• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 205
  • 123
  • 59
  • 11
  • 9
  • 4
  • 4
  • 4
  • 4
  • 4
  • 4
  • 4
  • 4
  • 3
  • 2
  • Tagged with
  • 468
  • 370
  • 194
  • 168
  • 144
  • 103
  • 65
  • 65
  • 61
  • 52
  • 52
  • 49
  • 48
  • 47
  • 47
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
281

Edifícios com lajes maciças e paredes portantes pré-moldadas de concreto leve com pérolas de EPS / Buildings with solid slabs and load bearing precast walls of lightweight concrete with EPS beads

Ferreira, Diego de Vasconcelos Gonçalves 28 May 2013 (has links)
Atualmente, muitas empresas de construção civil não acompanham o avanço tecnológico, preferindo utilizar sistemas convencionais em vez de investir em novas soluções. Além disso, há sérios problemas com mão de obra, que estão cada vez mais presentes na sociedade. Este trabalho apresenta o projeto de um edifício com elementos pré-moldados de Concreto Leve com pérolas de EPS, considerando lajes prontas maciças e paredes portantes, executadas com esse tipo de material. A princípio, foram considerados os estados limites últimos e de serviço para os elementos da estrutura, utilizando os modelos clássicos de análise estrutural. Para modelagem do edifício, foi utilizado o programa comercial SAP2000. Quanto aos procedimentos para dimensionamento das peças, foram preparadas planilhas do Excel, enquanto o detalhamento foi realizado por meio do AutoCAD. Definido o projeto estrutural, foram considerados aspectos construtivos na fábrica e na obra, levando em conta os custos de produção e de transporte, além de apresentar as vantagens que esse sistema construtivo pode proporcionar. Esses custos foram considerados para as lajes prontas maciças e para as paredes pré-moldadas. Mesmo levando em conta apenas os custos de produção e de transporte, o Concreto Leve com EPS foi comparado com o Concreto Autoadensável, o que permitiu visualizar as vantagens do primeiro, quando for considerado o custo global do empreendimento. / Currently, many construction companies do not follow the technological advances, preferring to use conventional systems rather than investing in new solutions. Moreover, there are serious problems with manpower, which are increasingly present in society. This work presents the design of a building with precast elements of lightweight concrete with EPS beads, considering solid slabs ready to use and load bearing walls, made with this type of material. As a rule, the ultimate limit states and serviceability were considered for the elements of the structure, using classical models of structural analysis. For modelling the building, the commercial software SAP2000 was used. Regarding the procedures for dimensioning of the pieces, Excel spreadsheets were prepared, while the detailing was carried out by means of the AutoCAD. Defined structural design, construction aspects were considered in the factory and in the work, taking into account costs of production and transportation, besides presenting the advantages that this constructive system can provide. These costs were considered for the solid slabs ready to use and for the precast walls. Even taking into account only the cost of production and transportation, the Lightweight Concrete with EPS was compared with Self-compacting Concrete, allowing visualize the advantages of the former when considering the overall cost of the project.
282

Contribuição à avaliação da estabilidade global e pré-dimensionamento de pórticos planos em concreto pré-moldado / Contribution to the assessment of global stability and preliminary design of precast concrete frames

Lins, Fernando de Faria Vecchio 01 July 2013 (has links)
O presente trabalho tem como objetivo desenvolver processos analíticos e programas computacionais para avaliação da estabilidade global e pré-dimensionamento de pórticos planos em concreto pré-moldado com base na garantia da estabilidade global. Em relação à avaliação da estabilidade global, são propostas duas expressões. A primeira está relacionada à expressão do limite do parâmetro de estabilidade aplicada a pórticos planos em concreto pré-moldado. A segunda expressão tem o objetivo determinar o deslocamento horizontal de topo de pórticos planos em concreto pré-moldado de um pavimento. A expressão do limite alternativo do parâmetro de estabilidade é deduzida a partir dos valores obtidos da relação entre o deslocamento horizontal médio e de topo de 1320 pórticos. A expressão é função do fator de restrição da ligação, contemplando, dessa forma, os efeitos causados pela semirrígidez das ligações no comportamento da estabilidade global desse sistema estrutural. A equação de determinação do deslocamento horizontal de topo de pórticos planos em concreto pré-moldado de um pavimento é deduzida com base no método dos deslocamentos. Em relação ao pré-dimensionamento de pórticos planos em concreto pré-moldado, são propostos processos analíticos para o pré-dimensionamento dos pilares de pórticos de um pavimento com ligação semirrígida e de pórticos de múltiplos pavimentos com ligações rígidas e articuladas. Os processos analíticos são constituídos pela expressão da rigidez equivalente de estabilidade de pórticos, desenvolvida através das equações do parâmetro de estabilidade e do seu limite alternativo. O trabalho ainda apresenta o Programa de Avaliação da Estabilidade Global e Pré-dimensionamento de Pórticos Planos em Concreto Pré-moldado, denominado PRE-MOLDIM. O programa é constituído por quatro módulos. O primeiro módulo realiza a avaliação da estabilidade global e verificação da deslocabilidade lateral de pórticos planos em concreto pré-moldado. O segundo módulo tem o objetivo de definir as dimensões mínimas dos pilares em função da garantia da estabilidade global e do deslocamento lateral admissível. O terceiro módulo define o valor da rigidez das ligações necessário para que sejam atendidos os quesitos de estabilidade global e deslocamento lateral admissível. O quarto módulo realiza o dimensionamento da armadura de continuidade de uma típica ligação viga-pilar em concreto pré-moldado. O dimensionamento da armadura de continuidade é realizado em função da garantia da estabilidade global e do deslocamento lateral admissível de pórticos planos em concreto pré-moldado. A aplicação dos processos analíticos e programas computacionais em exemplos comprovaram, de forma satisfatória, o desempenho de suas funções. Os valores obtidos pela expressão alternativa do limite do parâmetro de estabilidade são compatíveis com o limite do coeficiente \'gama\'z. Os valores do deslocamento de topo de pórticos de um pavimento com ligações semirrígidas, obtidos pelo processo analítico, são próximos dos valores obtidos pela simulação numérica. Os pilares pré-dimensionados pelos processos analíticos conseguem garantir de forma satisfatória estabilidade global dos pórticos planos em concreto pré-moldado. / The present work aims to develop analytical processes and computer programs for the evaluation of global stability and preliminary design of plane frames in precast concrete based on ensuring global stability. Regarding the evaluation of global stability, two analytical expressions are proposed. The first is related to the expression of the limit of the stability parameter applied to plane frames in precast concrete. The second expression has the objective to determine the horizontal displacement of the top of plane frames in precast concrete for a floor. The expression of the alternative stability limit of the parameter is deduced from the values obtained from the relationship between the average and the top horizontal displacement of 1320 frames. The expression is a function of the limiting factor of the connection, thus contemplating the effects caused by the semi-rigidity of the connection on the global stability behavior of this structural system. The equation for determining the horizontal displacement of the top of plane frames in precast concrete pavement is obtained based on the displacement method. Regarding the preliminary design of plane frames in precast concrete, analytical procedures are proposed for the preliminary design of column of an one store frame with semi-rigid connection and a multiple store frames with rigid and articulated connections. The analytical processes are constituted by the expression of equivalent stiffness of frame stability, developed through the equations of the stability parameter and its alternative limit. The work also presents the Program of Global Stability Evaluation and Preliminary Design of Plane Frames in Precast Concrete, called PRE-MOLDIM. The program consists of four modules. The first module performs the evaluation of global stability and verification of lateral plane frames displaceability in precast concrete. The second module aims to set minimum dimensions for the pillars due to guarantee the global stability and check the allowable lateral displacement. The third module defines the value of the connections stiffness so the matter of global stability and allowable lateral displacement are satisfied. The fourth module performs the design of continuity armor of a typical beam-column connection in precast concrete. The design armour continuity is made on the basis of ensuring the global stability and lateral displacement allowable plane frames in precast concrete. The application of analytical processes and computer programs in examples proved satisfactorily, the performance of its functions. The values obtained by the alternative expression of the limit of stability parameter are compatible with the limit of the coefficient \'gama\'z. The offset values top venting a pavement with semi-rigid connections, obtained by the analytical process, are close to the values obtained by numerical simulation. The preliminary designed pillars by analytical processes can ensure a satisfactory global stability of the plane frames in precast concrete.
283

Ligações viga-pilar de estruturas de concreto pré-moldado: análise com ênfase na deformabilidade ao momento fletor / Precast concrete beam-to-column connections: emphasis on the deformability analysis

Miotto, Anamaria Malachini 20 December 2002 (has links)
No presente trabalho foram estudadas duas ligações viga-pilar de estruturas de concreto pré-moldado com ênfase na deformabilidade ao momento fletor. A primeira é muito utilizada em galpões com sistema estrutural de pórticos para telhado com duas águas. A segunda é utilizada em estruturas de edifícios com múltiplos pavimentos. Foram realizados ensaios físicos em dois modelos de cada tipo de ligação. Com base nos resultados experimentais, foram propostos modelos analíticos, baseados no Método dos Componentes, e realizadas simulações numéricas, baseadas no Método dos Elementos Finitos, através dos quais determinou-se a curva momento-rotação das ligações em estudo. As curvas momento rotação teóricas, para as duas ligações estudadas, ficaram bastante próximas das experimentais. De acordo com os resultados, pode-se dizer que a primeira ligação teve um comportamento próximo ao de uma ligação perfeitamente rígida. Isso porque, para uma estrutura típica, ela transmitiu mais de 90% do momento equivalente ao de uma estrutura monolítica. A segunda ligação também garantiu uma boa transferência de momento fletor. Observou-se que, ao considerar a semi-rigidez dessa ligação na análise estrutural, há uma redução significativa no momento na base dos pilares mais solicitados, o que permite uma redução na armadura dos pilares e nas dimensões da fundação / The present research deals with the study of two types of precast beam-to-column connections with emphasis on the deformability analysis. The first one is extensively used in precast concrete portal frames with sloping beams. The second one is used in multi-storey framed structures. Experimental tests on two models of each type of beam-to-column connections were done. Based on the experimental results, analytical models, based on the Component Method, were proposed and numerical simulations, based on the Finite Element Method, were developed, which provide the moment-rotation curves of the studied connections. The theoretical moment-rotation curves, for both studied connections, are in good agreement with the experimental ones. According to the results, the first connection had almost the same behaviour of a rigid one. It transmitted about 90% of the bending moment of an equivalent monolithic structure. The second connection also transmitted a good portion of bending moment. It was observed that when its semi-rigidity is considered on the structural analysis there was a significant reduction on the column base bending moment and on the foundation dimensions
284

Ligação viga-pilar em elementos pré-moldados de concreto solidarizados por concreto reforçado com fibras de aço: análises estática e dinâmica / Beam-column connection in precast concrete structures using steel fiber reinforced concrete

Oliveira Júnior, Luiz Álvaro de 13 June 2012 (has links)
No presente trabalho, utiliza-se concreto com fibras de aço, traspasse de armaduras e chaves de cisalhamento para desenvolver uma ligação viga-pilar capaz de resistir a ações cíclicas e dinâmicas e que possa ser empregada na pré-moldagem de estruturas de casas de força de usinas hidrelétricas. Para atingir este objetivo, inicialmente foram realizados ensaios de caracterização dos materiais, cujos resultados mostraram aumentos de 34% na resistência à tração na flexão, 16% na resistência à compressão e 33% na tenacidade, comprovando os efeitos benéficos das fibras de aço nas propriedades mecânicas do concreto. Em seguida, foram realizados ensaios de tração em tirantes, cujos resultados sugeriram que um comprimento de 15Ø é suficiente para que a emenda desenvolva as tensões de aderência de modo adequado; e ensaios de cisalhamento, cujos resultados mostraram que a ligação viga-pilar resiste a tensões de cisalhamento direto de até 0,77 MPa. Na sequencia, foram realizados ensaios cíclicos em dois modelos cruciformes para caracterização da ligação (um monolítico e outro de concreto pré-moldado, o qual empregava concreto com 1% de fibras na região da ligação), sendo o carregamento aplicado em cinco níveis de força, cada um com dez ciclos de carregamento e descarregamento. Os resultados desses ensaios mostraram que a ligação do modelo em concreto pré-moldado apresentou 85% da resistência do modelo monolítico e ruptura governada por flexão. Por fim, os ensaios dinâmicos foram realizados nos modelos cruciformes em três diferentes situações (íntegros, fraturados e após ruptura da ligação) para estimar o coeficiente de amortecimento, o qual sofreu uma redução de 31% após o ensaio cíclico. Simulações computacionais foram realizadas para complementar a investigação realizada neste trabalho. Elas mostraram representação aceitável da rigidez, mas não da resistência do modelo. / In the present work, steel fiber reinforced concrete, splicing bars and shear keys are used in order to develop a beam-column connection able to support cyclic and dynamic loadings and which can be used in precasting power houses structures of power plants. To achieve this goal, tests were carried out to characterize the materials, which showed increases of 34% in flexural tensile strength, 16% in compressive strength and 33% in toughness factor, confirming the beneficial effects of steel fibers in mechanical properties of the concrete. Then, tensile tests were carried out on rods, whose results suggested that a length of 15Ø can assure appropriate development of bond stresses through the splice; and shear tests, whose results showed that the beam-column connection resists to shear stresses of up to 0,77 MPa on shear key. After, cyclic tests were performed in two cruciform models in order to characterize the beam-column connection (one monolithic and the other precast concrete, which employed 1% steel fiber reinforced concrete in connection region, being the loading applied in five loading levels, each one in 10 cycles of loading and unloading. Results of these tests showed that precast beam-column connection presented 85% of the strength presented by the monolithic model and bending failure. Finally, dynamic tests were performed in cruciform models in three different situations (uncracked, cracked and after failure) for estimating the damping ratio, which was reduced by 31% after cycles. Computer simulations were performed to complement the research developed in this work. They showed acceptable representation of stiffness, but the strength of the model.
285

Estudo teórico-experimental de ligação viga-pilar com almofada de argamassa e chumbador para estruturas de concreto pré-moldado / Theoretical and experimental study of beam-to-column connection with pad of mortar and bolts for precast concrete structures

Sawasaki, Fábio Yoshio 05 May 2010 (has links)
As ligações com chumbador e almofada, sem continuidade estrutural, são comumente empregadas em obras de concreto pré-moldado como galpões, edifícios de poucos pavimentos e no topo de pilares. Na análise estrutural, este tipo de ligação é caracterizado como articulado. Este trabalho teve como objetivo fazer um estudo com este tipo de ligação levando em conta que a transferência de momento fletor ocorrerá em função da rigidez proporcionada por uma almofada de compósito de argamassa e por chumbadores de aço. A idéia é considerar o benefício da redução das solicitações nos elementos de concreto pré-moldado, particularmente, na base dos pilares. A análise experimental foi feita com modelos em escala reduzida 1:2. Foram ensaiados quatro modelos da ligação que são: a) Modelo 1 - chumbadores de aço CA-25 e almofada de compósito de argamassa; b) Modelo 2 - chumbadores de aço CA-25 e almofada de policloropreno; c) Modelo 3 - chumbadores de aço CA-50 e almofada de compósito de argamassa e; d) Modelo 4 - chumbadores de aço CA-50 e pilar com largura igual a 50% maior que os casos anteriores e almofada de argamassa. Foi feita ainda a análise numérica tridimensional dos modelos da ligação utilizando o software Ansys e análises de pórtico plano para avaliar a distribuição de solicitações ao longo de estruturas representativas. Foi desenvolvido um modelo de projeto para prever o comportamento da ligação. Com as simulações de pórtico plano, onde foram consideradas as semirigidezes das ligações, obteve-se uma redução de até 48% do momento fletor na base dos pilares para um edifício de quatro pavimentos, cujas ligações viga-pilares apresentavam um consolo de 40 cm, e de 21,8% para um edifício de um pavimento do tipo galpão, cujas ligações continham quatro chumbadores, considerando apenas a carga de frenagem. A análise de deslocamentos nos pórticos planos também aponta o benefício da consideração da semirigidez nas ligações. Uma redução de deslocamento horizontal do topo do pórtico do tipo galpão de até 32,8% para o modelo com ligações com quatro chumbadores e somente força horizontal, e de até 71,9% para o edifício de quatro pavimentos considerando as ligações semirígidas com consolos de 40 cm. / Connections with bolts and pad, without structural continuity, are commonly used in construction of precast concrete as one-storey building, building with a few storeys and on top of columns. In structural analysis, this type of connection is characterized as pinned, that is, without restriction of the rotation on the connection. This work aims to make a study of this type of connection taking into account that the transfer of bending moment will occur due to the stiffness provided by a pad of mortar composite and the steel bolts. The idea is to consider the benefit of reducing the demands on the elements of precast concrete, particularly at the base of the columns. The experimental analysis was done with models scale 1:2. Four models of connection were tested: a) Model 1 - steel bolts CA-25 and pad of mortar composite, b) Model 2 - steel bolts CA-25 and chloroprene rubber pad, c) Model 3 - bolts of CA-50 steel and pad of mortar composite, and d) Model 4 - steel bolts CA-50 and column with a width of 50% larger that the others and mortar pad. It was still a three-dimensional numerical analysis of the lead models using Ansys software and frame plan analysis to evaluate the stress distribution along the representative structures. A model design to predict the behavior of the connection was developed. Based on the numerical simulations on precast concrete frames, semi-rigidity of connections was take in to account, it was obtained a reduction of up to 48% of the bending moment at the base of the columns of a four-storey building, which beam-to-column connections had a corbel 40 cm, and 21,8% for a one-storey building, which connections contained four bolts, considering only the horizontal load. The analysis of displacements in the plane frame also shows the benefit of considering the semi-rigidity connections. Reduction in horizontal displacement of the top of the one-storey building to 32,8% for the model with four bolts in the connections with only horizontal force, and 71,9% for the four-storey buildings with semi-rigid connections considering the corbels of 40 cm.
286

Análise da base de pilares pré-moldados na ligação com cálice de fundação / Analysis of the precast concrete column base in the connection socket

Ebeling, Eimair Bottega 22 May 2006 (has links)
O trabalho apresenta a análise do comportamento da base de pilares de concreto pré-moldado na ligação com cálice de fundação, dando-se continuidade a estudos anteriores sobre este tipo de ligação. A pesquisa visa preencher a falta de informações sobre o comportamento da base de pilares na região de embutimento, já que praticamente não existem recomendações sobre o assunto. É realizada uma investigação experimental, com a construção de dois modelos, em que os cálices de fundação foram aproveitados de pesquisas anteriores. Os modelos possuem interface de contato lisa, com comprimento de embutimento diferente e foram submetidos a força normal com grande excentricidade. São apresentadas simulações numéricas pelo Método dos Elementos Finitos, com a consideração das não linearidades físicas, geométricas e de contato. É feita uma análise comparativa entre os modelos físicos e numéricos, sendo observados os deslocamentos, deformações na armadura longitudinal e transversal, fissuração e fluxo de tensões. Os resultados apresentados mostram que a ruína dos modelos ocorreu pela plastificação da armadura longitudinal tracionada, localizada fora da região de embutimento e que a armadura transversal foi pouco solicitada. São feitas recomendações sobre a ancoragem da armadura longitudinal e ao final do trabalho é sugerido um modelo de bielas e tirantes que represente o comportamento da base de pilares na região de embutimento / The study presents the analysis of precast concrete column base in the connection socket. This research follows previous studies on this connection type. The research aim to fill out the lack of information about column base in the embedded length, because almost do not exist recommendations about this subject. An experimental investigation was developed with the construction of two models, which connection sockets were reused from previous researches. The models have smooth contact interface with different embedded lengths and the axial load with great eccentricity was applied in the models. Numeric simulations are presented by using the Finite Element Method adopting non-linear physical, geometric, and contact. A comparative analysis was done between the tests and numeric models that were observed the displacements, longitudinal and transversal reinforcement strain, cracking, and stress flow. The results show that the ruin of the models occurred for large strain in longitudinal tensioned reinforcement located out of embedded length. The transversal reinforcement presents little strain. Recommendations are made for anchorage of longitudinal reinforcement and at the end of the research an analytical model for column base behavior is suggested for connecting foundation by socket
287

Almofada de apoio de compósito de cimento para ligações em concreto pré-moldado / Bearing pad of cement composite for connections in precast concrete

Siqueira, Gustavo Henrique 30 March 2007 (has links)
Esta pesquisa apresenta um estudo de uma argamassa modificada para uso como elemento de ligação entre elementos de concreto pré-moldado. A argamassa utilizada nesta pesquisa é obtida pela introdução de látex estireno-butadieno (SB) e fibras de polipropileno a uma argamassa de cimento e areia. Estas adições modificam suas propriedades mecânicas, proporcionando o aumento da deformabilidade por diminuição do módulo de elasticidade do compósito, conferindo-lhe características favoráveis ao uso como elemento de apoio para elementos pré-moldados de concreto. Foram realizados ensaios de caracterização do compósito por meio da obtenção das resistências à compressão e à tração e, do módulo de elasticidade para corpos-de-prova cilíndricos com 50 mm de diâmetro com 100 mm de altura. Ensaios de capacidade de deformação, capacidade de rotação e capacidade de acomodação de imperfeições e distribuição das tensões foram realizados em almofadas de 150 mm x 150 mm com espessura de 10 mm. Os resultados mostraram que o material possui boa capacidade de se deformar em níveis de tensão da ordem de 10 a 20 MPa mantendo sua resiliência. Valores de rotações entre 0,01 e 0,02 rad foram obtidos nos ensaios, sendo estas maiores que os valores necessários para a maioria dos casos convencionais de projeto. Na acomodação e distribuição das tensões, a presença das almofadas promoveu uma melhora de 25% no desempenho de ligações submetidas à compressão uniforme, com rugosidades de 1,0 mm. / This research presents a study of a mortar modified to use as bearing pad between precast concrete elements. The mortar used in this research is achieved by the introduction of styrene-butadiene latex (SB) and polypropylene fibers into a cement mortar and sand, modifying their mechanical properties, as increase of the potential deformation by decrease of the composite modulus of elasticity, providing favorable characteristics to the use as bearing pad for precast concrete elements. Cylindrical samples of 50 mm of diameter with height of 100 mm were molded and tested to determination the compressive and the tensile strength and also the modulus of elasticity of the composite. Compression tests with cushions of 150 mm x 150 mm of base with thickness of 10 mm were done to determinate the deformation capacity, rotation capacity and capacity of accommodation of imperfections and distribution of the stresses between precast elements. The results showed that the material has a capacity to deform in levels of tension from 10 to 20 MPa maintaining his resilience. Values of rotations among 0,01 and 0,02 rad were obtained, being these larger ones than the necessary values for most of the conventional cases of project. In the accommodation and distribution of the stresses, the presence of the bearing pad promoted an improvement of 25% in the strength of connections subject to uniform compressive stresses, with surface irregularities of 1,0 mm.
288

Ligações de montagem viga-pilar para estruturas de concreto pré-moldado: estudo de caso / Assembly connections beam-column for structures of precast concrete: case study

Prado, Lisiane Pereira 19 September 2014 (has links)
A pesquisa em questão é direcionada ao estudo de uma ligação provisória entre o pilar e a viga pré-moldada para que possa servir de suporte durante a execução da ligação de estrutura, que consiste na utilização de barras de aço salientes do pilar e da viga, traspassando entre si, finalizada por concreto com adição de fibras. O uso de consolo metálico formado por perfil tipo \"U\" e dente metálico constituído de um perfil de seção retangular vazado foi o método proposto para a ligação provisória, na qual a montagem da viga no pilar se dá pelo encaixe dos elementos. O modelo adotado como dente metálico é denominado \"Cazaly Hanger\". Para avaliar o comportamento da ligação estudada foram analisados os modelos analíticos referentes aos elementos da ligação e, posteriormente, foi montado um pórtico estrutural com a ligação provisória em estudo, para analisar o seu comportamento sob um carregamento estático e monotônico. Inicialmente foi aplicada uma força referente a 71,75% da capacidade da ligação, no meio do vão da viga e excêntrico ao seu eixo para analisar a torção na ligação, simulando uma possível força acidental que venha a ocorrer durante a montagem dos elementos. Na segunda etapa foi aplicada uma força a 1/2,94 do vão da viga a fim de determinar a capacidade do dente metálico e, na terceira e última etapa, o carregamento foi aplicado a 1/7,14 do vão da viga, na extremidade oposta a força aplicada na etapa 2, para determinar a capacidade de suporte do consolo metálico. Os resultados dos ensaios mostraram que a capacidade resistida pelo dente metálico foi 33% maior que o determinado no modelo analítico e, o estado limite último do consolo metálico constituído por perfil \"U\" foi caracterizado pela deformação excessiva da alma, na região superior do consolo. Pode-se concluir que o modelo de cálculo usado no trabalho foi coerente com os resultados encontrados para o dente metálico, mas, para os consolos metálicos, os valores teóricos não foram compatíveis com os resultados encontrados no modelo prático. / The research is directed to the study of a beam-column temporary connections to provide support during the execution of structure connection, which consist on using steel bars protruding from the column and beam finalized by addition of concrete with fibers. The use of steel \"U\" shaped corbel in the column and a steel hangers rectangular hollow core section in the beam was proposed for temporary connection method, in which the erecting the beam in the columns occurs by the nest of the elements. To evaluate the behavior of the studied connections it was analyzed the analytical models of connections and, after were building a structural portico with the connection to analyze their behavior under static and monotonic loading. Initially it was applied a load corresponding to 71,75% of the connection capacity, mid-span of the beam and its eccentric to check the torsion moment on the connection, simulating a possible live load that may occur during assembly of the elements. In the second stage was applied a load of 1/2,94 span beam to determine the capacity of steel hanger rectangular hollow core section and the third and last step the load was applied at 1/7,14 span of the beam, the end opposite the load applied in step 2, to determine the ability of the steel \"U\" shaped corbel. The results showed that the steel hanger inserted capacity was 33% higher than determined in the analytical model and the ultimate limit state of the steel \"U\" shaped corbel was characterized by excessive deformation of vertical plate, in the upper region of corbel. Can conclude that the calculation model used in the study was consistent with the results found for the steel hangers rectangular hollow core section, but for the steel \"U\" shaped corbel, the theoretical values were not consistent with the results found in practical model.
289

Análise estrutural de pórticos planos de elementos pré-fabricados de concreto considerando a deformabilidade das ligações / Structural analysis of precast concrete portal frames considering the semi-rigid behavior of the connections

Soares, Anamaria Malachini Miotto 19 June 1998 (has links)
Os sistemas pré-fabricados vêm conquistando espaço em todo o Brasil. Dentre eles, os pórticos planos de elementos pré-fabricados de concreto com sistema estrutural para telhado de duas águas, comumente denominados de galpões, tem sido amplamente aplicados. Os galpões, como a matona das estruturas pré-moldadas de concreto, apresentam suas ligações, em maior ou menor grau, deformáveis. Portanto, este trabalho refere-se ao estudo da deformabilidade de uma de suas ligações: a ligação viga-pilar executada através de consolo e chumbador, e da sua influência na distribuição dos esforços solicitantes destas estruturas. Neste sentido, foram realizadas simulações numéricas, com o emprego do Método dos Elementos Finitos e ensaios físicos. Através do ensaio físico realizado no modelo da ligação viga-pilar foi possível determinar sua deformabilidade à flexão e observar seu modo de ruptura. As simulações numéricas foram realizadas tanto para obter teoricamente o valor da deformabilidade à flexão da ligação em análise, como para avaliar sua influência no comportamento estrutural dos galpões pré-moldados. Com base nos resultados obtidos, foram elaboradas algumas recomendações de projeto para os galpões pré-moldados. / The use of precast concrete structures has increased in Brazil. Among them, the precast concrete portal frames with sloping beams have been extensively used in storehouses and commercial and industrial buildings. This type of portal frame, as the most precast concrete structures, has semirigid connections. So, this work deals with the study of the semi-rigid behavior of one beam-column connection type frequently used in these structures. In this kind of connection the beam rests on a corbel which has two projecting bolts connecting it. The aim of this thesis is also to determine the influence of the flexibility connection on the structure behavior. Numerical modeling applying the Finite Element Method and experimental tests were done to analyse these aspects. The test results of a beam-column model allowed the construction of the moment-rotation diagram and the failure mode observation. The numerical modeling was done to get the value of the connection flexibility and to study its influence on the precast concrete portal frame behavior. Based on the results some design recommendations were established.
290

Contribuição ao projeto estrutural de galerias de concreto pré-moldado com seções transversais não usuais / Contribution to the study of precast concrete culverts with unusual cross sections

Aline Bensi Domingues 20 March 2017 (has links)
As galerias enterradas são amplamente utilizadas em obras de arte corrente (OAC) na infraestrutura de rodovias e ferrovias. Visando disponibilizar mais alternativas na produção de galerias de concreto pré-moldado, a pesquisa apresenta uma análise comparativa de custos para seções transversais não usuais, direcionado a grandes profundidades de instalação. A primeira seção proposta é denominada modificada e é composta por uma base retangular com uma cobertura em arco e a segunda seção proposta é definida por três arcos com uma base plana. Essas seções além de possuir formato de geometria favorável à distribuição dos esforços solicitantes, mantêm o benefício de possibilitar uma compactação adequada do solo na lateral da galeria, como acontece em galerias retangulares convencionais, e isso garante o confinamento do solo e a redistribuição de pressões, graças à mobilização do efeito de arqueamento. Para considerar a interação solo-estrutura foram realizadas análises via elementos finitos com o pacote computacional GeoStudio® próprio para análises geotécnicas. Os resultados comprovaram a interferência do formato das geometrias no comportamento da interação solo-galeria e também evidenciaram que a redução da espessura das paredes da galeria mobiliza em maior intensidade a capacidade resistente do solo e isso reduz os esforços na estrutura. Quanto à análise dos dimensionamentos, com base na comparação dos custos evidenciou-se que, para as galerias modificadas a redução das taxas de armadura está relacionada com flecha do arco da cobertura, sendo que a economia verificada no custo total de materiais das seções estudadas variou de 4 a 29% comparado à galeria retangular. Para a galeria definida por três arcos, confirmou-se que quanto mais alongado for o seu formato, melhor é o comportamento à grandes profundidades de instalação, sendo que a economia verificada no custo total da galeria mais elíptica (DTA I-b) chegou a 50% em relação à galeria retangular e demais geometrias estudadas tiveram economia entre 17 e 42%. / Box culverts are often used in current drainage in the infrastructure of highways and railways. In order to provide more production\'s alternatives of precast concrete culvert, the research presents the comparative cost analysis for unusual cross sections, directed to large depths of installation. The first proposed cross section called modified culvert is composed of a rectangular base with an arc roof. The second is defined by three arcs with a flat base. These cross sections have geometric shapes favorable to the distribution of bending moment and shear forces. It maintains the benefit of adequate compaction of the backfill at the side of the culvert, as well as in conventional box culvert, which ensures ground confinement and pressure redistribution due to the mobilization of the arching effect. In order to consider the soil-structure interaction, finite element analyzes were performed using GeoStudio® software, which is a computational package specific for geotechnical analysis. The results showed that the geometries have influence on the behavior of the soil-culvert interaction, and that the reduction of the thickness of the culvert walls mobilizes the soil resistant capacity, reducing the stresses in the structure. Regarding the structural design, considering the comparison of costs, it was evidenced a reduction of steel reinforcements for the modified culvert, which is related to the arrow of the arc of the cover. The materials saving verified in the total cost of the studied sections ranged from 4% to 29% compared to the box culvert. For the culvert defined by three arches, it was evidenced that the more elongated its geometry, better the behavior for the great depths of installation. The highest materials saving was verified in the total cost of the most elliptical culvert (DTA I-b), which reached a value of 50%. Compared to the box culvert, the others geometries studied had savings between 17-42%.

Page generated in 0.0447 seconds