• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 5
  • 1
  • 1
  • Tagged with
  • 8
  • 3
  • 3
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Corvette girls : it's not just a guy thing anymore : adventures of women and their 'vettes /

Ruggieri, Denise M. January 1900 (has links)
Thesis (M.A.)--Rowan University, 2007. / Typescript. Includes bibliographical references.
2

A socio-economic analysis of the spatial distribution of the Corvette automobile

Bush, Lee Compton, 1936- January 1970 (has links)
No description available.
3

The Corvette in Literature and Culture: Material Object and Persistent Image

Passon, Jerry Walter 01 May 2010 (has links)
This study examines the Corvette, an automobile with a distinct place in American literature and culture. For more than fifty years, the Corvette has been in the process of becoming what is described as an "icon," although this progress has never been satisfactorily approached and explained. Why this particular machine has not just survived, but come to be recognized--by and large by most if not all Americans--as the signifier of various virtues (and some vices) is a question of some significance: in analyzing the reasons for the Corvette's long life and success as an overwhelmingly positive and distinctively American car, we look at the literature and culture of the United States. What this reveals is a complex web of ideas and attitudes that centers on one thing--a material object with six different forms over fifty years, yet one that has always retained its identity and power to signify. The approach here is thematic rather than historical. As a popular subject, the Corvette already has historians who look at it as a tangible thing that can be described, measured, and defined. My assignment is different: through the lens of critical theories, several of them, and a wide range of materials--film, novels, songs, and more--I seek to discover some essential aspects of the car that make its image dynamic and permit it to evolve over time. This is not an easy process; it has demanded an open mind to materials not often looked at in an English dissertation. The Corvette and its image are described in four areas and a conclusion: * The Corvette: the Empty, the American, and the Deadly Signifier (the original that becomes America's image of itself and the danger of speed and technology out of control) * The Image of Potency: the Corvette, Males, and Minorities (aggressive sexuality, African-American males, and male domination) * Women, Sex, and Identity as Power: the Corvette, Baddest Mother of Them All (phallic females, the car as sexual power and identity) * Corvette as Art: the Expressive Image (the car's own self-reflexive nature, the automobile as fashion--belonging ["I stand out, yet I belong"] and sense of self--and its presence in "art") * The Corvette: Image and Object
4

Funktionsbeskrivning av brandlarmsstyrningen i ventilationssystemet ombord korvett av Göteborgsklass

Jonsson, Jesper January 2010 (has links)
Denna slutrapport beskriver projektarbetet Funktionsbeskrivning av Brandlarms-styrningen av Ventilationssystemet ombord Korvett av Göteborgsklass som beställdes av divisionsingenjören vid 41.korvettdivisionen. Bakgrunden till projektets beställning var att fartygens dokumentation över ventilationssystemets funktion vid brand var bristfällig vilket försvårade underhåll, felsökning och utbildning av och på systemet. Den ofullständiga dokumentationen var ett resultat av att individerna i fartygs­klassen modifierats i flera olika omgångar utan att dokumentationen uppdaterats på ett tillfredsställande sätt. Det hade även framkommit att det fanns olikheter i konfigurationen av fartygsindividernas system. Projektet genomfördes dels genom studier av den befintliga dokumentation som fanns att tillgå ombord och på divisionen, dels genom praktiska under­sökningar ombord på fartygen. Under de praktiska undersökningarna framkom behov av ytterligare utredningar än de som ursprungligen framgick av det erhållna uppdraget. Projektet påvisade skillnader mellan fartygens system, vissa förmodat felaktiga styr­ningar av fläktar och spjäll samt fastställde att dokumentationen var bristfällig. Projektet resulterade i ett antal beskrivande dokument som sammanställdes i en pärm för respektive fartyg. Dessa uppfyller det givna uppdraget och målen med projektet. En större modifiering av fartygen i klassen med syfte att förlänga deras operativa livslängd är under planeringsstadiet. Under modifieringen skall bland annat fartygens dokumen­tation uppdateras, något som resultaten från detta projekt kommer underlätta. / This is the final report regarding the project A Functional Description of the Fire Alarm Con­trol in the Ventilation System aboard the Swedish Navy’s Gothenburg-class Corvettes, wh­­ich was commissioned by the Senior Marine Engineer Officer of the 41st Corvette Sq­­ua­d­ron of the 4th Naval Warfare Flotilla. The reason for the commission was that the set of documentation concerning the function of the ventilation system in case of a fire was insufficient. This caused problems, both during maintenance work done to en­­­su­re that the system was operating in accordance with the design parameters, as well as when trouble-shooting the system. The insufficient set of documentation was a result of a number of upgrades done to the ships over the ye­ars without any corr­e­s­p­on­ding up­date of the documentation. During the project it has also been made clear that there were non-documented differences existing be­­tween the ships in the class. The project was fulfilled by a combination of studies of the existing set of do­cumen­tation and practical surveys aboard the ships. During the surveys, more short­comings in the existing set of documentation became evident. The project demonstrated differences between the individual ships, assumed inaccuracies in the control of fans and dampers and determined the shortage in the set of documentation. The project has resulted in a number of describing documents that are collected in one unique file for each ship. These documents fulfil the commission and the objectives of the project. A major upgrade of the ships in the class with the purpose of extending their operational lifetime is now being planned. The ships’ set of documentation will be simultaneously updated, a task that will be simplified with the support of the results of this project.
5

Funktionsbeskrivning av brandlarmsstyrningen i ventilationssystemet ombord korvett av Göteborgsklass

Jonsson, Jesper January 2010 (has links)
<p>Denna slutrapport beskriver projektarbetet <em>Funktionsbeskrivning av Brandlarms-styrningen av Ventilationssystemet ombord Korvett av Göteborgsklass</em> som beställdes av divisionsingenjören vid 41.korvettdivisionen. Bakgrunden till projektets beställning var att fartygens dokumentation över ventilationssystemets funktion vid brand var bristfällig vilket försvårade underhåll, felsökning och utbildning av och på systemet. Den ofullständiga dokumentationen var ett resultat av att individerna i fartygs­klassen modifierats i flera olika omgångar utan att dokumentationen uppdaterats på ett tillfredsställande sätt. Det hade även framkommit att det fanns olikheter i konfigurationen av fartygsindividernas system.</p><p>Projektet genomfördes dels genom studier av den befintliga dokumentation som fanns att tillgå ombord och på divisionen, dels genom praktiska under­sökningar ombord på fartygen. Under de praktiska undersökningarna framkom behov av ytterligare utredningar än de som ursprungligen framgick av det erhållna uppdraget.</p><p>Projektet påvisade skillnader mellan fartygens system, vissa förmodat felaktiga styr­ningar av fläktar och spjäll samt fastställde att dokumentationen var bristfällig. Projektet resulterade i ett antal beskrivande dokument som sammanställdes i en pärm för respektive fartyg. Dessa uppfyller det givna uppdraget och målen med projektet.</p><p>En större modifiering av fartygen i klassen med syfte att förlänga deras operativa livslängd är under planeringsstadiet. Under modifieringen skall bland annat fartygens dokumen­tation uppdateras, något som resultaten från detta projekt kommer underlätta.</p> / <p>This is the final report regarding the project <em>A Functional Description of the Fire Alarm Con­trol in the Ventilation System aboard the Swedish Navy’s Gothenburg-class Corvettes,</em> wh­­ich was commissioned by the Senior Marine Engineer Officer of the 41st Corvette Sq­­ua­d­ron of the 4th Naval Warfare Flotilla. The reason for the commission was that the set of documentation concerning the function of the ventilation system in case of a fire was insufficient. This caused problems, both during maintenance work done to en­­­su­re that the system was operating in accordance with the design parameters, as well as when trouble-shooting the system. The insufficient set of documentation was a result of a number of upgrades done to the ships over the ye­ars without any corr­e­s­p­on­ding up­date of the documentation. During the project it has also been made clear that there were non-documented differences existing be­­tween the ships in the class.</p><p>The project was fulfilled by a combination of studies of the existing set of do­cumen­tation and practical surveys aboard the ships. During the surveys, more short­comings in the existing set of documentation became evident.</p><p>The project demonstrated differences between the individual ships, assumed inaccuracies in the control of fans and dampers and determined the shortage in the set of documentation. The project has resulted in a number of describing documents that are collected in one unique file for each ship. These documents fulfil the commission and the objectives of the project.</p><p>A major upgrade of the ships in the class with the purpose of extending their operational lifetime is now being planned. The ships’ set of documentation will be simultaneously updated, a task that will be simplified with the support of the results of this project.</p>
6

Lever vi som vi lär? : transportplaneringsprocessen ur ett teoretiskt och praktiskt perspektiv / Do we live as way we learn? : the transport planing process from a theoretical and practical perspective

Walldén, Göran January 2009 (has links)
<p>Operation Atalanta är en EU gemensam marin operation utanför Somalias kust som syftar till att skydda Word Food Program sjötransporter från piratattacker i området. Försvarsmaktens styrkebidrag till operationen består i huvudsak av Internationella Korvettstyrkan (IKS) som innehåller korvetterna HMS Stockholm, HMS Malmö och stödfartyget HMS Trossö. Förbandet transporterades till insatsområdet med strategisk sjötransport. Att transportera svenska örlogs-fartyg på detta sätt är tämligen nytt inom marinen. Strategiska sjötransporter kräver framförhållning då sjötransportresurserna i vissa fall kan vara svårt att få tillgängliga på den tid som önskas. Därför har denna uppsats inriktats på transportplaneringen av operation Atalanta.</p><p>Uppsatsen syftar till att undersöka och jämföra teori med praktik där kvalitativ textanalys har ställts mot kvalitativa intervjuer. Genom en undersökning av transportplaneringen under operation Atalanta som jämförts med <em>Handbok Försvarsmaktens Transporter Grunder (H FM Tp Grunder) </em>har skillnader identifieras. Dessa skillnader har senare värderas mot hur transportplanerings- processen följdes.</p><p>Processen har i denna uppsats begränsats till att undersöka de tre första delprocesserna, som författaren valt kalla för faser: <em>inhämtning, bedömning och upphandling.</em> Faserna används genomgående genom empirin där underaktiviteterna i respektive fas presenteras. Faktorer att beakta under planeringen är <em>kostnadseffektivitet, tid</em> och <em>kvalitet</em>. Dessa faktorers inverkan undersöks närmare i respektive fas.</p><p>Fallstudien visar att transportplaneringsprocessen inte följts enligt <em>H</em> <em>FM Tp Grunder</em>. Den främsta orsaken är tidsbrist som forcerat planeringen. Erfarenhet hos dem som varit involverade i planeringen har dock medgett att kontrollerade avsteg från processen kunnat göras.</p> / <p>Operation Atalanta is an EU combined maritime operation outside Somalia’s coasts. The main objective of the operation is to protect World Food Program sea transports in the area from pirate attacks. The Swedish Armed Forces has contributed with a maritime task force containing two corvettes and a supply ship. The ships were transported by a strategic sealift to area of operations. The knowledge of transporting Swedish naval vessels this way is limited due to lack of experience. Sea transports of this kind need to be planned with a long-term view due to the competitive situation on the sea transport market and the limitation of resources. </p><p>This essay is therefore focused on the planning process of the described transport where an investigation of theory and practice is done. The theory comes from an internal handbook which describes The Swedish Armed Forces planning process for military transports. This planning process will be compared to the case study, operation Atalanta in order to sort out differences. These differences will show how well the planning process was followed in this particular case.  </p><p>The author has limited the planning process to involve three different stages in the planning process, these are: <em>Information gathering, Assessment </em>and<em> Procurement</em> and hereafter called phases. The stages will in time be set from the political directive to a sea transport has been procured. Different aspects are to be considered during the planning process. These are cost efficiency, time and quality. These aspects will be examined in each phase in order to investigate how they have affected the planning process.    </p><p>The case study shows that the planning process has not been followed according to what the handbook describes. The main reason is the lack of time. The time has been a crucial factor which has driven the transport planning to make deviations. However this deviation has been done with good knowledge about the planning process thru experience.</p>
7

Lever vi som vi lär? : transportplaneringsprocessen ur ett teoretiskt och praktiskt perspektiv / Do we live as way we learn? : the transport planing process from a theoretical and practical perspective

Walldén, Göran January 2009 (has links)
Operation Atalanta är en EU gemensam marin operation utanför Somalias kust som syftar till att skydda Word Food Program sjötransporter från piratattacker i området. Försvarsmaktens styrkebidrag till operationen består i huvudsak av Internationella Korvettstyrkan (IKS) som innehåller korvetterna HMS Stockholm, HMS Malmö och stödfartyget HMS Trossö. Förbandet transporterades till insatsområdet med strategisk sjötransport. Att transportera svenska örlogs-fartyg på detta sätt är tämligen nytt inom marinen. Strategiska sjötransporter kräver framförhållning då sjötransportresurserna i vissa fall kan vara svårt att få tillgängliga på den tid som önskas. Därför har denna uppsats inriktats på transportplaneringen av operation Atalanta. Uppsatsen syftar till att undersöka och jämföra teori med praktik där kvalitativ textanalys har ställts mot kvalitativa intervjuer. Genom en undersökning av transportplaneringen under operation Atalanta som jämförts med Handbok Försvarsmaktens Transporter Grunder (H FM Tp Grunder) har skillnader identifieras. Dessa skillnader har senare värderas mot hur transportplanerings- processen följdes. Processen har i denna uppsats begränsats till att undersöka de tre första delprocesserna, som författaren valt kalla för faser: inhämtning, bedömning och upphandling. Faserna används genomgående genom empirin där underaktiviteterna i respektive fas presenteras. Faktorer att beakta under planeringen är kostnadseffektivitet, tid och kvalitet. Dessa faktorers inverkan undersöks närmare i respektive fas. Fallstudien visar att transportplaneringsprocessen inte följts enligt H FM Tp Grunder. Den främsta orsaken är tidsbrist som forcerat planeringen. Erfarenhet hos dem som varit involverade i planeringen har dock medgett att kontrollerade avsteg från processen kunnat göras. / Operation Atalanta is an EU combined maritime operation outside Somalia’s coasts. The main objective of the operation is to protect World Food Program sea transports in the area from pirate attacks. The Swedish Armed Forces has contributed with a maritime task force containing two corvettes and a supply ship. The ships were transported by a strategic sealift to area of operations. The knowledge of transporting Swedish naval vessels this way is limited due to lack of experience. Sea transports of this kind need to be planned with a long-term view due to the competitive situation on the sea transport market and the limitation of resources.  This essay is therefore focused on the planning process of the described transport where an investigation of theory and practice is done. The theory comes from an internal handbook which describes The Swedish Armed Forces planning process for military transports. This planning process will be compared to the case study, operation Atalanta in order to sort out differences. These differences will show how well the planning process was followed in this particular case.   The author has limited the planning process to involve three different stages in the planning process, these are: Information gathering, Assessment and Procurement and hereafter called phases. The stages will in time be set from the political directive to a sea transport has been procured. Different aspects are to be considered during the planning process. These are cost efficiency, time and quality. These aspects will be examined in each phase in order to investigate how they have affected the planning process.     The case study shows that the planning process has not been followed according to what the handbook describes. The main reason is the lack of time. The time has been a crucial factor which has driven the transport planning to make deviations. However this deviation has been done with good knowledge about the planning process thru experience.
8

Militär nytta av att låta andra fartyg än korvetter dra Towed Array Sonar (TAS) / Military utility by letting ships other than corvettes carry a Towed Array Sonar (TAS)

Weidenmark, Mattias January 2016 (has links)
No description available.

Page generated in 0.0482 seconds