• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 37
  • Tagged with
  • 38
  • 38
  • 27
  • 27
  • 23
  • 13
  • 12
  • 9
  • 8
  • 8
  • 6
  • 5
  • 5
  • 4
  • 4
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
11

Propuesta de mejora del proceso de abastecimiento de equipos de bombeo en una empresa distribuidora usando las herramientas de Lean Six Sigma

Sotomayor Ponte, Edin Lincol 23 May 2018 (has links)
En el presente trabajo se describen los resultados alcanzados al integrar las herramientas de Lean y Six Sigma para mejorar el proceso de abastecimiento de los equipos de bombeo en una empresa distribuidora de Equipos de Bombeo. En primer lugar, se hizo el análisis de la situación actual, en la cual se determinó que existe baja eficiencia en los procesos logísticos, debido al elevado ciclo de abastecimiento, deficiente gestión de inventario y falta de procedimientos estandarizados. En segundo lugar, se utilizó la metodología DMAIC para implementar la propuesta de mejora. En las fases analizar y mejorar se usó el VSM y herramientas estadísticas de Six Sigma, a fin de reducir el ciclo de abastecimiento elevado. Asimismo, se normalizó los procesos del ciclo logístico y se implementó un sistema de gestión de inventario. Finalmente, con la implementación de la metodología Lean Six Sigma se logró la reducción de tiempo del ciclo de abastecimiento de 52 a 33 días y un ahorro anual de S/. 201, 282.50. En consecuencia, las herramientas de la metodología implementada y los resultados alcanzados, pueden servir como guía y referencia a los investigadores que necesiten mejorar los procesos logísticos de una organización. / This paper describes the results achieved by integrating Lean and Six Sigma tools to improve the process of supplying pumping equipment within a pumping equipment distributor company. First, an analysis of the current situation was made, in which it was determined that there is a low efficiency in logistics processes due to the high supply cycle, poor inventory management and lack of standardized procedures. Second, the DMAIC methodology was used to implement the improvement proposal. In the analysis and improvement phases, the VSM and Six Sigma statistical tools were used in order to reduce the high supply cycle. Also, the processes of the logistic cycle were normalized and an inventory management system was implemented. Finally, the reduction of the supply cycle time was achieved from 52 to 33 days with the implementation of the Lean Six Sigma methodology as well as a saving of the annual logistic cost of S /. 201, 282. Consequently, the tools of the methodology implemented and the results achieved can be used as a guide and reference for researchers who actually need to improve the logistics processes of an organization. / Tesis
12

Macerados de PiscoTajahuana

Chevarria Castro, Roberto Hernando, Silva Santisteban Sánchez, Rodolfo Enrique, Vallejos Sanchez, Luzdina, Vega Mejía, Sandra Orfelina 16 December 2017 (has links)
Nuestro proyecto de negocio involucra a nuestra bebida bandera el Pisco, que en los últimos años debido al apoyo de empresas privadas y el estado ha incrementado su producción considerablemente. Para ello, se enfocó en conocer las variantes de la preparación del Pisco, uno de ellos es el macerado, actualmente el mercado cuenta con 2,385 bares y restaurantes pero solo existen 6 empresa dedicadas a la producción y comercialización del pisco bajo la modalidad de macerados. Como vemos la demanda es más grande que la oferta situación que nos lleva a presentar esta idea de constituirnos en una empresa dedicada a la elaboración y comercialización de macerados de Pisco, empresa a la que llamaremos Macerados de Pisco “Tajahuana”.
13

Propuesta de mejora en el proceso productivo de una empresa que fabrica productos sanitarios en fibra de vidrio

Escudero Arrieta, Andrea 01 December 2017 (has links)
Basado en una empresa que se dedica a la fabricación de productos sanitarios en fibra de vidrio. Se recabó información con el personal de la empresa para posteriormente validarlo in situ. Se detectó que la empresa está rechazando producir cerca del 15% de productos en el mes, atribuyendo que no cuenta con capacidad para realizarlos. Ante la problemática expuesta se planteó una propuesta de mejora integral, en la cual se aplicarán herramientas de ingeniería, tales como: 5 “S”.
14

Propuesta de mejora de la productividad en el área de producción en una fábrica de snacks

Palomino Laureano, Cristian Paul 05 February 2018 (has links)
Elaborar propuestas de mejora en el área de producción de una fábrica de snacks a fin de aumentar la capacidad de la planta por medio del incremento de sus dos principales cuellos de botella (Capacidad de envasado y producción de productos intermedios) utilizando las herramientas Lean, la correcta gestión de procesos e investigación de las operaciones y así se reduzcan las entregas pendientes de productos terminados al área comercial. / Improvement of productivity in a snacks factory in the production area in order to increase the capacity of the plant through the increase of its two main bottlenecks (packaging capacity and production of intermediate products) using the Lean tools, the correct management of processes and research of operations to reduce the pendings of finished products to the commercial area.
15

Propuesta de mejora para el control y la programación de la producción en una fábrica metal mecánica

Cardenas Vasquez, Sthefany Milagros 23 January 2019 (has links)
El presente proyecto consiste en el diseño de una propuesta de mejora aplicado a la industria manufacturera en el rubro metal mecánico, que consiste en el desarrollo de cuatro capítulos que busca analizar, identificar el problema, diseñar y validar el modelo que se rige bajo las características de este sector. En el primer capítulo se realiza un análisis de la situación actual de las industrias metal mecánicas, determinar su comportamiento en el país y en el mundo. En el segundo capítulo se realiza un estudio de la empresa seleccionada para determinar el problema y el impacto económico; así mismo, se hace un análisis detallado de las causas que pueden originar dicho problema y midiendo la relevancia de cada uno. El tercer capítulo inicia con la selección de las propuestas mediante la aplicación de criterios para determinar la inocuidad de la solución con el problema. El cuarto capítulo presenta la validación mediante un piloto aplicado en la empresa, siguiendo los pasos planteados en el capítulo anterior; adicionalmente se realiza el monitoreo de los indicadores requeridos para medir la efectividad y el cumplimiento de los objetivos en relación con las causas encontradas. También se realiza una evaluación económica para determinar la factibilidad del proyecto a lo largo del tiempo. Finalmente, se exponen las conclusiones por cada capítulo desarrollado y luego se redactan las recomendaciones para que el estudio realizado sirva como base para aquellas empresas que requieran tomar como ejemplo la propuesta de mejora. / This project consists in the design of a proposal for improvement applied to the manufacturing industry in the field of mechanical metal, which consists in the development of four chapters that seeks to analyses, identify the problem, design and validate the model that is governed under the characteristics of this sector. In the first chapter an analysis of the current situation of the metal-mechanical industries is carried out, to determine their behavior in the country and in the world. In the second chapter, a study of the selected company is carried out to determine the problem and the economic impact; Also, a detailed analysis is made of the causes that can cause this problem and measuring the relevance of each one. The fourth chapter presents the validation by a pilot applied in the company, following the steps raised in the previous chapter; In addition, monitoring of the indicators required to measure the effectiveness and fulfillment of the objectives in relation to the found causes is carried out. An economic evaluation is also carried out to determine the feasibility of the project over time. Finally, the conclusions are presented for each chapter developed and then the recommendations are drafted so that the study serves as a basis for those companies that require to take as an example the proposal for improvement. / Tesis
16

Mejora de la productividad de una mype fabricante de calzado infantil a través de herramientas del lean manufacturing / Improvement of the productivity of a mype children's footwear manufacturer through lean manufacturing tools

Domínguez Matos, María Claudia 13 May 2019 (has links)
Este proyecto de tesis fue aplicado en la empresa Le Carré SAC, dedicada a la producción exclusiva de calzado de cuero para niños, la cual fue objeto de análisis y diagnóstico, y así hacer posible la implementación de la propuesta de mejora en su proceso de producción. En el último año la empresa ha incurrido en mayores costos por tercerizar pares de calzado, debido a que no ha logrado alcanzar las cantidades que, como empresa, se ha proyectado para cubrir con la demanda anual. La aparición de distintos tipos de defectos durante los procesos de fabricación de calzados, generó la baja productividad y un impacto económico de 6.91% en la utilidad anual. Para solucionar o mitigar este problema se optó por diseñar y desarrollar un sistema de gestión integral para mipymes, el cual se orienta en la gestión por procesos y conceptos de mejora continua y manufactura esbelta, todos ellos alineados a la gestión de la calidad. El presento proyecto inicia con la descripción del marco teórico y metodológico, en donde se señalan las diferentes herramientas a utilizar, como la 5S, 7 mudas, VSM, Balance de línea y otras herramientas de análisis. Luego, se hará un análisis y diagnóstico de la situación inicial en general de la empresa. Posteriormente, se analizarán los factores causantes de la baja productividad y su impacto en la empresa, para que finalmente, se puedan plantear propuestas de mejora y así, aplicarlas correctamente. / This thesis project was carried out in Le Carré SAC company, dedicated to the exclusive production of leather footwear for children, which was the object of analysis and diagnosis, and thus make possible the implementation of the improvement proposal in its production process. In the last year the company has incurred higher costs for outsourcing pairs of footwear, because it has not managed to reach the amounts that, as a company, has been projected to cover the annual demand. The appearance of different types of defects during the manufacturing processes of footwear, generated low productivity and an economic impact of 6.91% on the annual profit. To solve or mitigate this problem, it was decided to design and develop a comprehensive management system for MSMEs, which is oriented to process management and concepts of continuous improvement and lean manufacturing, all aligned to quality management. The present project begins with the description of the theoretical and methodological framework, where the different tools to be used are pointed out, such as 5S, 7 Wastes, VSM, Line Balance and other analysis tools. Then, it is showed an analysis and diagnosis of the initial situation in general of the company. Subsequently, the factors that cause low productivity and its impact on the company, so that, finally, proposals for improvement can be implemented correctly. / Tesis
17

Propuesta de mejora de procesos en la producción de bebidas alcohólicas utilizando herramientas del Lean Manufacturing

Vidal Gonzales, William John 01 October 2018 (has links)
Este estudio se centra en la mejora del proceso productivo en la planta de elaboración de bebidas alcohólicas de la empresa Bebidas RTD SAC, ubicada en el distrito de Lurín, y como este desarrollo genera un impacto en el nivel de servicio al cliente. Para ello, se aplicaron herramientas de ingeniería para diagnosticar de manera eficiente la situación actual y las causas que están generando el problema. El resultado fue la falta de capacidad de producción debido al retraso y demora en la ejecución de los procesos de etiquetado y acondicionado. En consecuencia, en la propuesta de mejora se aplicaron técnicas lean como el diagrama VSM, 5´s, estudio de tiempos y movimientos, modificación del layout y balanceo de líneas con el fin de reducir los tiempos, incrementar la capacidad de producción y mejorar el nivel de servicio actual. Los resultados permitieron la mejora en la capacidad de producción en un 75% y el incremento del nivel de servicio superior al 95%. / This study focuses on the improvement of the production process in the alcoholic beverage manufacturing plant of the company Bebidas RTD SAC located in the district of Lurín and how this generates an impact on the level of customer service. For this, engineering tools were applied to efficiently diagnose the current situation and the causes that are generating the problem. The result was the lack of production capacity due to the delay and delay in the execution of the labeling and conditioning processes. Consequently, in the improvement proposal lean techniques such as the VSM diagram, 5's, study of times and movements, layout modification and line balancing were applied in order to reduce the times, increase the production capacity and improve the current service level. The results allowed the improvement in production capacity by 75% and the increase in the level of service above 95%. / Tesis
18

Propuesta de un proceso de gestión logística para las mypes cafetaleras ubicadas en el departamento de Cerro de Pasco, provincia de Oxapampa, distrito de Villa Rica; con el objetivo de incrementar su productividad

Miranda Chinchay, Frank Ginger, Tamayo Valdivia, Angello André 05 September 2018 (has links)
Este proyecto de investigación muestra los hallazgos encontrados en una indagación de campo de la industria cafetalera presente en el departamento Cerro de Pasco, provincia de Oxapampa, distrito de Villa Rica - Perú. La información recaudada se obtuvo de fuentes primarias, como publicaciones del Ministerio de Agricultura del Perú, artículos relacionados a la gestión logística, evolución de la producción de café, retos del sector de agricultura, entre otros. Además de este enfoque, la información principal utilizada para el planteamiento de una propuesta de gestión logística ad hoc a las necesidades de la comunidad de Villa Rica, ha sido producto de las entrevistas a profundidad realizadas a la comunidad cafetalera de dicho distrito. / This investigation project looks at the findings of a field research into Villa Rica coffee industry. Villa Rica is a district located at Oxapampa province, Cerro de Pasco department – Peru. This research draws upon primarily primary sources including publications by the Peruvian Ministry of Agriculture, logistic management papers, coffee production papers, articles related to emerging challenges in the agriculture sector, inter alia. Besides this approach, the main information used for the proposal of an ad hoc logistics management process for Villa Rica coffee community, has been the result of in-depth interviews. / Tesis
19

Desarrollo de un sistema alternativo de control para la automatización de maquina arenadora de vidrio industrial Glasstek X20

Vargas Montero, Alberto Saúl, Canaza Tapia, Rene Jhonatan 01 March 2018 (has links)
En la actualidad, unos de los problemas que tienen las empresas arenadoras de vidrio, es la poca disponibilidad de repuestos, en el mercado local, en caso de avería del sistema de control de sus equipos. Este hecho impacta directamente en la producción y en la rentabilidad de la empresa. Si bien existen varios modelos y tipos de máquinas de arenado que cumplen técnicamente con los requisitos necesarios para realizar el proceso de arenado de vidrio eficientemente. Es la parte económica y el tiempo de adquisición son las principales razones que dificultan la adquisición e importación de los mismos. En algunos casos podría tomar hasta 60 días que implicaría una pérdida del 30 % de la utilidad anual esperada. Considerando que sólo el sistema de control de fábrica falle una vez, pero si este problema es recurrente las consecuencias para el negocio pueden ser más graves. Por ello, el presente proyecto, busca implementar un sistema de control alternativo que sea capaz de funcionar de similar o de mejor manera que el sistema de control de fábrica El costo de producción del sistema alternativo es altamente competitivo a diferencia del costo de compra e importación de un nuevo sistema de control de fábrica, el cual puede significar hasta el 60% del costo de una máquina nueva. El costo del sistema del control propuesto significa menos del 10% del costo de un sistema de control de un proveedor local incluyendo los gastos de importación. / Currently, one of the problems that have glassblower companies, is the limited availability of spare parts, in the local market, in case of failure of the control system of their equipment. This fact directly impacts the production and profitability of the company. Although there are several models and types of sandblasting machines that technically comply with the necessary requirements to perform the process of glass sandblasting efficiently. It is the economic part that hinders the acquisition and importation of them. In some cases it could take up to 60 days which would imply a loss of 30% of the expected annual profit. Whereas only the factory control system fails once, but if this problem is recurrent the consequences for the business can be more serious. Therefore, the present project seeks to implement an alternative control system that is capable of functioning similarly or better than the factory control system. The production cost of the alternative system is highly competitive, unlike the cost of purchase and import of a new factory control system, which can mean up to 60% of the cost of a new machine. The cost of the proposed control system means less than 10% of the cost of a control system of a local supplier including import costs. / Tesis
20

Propuesta de un modelo básico de gestión de supply chain del café orgánico en la región San Martín

Hilario Meza, Slee Kevinn, Robles Montes, Diego Leandro 03 October 2018 (has links)
La presente investigación aborda una exploración de un modelo de gestión de cadena de suministro del café orgánico en la región de San Martín, que fue realizada a través de un proyecto de investigación a largo plazo para la gestión de la cadena de suministro del café orgánico en el Perú. La investigación se consolidó con la experiencia de investigadores que han evaluado y analizado cadenas de suministro de productos agrícolas en todo el mundo; por otro lado, también se tienen en cuenta los riesgos que afectan al desarrollo y a la fluidez a través de toda la cadena de suministro. Se propone que los aportes de un modelo de gestión de la cadena de suministro del café orgánico son adecuados para explorar problemas externos e internos encontrados que disminuyen la eficiencia de la cadena de suministro. El modelo es importante para analizar y requiere de la colaboración de las observaciones de especialistas para realizar un modelo básico que puede ayudar a resolver los problemas, los cuales mejoran procesos y las organizaciones en las cooperativas de los productores de café en el país y en el mercado extranjero, y lograr el reconocimiento por su calidad y sostenibilidad en el Perú. / The paper is to explore a model of supply chain management organic coffee in San Martin Region, which was by a long-term research project for organic coffee supply chain management in Peru. The investigation was consolidated with items of researchers who have experiences in the evaluation and analysis of the supply chain of agricultural products worldwide; on the other hand, it is also taken into account the risks affecting the development and fluency through whole supply chain. The contributions here is proposed model of supply chain management organic coffee is suitable for exploring external and internal problems encountered decrease the efficiency of the supply chain. The model is important to analyze and require observations of specialists to collaborate to perform basic modeling that can help solve the problems that improving processes and organizations in the coffee farmers’ cooperatives in the domestic and foreign market, and achieve recognition for their quality and sustainability in Peru. / Tesis

Page generated in 0.0987 seconds