1 |
En villaleverantörs möjlighet till etablering i Finland : analys av för- och nackdelarAndersen, Linn, Widell, Hanna January 2015 (has links)
The construction market has, as a result of the crisis in Europe been uncertain in recent years. During the year 2013, the construction will be stabilized, in particular Finland. The geographical proximity between Sweden and Finland and similarities in cultures and climates makes Finland a coveted market for many Swedish companies. Differences in national regulations and guidelines, which are produced by the authorities in different countries, are examples of barriers that may hamper the process, including for Swedish villa suppliers, to establish themselves on the Finnish market. It may be useful when facing a new export drive, to look up what similarities and differences there are between the countries building codes, to prevent mistakes and unnecessary costs to the project work.
|
2 |
Off-grid hus : En simuleringsmodell för hus utan koppling mot elnätet / Off-grid house : Computer aided model to simulate a house without grid connectionKuehn, Bernhard January 2014 (has links)
Den Europeiska unionen har sina medlemsländer genom direktivet Energy Performance of Buildings Directive (EPBD) gett i uppdrag att minska energiåtgången för byggnader. Detta ingår i satsningen för att minska klimatpåverkan i hela EU. Nybyggda hus innebär bäst förutsättningar för att minska energiförbrukningen genom att den senaste tekniken kan utnyttjas ihop med utformning enligt de nyaste forskningsrönen. Syftet med det här arbetet är att undersöka om det är möjligt att bygga ett hus som är självförsörjande på el i Sverige genom att använda beprövad teknik. Undersökningen görs genom att bygga en datormodell av ett hus i Simulink för att beräkna energibehov under januari 2010 till december 2013. Huset är 160 m2 stort och står i Karlstad, Värmland. Den använda tekniken i huset är omfattande. De viktigaste komponenterna är en ackumulatortank på 9,3 m3, litium-jon batteri på 58 kWh vid 48 volt, ett vindkraftverk på 2 kWp, solceller på 58 m2och solfångare på 46 m2. Modellhuset liknar i sina egenskaper ett hus som har byggts i Tyskland och jämförs också mot detta avseende energiförbrukning och kostnader. För att kunna bedöma ekonomin jämförs modellhuset även med fem energieffektiva småhus från olika svenska hustillverkare. Modellen använder sig av mätdata som Sveriges meteorologiska och hydrologiska institut (SMHI) ställer allmänheten till förfogande. Data finns för varje timme under beräkningsperioden. Beräkningarna visar att 100 % självförsörjningsgrad på el är möjligt med den valda tekniska utrustningen genom att begränsa elanvändningen till ungefär 2 000 kWh/år. Värmeförsörjning görs med hjälp av solfångarna och ackumulatortanken. Självförsörjningsgraden på solvärme visar sig hamna omkring 58 % av värmebehovet. Den resterande värmen kommer från 4,6 m3 stjälpt björkved som eldas i en vattenmantlad vedpanna och motsvarar ungefär 5 400 kWh. Denna mängd ved kostar i dagsläget mindre än 3 000 kr/år. Datormodellhuset använder sig av mycket teknik vilket medför att priset ligger på ungefär 3,5 miljoner kr. Ett, i storlek och energibehov, jämförbart småhus koster i snitt 3,1 miljoner kr. Ett sådant småhus är dock inte självförsörjande på el. När man bygger ett hus som ligger långt från närmaste elanslutningspunkt behöver även kostnaden för anslutningsarbete beaktas. Ligger den närmaste anslutningspunkt 1 800 meter eller mer från den tänkta byggplatsen blir enbart kostnaderna för att ansluta huset till elnätet över 313 000 kr. Husbyggaren som vill bli oberoende av tillgängligheten av elnätet eller planerar att bygga ett hus som ligger långt ifrån en anslutningspunkt till elnätet har med resultatet från undersökningen ett verktyg för att ta fram planer för sitt bygge. Den undersökta husmodellen sänker de framtida kostnaderna för att driva huset och håller arbetsinsatsen nere för att förse huset med värme och varmvatten. / The European Union has through the Directive Energy Performance of Buildings Directive (EPBD) given a mandate to its members to reduce energy consumption of buildings. This is part of the effort to reduce the carbon footprint across Europe. New houses have the best conditions to reduce their energy consumption by utilizing the latest technologies. This work examines whether it is possible to build a house that is self-sufficient in electricity in Sweden using proven technology. The survey is done by building a computer aided model of a house in Simulink to calculate energy requirements during January 2010 December 2013. The modelhouse is 160 m2 and use climatedata from Karlstad, Värmland. The calculations show that a self-sufficiency rate of 100 % of electricity is possible with the selected technical equipment by limiting the power consumption to 2 000 kWh per year. Heat supply is done by using solar collectors and a storage tank. Self-sufficiency for the heating is up to 58 %, wooden heating supplies the rest.
|
3 |
Golv på mark för småhus : Systematiska beräkningar av fuktbalans med underliggande värmeisoleringOmarr, Ahmed January 2018 (has links)
No description available.
|
4 |
Ecologically sustainable housing and transporting in Pune, India : Ekologiskt hållbar hus- och transportplanering i Pune, IndienFriestedt, Anna, Sjövall, Kristin January 2006 (has links)
This thesis is the result of a final project work carried out by Anna Friestedt and Kristin Sjövall during the spring semester of 2006. The purpose of this work is to investigate in what ways the Indian city Pune is working towards ecological sustainability within the fields of housing and transporting. The work contains a case study of an area in Pune called Magarpatta City. The report is split into four parts. First, laws and regulations both in Sweden and in India that concern ecologically sustainable development are presented. Second, an explanation on existing solutions within housing and transporting in Pune follows, later specified details concerning the case study in Magarpatta City is presented and finally this is analysed. Pune is in many ways working to improve their ways of ecologically sustainable development. In India, and Pune, there are several laws and regulations to regulate sustainable development. Unfortunately it has been a long time since these laws and regulations were updated and by doing so one might achieve sustainability. Pune Municipal Corporation (PMC) has many projects on the go to improve the city environmentally. PMC has brought out an Eco-housing concept which promotes a more ecological way of building. The concept makes it easier for private builders to get a bank loan if the construction is considering several eco-friendly aspects. To achieve more houses constructed in an eco-friendly way Pune and India are in the need of more pilot projects showing eco-friendly materials and construction techniques. PMC is also taking decisions in how to transform the public transportation system to a more environmentally sustainable one. Several different transportations systems are under evaluation. After our time in Pune our meaning is that the Bus Rapid Transit system is the most cost efficient one to implement in Pune. Magarpatta City is an area in Pune that is developed considering the concept ‘walk-to-work and walk-to-school’. The area has made many efforts towards ecological sustainability and is probably the best area in Pune, as well as in all of India, to do a case study at, in the aspect of ecological sustainable housing and transporting. / Denna rapport är resultatet av ett examensarbete utfört av Anna Friestedt och Kristin Sjövall under vårterminen 2006. Syftet med arbetet är att undersöka på vilka sätt den indiska staden Pune arbetar med ekologisk hållbar utveckling i områdena husbyggnation och trafikplanering samt utföra en fallstudie på ett område kallat Magarpatta City beläget i Pune. Arbetet har utmynnat i fyra huvuddelar. Inledande tas upp vilka lagar och förordningar som finns i det svenska respektive indiska systemet. Sedan presenteras på vilka sätt Pune eftersträvar ekologiskt hållbar utveckling inom områdena husbyggnation och transportplanering. Därefter följer en fallstudie av området Magarpatta City där deras lösningar och system tas upp. Avslutande diskuteras det nuvarande systemen och förslag på förbättringsmöjligheter presenteras. Under vår tid i Indien har vi sett att Pune på många sätt arbetar för ekologisk hållbar utveckling. I Indien och Pune finns ett antal lagar och förordningar som styr åt vilket håll utvecklingen bör gå. Tyvärr var det länge sedan många av dessa lagar uppdaterades, så för att bli mer ekologiskt hållbara bör de revideras. Pune Municipal Corporation (PMC, motsvarar kommunen) har tagit fram ett eco-housing koncept där de främjar ett mer ekologisk byggande genom att göra det enklare för privatpersoner att få banklån om de tar hänsyn till ett antal parametrar som bidrar till ett mer hållbart samhälle. För att främja ekologiskt byggande behöver Pune och Indien pilotprojekt som visar ekologiskt hållbara material och konstruktionslösningar. PMC arbetar även med att besluta hur de ska förändra det kommunala transportsystemet till att bli ett mer ekologiskt hållbart sådant. Flera olika system utvärderas för närvarande. Efter våra veckor i Pune har vi kommit fram till att Bus Rapid Transit troligtvis är det mest kostnadseffektiva systemet att arbeta vidare med. Visserligen krävs speciella filer för bussarna och plats på de existerande gatorna är något som Pune inte har gott om, men det behövs förutom det minimalt med investering, ingen räls eller tunnelbana. Området Magarpatta City i Pune är uppbyggt kring konceptet ’gå-till-jobbet’ och ’gå-till-skolan’. Det har i området på många sätt arbetats med ekologisk hållbarhet och är troligtvis det bästa området i Pune, såväl som i hela Indien, att utföra en fallstudie på rörande ekologiskt hållbar husbyggnation och transportplanering.
|
5 |
Ecologically sustainable housing and transporting in Pune, India : Ekologiskt hållbar hus- och transportplanering i Pune, IndienFriestedt, Anna, Sjövall, Kristin January 2006 (has links)
<p>This thesis is the result of a final project work carried out by Anna Friestedt and Kristin Sjövall during the spring semester of 2006. The purpose of this work is to investigate in what ways the Indian city Pune is working towards ecological sustainability within the fields of housing and transporting. The work contains a case study of an area in Pune called Magarpatta City.</p><p>The report is split into four parts. First, laws and regulations both in Sweden and in India that concern ecologically sustainable development are presented. Second, an explanation on existing solutions within housing and transporting in Pune follows, later specified details concerning the case study in Magarpatta City is presented and finally this is analysed.</p><p>Pune is in many ways working to improve their ways of ecologically sustainable development. In India, and Pune, there are several laws and regulations to regulate sustainable development. Unfortunately it has been a long time since these laws and regulations were updated and by doing so one might achieve sustainability.</p><p>Pune Municipal Corporation (PMC) has many projects on the go to improve the city environmentally. PMC has brought out an Eco-housing concept which promotes a more ecological way of building. The concept makes it easier for private builders to get a bank loan if the construction is considering several eco-friendly aspects. To achieve more houses constructed in an eco-friendly way Pune and India are in the need of more pilot projects showing eco-friendly materials and construction techniques. PMC is also taking decisions in how to transform the public transportation system to a more environmentally sustainable one. Several different transportations systems are under evaluation. After our time in Pune our meaning is that the Bus Rapid Transit system is the most cost efficient one to implement in Pune.</p><p>Magarpatta City is an area in Pune that is developed considering the concept ‘walk-to-work and walk-to-school’. The area has made many efforts towards ecological sustainability and is probably the best area in Pune, as well as in all of India, to do a case study at, in the aspect of ecological sustainable housing and transporting.</p> / <p>Denna rapport är resultatet av ett examensarbete utfört av Anna Friestedt och Kristin Sjövall under vårterminen 2006. Syftet med arbetet är att undersöka på vilka sätt den indiska staden Pune arbetar med ekologisk hållbar utveckling i områdena husbyggnation och trafikplanering samt utföra en fallstudie på ett område kallat Magarpatta City beläget i Pune.</p><p>Arbetet har utmynnat i fyra huvuddelar. Inledande tas upp vilka lagar och förordningar som finns i det svenska respektive indiska systemet. Sedan presenteras på vilka sätt Pune eftersträvar ekologiskt hållbar utveckling inom områdena husbyggnation och transportplanering. Därefter följer en fallstudie av området Magarpatta City där deras lösningar och system tas upp. Avslutande diskuteras det nuvarande systemen och förslag på förbättringsmöjligheter presenteras.</p><p>Under vår tid i Indien har vi sett att Pune på många sätt arbetar för ekologisk hållbar utveckling. I Indien och Pune finns ett antal lagar och förordningar som styr åt vilket håll utvecklingen bör gå. Tyvärr var det länge sedan många av dessa lagar uppdaterades, så för att bli mer ekologiskt hållbara bör de revideras.</p><p>Pune Municipal Corporation (PMC, motsvarar kommunen) har tagit fram ett eco-housing koncept där de främjar ett mer ekologisk byggande genom att göra det enklare för privatpersoner att få banklån om de tar hänsyn till ett antal parametrar som bidrar till ett mer hållbart samhälle. För att främja ekologiskt byggande behöver Pune och Indien pilotprojekt som visar ekologiskt hållbara material och konstruktionslösningar. PMC arbetar även med att besluta hur de ska förändra det kommunala transportsystemet till att bli ett mer ekologiskt hållbart sådant. Flera olika system utvärderas för närvarande. Efter våra veckor i Pune har vi kommit fram till att Bus Rapid Transit troligtvis är det mest kostnadseffektiva systemet att arbeta vidare med. Visserligen krävs speciella filer för bussarna och plats på de existerande gatorna är något som Pune inte har gott om, men det behövs förutom det minimalt med investering, ingen räls eller tunnelbana.</p><p>Området Magarpatta City i Pune är uppbyggt kring konceptet ’gå-till-jobbet’ och ’gå-till-skolan’. Det har i området på många sätt arbetats med ekologisk hållbarhet och är troligtvis det bästa området i Pune, såväl som i hela Indien, att utföra en fallstudie på rörande ekologiskt hållbar husbyggnation och transportplanering.</p>
|
6 |
Arbetsbeskrivning av allmänna kostnader : För bedömning och uppföljning inom husbyggnation / Work description of the general project costs : For assessing and monitoring within house buildingHussein, Marwa, Zhou, Sara January 2012 (has links)
I samarbete med Skanska Sverige AB, Region Hus Stockholm Bostäder har detta examensarbete upprättats. Examensarbetet handlar om bedömning och uppföljning av de allmänna kostnaderna, (AK), inom regionen. Inom husbyggnation är de allmänna kostnaderna en del av projektets totalkostnad och är i de flesta fall svåra att beräkna. Delar av Region Hus Stockholm Bostäder har arbetat med att ta fram erfarenhetsvärden och nyckeltal, för att få ökade kunskaper om AK i projekten och därigenom underlätta bedömningarna för prissättning i kommande projekt. Syftet är att försöka bidra till högre produktivitet genom att göra bättre bedömning, uppföljning och erfarenhetsåterföring med hjälp rekommendationer. Målet är ta fram en generell beskrivning av en rekommenderad arbetsrutin som ska ha en ”best practice” funktion för framtida arbeten. Materialet som detta examensarbete baseras på är en sammanställning av intervjuer med olika personer inom Skanska Sverige AB, inom Region Hus Stockholm Bostäder och Region Hus Stockholm Kommersiellt. Jämförelse görs mellan bostadsprojekt inom regionerna. Information har även hämtats från litteratur och Skanskas hemsida. Arbetsrutinerna inom regionen varierar till viss del. Beräkning av AK görs på samma sätt över regionen, dock är uppföljningen personlig och varierande i strukturen under produktionsskedet. Detta gör att i dagsläget är arbetet personberoende och inte processberoende. Rekommendationerna presenteras i form av en arbetsbeskrivning och en erfarenhetsåterföringsmodell. Arbetsbeskrivningen omfattar de viktigaste delarna i arbetet med AK under anbudsskedet, produktionsskedet samt vid projektavslut. Erfarenhetsåterföringsmodellen behandlar hur de befintliga erfarenheterna kan återföras i företaget. Vidare förelås även en utveckling av projektstyrningsverktyget SPIK att agera som informationsbärare för att kunna ta sammanställa säkrare nyckeltal samt en stabil erfarenhetsbank. Vidare förelås även ytterligare utveckling av projektstyrningsverktyget SPIK, för att agera som informationsbärare och därefter kunna ta sammanställa säkrare nyckeltal samt en stabil erfarenhetsbank. / This thesis was established in collaboration with Skanska Sweden AB, Region Hem Stockholm Bostäder. The thesis deals with the assessment and monitoring of the general costs in the region. AK is a part of the project's total cost in house building and is in most cases difficult to estimate. Parts of the Region House Stockholm Homes have been working to develop empirical values and key performance indicators, to gain greater knowledge of the general costs in the projects, thereby facilitating the estimation of pricing in future projects. It aims to contribute to higher productivity by making better assessment, monitoring and feedback with recommendations. The goal is to develop a general description of a recommended practice is to have a "best practice" function for future works. This thesis is based on material from a compilation of interviews with various people at Skanska Sweden AB, Region Hus Stockholm Bostäder and Region Hus Stockholm Kommersiellt. Comparison is made between the housing construction projects in the regions. Information was also gathered from literature and Skanska´s website. The working procedures within the region vary to some degree. Calculation of the general costs is similar across the region; however the follow-up is personal and vary in process during the production phase. This means that in the current situation is the work is depending on individuals rather than process. The recommendations are presented in the form of a job description and an experience feedback model. The job description includes the main elements in the work of the general costs during the tendering stage, production stage and at project completion. The model for experience feedback addresses how existing experience can be brought back into to the company. Furthermore, it is proposed also a development of the project management tool SPIK to act as an information carrier, and with it produce more reliable key performance indicators and create a solid bank of experiences.
|