• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 789
  • 239
  • 91
  • 17
  • 15
  • 8
  • 2
  • 1
  • 1
  • 1
  • Tagged with
  • 1215
  • 564
  • 333
  • 215
  • 214
  • 204
  • 195
  • 147
  • 146
  • 143
  • 143
  • 131
  • 111
  • 103
  • 97
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
111

Optimisation de la chaîne logistique dans l'industrie de process. Méthodes et application à l'industrie du verre plat

Miegeville, Nicolas 21 September 2005 (has links) (PDF)
L'importance croissante que le client accorde à la manière dont une entreprise<br />satisfait sa demande bouleverse les fondements des organisations anciennement pensées sous l'angle de la production. Phénomène tout à fait perceptible dans un grand<br />groupe industriel comme Saint-Gobain, à forte culture ingénieur, cette prise de<br />conscience donne un nouvel élan aux métiers transversaux focalisés à la fois sur<br />l'optimisation du schéma industriel et de la chaîne logistique. Cette thèse est une<br />illustration de cette évolution : l'intérêt porté aux problèmes d'optimisation des systèmes industriels et logistiques est relativement récent à Saint-Gobain Recherche.<br />Nous nous sommes intéressés dans nos travaux à différents problèmes industriels<br />complémentaires rencontrés chez Saint-Gobain Glass, leader de la production de<br />verre plat en Europe. Nous avons apporté des solutions mettant en lumière l'interdépendance de différentes décisions à des problèmes industriels complexes, avec un<br />souci constant de produire des outils d'aide à la décision utiles et appréciés.<br />Après un avant-propos rappelant le sens de notre démarche, nous découvrirons<br />dans le chapitre 1 le contexte industriel qui a motivé notre recherche. Nous présentons<br />les métiers du groupe - produire, transformer et distribuer du verre plat - et les<br />différents niveaux de décision que nous avons décidé d'aborder. Les chapitres suivants<br />présentent les problèmes d'optimisation que nous avons identifiés et qui nous sont<br />apparus comme clés.<br />Nous abordons dans le chapitre 2 un modèle permettant de déterminer les dimensions<br />des produits standards. L'intégration verticale du groupe permet l'étude<br />du meilleur compromis entre les chutes de verre tout au long de la chaîne logistique<br />et le nombre de références à gérer. La suite de la thèse tend à aboutir à une modélisation complète du schéma industriel et logistique et fait l'objet du chapitre 6. Pour cela, nous traitons les questions de localisation d'installations logistiques (chapitre 3) et de modélisation des processus de production : le chapitre 4 présente notre modèle<br />et l'illustre avec la production de verre plat, tandis que le chapitre 5 présente un<br />travail complémentaire permettant de l'appliquer aux lignes de transformation. Finalement, nous intégrons dans le chapitre 6 tous ces travaux dans un modèle linéaire<br />en nombres entiers.<br />Fruit d'une véritable collaboration entre chercheurs et industriels, ce travail présente<br />un modèle générique déterministe d'optimisation de la chaîne logistique appliqué avec succès à l'industrie du verre. De nombreuses perspectives dignes d'intérêt<br />sont imaginables, autant théoriques que pratiques.
112

Vers une planification robuste et sûre pour les systèmes autonomes

Pepy, Romain 04 February 2009 (has links) (PDF)
De nombreux outils existent pour résoudre les problèmes de planification sous contraintes. On peut les regrouper en deux classes principales. Les plus anciens planificateurs utilisent une discrétisation préalable de l'espace d'état. Les plus récents, les planificateurs à échantillonnage, permettent une exploration plus efficace. Ces planificateurs sont utilisés dans de nombreux domaines, comme la chimie, la biologie, la robotique, l'automatique ou encore l'intelligence artificielle. La contribution majeure de nos travaux est d'apporter une réponse au problème de planification de trajectoires en présence d'incertitudes en associant une technique de planification moderne, permettant une exploration rapide de l'espace d'état à des méthodes de localisation permettant de caractériser l'incertitude sur l'état du système à un instant donné. Deux approches ont été suivies. Dans la première, le planificateur utilise une représentation probabiliste de l'état du système à un instant donné, par une densité de probabilité gaussienne. La propagation des erreurs est effectuée en utilisant un filtre de Kalman étendu. Dans la deuxième approche, nous englobons dans un ensemble calculable les états que peut prendre le système à un instant donné compte tenu de bornes sur les erreurs commises. Contrairement à l'approche probabiliste précédente, cette approche permet de fournir une garantie sur la sûreté du système, à condition bien sûr que les hypothèses sur les bruits d'états qui la fondent soient satisfaites.
113

Dimensions subjectives de l'expérience de planification d'arrangements de vie futurs chez les parents perpétuels vieillissants vivant avec un adulte présentant un syndrome de Down

Lacasse-Bédard, Joanie January 2009 (has links)
This project consists of an exploratory research pertaining to the issues linked to the future life planning of elderly parents of an adult with Down syndrome. The studies we inventoried mainly focused on the amount of residential, financial and legal planning undertaken by these elderly parents. In our study, a fourth planning modality emerged, namely affective planning.This fourth modality, which posses a greater relational dimension, is highly significant in the eyes of the perpetual parents. To apprehend this concept in more depth, it appeared important to us to question ourselves about the reasons that drive a parent to engage or not in future planning. From a life-course perspective, this study had, as its first specific objective, to identify the subjective dimensions of experience that facilitate or act as obstacles to the initiation of a life planning process and, as its second specific objective, to explore the perceived needs for formal or informal support of the elderly parents in regards to planning. Our results demonstrate that many dimensions modulate the engagement of parents in such a process. Amongst the elements acting as barriers, we find, notably, the negative experiences and representations of formal services, the negative representations of alternative long-term care institutions and the religious, family or continuity values of the parents. The favorable aspects notably include the regular recourse to respite services and formal services. We've also demonstrated the importance of siblings in regards to immediate instrumental and affective support, but also their capital role concerning future planning. In terms of the perceived needs of the parents, needs for general information about potential alternatives, for financial support and for respite were frequently expressed by the ageing parents.
114

Apport des méthodes de planification automatique dans les simulations interactives d'industrialisation et de maintenance en réalité virtuelle / Contribution of automatic motion planning methods in virtual reality simulations of industrialization and maintenance

Ladeveze, Nicolas 19 April 2010 (has links)
Ce document explore l'utilisation de méthodes de planification automatique dans des simulations interactives. Lors de simulations de montage et de démontage de composants industriels en environnement virtuel, l'utilisateur peut nécessiter une assistance. Cette assistance est réalisée par l'utilisation d'une solution de planification de trajectoire en temps réel. Cette solution permet la construction interactive d'une chemin par la combinaison de l'avis de l'utilisateur avec la performance de planificateurs automatiques. / This PhD thesis explores the use of motion planning methods in interactive simulations. In the context of assembling and disassembling simulations of industrial components using haptic devices, the user may require assistance to find collision free paths. This assistance can be provided using real time interactive path planning methods. Our solution allows an interactive construction of free paths by combining the opinion of the user with the performance of fast modified automatic path planners.
115

La stratégie syndicale dans le contexte institutionnel de la formation continue au Québec : l'étude du cas de la Fédération des travailleurs et travailleuses du Québec

Gagné, Diane January 2004 (has links)
Mémoire numérisé par la Direction des bibliothèques de l'Université de Montréal.
116

La planification de la relève chez ABC

Carrière, Lucie January 2007 (has links)
Mémoire numérisé par la Direction des bibliothèques de l'Université de Montréal.
117

La préparation patronale à la négociation collective : ses attributs, ses déterminants et sa perspective stratégique

Tremblay, Jean-François January 2006 (has links)
Thèse numérisée par la Direction des bibliothèques de l'Université de Montréal.
118

Le modèle de gestion du patrimoine par les valeurs comme outil de développment : la restructuration de l'ancien port et du quartier de la Petite Sicile à Tunis

Ayadi, Sofiène January 2008 (has links)
Mémoire numérisé par la Direction des bibliothèques de l'Université de Montréal.
119

La stratégie syndicale dans le nouveau contexte institutionnel de la formation continue au Québec : l'étude du cas de la Confédération des Syndicats nationaux

Venditti, Angela January 2003 (has links)
Mémoire numérisé par la Direction des bibliothèques de l'Université de Montréal.
120

Correction d'une erreur induite expérimentalement : je ne l'ai pas vue... mais je l'ai corrigée quand même

Al Roujoula, Ahmad Adel January 2004 (has links)
Mémoire numérisé par la Direction des bibliothèques de l'Université de Montréal.

Page generated in 0.0878 seconds