• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 42
  • 7
  • 7
  • 7
  • 7
  • 6
  • 1
  • 1
  • 1
  • 1
  • Tagged with
  • 42
  • 42
  • 42
  • 42
  • 25
  • 21
  • 20
  • 14
  • 12
  • 10
  • 8
  • 8
  • 6
  • 6
  • 5
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
21

Uma exploração dos modelos de uso integrado da teoria das restrições, produção enxuta e seis sigma /

Okimura, Luciano Itio. January 2013 (has links)
Orientador: Fernando Bernardi de Souza / Banca: Gilberto Miller Devos Ganga / Banca: Daniel Jugend / Resumo: Tendo como base o reconhecimento que os métodos Teoria das Restrições (theory of Constraints - TOC), Produção Enxuta (Lean Production - LP) e o Seis Sigma (Six Sigma - SS) possuem características complementares que podem potencializá-los quando utilizados em conjunto, algumas empresas relatam experiências de aplicação concomitantes destes método. Entretanto, o desafio de obter melhores resultados levaram pesquisadores e profissionais a buscarem melhores soluções, resultando, entre outras, em iniciativas de integração. Conhecidas como Integração TLS, estas iniciativas vêm procurando encontrar soluções que permitem compatibilizar características muitas vezes conflitantes entre elas, encontrando um modelo que as unifiquem. O objetivo prinicpal deste trabalho é realizar uma pesquisa de cunho fundamentalmente teórico que investigue tais modelos, avaliando suas características e identificando como tal integração foi viabilizada. A pesquisa teórica é complementada por uma pesquisa de campo com a aplicação de questionários para os autores dos modelos de integração, para as empresas que realizam a implantação dos modelos de integração e para as empresas praticantes da Integração TLS. Esta pesquisa foi direcionada para avaliação dos cinco modelos existentes de Integração TSL, não considerando eventuais integrações com outros métodos de gestão. Também se buscou encontrar na literatura relatos de casos de aplicação destes modelos. Cinco modelos foram identificados, nos quais se constatou que a base de todos eles é a proposição de um proposição de um processo focalizado de melhoria contínua, com papeis bem definidos para cada método que os constitui. Ao final da pesquisa teórica e pesquisa de campo é proposto um modelo de Integração TLS, concretizando as etapas do método de pesquisa de desenvolvimento teórico conceitual / Abstract: Based on the recognition that the methods Theory of Constraints (TOC), Lean Production (LP) and Six Sigma (SS) have complementary characteristics that can empower them when used together, some companies report these experiences concomitant application method . However, the challenge of getting better results led researchers and practitioners to seek better solutions , resulting, among others, in integration initiatives. Integration known as TLS, these iniatives are seeking to find solutions to reconcile often conflicting features between them, finding a model that unify. The main objective of this paper is to research largely theoretical slant to investigate such models, assessing their characteristics and identifying how such integration was made possible. Theoretical research is complemented by a field survey with questionnaires to the authors of integration models for companies that perform the deployment and integration models for business practitioners Integration TLS. This research was concluded to evalue the five existing models Integration TLS, without considering future integration with other management methods. We also sought to find in the literature reports of applications of these models. Five models were identified, of which it was found that the basis of all of them is the proposition of a focused continuous process improvement, with well-defined roles for each method that is. At the end of the theoretical research and field research is proposed a model of integration. TLS, implemeting the steps of the method of theoretical conceptual development research / Mestre
22

A utilização dos conceitos de manufatura enxuta e da teoria das restrições no abastecimento de uma linha de montagem /

Puerta, Marcus Vinicius. January 2016 (has links)
Orientador: Marcela Aparecida Guerreiro Machado Freitas / Coorientador: Bruno Chaves Franco / Banca: Andreia Maria Pedro Salgado / Banca: Ricardo Batista Penteado / Resumo: O grande número de competidores globais existentes no mercado tem levado as indústrias da cadeia automotiva a buscarem incessantemente melhorias na gestão operacional, e nesse sentido esse trabalho apresenta uma proposta de integração das técnicas e abordagens da Manufatura Enxuta e da Teoria das Restrições, através de uma aplicação prática, visando a melhoria da sistemática de abastecimento de componentes para utilização em células de solda pertencentes a uma linha de montagem de chassis. Em uma primeira etapa foram apresentados os conceitos e as possibilidades de integração de ambas as teorias e, a partir de um diagnóstico inicial do sistema de abastecimento, foram propostas alterações, de maneira evolutiva, em que melhorias baseadas na Manufatura Enxuta eram implementadas a cada rodada de experimento, culminando com a implementação de melhorias baseadas na Teoria das Restrições, integrando ambos os conceitos. O resultado final obtido corrobora a eficiência da integração das duas abordagens para a melhoria de processos, as quais contribuíram para uma diminuição dos tempos de ciclo de abastecimento na ordem de 89% para a célula alvo estudada, sendo superior ao resultado obtido utilizando-se apenas uma das técnicas, sem que houvesse necessidade de investimentos e/ou despesas significativas. / Abstract: The large number of global players in the market has led the automotive industry chain to incessantly seek improvements in operations management to increase their results and, based on this fact, this paper presents a proposal for integrating the techniques and approaches of Lean Manufacturing and Theory of Constraints through an action research application, aiming at improving the material supply system of welding cells from a chassis frame assembly line. In the first stage were presented the concepts and possibilities of integration of both theories and, from an initial diagnosis of the supply system, changes were proposed in an evolutionary way, in which improvements based on Lean Manufacturing were implemented on each experiment round, culminating in the implementation of improvements based on the Theory of Constraints, integrating both concepts. The final result confirms the efficiency of the integration of these two approaches as a way to improve processes, which contributed to an 89% decrease of the supply cycle times of the studied target cell. This result is better than the result obtained using only one of the techniques, without the need for investments and / or significant expenses. / Mestre
23

Influências e contribuições da teoria das restrições em sistemas de medição de desempenho : uma análise teórico-conceitual /

Fantini, Rodrigo. January 2011 (has links)
Orientador: Fernando Bernardi de Souza / Banca: Antonio Freitas Rentes / Banca: Jair Wagner de Souza Manfrinato / Resumo: A utilização de sistemas de medição de desempenho baseados em indicadores vêm crescendo a cada dia nas companhias. A busca por vantagens competitivas frente a esse mercado globalizado é o grande desafio. As empresas têm acompanhado diariamente seus resultados no intuito de saberem quão perto estão da meta. Uma forma eficaz de acompanharem tais desempenhos é por meio da adoção de sistemas de medição de desempenho (SMD). Os SMDs são métodos estruturados utilizados para gerenciarem a implementação de sua estratégia e manterem um monitoramento do resultado das ações tomadas. O objetivo desa pesquisa é identificar, por meio de uma ampla revisão da literatura sobre teoria das restrições (TOC), de que maneira os princípios da TOC complementa, contribui ou influência o arcabouço conceitual clássico de SMDs. Para tanto, foram pesquisadas as principais características de um SMD clássico, compilado nove quesitos dados como essenciais para um SMD, baseado em importantes autores do tema e por fim analisado o grau de aderências dos princípios da TOC aos quesitos de SMD. O trabalho apresenta algumas das práticas mais atuais de gestão de operações sugeridas pela TOC, as quais permitem a construção de vantagens competitivas sobre as quais as empresas devem saber capitalizar para garantir geração de vendas a uma taxa crescente. Baseado nas análises conceituais realizadas nesse trabalho, conclui-se que os princípios da TOC demonstraram-se convergentes quando comparados com os quesitos essências de um SMD aqui propostos / Abstract: The use of performance measurement systems based on indicators have been growing every day in organizations. The search for competitive advantages in the global market this is the big challenge. Companies have their results checked daily in order to know close are the goal. An effective way to monitor such performance is through the adoption of performance systems (PMS). The PMS are structured methods used to manage the implementation of its strategy and maintain a monitoring result of the actions taken. The objective of this research is to identify, through a comprehensive review of the literature on theory of constraints (TOC), how the principles of TOC complements, contributes or influences the conceptual framework of classical PMS. Thus, was surveyed the main features of a classic PMS, compiled ten items as essential for an PMS based on important authors of the subject and finally analyzed the degree of adherence to the principles of TOC to the questions of PMS. In this work was presented some of the most current practices of operations suggested by the TOC, which allow the construction of competitive adavantages on which companies must capitalize to ensure the generation of sales at an increasing rate. Based on the conceptual analysis performed in this study, was conclude that the principles of TOC demonstrate convergent when compared with the supposed essences of PMS items / Mestre
24

Conceitos de gestão de projetos e teoria das restrições, aplicados ao planejamento e controle da produção de uma empresa aeronaútica

Lemes, Carlos Alberto [UNESP] 01 December 2008 (has links) (PDF)
Made available in DSpace on 2014-06-11T19:30:09Z (GMT). No. of bitstreams: 0 Previous issue date: 2008-12-01Bitstream added on 2014-06-13T18:40:01Z : No. of bitstreams: 1 lemes_ca_me_guara.pdf: 2609773 bytes, checksum: b48233c10c62c2e639a2e6e8f0652138 (MD5) / Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES) / Este trabalho aborda planejamento e controle da produção para uma indústria de grande porte, no setor aeronáutico, cujos produtos têm alto grau de customização, ciclos elevados e uma exigência de alta qualidade e prazo por parte dos clientes. Uma produção bastante complexa, com muita movimentação de material, produto e pessoal e um considerável volume de dados a serem processados diariamente. Nesse cenário não há margem para erros e o caminho é a busca constante do diferencial competitivo. Com isso, a presente dissertação vem apresentar um modelo de planejamento e controle da produção utilizando conceitos de gestão de projetos através da programação das atividades de montagem por meio de rede de precedências juntamente com a aplicação da Corrente Crítica como recurso para minimizar as dificuldades de se trabalhar em ambientes multiprojetos. Um sistema estruturado e operado por aplicativos disponíveis no mercado, que permita a manipulação de informações oriundas do ambiente produtivo. O método adotado nesse trabalho foi a pesquisa-ação, contando com a participação efetiva e constante do pesquisador no equacionamento dos problemas encontrados. Tem-se como resultado da pesquisa o desenvolvimento e implantação de um sistema de gestão, com seus processos, bem como ganhos significativos de ciclo, mãode- obra e Work in Process - WIP, resultados estes determinantes para a conquista do diferencial competitivo e atendimento do alto grau de exigência do mercado aeronáutico. / This work approaches production planning and control of a large company, in the aerospace industry, whose products have high degree of customization, high cycles and a demand of high quality and delivery on time by the customers. The production is very complex, too many material transportation, products and personnel movement and a considerable volume of information being processed daily. In this scenario there is no margin for error and the path is the constant search of competitive differential. This study presents a model for a production planning and control assembly using concepts of project management by programming activities with network precedence and the implementation of the Critical Chain Method as a resource to minimize the noxious effects of working in multiprojects. A system structured and operated by applications available on the market, allowing the manipulation of information originating from of the productive atmosphere The method adopted in this work was the action-research, with the effective participation of the researcher solving some problems during the study. As a result, the study shows the development and implementation of a management system, with its processes, as well as significant gains cycle, manpower and Work In Process - WIP, these results are decisive for the conquest of the differential competitive to assist with excellence the high degree of demand of the aeronautical market.
25

A execução dos Convênios de Fundo de Infraestrutura (CT- INFRA) celebrados entre a Financiadora de Estudos e Projetos (FINEP) e a Universidade Federal do Espírito Santo (UFES) sob a ótica da eficácia

Souza, Juliano Azevedo de 14 December 2016 (has links)
Submitted by Patricia Barros (patricia.barros@ufes.br) on 2017-07-06T14:20:22Z No. of bitstreams: 2 license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) tese_10520_Dissertação Final - Juliano Azevedo de Souza (1).pdf: 1499218 bytes, checksum: 8128c22c517779eb5514a21f9773faa0 (MD5) / Approved for entry into archive by Patricia Barros (patricia.barros@ufes.br) on 2017-07-06T14:21:43Z (GMT) No. of bitstreams: 2 license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) tese_10520_Dissertação Final - Juliano Azevedo de Souza (1).pdf: 1499218 bytes, checksum: 8128c22c517779eb5514a21f9773faa0 (MD5) / Made available in DSpace on 2017-07-06T14:21:43Z (GMT). No. of bitstreams: 2 license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) tese_10520_Dissertação Final - Juliano Azevedo de Souza (1).pdf: 1499218 bytes, checksum: 8128c22c517779eb5514a21f9773faa0 (MD5) / O presente trabalho aborda sobre a execução dos Convênios de Fundo de Infraestrutura (CT-INFRAs) celebrados entre a Financiadora de Estudos e Projetos (FINEP) e a Universidade Federal do Espírito Santo (UFES) no período 2004-2010 sob a ótica da eficácia. A questão central é verificar se as instituições conseguem executar os CT-INFRAs no prazo acordado com a FINEP. O estudo foi realizado na UFES. O ponto de partida foi questionar à FINEP, via portal de informação, dados de todas as instituições que participaram dos convênios no referido período. Tais dados foram referentes ao prazo de execução do convênio, tempo destinado para liberar a segunda parcela e porcentagem gasta do valor total. Ao se comparar os dados, chegou-se à conclusão que raramente uma instituição consegue executar os convênios no prazo acordado de três anos. Além disso, foram aplicados questionários junto aos coordenadores de projetos, à FINEP, à Prefeitura Universitária (PU) e à Fundação Espírito Santense de Tecnologia (FEST), para verificar a execução dos convênios, relativamente, à UFES. Paralelamente, aplicou- se grupo de foco, junto à PU e à FEST para se construir a Árvore de Realidade Atual (ARA), com o objetivo de encontrar as causas raízes para a deficiente execução dos convênios. Os resultados obtidos por intermédio da análise apontam para a necessidade de melhoria no planejamento, relativamente, à gestão dos convênios. Foi utilizada, também, a ferramenta Script Lattes para averiguar a produção de artigos de cada equipe científica dos CT-INFRAs. Ao se relacionar à produção científica de cada equipe com os artigos produzidos pela UFES, chegou-se a conclusão que, os CT-INFRAs podem impactar, significativamente, na produção de artigos e contribuir na melhoria dos programas de pós-graduação. Por fim, foi apresentada uma proposta de melhoria com o intuito de que, os convênios passem a ser geridos de uma forma mais eficaz / The present work deals with the execution of the Infrastructure Fund Agreements (CT-INFRAs) concluded between the Studies and Projects Funder (FINEP) and the Federal University of Espírito Santo (UFES) in the period of 2004-2010 from the perspective of efficacy. The central question is to verify if the institutions are able to execute the CT-INFRAs within the agreed period of time with the FINEP. The study was conducted at the UFES. The starting point was to question the FINEP, via information portal, data from all the institutions that participated in the agreements in the referred period. Such data were related to the term of execution of the agreement, time destined to release the second installment and percentage spent of the total value. When comparing the data, it was concluded that rarely can an institution execute the agreements within the agreed three-year time frame. In addition, questionnaires were applied to project coordinators, the FINEP, the University City Hall (PU) and the Espírito Santense Foundation of Technology (FEST), to verify the execution of the agreements, relative to the UFES. In parallel, a focus group was applied, together with the PU and the FEST to build the Current Reality Tree (ARA), with the objective of finding the root causes for poor performance of agreements. The results obtained through the analysis point to the need for improvement in planning, relative to the management of the agreements. The Script Lattes tool was also used to investigate the production of articles from each scientific team of the CT-INFRAs. When relating the scientific production of each team with the articles produced by the UFES, it was concluded that the CT-INFRAs can significantly impact production of articles and contribute to the improvement of postgraduate programs. Lastly, a proposal for improvement was presented with the intent that the agreements could be managed more effectively
26

Restrições e perdas no contexto do transporte rodoviário de cargas : um estudo de caso

Billig, Osvaldo Alencar de Oliveira 30 March 2016 (has links)
As atividades de transporte rodoviário de cargas têm evoluído ao passo em que o mercado exige serviços diferenciados, no que se refere a velocidade, confiabilidade, com custos compatíveis. Circunstâncias que condicionam as empresas prestadoras que atuam no ramo de transportes empenhar esforços na melhoria dos seus processos de gestão, tencionando posicionar-se em um cenário competitivo. Conhecer os processos de maneira sistêmica possibilita tomada de decisões mais assertivas e para tanto, compreender as restrições oriundas das adversidades do mercado e ou perdas que advenham dos procedimentos organizacionais são itens fundamentais para a melhoria da gestão organizacional. Nesta perspectiva, esta dissertação objetivou compreender restrições e perdas no contexto do transporte rodoviário de cargas, tomando como adágio as Teorias das Restrições e o Sistema Toyota de Produção. Para tanto, foi desenvolvido estudo com natureza da pesquisa aplicada, abordagem qualitativa, exploratório e com procedimento técnico estudo de caso. Por meio da categorização, foi possível identificar e analisar informações que em última instância, atenderam os objetivos propostos neste estudo. Os elementos com mais influxo, foram a ruptura na comunicação entre o comando tático da matriz para com as operações de cada uma das unidades estratégicas de negócio, a gestão dos processos de forma eficiente e eficaz entre unidades e as perdas oriundas de avaria, erros de aferição e descaminhos de mercadorias. Os resultados apurados, apontam para as esferas empresarial e acadêmica, por meio da identificação de restrições e perdas, plausíveis de tomada de decisão, melhorias na organização e contribuição científica. / Fundação de Amparo à Pesquisa do Estado do Rio Grande do Sul, FAPERGS / The road transport activities has improved in regarding of market requirements for premium services, what includes speed, reliability, with compatible costs. Some conditions that affect companies that operate in transport sector induces to engage efforts in management process improvements, intending to position themselves in a competitive environment. Knowing the processes in a systemically way enables to make more assertive decisions, and to do so, understand the constraints arising from market adversities and/or losses coming from organizational procedures are essential keys for organizational management improvements. In this perspective, this dissertation aims to understand the constraints and losses in the context of road transport, taking as adage on Theory of Constraints and on Toyota Production System, therefore, was developed a study with applied research essence, qualitative approach, exploratory and technical procedure case study. Through the categorizing, it was possible to identify and analyze information that in the last instance, met the objectives proposed in this study. The elements with most influx were the breakdown in communication between the tactical command of the headquarters towards the operations of each strategic business units, the management of process in an efficient and effective way between units and losses in regarding to damages, measurement errors and waywardness of goods. The results obtained aim to the business and academic environment, by identifying constraints and losses, improvements on making plausible decisions in the organization and scientific contribution.
27

A execução dos Convênios de Fundo de Infraestrutura (CT- INFRA) celebrados entre a Financiadora de Estudos e Projetos (FINEP) e a Universidade Federal do Espírito Santo (UFES) sob a ótica da eficácia

Souza, Juliano Azevedo de 14 December 2016 (has links)
Submitted by Patricia Barros (patricia.barros@ufes.br) on 2017-07-06T14:20:22Z No. of bitstreams: 2 license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) tese_10520_Dissertação Final - Juliano Azevedo de Souza (1).pdf: 1499218 bytes, checksum: 8128c22c517779eb5514a21f9773faa0 (MD5) / Approved for entry into archive by Patricia Barros (patricia.barros@ufes.br) on 2017-07-06T14:21:43Z (GMT) No. of bitstreams: 2 license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) tese_10520_Dissertação Final - Juliano Azevedo de Souza (1).pdf: 1499218 bytes, checksum: 8128c22c517779eb5514a21f9773faa0 (MD5) / Made available in DSpace on 2017-07-06T14:21:43Z (GMT). No. of bitstreams: 2 license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) tese_10520_Dissertação Final - Juliano Azevedo de Souza (1).pdf: 1499218 bytes, checksum: 8128c22c517779eb5514a21f9773faa0 (MD5) / O presente trabalho aborda sobre a execução dos Convênios de Fundo de Infraestrutura (CT-INFRAs) celebrados entre a Financiadora de Estudos e Projetos (FINEP) e a Universidade Federal do Espírito Santo (UFES) no período 2004-2010 sob a ótica da eficácia. A questão central é verificar se as instituições conseguem executar os CT-INFRAs no prazo acordado com a FINEP. O estudo foi realizado na UFES. O ponto de partida foi questionar à FINEP, via portal de informação, dados de todas as instituições que participaram dos convênios no referido período. Tais dados foram referentes ao prazo de execução do convênio, tempo destinado para liberar a segunda parcela e porcentagem gasta do valor total. Ao se comparar os dados, chegou-se à conclusão que raramente uma instituição consegue executar os convênios no prazo acordado de três anos. Além disso, foram aplicados questionários junto aos coordenadores de projetos, à FINEP, à Prefeitura Universitária (PU) e à Fundação Espírito Santense de Tecnologia (FEST), para verificar a execução dos convênios, relativamente, à UFES. Paralelamente, aplicouse grupo de foco, junto à PU e à FEST para se construir a Árvore de Realidade Atual (ARA), com o objetivo de encontrar as causas raízes para a deficiente execução dos convênios. Os resultados obtidos por intermédio da análise apontam para a necessidade de melhoria no planejamento, relativamente, à gestão dos convênios. Foi utilizada, também, a ferramenta Script Lattes para averiguar a produção de artigos de cada equipe científica dos CT-INFRAs. Ao se relacionar à produção científica de cada equipe com os artigos produzidos pela UFES, chegou-se a conclusão que, os CT-INFRAs podem impactar, significativamente, na produção de artigos e contribuir na melhoria dos programas de pós-graduação. Por fim, foi apresentada uma proposta de melhoria com o intuito de que, os convênios passem a ser geridos de uma forma mais eficaz / The present work deals with the execution of the Infrastructure Fund Agreements (CT-INFRAs) concluded between the Studies and Projects Funder (FINEP) and the Federal University of Espírito Santo (UFES) in the period of 2004-2010 from the perspective of efficacy. The central question is to verify if the institutions are able to execute the CT-INFRAs within the agreed period of time with the FINEP. The study was conducted at the UFES. The starting point was to question the FINEP, via information portal, data from all the institutions that participated in the agreements in the referred period. Such data were related to the term of execution of the agreement, time destined to release the second installment and percentage spent of the total value. When comparing the data, it was concluded that rarely can an institution execute the agreements within the agreed three-year time frame. In addition, questionnaires were applied to project coordinators, the FINEP, the University City Hall (PU) and the Espírito Santense Foundation of Technology (FEST), to verify the execution of the agreements, relative to the UFES. In parallel, a focus group was applied, together with the PU and the FEST to build the Current Reality Tree (ARA), with the objective of finding the root causes for poor performance of agreements. The results obtained through the analysis point to the need for improvement in planning, relative to the management of the agreements. The Script Lattes tool was also used to investigate the production of articles from each scientific team of the CT-INFRAs. When relating the scientific production of each team with the articles produced by the UFES, it was concluded that the CT-INFRAs can significantly impact production of articles and contribute to the improvement of postgraduate programs. Lastly, a proposal for improvement was presented with the intent that the agreements could be managed more effectively
28

Conceitos de gestão de projetos e teoria das restrições, aplicados ao planejamento e controle da produção de uma empresa aeronaútica /

Lemes, Carlos Alberto. January 2008 (has links)
Resumo: Este trabalho aborda planejamento e controle da produção para uma indústria de grande porte, no setor aeronáutico, cujos produtos têm alto grau de customização, ciclos elevados e uma exigência de alta qualidade e prazo por parte dos clientes. Uma produção bastante complexa, com muita movimentação de material, produto e pessoal e um considerável volume de dados a serem processados diariamente. Nesse cenário não há margem para erros e o caminho é a busca constante do diferencial competitivo. Com isso, a presente dissertação vem apresentar um modelo de planejamento e controle da produção utilizando conceitos de gestão de projetos através da programação das atividades de montagem por meio de rede de precedências juntamente com a aplicação da Corrente Crítica como recurso para minimizar as dificuldades de se trabalhar em ambientes multiprojetos. Um sistema estruturado e operado por aplicativos disponíveis no mercado, que permita a manipulação de informações oriundas do ambiente produtivo. O método adotado nesse trabalho foi a pesquisa-ação, contando com a participação efetiva e constante do pesquisador no equacionamento dos problemas encontrados. Tem-se como resultado da pesquisa o desenvolvimento e implantação de um sistema de gestão, com seus processos, bem como ganhos significativos de ciclo, mãode- obra e Work in Process - WIP, resultados estes determinantes para a conquista do diferencial competitivo e atendimento do alto grau de exigência do mercado aeronáutico. / Abstract: This work approaches production planning and control of a large company, in the aerospace industry, whose products have high degree of customization, high cycles and a demand of high quality and delivery on time by the customers. The production is very complex, too many material transportation, products and personnel movement and a considerable volume of information being processed daily. In this scenario there is no margin for error and the path is the constant search of competitive differential. This study presents a model for a production planning and control assembly using concepts of project management by programming activities with network precedence and the implementation of the Critical Chain Method as a resource to minimize the noxious effects of working in multiprojects. A system structured and operated by applications available on the market, allowing the manipulation of information originating from of the productive atmosphere The method adopted in this work was the action-research, with the effective participation of the researcher solving some problems during the study. As a result, the study shows the development and implementation of a management system, with its processes, as well as significant gains cycle, manpower and Work In Process - WIP, these results are decisive for the conquest of the differential competitive to assist with excellence the high degree of demand of the aeronautical market. / Orientador: Valério Antonio Pamplona Salomon / Coorientador: Fernando Augusto Silva Marins / Banca: Ubirajara Rocha Ferreira / Banca: Carlos Henrique Pereira Mello / Mestre
29

Desenvolvimento de um software de apoio ao ensino de métodos de planejamento e controle da produção em ambientes MTS baseado na teoria das restrições

Maciel, Maurício Roberto [UNESP] 16 August 2012 (has links) (PDF)
Made available in DSpace on 2014-06-11T19:26:17Z (GMT). No. of bitstreams: 0 Previous issue date: 2012-08-16Bitstream added on 2014-06-13T19:54:30Z : No. of bitstreams: 1 maciel_mr_me_bauru.pdf: 1930775 bytes, checksum: dbddb8110bec5711cf48bb47cc114131 (MD5) / Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES) / Um dos aspectos que mais contribui para o cenário competitivo é a gestão da produção das empresas. As organizações enfrentam grandes mudanças e diversas são as abordagens que estão sendo aplicadas visando vantagens competitivas. Entre estas abordagens destaca-se a Teoria das Restrições, do original em inglês Theory of Constraints (TOC), cujas técnicas de gestão da produção, nela baseadas reconhecem o importante papel das restrições do sistema e tem como foco melhorar o fluxo produtivo. Tais técnicas partem de premissas nem sempre facilmente compreendidas por alunos ou pessoas ligadas às organizações, o que parece favorecer a utilização de formas não convencionais de ensino, como aplicação de jogos ou simuladores. Contudo, tais jogos ou simuladores atualmente disponíveis os quais foram pesquisados neste trabalho não contemplam os conceitos mais atuais de planejamento e controle da produção baseados na TOC, em especial aqueles relacionados aos métodos Tambor-Pulmão-Corda Simplificado (TPC-S) e GP (Gerenciamento de Pulmao) aplicados em sistemas de produção para estoque, denominados de Produção para Disponibilidade (Make to Availability - MTA). Assim, esse trabalho visa levantar as funcionalidades necessárias para que tal software obtenha êxito no ensino da abordagem MTA, assim como em desenvolvê-lo e elaborar um plano de aula para demonstrar sua utilização / One of the aspects contributes most to the competitive scenario is the management of production of the companies. Organizations are facing major changes and there are several approaches being implemented in order to advantage. These approaches there is the Theory of Constraints (TOC), whose production management techniques based on it recognize the important role of system constraints and focuses enhance the production flow. These techiniques depart from the premises do not always easily understood by students or people associated with organizations, which appears to favor the use of unconventional forms of education such as the application or game simulators. However, such games or simulators available which were investigated in this work don't include the latest concepts of production planning and control based on TOC, especially those related to methods Drum-Buffer-Rope Simplified and Buffer Management applied in production systems for stock, called make to availability - MTA. Thus, this paper aims to raise the necessary features for such software is successful in teaching approach MTA, as well as develop it and develop a lesson plan to demonstrate its use
30

Utilização da corrente crítica no gerenciamento de uma obra no setor da construção civil

Cavalcanti, Nathalie da Silva 28 November 2011 (has links)
Verifica-se uma crescente necessidade de gerenciar melhor a execução de obras de construção civil. Desta forma, este trabalho tem como enfoque demonstrar a aplicabilidade de uma nova metodologia de gerenciamento de projetos, baseada na Teoria das Restrições, chamada de Gerenciamento de Projetos por Corrente Crítica (CCPM), a fim de auxiliar a gestão de obras. A metodologia da pesquisa foi realizada por meio da pesquisa-ação na obra de uma construtora de médio porte, com duas fases de implementação da CCPM. Na primeira fase, formulou-se o planejamento do processo de construção de dois sobrados geminados. Após detalhamento do cronograma de atividades, a CCPM foi implementada e os resultados foram analisados. Na segunda fase, buscou-se entender e melhorar o processo de execução, na tentativa de eliminar ou reduzir os obstáculos identificados na primeira fase. Os resultados obtidos na segunda fase evidenciaram que a abordagem da CCPM aumentou o foco da equipe nas atividades; apresentou um controle simples e visual do andamento da obra; motivou as pessoas e o trabalho em equipe; aumentou a produtividade e reduziu a multitarefa nas atividades. No entanto, exigiu tempo de preparação e dedicação para realização do planejamento, mudança de hábitos, cultura e pensamento, além da necessidade de obtenção de consenso entre os envolvidos. / There is a growing need to improve management in civil construction. Therefore this work focuses on demonstrating the applicability of a new project management methodology, based on the Theory of Constraints, called Critical Chain Project Management (CCPM), which can collaborates with civil construction management. The research method was an action research in a medium company with two implementation phases. In the first phase, the construction of two semi-detached houses planning was formulated and the results were analyzed. The second phase was to understand and improve the implementation process in an attempt to eliminate or reduce the problems identified at the first phase. The second phase results showed that the CCPM approach increased the team's focus, presented a simple and visual control of the work status, motivated people and teamwork; increased productivity and reduced the multitasking. However, the process required time and dedication for the planning, changed habits, culture and thoughts, besides that it required consensus among stakeholders.