• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 36
  • 33
  • 18
  • 5
  • 4
  • 2
  • 2
  • 2
  • 2
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • Tagged with
  • 130
  • 130
  • 57
  • 33
  • 31
  • 29
  • 20
  • 17
  • 14
  • 14
  • 14
  • 14
  • 13
  • 12
  • 12
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
111

Příprava staveb a BOZP / Preparation of Construction and OSH

Vaculík, Jakub January 2022 (has links)
This study investigates the management of a construction project from the building contractor’s point of view. The main aim is to describe the construction readiness process, including the technical drawings, risk assessment and OSH solutions. The literature review provides an overview of the key terminology used in the management of a construction site, contractor readiness and OSH. The practical section of this study then describes order preparation, construction readiness, risk assessment, OSH solutions and fire risk assessment for the I/43 Milonice intersection turn lane.
112

Polyfunkční dům v Sezemicích - stavebně technologický projekt / Architectural and technological project to construct a new multipurpose facibility in Sezemice

Libánská, Barbora January 2012 (has links)
Architectural and technological project to construct a new multipurpose facility. The work includes: a technical report explaining the construction technology of the project, a construction site plan, time and financial plan of the construction, an implementation study of the major technological stages of the building, a project of site equipment, a design of main construction machines and mechanisms, a work schedule of the main building structure, a technological specification and a plan of control and quality assurance.
113

Post Occupancy Evaluation of Estero de San Miguel Pilot Project

Al-maliki, Zainab, Baross, Wanessa January 2023 (has links)
Abstract Introduction: This thesis focuses on the housing situation and sustainability in Manila, the capital of the Philippines. According to a report by the United Nations Human Settlements Programme, approximately 25% of Manila's population resides in substandard living conditions and informal settlements. The thesis is based on a case study conducted on the Estero De San Miguel pilot project, where a Post-Occupancy Evaluation (POE) study was carried out on the housing project. The findings revealed that relocating people from slums to the housing project and providing them with a home led to an improvement in the quality of life and sustainability in the project area. The aim of the study was to conduct a POE and assess the quality of life and identify areas for improvement in future low-budget projects. Method: The research methods are based on a combination of qualitative and quantitative methods. Interviews were conducted with architects and other key individuals involved in the project. Surveys were administered to residents, and personal observations were made regarding the quality of life. Plan analysis and area analysis were also conducted. Results: The case study resulted in answers obtained through surveys administered to the residents in the area and interviews with key personnel involved in the project, providing responses to the research questions. Analysis: The Estero De San Miguel Pilot Project (EDSM) has made a significant impact on improving the quality of life and sustainability within the project area. Previously, informal settlements were typically reconstructed outside the city center, resulting in limited access to employment, education, and social services. The residents lived in poverty within these informal settlements, with their needs neglected by both society and the government. Since relocating to the EDSM housing project, 72% of the residents have experienced notable improvements in their lives. This project has provided them with an opportunity to enhance their quality of life and foster a stronger, more supportive community. Discussion: The method, with its specific limitations, in this case study yields results that align with the study's purpose and thereby addresses the research question of the thesis. There is a strong correlation between the findings and the theoretical framework.
114

Moving towards BIM : Managing the gap between design and construction / Flytta mot BIM : Hantera klyftan mellan design och konstruktion

Purba, Prisila Putri Pinarsinta January 2018 (has links)
Many literature suggested that BIM (Building Information Modeling) is a promising future for the AEC (Architecture, Engineering, and Construction) industry that offers enormous benefits to its actors, such as improved design quality due to less collision between disciplines and better understanding of building overview for better communication among the project team and decision-making process. However, lack of BIM knowledge and skill, absence of BIM legal acts, huge investment, software limitations, etc, are most of the time becoming barriers for them to reap the full potential of BIM. Especially during the project processes, there is a loss of value in information assets across phases.  In a project setting, CPM (construction project management) organisation is believed to be in a key position between the client and the other project team members to encourage BIM implementation, for instance by the ability to formulate BIM guidelines, influence the organisational and contractual arrangement, and mandating model-based deliverables. Yet, this power comes with a bigger responsibility to manage those challenges aforementioned. The purpose of the study is to investigate the current practise of a chosen CPM organisation, Forsen Projekt AB, and propose a suggestion of improvement to implement BIM during the design and construction phase. This study adopts qualitative method that builds on literature study and semi-structured interview in order to answer the research questions on what are the gaps faced by CPM organisation in implementing BIM and how to align BIM with the CPM practise in order to manage those gaps. The interview with eight different project roles from Forsen and its affiliated organisations in a project setting enables multiple perspectives about the challenges they perceived when working in BIM environment. The findings revealed that the major gaps founded in BIM implementation are related to organisational, legal or contractual, people and process, and IT-capacity. Suggestions on how to bridge those gaps are then formulated accordingly, such as the collaborative organisational structure, BIM general guidelines, and knowledge management strategies. / Många litteratur föreslog att BIM (Building Information Modeling) är en lovande framtid för AEC (arkitektur, teknik och konstruktion) som erbjuder enorma fördelar för sina aktörer, till exempel förbättrad designkvalitet på grund av mindre kollision mellan discipliner och bättre förståelse för byggande överblick för bättre kommunikation bland projektgruppen och beslutsprocessen. Bristen på BIM-kunskaper och färdigheter, frånvaron av BIM-rättsakter, stora investeringar, programvaru begränsningar, etc, är emellertid oftast hinder för att de kan skörda BIMs fulla potential. Speciellt under projektprocesserna finns värdeminskning i informations tillgångar över faser. I en projektinställning antas CPM-organisation (byggprojektledning) vara en nyckelposition mellan klienten och de andra projektgruppsmedlemmarna för att uppmuntra BIM-genomförandet, till exempel genom förmågan att formulera BIM-riktlinjer, påverka organisatoriska och avtalsmässiga arrangemang , och mandatmodellbaserade leveranser. Ändå kommer denna kraft med ett större ansvar för att hantera de utmaningar som nämns ovan. Syftet med studien är att undersöka den nuvarande praxisen hos en utvald CPM-organisation, Forsen Projekt AB, och föreslå ett förslag om förbättring för att implementera BIM under design och konstruktionsfasen. Denna studie antar kvalitativ metod som bygger på litteraturstudie och halvstrukturerad intervju för att svara på forskningsfrågorna om vilka luckor som CPM-organisationen står inför för att implementera BIM och hur man anpassar BIM med CPM-praxis för att hantera dessa luckor. Intervjun med åtta olika projektroller från Forsen och dess anknutna organisationer i en projektinställning möjliggör flera perspektiv på de utmaningar som de uppfattar när de arbetar i BIM-miljö. Resultaten visade att de stora luckorna som grundas i BIM-genomförandet är relaterade till organisatoriska, juridiska eller avtalsmässiga, människor och processer och IT-kapacitet. Förslag på hur man överbryggar dessa luckor formuleras därefter i enlighet med den samarbetsorganisationsstruktur, BIM: s allmänna riktlinjer och strategier för kunskapshantering.
115

Теоретические основы управления проектами и сравнительный анализ методик оценки качества инвестиционно-строительного проекта : магистерская диссертация / Theoretical foundations of project management and comparative analysis of methods for assessing the quality of an investment and construction project

Винокуров, Д. С., Vinokurov, D. S. January 2023 (has links)
Во введении обоснована актуальность темы ВКР, определены объект и предмет исследования, сформулирована цель работы, поставлены задачи, которые необходимо решить для достижения цели исследования, обозначена степень разработанности темы, показана научная новизна результатов проведенного исследования. В первой главе на основе анализа теоретических основ управления проектами показано, что знание их необходимо для корректной оценки качества инвестиционно-строительного проекта (ИСП). Во второй главе на основе анализа показателей качества решений проектно-конструкторской документации, показано, что для оценки качества ИСП целесообразно рассматривать: проектные решения, проектно-конструкторскую деятельность и исполнение проектной документации. В третьей главе описаны методики оценки качества инвестиционно-строительного проекта, проведен сравнительный анализ методик на основе их применения на примере конкретного объекта капитального строительства (физкультурно-спортивный комплекс). В заключении приведены результаты, полученные в ходе исследования, и основные выводы по ВКР. / In the introduction the relevance of the final qualifying work is substantiated, the object and subject of research are defined, the purpose of the work is formulated, tasks are set, the scientific novelty of research is shown. In the first chapter it is shown based on the analysis of the theoretical foundations of project management that knowledge of them is necessary for a correct assessment of the quality of an investment construction project. In the second chapter it is shown based on the analysis of the quality indicators of design documentation solutions that it is advisable to consider: design solutions, design activities and execution of design documentation to assess the quality of an investment construction project. The third chapter describes the methods of assessing the quality of an investment and construction project, a comparative analysis of the methods based on their application on the example of a specific object of capital construction (a sports complex). In conclusion, the results obtained during the study and the main conclusions on the work are presented.
116

Методика экологической оценки инвестиционно-строительного проекта : магистерская диссертация / Method for environmental assessment of the investment and construction project

Огородникова, С. С., Ogorodnikova, S. S. January 2023 (has links)
Разработана методика экологической оценки инвестиционно-строительных проектов на основе применения известного математического метода стандартизации рангов, применение которой позволит инвесторам и застройщикам оценивать экологические риски и возможности при принятии инвестиционных решений, а также уменьшить негативное воздействие на окружающую среду и повысить экологическую устойчивость проектов. / A method for environmental assessment of investment and construction projects have been developed based on the application of the well-known mathematical method of ranks standardization, the use of which will allow investors and developers to assess environmental risks and opportunities when making investment decisions, as well as reduce the negative impact on the environment and increase the environmental sustainability of projects.
117

My Learning Experiences at the Environmental Consulting Firm: Parsons Corporation

Lanham, Abigail E. 26 November 2014 (has links)
No description available.
118

Utvärdering av miljöarbetet vid nybyggnad av butik : miljöledning och avfallshantering

Othén, Anna, Persson, Sofie January 2010 (has links)
According to recent statistics the construction industry is responsible for the largest waste discharges of both dangerous and non-dangerous waste, when disregarding the "non-dangerous" amount of granite waste produced by the mining industry and the waste produced by the pulp and paper industry. Preventive work within waste management is an ongoing practice so to be able to reduce negative environmental effects. One of the most common actions for the companies to take is to separate the different kinds of waste from one another at the construction site. Although by working with the problem in earlier stages of the process a large amount of the waste could already have been reduced. Companies in the construction business that are actively working to decrease environmental impact in their operations often use an EMS (Environmental Management System). By using environmental management as method the company can manage their environmental work so that actions can be taken where they are needed the most. It may though be difficult to adapt the tool for a project-oriented organization such as a construction project. Which effect the environmental work will have does not depend on the fact that the company uses EMS, it depends on how they use it. ICA Real-estate Sweden AB is about to have a new "ICA Kvantum" store built in Avesta, the company has chosen to use an EMS in their environmental work in order to reduce their environmental impact. ICA Real-estate’s environmental review showed that a considerable environmental aspect was waste management in new constructions and rebuilding’s and as a result they have a new environmental goal for the year 2010. The goal was that they would conduct a pilot project within waste management which is currently realized through the construction of the ICA Kvantum store in Avesta. In order to specify how the environmental work should be done in the project and which environmental demands that have been demanded ICA Real-estates has established an environmental program that the entrepreneurs have received and will abide by. Based on the notion from ICA Real-estate concerning the fact that the contractor’s should have high-quality environmental work the company ByggPartner i Dalarna AB was granted the entire contract for the new ICA Kvantum store. ByggPartner also have their own agenda and goals for waste management in the project and are working towards fulfilling them through coordination and planning. The results presented from the investigation that have been done in this report shows that both companies has got many good factors in their environmental work but compared to contemporary research in the area there are still things that could be improved so that the environmental work will be even more successful. / Enligt statistik bidrar byggsektorn med mest farligt och icke-farligt avfall i Sverige, bortsett från ”ofarligt” gråberg från gruvindustrin och avfall från massa- och pappersindustrin. Det arbetas förebyggande med avfallshantering inom sektorn för att minska den negativa miljöpåverkan avfall utgör. Den vanligaste åtgärden företag utför är att källsortera på byggarbetsplatsen men en stor mängd av avfallet kan reduceras genom att arbeta med problemet i byggprocessens tidigare skeden. Majoriteten av företag inom byggbranschen som arbetar med att minska miljöbelastningen använder ett miljöledningssystem. Miljöledning är en metod där företagets miljöarbete styrs så åtgärder utförs där de är mest behövliga. En svårighet som finns inom branschen är att anpassa verktyget till projektorienterade organisationer som ett byggprojekt. Vilket resultat miljöarbetet får beror på hur företaget använder miljöledningssystemet inte att de använder verktyget. ICA Fastigheter Sverige AB skall låta uppföra en ICA Kvantumbutik i Avesta. Företaget använder ett miljöledningssystem i arbetet med minskning av verksamhetens miljöbelastning. ICA Fastigheters miljöutredning visade att en betydande miljöaspekt är avfallshantering vid nyproduktion och ombyggnader, därför sattes ett miljömål upp för 2010. Målet är att bedriva ett pilotprojekt inom avfallshantering vilket nu realiseras genom uppförandet av en ICA Kvantumbutik i Avesta. För att specificera hur miljöarbetet skall gå till i projektet och vilka miljökrav som ställs har ICA Fastigheter upprättat ett miljöprogram som entreprenören skall följa. Baserat på att entreprenören skall ha ett bra miljöarbete inom företaget erhöll ByggPartner i Dalarna AB totalentreprenaden för ICA Kvantumbutiken. ByggPartner har satt upp egna mål angående avfallshanteringen i projektet. Genom samordning och planering arbetar företaget för att uppnå dessa mål samt ICA Fastigheters krav. Resultatet av företagens miljöarbete som beskrivs i rapporten visar att båda företagen har flera bra faktorer i sitt miljöarbete. Jämfört mot forskning inom området finns det delar inom miljöarbetet hos ICA Fastigheter och ByggPartner som har förbättringspotential.
119

Bytový dům "Za Pivovarem" Lázně Bohdaneč - stavebně technologický projekt / Construction Project - Apartment Building "Za Pivovarem" Lázně Bohdaneč

Volf, Miroslav January 2018 (has links)
The aim of this diploma thesis is to process a building construction project for the apartment building “Za Pivovarem” in Lázně Bohdaneč. The building is designed as a four-floor object which has a flat roof, 24 apartments, 24 cellars, 10 garage stalls, 3 terraces that belong to the apartments on the 1st floor and enclosed balconies or balconies for the apartments in the above floors. The thesis focuses on the organization and preparation of the construction process. It contains a technological project for the cast-in-place reinforced concrete floors, which includes also drawings of formwork, a technical-economic balance sheet of the formwork costs and a calculation of the time for formwork removal, a technological project for anhydrite floors and inspection and test plans for both of the above mentioned building procedures, which are dealt with in a more detailed way. The implementation of other construction procedures is described in the preliminary design of implementation. Concerning the work safety, the plan of health and safety at work, focusing on work at heights and other dangers connected to work on the floor constructions, has been processed. Furthermore, there is a time and finance schedule for the whole construction, a construction site project, a set of main machines and mechanisms which includes a comparison of a mobile crane and a tower crane. In addition, broader transport relations have been assessed. The thesis also contains an instruction manual on the main object.
120

Rezidence na Dlouhé - stavebně technologický projekt / Residence Dlouha - Building Contruction Project

Teplý, Tomáš January 2018 (has links)
The subject of this diploma thesis is the building construction project of Residence Dlouha in Olomouc. It is an apartment building with two to four floors and a basement with garages. The diploma thesis contains a time and finance schedule, a site equipment project and technological procedure of a cast-in-place reinforced concrete floor and a green roof including a quality control. Moreover, a set of machines, usage options of a tower crane or a mobile crane and usage options of a mobile pump or a concrete container have been processed for this building. During the building process it is cared about work safety and environment protection.

Page generated in 0.0933 seconds