• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 287
  • 4
  • 4
  • 4
  • 4
  • 3
  • 3
  • 1
  • 1
  • Tagged with
  • 295
  • 295
  • 208
  • 134
  • 78
  • 71
  • 62
  • 53
  • 49
  • 45
  • 42
  • 40
  • 39
  • 29
  • 27
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
231

Integrated production planning and control model for engineer-to-order prefabricated building systems

Viana, Daniela Dietz January 2015 (has links)
A industrialização da construção civil é uma das possíveis estratégias adotadas para melhorar a qualidade e produtividade da produção neste ambiente altamente competitivo. Entretanto para uma melhoria na eficiência da produção, a simples implantação de uma tecnologia industrializada não é o suficiente. Existe a necessidade de melhorar os sistemas de gestão como um todo. O sucesso da implementação de sistemas de planejamento como o Last Planner, desenvolvidos especialmente para a construção civil, instiga o desenvolvimento de estudos em diferentes processos produtivos. Em relação à implementação de princípios da produção enxuta, o sistema é apontado como um ponto de partida para uma empresa atingir uma estabilidade básica. Este estudo foca-se em um tipo específico de sistema de produção industrializadas chamado engineer-to-order (ETO), quando a requisição de produto pelo cliente é realizada na fase de projeto. Neste tipo de sistema construtivo há uma necessidade de integrar a fabricação das peças conforme as necessidades do canteiro de obras. Esta pesquisa visa a desenvolver um modelo integrado de planejamento e controle da produção de sistemas ETO pré-fabricados para construção civil, integrando o projeto, manufatura e montagem em obra. A pesquisa faz parte de uma parceria da Universidade Federal do Rio Grande do Sul com uma empresa de fabricação e montagem de estrutura (Empresa A) metálica interessada em melhorar seus processos de planejamento e controle da produção. O método de pesquisa é baseado na pesquisa construtiva, ou design science, em que há um esforço do pesquisador em produzir um artefato como resultado da pesquisa, que neste caso, é um modelo de planejamento e controle da produção. O processo de implementação de mudanças da empresa adotou a estratégia da pesquisa-ação, de forma que as soluções eram coletivamente acordadas com as pessoas responsáveis pela sua utilização, para garantir que a mesma se efetivasse nos procedimentos da empresa. Neste tipo de estratégia procura-se estabelecer ciclos de aprendizagem ao longo da pesquisa, em que as soluções são continuamente avaliadas e adaptadas para melhoria dos processos em análise. Os resultados da empresa A foram divididos em quatro fases de implementação. Na primeira fase houve um esforço em consolidar uma integração nos planos de curto prazo. Na segunda fase o foco foi no sistema como um todo, promovendo mecanismos para coletar informações sobre o andamento das obras para retroalimentar a fábrica. As barreiras enfrentadas para garantir esta retroalimentação demonstraram a necessidade da utilização de outros métodos. Por isso, a terceira fase se concentrou no desenvolvimento de ferramentas de gestão visual para melhorar os processos analisados nas fases anteriores. A quarta fase do estudo foi baseada no estudo dos processos logísticos da empresa, visto que representam a interface entre fábrica e obra. Terminado o estudo na empresa A dois estudos foram conduzidos no exterior para compreender contextos distintos de sistemas de produção ETO. O primeiro (empresa B) responsável pelo sistema de climatização da edificação. A empresa realiza o projeto, fabricação e instalação dos sistemas de dutos em metal laminado, assim como o maquinário necessário para as trocas de ar. O estudo foi baseado no fornecimento do sistema para uma obra específica. Neste estudo foram desenvolvidas ferramentas de planejamento para facilitar a sincronização entre fabricação e instalação do material em obra. O segundo estudo (empresa C) foi realizado em uma empresa de estrutura metálica que desenvolveu uma conexão inovadora, facilitando seus processos produtivos. Este estudo teve caráter descritivo, analisando como a sua tecnologia facilitou o sistema de planejamento e controle da produção. A partir dos resultados obtidos nos estudos foi possível desenvolver o modelo final de planejamento e controle da produção para sistemas ETO de pré-fabricados. A maioria dos processos propostos neste modelo foi testada na empresa A. Embora a empresa estudada ainda necessite implantar algumas melhorias no seu sistema de planejamento e controle para se adequar ao modelo proposto, as mudanças realizadas trouxeram benefícios na comunicação e sistematização das informações entre os diferentes níveis de planejamento e controle. As contribuições teóricas do trabalho foram um modelo conceitual para compreender a complexidade neste tipo de sistema de produção; a identificação dos principais requisitos para desenvolver sistemas de planejamento e controle da produção para este ambiente; e a adaptação do conceito de WIP utilizando o status dos produtos. / The industrialization of construction work is one of the ways it is possible to achieve better quality and productivity in this competitive environment. However, in order to improve efficiency using industrialized technologies is not enough. There is a need to improve planning and control systems. Although the Last Planner System has been developed for the construction environment, since it was devised the successful results promoted its implementation in different production environments. Regarding lean production implementations, the system has been pointed out as a starting point for a company to achieve the basic stability. This study is focused in one type of industrialized production system: the engineer-to-order. By industrialized, it is the prefabrication that has been addressed. In these kinds of production systems, there is a need to integrate the prefabrication plant with the construction site needs. This research project aims to develop an integrated planning and control production planning and control model for ETO prefabricated systems, integrating design, manufacturing and site assembly. The research is part of a partnership with a steel fabricator company (Company A) that was interested in improving its production planning system. The research method is grounded in the design science research, in which there is an effort from the researcher to develop an artefact as an output of the research process, in this case, a planning and control model. The implementation adopted some strategies from the action-research, so some solutions needed to be collectively constructed between the researcher and the practitioners, in order to have an effective use in the organization. Following this strategy, it is possible to have same learning cycles during the implementation of the solutions, which are continually assessed and adapted in order to improve the processes analysed. The results are divided into four phases of implementation. In the first step the main effort was in consolidating an integrated planning and control process for the short-term in the production units. In the second step the focus was the overall system, mainly providing mechanisms to collect the status of all construction sites for the plant. The barriers to improve this feedback process brought to light the need for using visual management tools. This development concerned the third step of implementation, further improving the changes made in the previous phases. The fourth step was based on the analysis of the logistics processes, as the interface between the plant and site assembly. After the main empirical study on Company A, two studies were carried out abroad in order to understand a different context of ETO production systems. The first concerns a mechanical contractor situated in a high complex project. In this study, it was possible to develop some planning tools to facilitate the analysis between the fabrication and site installation of the products. The second concerns a steel fabricator focused on the structural system. This was a descriptive study that analysed the differentiation of the products provided by this company and the impact of it in the planning and control system. Based on the results obtained in the implementation process, the integrated planning and control model for ETO building systems was devised. Most of the processes proposed in the model were assessed in Company A. Although there is still a need to improve the production planning and control system of that company, the implementation enhanced the communication between the operational and tactics level and also promoted a systematic way to collect information for each level of the production planning and control system. The theoretical contributions of the research were the development of a framework to understand the complexity of this kind of production system; the identification of the main requirements for developing a planning and control system for this environment; and the adaptation of the concept of WIP using the status of the product.
232

Proposta de metodologia de implantação de plano para cada peça e introdução do sistema de abastecimento por kits

Salaverry, Pietro Barbiani January 2014 (has links)
Esta dissertação contempla uma proposta de metodologia para implantação de Plano Para Cada Peça e introdução do sistema de abastecimento por kits. Contemplados em dois artigos, onde respectivamente no primeiro foi desenvolvida uma ferramenta para captura de dados, um método de como estruturá-los, como organizá-los em um banco de dados e interpretá-los de acordo com as características do produto e produtivas para definição do método de abastecimento. No segundo artigo, foi proposta uma metodologia de introdução do processo de abastecimento por kits, onde de acordo com as características do produto e do processo produtivo, foram definidos: os layouts das áreas de separação e sequenciamento de peças, a quantidade de entradas de abastecimento, a quantidade de peças necessárias em cada kit, a disposição das peças e layout dos kits, o processo de separação de peças e montagem dos kits, assim como os carros de movimentação e abastecimento na linha. / This dissertation includes a methodology proposal for deploying Plan For Every Part and implement the kit line feeding. Conceived respectively in two articles, on the first one was developed a tool for data capture, a method of how to structure, arrange in a database and interpret it according to product and production characteristics for setting the supply method. The second article presents a method to introduce the process by kits supply, which according to the product characteristics and the production process were defined: the parts picking and sequencing area layouts, the amount of supply inputs, the required quantity of parts in each kit, the layout and parts arrangement of kits, the picking process and kits assembly, as well as the handling and supply cars to the assembly line.
233

Desenvolvimento e aplicação de um método para implementação de sistemas de produção enxuta / Development and application of a method for lean production systems implantation

Ricardo Renovato Nazareno 15 September 2003 (has links)
Este trabalho apresenta um método que visa auxiliar os agentes de mudança na condução de processos de implementação de sistemas de produção enxuta, cujo conceito tem sido largamente aplicado em diversas indústrias no Brasil, tais como a Ford, a GM, a Visteon, a Eaton, a Delphi, a Meritor, para citar apenas algumas. Entretanto, principalmente nas empresas que possuem produtos com grande variedade de peças e componentes, e com características distintas de demanda, muitos gerentes têm encontrado dificuldades ao tentar implementar um sistema de produção enxuta. O método é desenvolvido a partir de uma ampla revisão bibliográfica em torno do conceito de gerenciamento da mudança e melhoria organizacional, bem como dos princípios e das principais práticas e ferramentas enxutas. Com isso, são estudados com mais profundidade o mapeamento do fluxo de valor, a produção puxada, o sistema de controle Kanban e o layout celular. Em seguida, o método é validado empiricamente por meio de duas aplicações, a primeira numa empresa produtora de bebedouros e a segunda numa empresa produtora de tanques para armazenagem e resfriamento de leite. / This work presents a method that aims to help the change agents in the Lean Production Systems implantation, whose concept has been applied in several industries in Brazil, such as Ford, GM, Visteon, Eaton, Delphi, Meritor, etc. However, mainly in the companies with great variety of goods and components, many managers have been difficulties to implement a lean production system. The method is developed from a wide bibliographical revision around change and improvement management concept, as well as lean production tools and techniques. It is studied value stream mapping, pull production, Kanban control system and cellular layout. The method is empirically validated in two applications, the first application is in a drinking fountain company, and the second one is in a tank of milk storage company.
234

Representação e análise de cadeias de suprimentos: uma proposta baseada no mapeamento do fluxo de valor / Supply chain representation and analysis: a proposal based on the value stream mapping

Mário de Oliveira Andrade 18 April 2002 (has links)
Este trabalho propõe um método de representação e análise de cadeias de suprimentos que visa permitir a identificação e conseqüente eliminação dos desperdícios que ocorrem ao longo de uma cadeia produtiva. Fundamentado nos conceitos de gestão da cadeia de suprimentos, produção enxuta e modelagem de empresas, este trabalho tem como principal justificativa a necessidade de se desenvolver mecanismos que possibilitem a integração entre empresas, melhorando os níveis de coordenação e sincronização dos fluxos de materiais e informações. O mapeamento do fluxo de valor, técnica de modelagem desenvolvida por ROTHERS & SHOOK (1998), visa auxiliar a obtenção de sistemas produtivos enxutos e foi utilizada como base para o desenvolvimento do método. Dois aspectos são levados em conta para a proposição do método: o primeiro diz respeito ao conteúdo de informações dos modelos e o segundo ao procedimento de aplicação. A principal característica do método é a decomposição em três níveis de mapeamento, indo de um nível mais genérico para um nível de maiores detalhes. Uma ilustração de um caso hipotético de aplicação é fornecida como exemplo. Como conclusões são expostas as vantagens e limitações percebidas no método. Os trabalhos futuros sugeridos se referem à avaliação, aplicação e complementação do método. / This work proposes a method for supply chain representation and analysis to allow the identiJication and consequent elimination of the waste in the production chains. The fundamental concepts this work is based on are: supply chain management, lean production and enterprise modeling. The main reason for the development of this research is the need of developing tools and mechanisms to help the integration between enterprises, improving the coordination and synchronization of the material and information flows. The Value Stream Mapping technique, developed by ROTHERS & SHOOK (1998), which helps the design of lean production systems, is used as a basis for the development of the method. Two aspects were observed during the development of the method: the first one deals with the information content of the models and the second one with the application procedure of the method. The main characteristic of the method is the decomposition in three levels of mapping, from a generic level to a more detailed one. An illustration based on a hypothetic case is given as an example. At the conclusion of this work the advantages and limitations of the method are discussed. Some future researches are suggested based on the evaluation, application and complementation of the method.
235

Estudo de práticas adotadas por empresas que utilizam a Produção Enxuta em paralelo ao Seis Sigma no processo de melhoria / Study of the practices adopted by enterprises that uses Lean Production in parallel to Six Sigma in their improvement process

Jeferson Straatmann 28 April 2006 (has links)
As empresas estão utilizando diversos processos de melhoria para adequarem seus negócios às necessidades dos clientes, à maior concorrência, a uma necessidade de flexibilização e de redução dos custos de seus processos de manufatura. O seis sigma e a produção enxuta são dois processos utilizados por empresas no Brasile no mundo. Atualmente a integração destes processos é um desafio para essas empresas, que buscam uma maneira mais eficiente de reduzir seus desperdícios e se adaptarem às necessidades de seus mercados consumidores. Surge, assim, o Lean Sigma aplicado nas empresas de diversas formas. O objetivo deste trabalho é estruturar, por meio de dois estudos de caso, como as empresas estão utilizando o seis Sigma e a Produção Enxuta em seus processos de melhoria. Verificou-se que existem diferentes formas de utilizar os processos em paralelo: na primeira empresa o processo iniciou em conjunto e depois foi separado em dois processos paralelos de melhoria. A segunda empresa foi ao contrário, começando de forma paralela, desagregada, e posteriormente se unindo em um único processo de melhoria, denominado Lean Sigma. O trabalho apresenta uma sistematização do processo de melhoria de duas empresas, dividido em Visão Geral e Objetivos, Estrutura Organizacional e Métodos de Melhoria. Foram verificadas as formas gerais de utilização dos processos de melhoria e que uma abordagem integrada, que contemple as peculiaridades de cada processo, se demonstra como uma melhor opção para um processo de melhoria que utiliza a Produção Enxuta e o Seis Sigma paralelamente. A pesquisa traz, também, como resultado, uma proposta de sistematização do Lean Sigma, considerando o conhecimento adquirido nos estudos de caso e na literatura consultada. / Enterprises are using several improvement processes to adequate their business to the clients needs, to the higher competition, to a need of been more flexible and to reduce the costs of their manufacturing costs. The Six Sigma and the Lean Production are two processes using by enterprises in Brazil and the world wide. Nowadays the integration of those two processes is a challenge to enterprises that search a more efficient way to reduce their wastes and get adapted to the needs of their markets. With this objective the Lean Sigma appears, been applied in the enterprises differently. The dissertation objective is to understand, trough two case studies, how enterprises are connecting Six Sigma and Lean Production in their improvement processes. It was verified that are several ways to run the processes in parallel: in the first enterprise, the two processes was integrated and them shared into two process in parallel. The second enterprise showed the opposite approach, beginning disintegrated, in parallel, and them running together in one improvement processes, called Lean Sigma. The dissertation presents the systematization of the improvement processes of these two enterprises, organized as follow: Global vision and Objectives, Organizational Structure and Improvement Method. Was verified the general approach used in the improvement process and that the integrated approach, that consider the peculiarities of each process, showns as a best option to run Lean Production and Six Sigma in parallel. The research presents, as a result too, a systematization proposal for Lean Sigma, considering the case studies and the consulted literature.
236

Desenvolvimento de sistemas híbridos de planejamento e programação da produção com foco na implantação de manufatura enxuta / Development of hybrid systems for planning and scheduling focusing on implementation of lean manufacturing

Ricardo Renovato Nazareno 20 October 2008 (has links)
Este trabalho tem como objetivo principal a proposição de um método de desenvolvimento de sistemas híbridos de planejamento e programação da produção para ambientes de manufatura enxuta que possuam alta variedade de itens, estruturas complexas, variabilidade de lead times e demanda flutuante. Nestes ambientes existe uma grande dificuldade na definição das estratégias para a adoção do sistema mais adequado de planejamento e programação da produção. A maioria das empresas acaba adotando um tratamento genérico de planejamento e programação para todos os itens. O método foi desenvolvido a partir de uma ampla revisão bibliográfica em torno de sistemas de planejamento, programação e controle da produção, de suas respectivas funções, dos desafios para os sistemas atuais, bem como dos princípios e das principais práticas e ferramentas enxutas. Em seguida, o método foi testado em quatro aplicações práticas nas quais a essência da discussão em torno de um sistema de planejamento e programação da programação migrou do tradicional conflito entre sistemas kanban versus MRP, puxar versus empurrar, para o desafio de se criar um ambiente no qual estes dois sistemas, juntamente com outros, devem coexistir em harmonia. / This work has as main goal to propose a method of developing hybrid systems for planning and scheduling for lean manufacturing environments that have high variety of items, complex structures, variability of lead times and fluctuating demand. In these environments there is great difficulty in defining the strategies to adopt the most appropriate system of planning and scheduling. Most companies just adopting a generic treatment planning and programming for all items. The method was developed from an extensive literature review around systems of planning and scheduling of production, their respective roles, the challenges to the current systems as well as the principles and practices of the major tools and dried. Then, the method was tested in four practical applications in which the essence of the debate on a system of planning and scheduling migrated from traditional conflict between kanban systems versus MRP, pull vs. push, to the challenge of creating an environment in which these two systems, along with others, must coexist in harmony.
237

Desenvolvimento e aplicação de um método para implementação de sistemas de produção enxuta utilizando os processos de raciocínio da teoria das restrições e o mapeamento do fluxo de valor / Development and application of a method for lean production systems implantation using the thinking processes of the theory of constraints and the value stream mapping

Cesar Augusto Campos de Araujo 12 November 2004 (has links)
Muitos avanços e progressos na dinâmica dos sistemas de produção têm sido conseguidos por meio da aplicação de diversas técnicas e ferramentas de produção enxuta, teoria das restrições e sistemas híbridos. No entanto, é importante salientar que estas técnicas e ferramentas não devem ser usadas unicamente para solução de problemas operacionais de curto prazo, mas sim como um avanço no sentido de obter-se maior competitividade a ser apreciada, também no longo prazo. Apesar dos resultados positivos alcançados, muitas iniciativas de melhoria acabam por esbarrar no descompasso entre as expectativas dos agentes de mudança e os ganhos reais obtidos no horizonte de planejado desejado. Neste sentido, este trabalho propõe-se a desenvolver um método de implementação, pautado nos processos de raciocínio da teoria das restrições, procurando estabelecer uma base lógica de relacionamento entre as ações de melhoria a serem promovidas, seus efeitos esperados e os potenciais obstáculos à sua efetiva aplicação. Com isso, são estudadas com maior profundidade as ferramentas que compõem o processo de raciocínio e algumas ferramentas de melhoria de processos produtivos. Em seguida, o método é validado empiricamente por meio de uma aplicação em uma empresa do setor moveleiro. / Many progresses have been made on the dynamic of production systems by the application of several techniques and tools of lean production, theory of constraints and hybrid systems. However, it is important to point out that this techniques and tools should not only be used for short term problem solution, but a progress in the sense of obtaining larger competitiveness to be appreciated, also on the long term. In spite of the positive results reached, a lot of improvement initiatives face the gap between the change agent\'s expectations and the real gains obtained along the horizon of time. In this sense, this work intends to develop an implantation method, guided by the theory of constraints\' thinking process tools, trying to establish a logical base of relationship among the improvement actions to be promoted, its expected effects and the potential obstacles to its effective application. So, a large depth studied is promoted on the tools that compose the thinking processes and some improvement tools used on production systems, such as lean production tools. Soon after, the method proposed is validated by its application on a furniture industry.
238

Integrated production planning and control model for engineer-to-order prefabricated building systems

Viana, Daniela Dietz January 2015 (has links)
A industrialização da construção civil é uma das possíveis estratégias adotadas para melhorar a qualidade e produtividade da produção neste ambiente altamente competitivo. Entretanto para uma melhoria na eficiência da produção, a simples implantação de uma tecnologia industrializada não é o suficiente. Existe a necessidade de melhorar os sistemas de gestão como um todo. O sucesso da implementação de sistemas de planejamento como o Last Planner, desenvolvidos especialmente para a construção civil, instiga o desenvolvimento de estudos em diferentes processos produtivos. Em relação à implementação de princípios da produção enxuta, o sistema é apontado como um ponto de partida para uma empresa atingir uma estabilidade básica. Este estudo foca-se em um tipo específico de sistema de produção industrializadas chamado engineer-to-order (ETO), quando a requisição de produto pelo cliente é realizada na fase de projeto. Neste tipo de sistema construtivo há uma necessidade de integrar a fabricação das peças conforme as necessidades do canteiro de obras. Esta pesquisa visa a desenvolver um modelo integrado de planejamento e controle da produção de sistemas ETO pré-fabricados para construção civil, integrando o projeto, manufatura e montagem em obra. A pesquisa faz parte de uma parceria da Universidade Federal do Rio Grande do Sul com uma empresa de fabricação e montagem de estrutura (Empresa A) metálica interessada em melhorar seus processos de planejamento e controle da produção. O método de pesquisa é baseado na pesquisa construtiva, ou design science, em que há um esforço do pesquisador em produzir um artefato como resultado da pesquisa, que neste caso, é um modelo de planejamento e controle da produção. O processo de implementação de mudanças da empresa adotou a estratégia da pesquisa-ação, de forma que as soluções eram coletivamente acordadas com as pessoas responsáveis pela sua utilização, para garantir que a mesma se efetivasse nos procedimentos da empresa. Neste tipo de estratégia procura-se estabelecer ciclos de aprendizagem ao longo da pesquisa, em que as soluções são continuamente avaliadas e adaptadas para melhoria dos processos em análise. Os resultados da empresa A foram divididos em quatro fases de implementação. Na primeira fase houve um esforço em consolidar uma integração nos planos de curto prazo. Na segunda fase o foco foi no sistema como um todo, promovendo mecanismos para coletar informações sobre o andamento das obras para retroalimentar a fábrica. As barreiras enfrentadas para garantir esta retroalimentação demonstraram a necessidade da utilização de outros métodos. Por isso, a terceira fase se concentrou no desenvolvimento de ferramentas de gestão visual para melhorar os processos analisados nas fases anteriores. A quarta fase do estudo foi baseada no estudo dos processos logísticos da empresa, visto que representam a interface entre fábrica e obra. Terminado o estudo na empresa A dois estudos foram conduzidos no exterior para compreender contextos distintos de sistemas de produção ETO. O primeiro (empresa B) responsável pelo sistema de climatização da edificação. A empresa realiza o projeto, fabricação e instalação dos sistemas de dutos em metal laminado, assim como o maquinário necessário para as trocas de ar. O estudo foi baseado no fornecimento do sistema para uma obra específica. Neste estudo foram desenvolvidas ferramentas de planejamento para facilitar a sincronização entre fabricação e instalação do material em obra. O segundo estudo (empresa C) foi realizado em uma empresa de estrutura metálica que desenvolveu uma conexão inovadora, facilitando seus processos produtivos. Este estudo teve caráter descritivo, analisando como a sua tecnologia facilitou o sistema de planejamento e controle da produção. A partir dos resultados obtidos nos estudos foi possível desenvolver o modelo final de planejamento e controle da produção para sistemas ETO de pré-fabricados. A maioria dos processos propostos neste modelo foi testada na empresa A. Embora a empresa estudada ainda necessite implantar algumas melhorias no seu sistema de planejamento e controle para se adequar ao modelo proposto, as mudanças realizadas trouxeram benefícios na comunicação e sistematização das informações entre os diferentes níveis de planejamento e controle. As contribuições teóricas do trabalho foram um modelo conceitual para compreender a complexidade neste tipo de sistema de produção; a identificação dos principais requisitos para desenvolver sistemas de planejamento e controle da produção para este ambiente; e a adaptação do conceito de WIP utilizando o status dos produtos. / The industrialization of construction work is one of the ways it is possible to achieve better quality and productivity in this competitive environment. However, in order to improve efficiency using industrialized technologies is not enough. There is a need to improve planning and control systems. Although the Last Planner System has been developed for the construction environment, since it was devised the successful results promoted its implementation in different production environments. Regarding lean production implementations, the system has been pointed out as a starting point for a company to achieve the basic stability. This study is focused in one type of industrialized production system: the engineer-to-order. By industrialized, it is the prefabrication that has been addressed. In these kinds of production systems, there is a need to integrate the prefabrication plant with the construction site needs. This research project aims to develop an integrated planning and control production planning and control model for ETO prefabricated systems, integrating design, manufacturing and site assembly. The research is part of a partnership with a steel fabricator company (Company A) that was interested in improving its production planning system. The research method is grounded in the design science research, in which there is an effort from the researcher to develop an artefact as an output of the research process, in this case, a planning and control model. The implementation adopted some strategies from the action-research, so some solutions needed to be collectively constructed between the researcher and the practitioners, in order to have an effective use in the organization. Following this strategy, it is possible to have same learning cycles during the implementation of the solutions, which are continually assessed and adapted in order to improve the processes analysed. The results are divided into four phases of implementation. In the first step the main effort was in consolidating an integrated planning and control process for the short-term in the production units. In the second step the focus was the overall system, mainly providing mechanisms to collect the status of all construction sites for the plant. The barriers to improve this feedback process brought to light the need for using visual management tools. This development concerned the third step of implementation, further improving the changes made in the previous phases. The fourth step was based on the analysis of the logistics processes, as the interface between the plant and site assembly. After the main empirical study on Company A, two studies were carried out abroad in order to understand a different context of ETO production systems. The first concerns a mechanical contractor situated in a high complex project. In this study, it was possible to develop some planning tools to facilitate the analysis between the fabrication and site installation of the products. The second concerns a steel fabricator focused on the structural system. This was a descriptive study that analysed the differentiation of the products provided by this company and the impact of it in the planning and control system. Based on the results obtained in the implementation process, the integrated planning and control model for ETO building systems was devised. Most of the processes proposed in the model were assessed in Company A. Although there is still a need to improve the production planning and control system of that company, the implementation enhanced the communication between the operational and tactics level and also promoted a systematic way to collect information for each level of the production planning and control system. The theoretical contributions of the research were the development of a framework to understand the complexity of this kind of production system; the identification of the main requirements for developing a planning and control system for this environment; and the adaptation of the concept of WIP using the status of the product.
239

Proposta de metodologia de implantação de plano para cada peça e introdução do sistema de abastecimento por kits

Salaverry, Pietro Barbiani January 2014 (has links)
Esta dissertação contempla uma proposta de metodologia para implantação de Plano Para Cada Peça e introdução do sistema de abastecimento por kits. Contemplados em dois artigos, onde respectivamente no primeiro foi desenvolvida uma ferramenta para captura de dados, um método de como estruturá-los, como organizá-los em um banco de dados e interpretá-los de acordo com as características do produto e produtivas para definição do método de abastecimento. No segundo artigo, foi proposta uma metodologia de introdução do processo de abastecimento por kits, onde de acordo com as características do produto e do processo produtivo, foram definidos: os layouts das áreas de separação e sequenciamento de peças, a quantidade de entradas de abastecimento, a quantidade de peças necessárias em cada kit, a disposição das peças e layout dos kits, o processo de separação de peças e montagem dos kits, assim como os carros de movimentação e abastecimento na linha. / This dissertation includes a methodology proposal for deploying Plan For Every Part and implement the kit line feeding. Conceived respectively in two articles, on the first one was developed a tool for data capture, a method of how to structure, arrange in a database and interpret it according to product and production characteristics for setting the supply method. The second article presents a method to introduce the process by kits supply, which according to the product characteristics and the production process were defined: the parts picking and sequencing area layouts, the amount of supply inputs, the required quantity of parts in each kit, the layout and parts arrangement of kits, the picking process and kits assembly, as well as the handling and supply cars to the assembly line.
240

Implementação da gestão enxuta em empresas de mineração a partir de um modelo de gestão integrada : uma perspectiva de sinergia entre a engenharia de minas e a engenharia de produção

Klippel, Altair Flamarion January 2007 (has links)
A produção de matérias-primas minerais é feita através de tecnologia conhecida mundialmente. No entanto, a crescente competição econômica mundial faz com que este domínio tecnológico não seja, por si só, suficiente para assegurar a sobrevivência das empresas de mineração. É necessário, também, que os métodos de gestão utilizados pela indústria de mineração estejam alinhados com a lógica da competitividade, visando maximizar os resultados econômicos financeiros das organizações como forma de sustentação no cenário globalizado atual. Esta tese está relacionada com a maximização dos resultados passíveis de serem alcançados nas indústrias de mineração, a ser obtida através de uma forma de gestão que integre a tecnologia intrínseca da Engenharia de Minas com a tecnologia de gestão da Engenharia de Produção. Esta integração é realizada através de um Modelo de Gestão Integrada, proposto nesta tese. A construção deste modelo teve como ponto de partida a experiência realizada pelo autor desta tese na mineração de fluorita no final dos anos 90, quando foram implementados alguns conceitos de Engenharia de Produção nesta atividade mineral.A partir desta experiência, sedimentada com a agregação de conceitos teóricos, foram selecionados três outros cenários na indústria de mineração para o desenvolvimento desta tese, nos quais foram utilizadas duas metodologias de pesquisa. Na mineração de calcário e na mineração de ametista, a Pesquisa-Ação foi a metodologia de pesquisa selecionada, enquanto que na mineração de carvão utilizou-se o Estudo de Caso. Na mineração de fluorita, a implementação de melhorias no processo de produção, devido à integração dos dois ramos da Engenharia considerados, resultou na redução dos gastos totais por tonelada de produto final, em função da eliminação de perdas no sistema de produção. A empresa transformou-se em uma organização de aprendizagem. Na mineração de calcário, a disseminação de conhecimentos da Engenharia de Produção através de processos de aprendizagem, propiciou o desenvolvimento de uma visão sistêmica do processo de produção por parte dos colaboradores, bem como a implementação de uma forma de gestão com o objetivo de otimizar o uso da capacidade existente. Neste cenário foi considerado, também, o desenvolvimento de novos produtos. Na mineração de ametista, o modelo de gestão proposto propiciou a realização de melhorias não somente no fluxo de produção, mas tambémna qualidade de vida dos trabalhadores devido à melhoria nas condições de trabalho desta atividade mineral. Na mineração de carvão, este trabalho procurou evidenciar a importância de se desenvolver novos produtos buscando a plena utilização da capacidade instalada. Neste cenário foram abordadas, também, questões relacionadas com o controle do meio ambiente. A análise e o estudo dos quatro cenários resultaram na construção de uma estrutura de mudanças e de um processo de mudanças para o Modelo de Gestão Integrada. A estrutura de mudanças do modelo é suportada pela integração das técnicas de lavra e beneficiamento mineral com as técnicas de gestão bem como pela inovação, que pode ser de produtos, serviços, métodos e mercado e, ainda, na forma de como é feita a gestão na Organização. Ela propicia a obtenção de melhores resultados nas organizações através da maior utilização dos ativos, com a ampliação do mercado, a redução dos custos operacionais e o aumento do lucro.O processo de mudanças do modelo tem início a partir da realização de um diagnóstico situacional para avaliar a sinergia existente na empresa entre os dois ramos da Engenharia considerados e tende a transformar a mesma em uma organização de aprendizagem para assimilação, integração e sedimentação dos conceitos, técnicas e ferramentas de Engenharia de Minas e de Engenharia de Produção. / Mineral raw material production is done through a well known worldwide technology. However, the technological domain seems to be insufficient to cope with the survival of mining industries in view of the increasing world economic competition. In addition, it is necessary that the management methods adopted by the mining industry be aligned with the logic of competitiveness aiming to maximize the financial and economic outcomes of the organizations as a way of supporting themselves in the current globalized scenario. This thesis deals with the maximization of outcomes to be achieved in the mining industries through a form of management that integrates Mining Engineering intrinsic technology with managing technology from Industrial Engineering. This integration is carried out through an Integrated Management Model proposed. The model was first devised by the author in the fluorspar mining in the late 90’s as some concepts from Industrial Engineering were being implemented. Drawing on the author’s experience, rooted in the aggregation of theoretical concepts, three other sites in the mining industry were chosen as a scenario for the work where two research methods were used. As for limestone and amethyst mining, the Survey-Action method was applied, while Case Study was used for coal mining. For fluorspar mining, the improvement in production based upon the integration of the Engineering areas resulted in a reduction of the total costs per ton for finished product, allowing the elimination of waste in such production system. The company became a learning organization. For limestone mining, the Industrial Engineering knowledge spread through learning steps provided a systemic view of the production process and implemented a management approach aiming to optimize the use of the existing capacity. In this setting, the development of new products was also taken into account. For amethyst mining, the management model provided improvements in the production flow and also improved the employee’s life quality due to better working conditions. In the last case study, coal mining, this work attempted to emphasize the importance of developing new products by using the company’s full capacity. In addition, issues related to environmental polution control were addressed. The analysis and study of the four scenarios led to the construction of a structure and a process of changes for the Integrated ManagementModel. The model changing structure is supported by the integration of mining and processing techniques with management through the innovation of products, services, methods and market. It provides better outcomes with the expansion of market share, operational costs reduction and higher profitability. The model changing process starts by a situational diagnostic to access the existing synergy between the two areas of Engineering previously mentioned and tends to transform the same into a learning organization to assimilate, integrate and consolidate the concepts, techniques and tools from Mining Engineering and Industrial Engineering.

Page generated in 0.0657 seconds