to 84% with an increase of CD loading from 2% to 6% and as the alkyl chain length of the SDA increases from dodecylamine to hexadecylamine. The adsorption isotherm of CH3Cl in the gas phase and that of p-nitrophenol in the aqueous phase at ambient temperature adopts a multilayer model of adsorption.
19

Análise crítica do processo de planejamento da implantação de um escritório de gerenciamento de projetos. / Critical analyses of planning process of implantation of a project management office.

Murilo Paes Lima 15 May 2008 (has links)
A implantação de estruturas como o Escritório de Gerenciamento de Projetos (EGP) é uma ação que tem sido muito utilizada recentemente visando desenvolver e aprimorar a gestão de projetos nas organizações. Num momento em que cada vez mais as empresas estão utilizando projetos para implantar o seu planejamento estratégico, torna-se fundamental garantir a maior eficiência e eficácia possível na gestão de seus projetos. A utilização de um EGP pode trazer uma série de benefícios à gestão de projetos de uma organização; entretanto, sua implantação é um processo complexo que deve ser planejado com cuidado. O objetivo desta dissertação é identificar os fatores que influenciam o processo de planejamento da implantação de um EGP e analisá-los quanto à forma que sua influência é exercida, de tal modo que propicie uma implantação de sucesso. Este objetivo é alcançado através da análise do processo de constituição de um EGP, do processo de planejamento estratégico do EGP e do processo de planejamento de suas fases. Dentro do processo de planejamento estratégico do EGP, são detalhadas as análises que envolvem o diagnóstico da situação atual da empresa, os benefícios esperados, as condições de viabilidade para implantação, a definição dos objetivos estratégicos, os tipos de EGP, suas funções e a influência da estrutura organizacional. São ainda analisadas a influência da cultura organizacional, da maturidade em gestão de projetos, dos fatores críticos de sucesso e os recursos e custos envolvidos na implantação. A dissertação ainda contempla um estudo de caso da implantação de um EGP em uma grande empresa brasileira, líder em seu setor. Neste estudo de caso buscou-se confrontar as conclusões das análises realizadas com as condições e resultados verificados no caso específico. Como conclusão do estudo, fica claro que não existe uma \"receita de bolo\" para a implantação de um EGP. Os responsáveis pela implantação devem entender quais fatores afetam o planejamento de um EGP e trabalhar no intuito de melhor adaptar estes fatores à implantação do EGP de sua organização. Deste modo, esta dissertação atinge seu objetivo e oferece ao leitor uma visão de quais são estes fatores, como eles afetam o planejamento e quais os possíveis caminhos que podem ser tomados para se implantar com sucesso um EGP. / The implantation of structures such as the Project Management Office (PMO) is an action that has been used much recently seeking the development and improves the project management in the organizations. At a moment in that each time more and more companies are using projects to establish their strategic planning, it becomes fundamental to assure the greater efficiency and efficacy possible in the management of their projects. The use of a PMO may bring many benefits to the project management of an organization; however, its implantation is a complex process that needs to be planed with care. The objective of this dissertation is to identify the factors that influence the process of planning the implantation of a PMO and to analyze them as the form that its influence is exercised, in such a way that propitiates a successful implantation. This objective is obtained through analyzes of the process of constitution of a PMO, the process of strategic planning of the PMO and the planning process of its phases. Within the process of strategic planning of the PMO, are detailed analyzes that involve the diagnosis of the present situation of the company, the benefits expected, the conditions of viability of implantation, the definition of strategic objectives, the types of PMO, its functions and the influence of the organizational structure. The influence of organizational culture, the maturity of project management, the critical factors of success and the resources and costs involved in the implantation are still being analyzed. This dissertation still contemplates a case study of implantation of a PMO in a large Brazilian company, leader in its sector. This case study aims to compare the conclusions of analyzes done with the conditions and results verified in the specific case. As conclusion of this study, it has become evident that there is no simple solution for implanting a PMO. The people responsible for the implantation must understand which factors affect the planning of the PMO and work to better adapt this factors for implantation of their organization. In this way, this dissertation reach\'s its objective and offers to reader a vision of these factors, how they affect the planning and which are the possible ways that could be taken to implant with success a PMO.
20

Gestão de projetos de P&D no IPEN: diagnóstico e sugestões ao Escritório de Projetos (PMO) / Project management of R&D in IPEN - Diagnosis and Suggestions to the Project Management Office (PMO)

Hannes, Egon Martins 12 March 2015 (has links)
O presente trabalho pretende entender a dinâmica do gerenciamento de projetos no IPEN. Para tal, decidiu-se pela pesquisa junto a literatura acadêmica de modelos que pudessem servir de base e que após modificações e ajustes pudessem refletir a realidade dos projetos de Institutos Públicos Pesquisa & Desenvolvimento. Após tratamento estatístico dos dados algumas hipóteses foram validadas e demonstraram sua influência positiva no desempenho do gerenciamento do projeto, tais como a influência das pessoas que compõem as equipes, o efeito da liderança, dentre outras. O modelo, inclusive mostrou-se válido para explicar quais fatores são relevantes para o sucesso dos projetos. Um das principais objetivos, foi exatamente o uso de modelo de avaliação de gestão projetos, que fossem passíveis de validação estatística, e não utilizar um dos disponíveis no mercado, tais como P3M3 e OPM3, para que houvesse um controle e confirmação estatística dos resultados. Outro objetivo foi utilizar um modelo cujas assertivas refletissem a natureza dos projetos de Pesquisa & Desenvolvimento gerenciados pelos pesquisadores do IPEN. Aliás, as referidas assertivas foram formuladas, e enviadas via pesquisa web, e respondidas por praticamente uma centena de profissionais do IPEN, envolvidos com projetos de P&D. A presente dissertação, acrescida das recomendações, ao final, tem como proposta servir de contribuição para os trabalhos desenvolvidos pelo Escritório de Projetos do IPEN. O modelo de avaliação, contido neste trabalho, pode ser aplicado em outras Instituições de P&D brasileiras, para que avaliem a forma e a maneira como gerenciam os seus respectivos projetos. / This paper aims to understand the dynamics involved in the project management at IPEN. To reach this goal, the method chosen was research along with academic literature of models that could serve as a base that after modifications and adjustments could reflect the reality of projects from the Public Institute of Research & Development. After undergoing statistical treatment of the data, some hypotheses were validated and showed positive influence on the project management performance, such as the influence of people who make up the teams, the leadership effect, among others. In fact, the model was found to be valid in explaining which factors are relevant for the success of the projects. One of the main goals was exactly the use of the project management evaluation model, submitted to statistical validation and not to use one available on the market, such as the P3M3 and OPM3, in order to assure the statistical control and confirmation of the results. Another goal was to use a model whose statements reflected the nature of the Research & Development project managed by researchers at IPEN. In fact, the aforementioned statements were formulated and sent via a web survey and answered by almost one hundred IPEN professionals who work on R&D projects. The following dissertation, along with the recommendations at the end, was included to serve as contribution to work developed by the IPEN Project Offices. The evaluation model included in this paper can be applied in other R&D organizations in Brazil, to evaluate the way their projects are managed.

Page generated in 0.0317 seconds