11 |
Análise da gestão empresarial das micro e pequenas indústrias de esquadrias de alumínio da cidade do Rio de Janeiro com base nas perspectivas do Balanced ScorecardAraujo, Alexandre de Souza 12 May 2016 (has links)
Submitted by Joana Azevedo (joanad@id.uff.br) on 2017-06-30T13:25:32Z
No. of bitstreams: 1
dissert Alexandre de Souza Araujo.pdf: 1400646 bytes, checksum: 6c7f360efe4c7e51cda92b6a4d7f4d25 (MD5) / Rejected by Biblioteca da Escola de Engenharia (bee@ndc.uff.br), reason: Favor verificar ficha catalográfica (fora do padrão).
Atenciosamente,
Catarina Ribeiro
Bibliotecária BEE - Ramal 5992
on 2017-07-04T11:57:53Z (GMT) / Submitted by Joana Azevedo (joanad@id.uff.br) on 2017-07-04T12:17:20Z
No. of bitstreams: 1
dissert Alexandre de Souza Araujo.pdf: 1400646 bytes, checksum: 6c7f360efe4c7e51cda92b6a4d7f4d25 (MD5) / Rejected by Biblioteca da Escola de Engenharia (bee@ndc.uff.br), reason: Joana, rejeitei esse item hoje, pois a ficha está fora de padrão e o mesmo foi reenviado contendo o mesmo erro.
Caso esteja com alguma dúvida, entre em contato conosco.
Atenciosamente,
Catarina Ribeiro
Bibliotecária BEE - Ramal 5992/5993/5994
on 2017-07-04T13:00:08Z (GMT) / Submitted by Joana Azevedo (joanad@id.uff.br) on 2017-07-04T13:38:33Z
No. of bitstreams: 1
dissert Alexandre de Souza Araujo.pdf: 1400646 bytes, checksum: 6c7f360efe4c7e51cda92b6a4d7f4d25 (MD5) / Rejected by Biblioteca da Escola de Engenharia (bee@ndc.uff.br), reason: Item rejeitado, pois a ficha catalográfica está fora do padrão.
Atenciosamente,
Catarina Ribeiro
Bibliotecária BEE - Ramal 5992/5993/5994
on 2017-07-05T13:36:52Z (GMT) / Submitted by Joana Azevedo (joanad@id.uff.br) on 2017-07-25T19:07:41Z
No. of bitstreams: 1
dissert Alexandre de Souza Araujo.pdf: 1400092 bytes, checksum: e3741caec1be9b92b4754226038752fb (MD5) / Approved for entry into archive by Biblioteca da Escola de Engenharia (bee@ndc.uff.br) on 2017-07-26T12:53:37Z (GMT) No. of bitstreams: 1
dissert Alexandre de Souza Araujo.pdf: 1400092 bytes, checksum: e3741caec1be9b92b4754226038752fb (MD5) / Made available in DSpace on 2017-07-26T12:53:37Z (GMT). No. of bitstreams: 1
dissert Alexandre de Souza Araujo.pdf: 1400092 bytes, checksum: e3741caec1be9b92b4754226038752fb (MD5)
Previous issue date: 2016-05-12 / Após 10 anos da pesquisa do SEBRAE "Fatores condicionantes e Taxa de Mortalidade de Empresas no Brasil", a qual revelava as deficiências aparentes nas micro e pequenas empresas, o presente estudo se propõe a analisar se houve uma melhoria na gestão empresarial das micro e pequenas empresas do segmento de esquadrias de alumínio da cidade do Rio de Janeiro. Com a finalidade de contemplar a pesquisa, utilizou-se da metodologia qualitativa com entrevistas a cinco empresas do segmento especificado. Um questionário, dividido em cinco bloco temáticos, foi aplicado com os gestores dessas empresas. Por meio da aplicação dos questionários, da análise das respostas e da observação empírica nessas empresas, foi possível identificar que há, ainda, uma deficiência na gestão e no uso dos indicadores de desempenho, o que pode levar as empresas à mortalidade, como indicava a pesquisa de 2004 do SEBRAE. / After 10 years of SEBREA’s research “Fatores Condicionantes e Taxa de Mortalidade de Empresas no Brasil", which revealed the apparent deficiencies in micro and small enterprises, this study aims to examine whether there was an improvement in business management of micro and small companies in the aluminum frames segment of the city of Rio de Janeiro. In order to contemplate the research, we used qualitative methodology with interviews with five companies in the specified segment. A questionnaire divided into five thematic block was applied with the managers of these companies. Through the questionnaires, analysis of answers and empirical observation in these companies, it was identified that there is still a deficiency in the management and use of performance indicators, which can lead companies to mortality, as indicated by the 2004 survey of SEBRAE.
|
12 |
Esquadrias de alumínio: análise dos critérios de escolha destes componentes em edifícios de apartamentos, padrão médio-alto, na Cidade de São Paulo / Aluminum fenestration: choice criterions analysis of these components in residential apartment buildings, medium-high standard, in São Paulo CityReis, Magda Netto dos 23 May 2011 (has links)
Esta Tese de Doutorado é o resultado de uma pesquisa sobre a utilização das esquadrias de alumínio em edifícios de apartamentos, padrão médio-alto, na Cidade de São Paulo. Trata da análise dos critérios de escolha das esquadrias de alumínio para uso nas edificações categorizadas acima, considerando todas as etapas pertinentes ao processo de adoção destes componentes, incluindo: seleção dos materiais; especificação técnica; comercialização; fabricação e instalação. Paralelamente, o desenvolvimento deste trabalho permitiu analisar o inter-relacionamento entre os profissionais envolvidos na cadeia produtiva das esquadrias de alumínio, particularmente fornecedores e clientes, representados respectivamente por fabricantes de esquadrias de alumínio e construtoras. A expectativa é que o produto resultante desta Tese forneça subsídios para futuros estudos sobre os temas tratados e; principalmente, contribua para o aprimoramento de toda cadeia produtiva das esquadrias de alumínio para os edifícios residenciais de apartamentos. / This Thesis is the result of a research on aluminum fenestration, used in residential apartment buildings of medium-high standard in São Paulo City. It is about the choice criterions analysis of aluminum fenestration for use in this kind of residential apartment buildings, considering all the relevant adoption process stages of these components, including: materials selection; technical specification; commercialization; fabrication and installation. In parallel, the development of this job could permit to analyses the inter-relationship between the professionals involved in the aluminum fenestration supply chain, particularly suppliers and customers, respectively represented by aluminum fenestration systems manufactures and building contractors. The expectation is that the resulting product of this Thesis could supply subsidies for future studies of the subject and, principally, could contribute for the improvement of all aluminum fenestration supply chain for residential apartment buildings.
|
13 |
Esquadrias de alumínio: análise dos critérios de escolha destes componentes em edifícios de apartamentos, padrão médio-alto, na Cidade de São Paulo / Aluminum fenestration: choice criterions analysis of these components in residential apartment buildings, medium-high standard, in São Paulo CityMagda Netto dos Reis 23 May 2011 (has links)
Esta Tese de Doutorado é o resultado de uma pesquisa sobre a utilização das esquadrias de alumínio em edifícios de apartamentos, padrão médio-alto, na Cidade de São Paulo. Trata da análise dos critérios de escolha das esquadrias de alumínio para uso nas edificações categorizadas acima, considerando todas as etapas pertinentes ao processo de adoção destes componentes, incluindo: seleção dos materiais; especificação técnica; comercialização; fabricação e instalação. Paralelamente, o desenvolvimento deste trabalho permitiu analisar o inter-relacionamento entre os profissionais envolvidos na cadeia produtiva das esquadrias de alumínio, particularmente fornecedores e clientes, representados respectivamente por fabricantes de esquadrias de alumínio e construtoras. A expectativa é que o produto resultante desta Tese forneça subsídios para futuros estudos sobre os temas tratados e; principalmente, contribua para o aprimoramento de toda cadeia produtiva das esquadrias de alumínio para os edifícios residenciais de apartamentos. / This Thesis is the result of a research on aluminum fenestration, used in residential apartment buildings of medium-high standard in São Paulo City. It is about the choice criterions analysis of aluminum fenestration for use in this kind of residential apartment buildings, considering all the relevant adoption process stages of these components, including: materials selection; technical specification; commercialization; fabrication and installation. In parallel, the development of this job could permit to analyses the inter-relationship between the professionals involved in the aluminum fenestration supply chain, particularly suppliers and customers, respectively represented by aluminum fenestration systems manufactures and building contractors. The expectation is that the resulting product of this Thesis could supply subsidies for future studies of the subject and, principally, could contribute for the improvement of all aluminum fenestration supply chain for residential apartment buildings.
|
14 |
As esquadrias na inter-relação entre os cheios e vazios na composição do espaço construído. / The relationshipbetween entrance ways and architectural composition in the built environment.Guerra, José David Pacheco 31 July 2007 (has links)
This work is based on the assumption that in order to understand and apprehend the
architectural space it is necessary to exam in detail each part that constitutes the totality of
architecture. Therefore, the aim of this work is to understand the incremental process of
interrelationships between the architectural elements existent in the so-called masses and nonexistent
masses. Among these elements, windows and doors can be highlighted, being
generally known as entrance ways. Data were gathered from a literature review that allowed a
better understanding on the use of entrance ways in the composition of architectural spaces,
over time. Following that, it was analyzed the use of composition of selected, residential
buildings in Maceió. Data analyses suggest that windows and doors are considered, in large
scale, architectural elements that control the flow of individuals, air and natural light, being
highlighted from others constructive elements, given its spread use all over the buildings,
which in turn considerably affects space in relation to its dimensions, functioning and other
sensitive and compositive aspects. In general terms, entrance ways appear not to have evolved
significanlty over time considering them as an architectural element, but have substantially
evolved as a compositive element. One should consider each part of the building in relation to
composition as letters of the alphabet to form both the spoken or written languages. / Este trabalho parte do pressuposto de que para compreender e interpretar os espaços
arquitetônicos é necessário conhecer com profundidade cada parte constituinte da totalidade
arquitetônica. Sendo assim, neste trabalho busca-se uma maior compreensão do processo
evolutivo das inter-relações entre os elementos componentes do binômio cheios e vazios.
Dentre outros elementos construtivos, destacam-se as portas e janelas, conhecidas de modo
genérico como esquadrias. Os dados foram obtidos a partir da literatura que foi revisada de
forma a permitir a compreensão sobre a utilização das esquadrias na composição do espaço
arquitetônico através da linha do tempo. Em seguida, foram feitas análises compositivas e
espaciais das esquadrias na arquitetura, utilizando edificações residenciais em Maceió. As
análises deste estudo sugerem que as esquadrias são consideradas, em larga escala, elementos
arquitetônicos controladores de fluxos de pessoas, ar e luz naturais, sendo destacadas dos
demais elementos construtivos, dada a sua multiplicação por todo o edifício, fato este que
afeta consideravelmente o espaço quanto ao seu dimensionamento, funcionamento e aos seus
aspectos plástico e sensitivo. Ao longo do tempo, as esquadrias parecem ter evoluído muito
pouco em relação às alterações de funções enquanto elemento arquitetônico, variando, porém,
de forma substancial enquanto elemento compositivo. Cada parte do edifício está para a
linguagem arquitetônica como as letras estão para a linguagem escrita ou falada.
|
15 |
Processo produtivo de esquadrias em madeira de eucalipto na marcenaria coletiva do Assentamento Rural Pirituba II - Itapeva-SP / Production of eucalyptus timber windows in a rural settlement called Pirituba II - Itapeva-SPLaverde, Albenise 07 December 2007 (has links)
O trabalho objetiva analisar a cadeia produtiva de esquadrias de madeira desde a sua aquisição até a montagem final, tendo em vista identificar as potencialidades e os limites de sua fabricação dentro de um contexto diferenciado: utilizando mão-de-obra em fase de capacitação, infra-estrutura mínima e matéria-prima na maior parte proveniente de plantios florestais não manejados para serraria. Os dados foram coletados a partir do acompanhamento e observação direta das atividades realizadas em uma marcenaria autogestionária no assentamento rural Pirituba II, durante a experiência Inovarural, com a utilização do método da pesquisa-ação. A produção de esquadrias em madeira de eucalipto embasada nessas condicionantes mostrou-se viável sob os aspectos econômico, técnico e social. O desempenho da matéria-prima utilizada revelou a carência da oferta de madeira de melhor qualidade na região e a necessidade da ampliação de áreas manejadas para esta finalidade. Embora as dificuldades encontradas, foi possível fabricar um componente de alta qualidade e acessível à população de baixa renda, atingindo as expectativas e satisfação das famílias envolvidas. Outro resultado de extrema relevância foi a formação de um grupo fixo e capacitado para a continuidade das atividades de incubação do empreendimento transformando-se na real possibilidade de geração de trabalho e renda local. / The objective of this work is to analyze the production chain of windows from its acquisition until the final assembly keeping in mind to identify the potentialities and the limits of its manufacture in a differentiated context: using work power in qualification phase, minimum infrastructure and raw material wich most of them came from not managed for saw forests. The data had been collected from the accompaniment and direct comment of the activities carried through in a collective self-managed joinery in a rural settlement called Pirituba II, during the Inovarural experience. The research method used was the research-action. The squadron\'s production by Eucalyptus wood under these conditions revealed viable under the aspects economic, social and technic. The raw material performance shows the lack of offers of better quality wooden in the region and the necessity of the magnifying the managed areas for this purpose. Although the difficulties that was found, were possible to manufacture a component of high quality accessible to the low income population, being reached the expectations and satisfaction of the involved families. Another result of extreme relevance was the formation of a group fixed and enabled to the continuity of the activities of incubation of the enterprise changedding itself into the real possibility of generation of work and local income.
|
16 |
A construtibilidade como requisito para avaliação de componentes para a edificação: o caso do Elemento de Integração alvenaria/esquadriaZucchetti, Lais January 2010 (has links)
Atualmente a utilização de sistemas modulares na indústria da construção tem crescido significativamente, e, dentre estes, destaca-se o sistema construtivo de alvenaria estrutural. Entretanto, diversos estudos apontam para um grande número de manifestações patológicas relacionadas a este sistema, em especial com a interface alvenaria/ esquadria como um dos locais de maior incidência, além de representar um gargalo construtivo, pela necessidade de realização de inúmeras atividades dependentes. Dentro deste contexto, a equipe do projeto COMPOHIS (FINEP) desenvolveu uma nova proposta de solução a estas questões, denominada Elemento de Integração (EI). Para a implementação deste novo elemento, foram necessárias avaliações que garantissem o comportamento adequado do produto nas construções e, um dos requisitos considerados foi a construtibilidade, visto que sua consideração e implementação trazem benefícios relacionados ao custo, tempo e qualidade das construções. Desta forma, o objetivo principal desta pesquisa foi avaliar a construtibilidade do EI. Para que esta avaliação fosse realizada, foram identificados, a partir de revisão bibliográfica, vinte e sete requisitos de construtibilidade. Dentre estes, foram selecionados vinte e dois e, agrupados em dez requisitos básicos. Estes dez requisitos foram utilizados na análise ao longo do desenvolvimento da pesquisa, considerando protótipos virtuais e físicos (construídos com diferentes materiais). Mais especificamente, foram utilizados quatro protótipos virtuais e três protótipos físicos do EI, sendo um em MDF e dois em GRC, e duas modelagens de seqüências construtivas, sendo uma com o EI e a outra com o método tradicional de construção. Sendo que, na última fase, foi construída uma parede experimental real com o EI e, submetida ao ensaio estrutural. Os principais resultados demonstram a adequação e aplicabilidade, formal, funcional e conceitual do EI ao sistema construtivo considerando os requisitos selecionados, com algumas ressalvas quanto à conexão entre o Elemento e a alvenaria (devido às fissuras identificadas nesta interface), quanto à dificuldade de manutenção dos componentes em GRC (considerando a necessidade de execução de substituições), quanto à exclusão de ajustes em canteiro, com relação à necessidade de cuidado com as arestas do EI e, finalmente com relação à segurança (pela instabilidade do EI logo que assentado). / Nowadays, the use of modular systems in the construction industry has grown substantially and, among those, the structural masonry system gains relevance. However, several studies point to a high incidence of pathological manifestations related to this system, particularly the interface between masonry and windows being one of the places with the highest number of problems, besides being a constructive bottleneck, since several activities depend on it. Within this context, the COMPOHIS project developed new solutions to these problems, named Element of Integration (EI). However, to implement this new element, performance evaluations were needed to ensure the adequate performance of the product in buildings, and one of these performance requirements that must be considered is the constructability of the solution. The use of this requirement brings benefits related to cost, time and quality of constructions. Thus, the main objective of this research is to evaluate the constructability of the EI. For this evaluation, 27 constructability requirements were identified in the literature. From those, 22 were selected and grouped into 10 major requirements. These 10 requirements were considered for analysis along the preparation and execution phases of this work, and the analysis was carried out considering physical and virtual prototypes (built with different materials). More specifically, 4 virtual prototypes and three physical prototypes of EI we used - one in MDF and two in GRC - and two sequences of constructive modeling, one with the EI and the other with the traditional method of construction. The last GRC prototype was used to build a wall, which was used for a structural resistance test. The main results demonstrated the formal, functional and conceptual adequacy of EI to the selected requirements, with some reservations about the connection between the element and the structural masonry, due to cracks observed in this interface, the difficulty of maintenance of GRC components, considering the need for repairs and replacements, the need to use protective elements at the edges of the GRC components and finally, in regard to safety, due to the instability of the EI when set in place.
|
17 |
A construtibilidade como requisito para avaliação de componentes para a edificação: o caso do Elemento de Integração alvenaria/esquadriaZucchetti, Lais January 2010 (has links)
Atualmente a utilização de sistemas modulares na indústria da construção tem crescido significativamente, e, dentre estes, destaca-se o sistema construtivo de alvenaria estrutural. Entretanto, diversos estudos apontam para um grande número de manifestações patológicas relacionadas a este sistema, em especial com a interface alvenaria/ esquadria como um dos locais de maior incidência, além de representar um gargalo construtivo, pela necessidade de realização de inúmeras atividades dependentes. Dentro deste contexto, a equipe do projeto COMPOHIS (FINEP) desenvolveu uma nova proposta de solução a estas questões, denominada Elemento de Integração (EI). Para a implementação deste novo elemento, foram necessárias avaliações que garantissem o comportamento adequado do produto nas construções e, um dos requisitos considerados foi a construtibilidade, visto que sua consideração e implementação trazem benefícios relacionados ao custo, tempo e qualidade das construções. Desta forma, o objetivo principal desta pesquisa foi avaliar a construtibilidade do EI. Para que esta avaliação fosse realizada, foram identificados, a partir de revisão bibliográfica, vinte e sete requisitos de construtibilidade. Dentre estes, foram selecionados vinte e dois e, agrupados em dez requisitos básicos. Estes dez requisitos foram utilizados na análise ao longo do desenvolvimento da pesquisa, considerando protótipos virtuais e físicos (construídos com diferentes materiais). Mais especificamente, foram utilizados quatro protótipos virtuais e três protótipos físicos do EI, sendo um em MDF e dois em GRC, e duas modelagens de seqüências construtivas, sendo uma com o EI e a outra com o método tradicional de construção. Sendo que, na última fase, foi construída uma parede experimental real com o EI e, submetida ao ensaio estrutural. Os principais resultados demonstram a adequação e aplicabilidade, formal, funcional e conceitual do EI ao sistema construtivo considerando os requisitos selecionados, com algumas ressalvas quanto à conexão entre o Elemento e a alvenaria (devido às fissuras identificadas nesta interface), quanto à dificuldade de manutenção dos componentes em GRC (considerando a necessidade de execução de substituições), quanto à exclusão de ajustes em canteiro, com relação à necessidade de cuidado com as arestas do EI e, finalmente com relação à segurança (pela instabilidade do EI logo que assentado). / Nowadays, the use of modular systems in the construction industry has grown substantially and, among those, the structural masonry system gains relevance. However, several studies point to a high incidence of pathological manifestations related to this system, particularly the interface between masonry and windows being one of the places with the highest number of problems, besides being a constructive bottleneck, since several activities depend on it. Within this context, the COMPOHIS project developed new solutions to these problems, named Element of Integration (EI). However, to implement this new element, performance evaluations were needed to ensure the adequate performance of the product in buildings, and one of these performance requirements that must be considered is the constructability of the solution. The use of this requirement brings benefits related to cost, time and quality of constructions. Thus, the main objective of this research is to evaluate the constructability of the EI. For this evaluation, 27 constructability requirements were identified in the literature. From those, 22 were selected and grouped into 10 major requirements. These 10 requirements were considered for analysis along the preparation and execution phases of this work, and the analysis was carried out considering physical and virtual prototypes (built with different materials). More specifically, 4 virtual prototypes and three physical prototypes of EI we used - one in MDF and two in GRC - and two sequences of constructive modeling, one with the EI and the other with the traditional method of construction. The last GRC prototype was used to build a wall, which was used for a structural resistance test. The main results demonstrated the formal, functional and conceptual adequacy of EI to the selected requirements, with some reservations about the connection between the element and the structural masonry, due to cracks observed in this interface, the difficulty of maintenance of GRC components, considering the need for repairs and replacements, the need to use protective elements at the edges of the GRC components and finally, in regard to safety, due to the instability of the EI when set in place.
|
18 |
Ventilação natural e códigos de obras: uma análise das tipologias de aberturas nos edifícios de escritório em Maceió/ALCândido, Christhina Maria 15 February 2006 (has links)
In office buildings located on hot humid climate areas, the architectonical typology
could improve the regional winds entrance and minimize the energy consumption.
The increase of ventilation inside the rooms depends on the architectonical typology
adopted and the specifications related on the room s openings. The room s openings
allow or make difficult to distribute the air flow inside the places, either being
responsible by the rain protection, noises and excessive solar radiation. Thus, the
opening s design must be considered, otherwise it will endanger the comfort
condition inside an ascertain place. The opening typology influences the ventilation
of the rooms offering more or less resistance to the air s flow. The Building
Regulation of Maceio of 1985 determines the minimum openings area based on the
floor s area, as 1/6 for light and 1/12 for ventilation. In this paper the position,
orientation or main kinds of ventilation are not mentioned. These items have a
straight influence on the air flow determination inside the rooms, as well the users
thermal comfort. The aim of this study is to investigate three different kinds of
openings in office buildings in Maceio city (sash, top hung and vertical pivot
window) with area based on the Building Regulation. Computational simulations
where realized with PHOENICS 3.6 software on a typical office building. The
opening design is an important aspect in buildings where passive cooling is a
bioclimatic strategy. Building Regulation needs to consider this aspect. For the same
opening area specified for the Building Regulation the airflow and air velocity inside
the office building will be different depends on the opening design. In this case,
some coefficients need to be investigating for different opening design. The Building
Regulation needs to apply large openings to improve air flow inside the buildings. / Coordenação de Aperfeiçoamento de Pessoal de Nível Superior / Em edificações de escritório localizadas em regiões quentes e úmidas, as tipologias
arquitetônicas poderiam favorecer o aproveitamento dos ventos regionais,
minimizando assim os gastos com energia para climatização dos mesmos. O
incremento da ventilação no interior dos ambientes dependerá, entre outros fatores,
da tipologia arquitetônica adotada e das especificações relacionadas às aberturas do
ambiente. Tais itens estão intrinsecamente relacionados às escolhas realizadas pelo
profissional que desenvolve o projeto que, por sua vez, se aplicar os princípios
bioclimáticos pode aumentar consideravelmente, a construção de edifícios
energicamente eficientes. Nesse sentido, pesquisas têm sido desenvolvidas para
incorporar o conhecimento existente sobre as estratégias de condicionamento
ambiental recomendadas para cada tipo de clima, transformando-as em
especificações para normas e Códigos de Obras. Entretanto, os aspectos relacionados
à ventilação, apresentam requerimentos referentes às áreas das aberturas,
independentemente das diversas tipologias de aberturas existentes e da localização
das mesmas. Esse trabalho investiga o impacto decorrente da utilização do tipo de 3
tipos diferentes de esquadrias (correr, maxim-ar e pivô vertical), na distribuição do
fluxo de ar, considerando a área de abertura especificada pelo Código de Obras de
Maceió/AL. A metodologia constitui-se em uma análise comparativa dos três tipos
de esquadrias, utilizando o software PHOENICS 3.6, de uma edificação considerada
típica. A esquadria de pivô vertical demonstrou um melhor desempenho quanto à
distribuição do fluxo do ar e velocidade do vento no interior dos ambientes. O tipo de
correr proporciona um insuflamento de ar concentrado na área das aberturas e ocorre
a formação de zonas de vórtices no ambiente. A esquadria maxim-ar, além de não
proporcionar um insuflamento de ar uniforme no ambiente, mostrou-se como
obstáculo à entrada dos ventos devido ao seu formato. Para a mesma especificação
de área de abertura do Código de Obras, a distribuição do fluxo de ar e a velocidade
do vento serão influenciadas pela tipologia de esquadria adotada pelo projetista. As
especificações poderiam adotar coeficientes de correção para diferentes tipologias de
esquadria a rever a área de abertura para a ventilação.
|
19 |
A construtibilidade como requisito para avaliação de componentes para a edificação: o caso do Elemento de Integração alvenaria/esquadriaZucchetti, Lais January 2010 (has links)
Atualmente a utilização de sistemas modulares na indústria da construção tem crescido significativamente, e, dentre estes, destaca-se o sistema construtivo de alvenaria estrutural. Entretanto, diversos estudos apontam para um grande número de manifestações patológicas relacionadas a este sistema, em especial com a interface alvenaria/ esquadria como um dos locais de maior incidência, além de representar um gargalo construtivo, pela necessidade de realização de inúmeras atividades dependentes. Dentro deste contexto, a equipe do projeto COMPOHIS (FINEP) desenvolveu uma nova proposta de solução a estas questões, denominada Elemento de Integração (EI). Para a implementação deste novo elemento, foram necessárias avaliações que garantissem o comportamento adequado do produto nas construções e, um dos requisitos considerados foi a construtibilidade, visto que sua consideração e implementação trazem benefícios relacionados ao custo, tempo e qualidade das construções. Desta forma, o objetivo principal desta pesquisa foi avaliar a construtibilidade do EI. Para que esta avaliação fosse realizada, foram identificados, a partir de revisão bibliográfica, vinte e sete requisitos de construtibilidade. Dentre estes, foram selecionados vinte e dois e, agrupados em dez requisitos básicos. Estes dez requisitos foram utilizados na análise ao longo do desenvolvimento da pesquisa, considerando protótipos virtuais e físicos (construídos com diferentes materiais). Mais especificamente, foram utilizados quatro protótipos virtuais e três protótipos físicos do EI, sendo um em MDF e dois em GRC, e duas modelagens de seqüências construtivas, sendo uma com o EI e a outra com o método tradicional de construção. Sendo que, na última fase, foi construída uma parede experimental real com o EI e, submetida ao ensaio estrutural. Os principais resultados demonstram a adequação e aplicabilidade, formal, funcional e conceitual do EI ao sistema construtivo considerando os requisitos selecionados, com algumas ressalvas quanto à conexão entre o Elemento e a alvenaria (devido às fissuras identificadas nesta interface), quanto à dificuldade de manutenção dos componentes em GRC (considerando a necessidade de execução de substituições), quanto à exclusão de ajustes em canteiro, com relação à necessidade de cuidado com as arestas do EI e, finalmente com relação à segurança (pela instabilidade do EI logo que assentado). / Nowadays, the use of modular systems in the construction industry has grown substantially and, among those, the structural masonry system gains relevance. However, several studies point to a high incidence of pathological manifestations related to this system, particularly the interface between masonry and windows being one of the places with the highest number of problems, besides being a constructive bottleneck, since several activities depend on it. Within this context, the COMPOHIS project developed new solutions to these problems, named Element of Integration (EI). However, to implement this new element, performance evaluations were needed to ensure the adequate performance of the product in buildings, and one of these performance requirements that must be considered is the constructability of the solution. The use of this requirement brings benefits related to cost, time and quality of constructions. Thus, the main objective of this research is to evaluate the constructability of the EI. For this evaluation, 27 constructability requirements were identified in the literature. From those, 22 were selected and grouped into 10 major requirements. These 10 requirements were considered for analysis along the preparation and execution phases of this work, and the analysis was carried out considering physical and virtual prototypes (built with different materials). More specifically, 4 virtual prototypes and three physical prototypes of EI we used - one in MDF and two in GRC - and two sequences of constructive modeling, one with the EI and the other with the traditional method of construction. The last GRC prototype was used to build a wall, which was used for a structural resistance test. The main results demonstrated the formal, functional and conceptual adequacy of EI to the selected requirements, with some reservations about the connection between the element and the structural masonry, due to cracks observed in this interface, the difficulty of maintenance of GRC components, considering the need for repairs and replacements, the need to use protective elements at the edges of the GRC components and finally, in regard to safety, due to the instability of the EI when set in place.
|
20 |
Processo produtivo de esquadrias em madeira de eucalipto na marcenaria coletiva do Assentamento Rural Pirituba II - Itapeva-SP / Production of eucalyptus timber windows in a rural settlement called Pirituba II - Itapeva-SPAlbenise Laverde 07 December 2007 (has links)
O trabalho objetiva analisar a cadeia produtiva de esquadrias de madeira desde a sua aquisição até a montagem final, tendo em vista identificar as potencialidades e os limites de sua fabricação dentro de um contexto diferenciado: utilizando mão-de-obra em fase de capacitação, infra-estrutura mínima e matéria-prima na maior parte proveniente de plantios florestais não manejados para serraria. Os dados foram coletados a partir do acompanhamento e observação direta das atividades realizadas em uma marcenaria autogestionária no assentamento rural Pirituba II, durante a experiência Inovarural, com a utilização do método da pesquisa-ação. A produção de esquadrias em madeira de eucalipto embasada nessas condicionantes mostrou-se viável sob os aspectos econômico, técnico e social. O desempenho da matéria-prima utilizada revelou a carência da oferta de madeira de melhor qualidade na região e a necessidade da ampliação de áreas manejadas para esta finalidade. Embora as dificuldades encontradas, foi possível fabricar um componente de alta qualidade e acessível à população de baixa renda, atingindo as expectativas e satisfação das famílias envolvidas. Outro resultado de extrema relevância foi a formação de um grupo fixo e capacitado para a continuidade das atividades de incubação do empreendimento transformando-se na real possibilidade de geração de trabalho e renda local. / The objective of this work is to analyze the production chain of windows from its acquisition until the final assembly keeping in mind to identify the potentialities and the limits of its manufacture in a differentiated context: using work power in qualification phase, minimum infrastructure and raw material wich most of them came from not managed for saw forests. The data had been collected from the accompaniment and direct comment of the activities carried through in a collective self-managed joinery in a rural settlement called Pirituba II, during the Inovarural experience. The research method used was the research-action. The squadron\'s production by Eucalyptus wood under these conditions revealed viable under the aspects economic, social and technic. The raw material performance shows the lack of offers of better quality wooden in the region and the necessity of the magnifying the managed areas for this purpose. Although the difficulties that was found, were possible to manufacture a component of high quality accessible to the low income population, being reached the expectations and satisfaction of the involved families. Another result of extreme relevance was the formation of a group fixed and enabled to the continuity of the activities of incubation of the enterprise changedding itself into the real possibility of generation of work and local income.
|
Page generated in 0.0578 seconds