• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 125
  • 2
  • Tagged with
  • 131
  • 131
  • 72
  • 56
  • 51
  • 51
  • 40
  • 38
  • 35
  • 27
  • 24
  • 22
  • 22
  • 18
  • 16
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
51

Estrategias para introducir al mercado un centro constructor en la ciudad de Iquitos

Ríos García, Agustín, Ruidías Croce, Úrsula Cristina, Saavedra Sevillano, Vanessa 20 September 2013 (has links)
El presente proyecto de inversión desarrolla un plan estratégico que permitirá el ingreso de un nuevo concepto de negocio, un centro constructor en el creciente mercado de venta de materiales de construcción en la ciudad de Iquitos. / Tesis
52

Uso de viguetas pretensadas para optimizar tiempo, calidad y costos en la autoconstrucción de losas aligeradas de los sectores C y D de Lima

Puicón Campos, Lizbeth, Vásquez Chávez, Oscar 29 November 2018 (has links)
En la presente investigación se realizó un estudio sobre la losa aligerada en la autoconstrucción de los sectores C y D de Lima con la finalidad de identificar el mejor sistema constructivo de losa aligerada para aplicarse en la autoconstrucción de viviendas unifamiliares. Esto tiene su origen a partir de una problemática actual que se tiene en la autoconstrucción de viviendas unifamiliares de Lima, especialmente en la losa, la cual no tiene una adecuada asesoría lo que genera deficiencias estructurales, de calidad y de costo. Esta investigación desarrolla los tres sistemas de losa aligera con más demanda en la actualidad: el sistema convencional, el sistema de vigueta pretensada y el sistema de vigueta tralicho. Posteriormente, se realizó una evaluación técnica y una evaluación económica de cada sistema en viviendas de los distritos de los Olivos y San Martin de Porres. En la evaluación económica se elaboró un presupuesto para cada sistema con precios actualizados y se tomó en cuenta todas las partidas que intervenían en cada sistema. Al comparar los tres sistemas se concluyó que la mejor alternativa de losa aligerada es el sistema de vigueta pretensada, ya que este representa un ahorro de costo directo de 12% frente a los otros sistemas, 33% de ahorro en tiempos de ejecución, mejor calidad en el acabado del fondo de losa y una mejor resistencia del concreto (350 kg/cm2). Como recomendación principal es importante empezar a utilizar sistemas constructivos innovadores que generen beneficios económicos, pero que sobretodo garanticen viviendas seguras. / In the present investigation a study was made on the lightened slab in the self-construction of sectors C and D of Lima with the purpose of identifying the best construction system of lightened slab to be applied in the self-construction of single-family homes. This has its origin from a current problem that is in the self-construction of single-family homes in Lima, especially in the slab, which does not have adequate advice which generates structural deficiencies, quality and cost. This research develops the three slab systems lightens with more demand at present: the conventional system, the prestressed joist system and the tralicho joist system. Subsequently, a technical evaluation and an economic evaluation of each system were carried out in dwellings in the districts of Los Olivos and San Martin de Porres. In the economic evaluation a budget was elaborated for each system with updated prices and all the items that intervened in each system were taken into account. When comparing the three systems, it was concluded that the best lightened slab alternative is the prestressed joist system, since this represents a direct cost saving of 12% compared to other systems, 33% savings in execution times, better quality in the finish of the slab bottom and better concrete strength (350 kg / cm2). As a main recommendation, it is important to start using innovative construction systems that generate economic benefits, but above all guarantee safe housing. / Tesis
53

Implementación del VDC (Virtual Design and Construction) en la etapa de planeamiento del proyecto Aloft, para minimizar la cantidad de Solicitudes de Información (SI) y No Conformidades (NC), en la etapa de ejecución

Padilla Saavedra, Nancy Elizabeth, Quispe Rodríguez, Katherine Elizabeth 01 December 2017 (has links)
Las nuevas construcciones exigen un mayor nivel de planeamiento y flujo de información entre todas las áreas de producción y soporte de una obra. Es importante tener en cuenta que una buena planificación en obra conlleva a minimizar los desperdicios, re-trabajos e inconsistencias en el entregable final para el cliente. En la actualidad, la empresa GYM se encuentra en la búsqueda de nuevas estrategias de trabajo donde no solo se busque anticipar los problemas e inconvenientes que pueda suscitarse en obra, sino que a la par tengamos la visión del cliente sobre el trabajo realizado a la fecha y puedan irse mejorando las observaciones y levantando las no conformidades paralelamente al avance del proyecto. Una deficiencia encontrada dentro de los proyectos ya realizados, es la gran cantidad de Solicitud de Información (SI) que se identifican durante la construcción, estos son derivados al especialista encargado del diseño o al cliente y, en muchos casos, terminan definiendo una ruta crítica dentro del cronograma de avance de construcción y/o al dilatarse el tiempo de respuesta o nunca tenerla, derivan en toma de decisiones en campo que crean la posibilidad de rechazo ante la entrega final al cliente. Por otro lado, se encuentran un gran número de No conformidades (NC) que repercuten en el incremento de horas hombre y, por ende, en consumir gastos de levantamiento de observaciones que no se encuentran contempladas dentro del presupuesto de obra, un desperdicio de recursos (mano de obra), materiales, equipos, etc. que es importante minimizar para beneficio del proyecto. Por ello, para minimizar estos desperdicios se plantea el uso de VDC mediante sesiones colaborativas e integradas con parte del equipo de Proyecto: Sub contratistas, Contratista principal y proveedores; el objetivo del proyecto se logrará si cada una de las partes involucradas trabaja desde la etapa de planeamiento de manera integrada. De esta manera, se logrará llegar a la etapa de ejecución con menos probabilidad de incurrir en gastos que no crear valor al entregable final. The new constructions require a higher level of planning and information flow between all areas of production and support of work. It is important to keep in mind that a good planning on site leads to minimize waste, re-works and inconsistencies in the final applicable to the client. Currently, the company GYM is in search of new work strategies where not only can anticipate the problems and inconveniences that may arise in the work, but at the same time has the vision of the client about the work done to the date and the observations can be improved and the non-conformities parallel to the progress of the project. A shortcoming found within the projects already carried out is the large amount of Information Request (SI) that was identified during the construction, these were derived to the specialist in the design of the client and in many cases, they end up defining a critical path within the construction progress schedule and / or when the response time is extended or never, resulting in decision making in the field that creates the possibility of rejection of the final delivery to the client. On the other hand, there are a large number of non-conformities (NC) that have an impact on the increase in man-hours, therefore, in consumption of expenses for the collection of observations that are not included in the work budget, a waste of resources (workforce), materials, equipment, etc. which is important to minimize for the benefit of the project. Therefore, to minimize this waste, the use of VDC is proposed through collaborative and integrated sessions with part of the Project team: Sub contractors, main contractor and suppliers; the objective of the project will be achieved if each of the parties involved works from the planning stage in an integrated form. In this way, it is possible to reach the execution stage with less probability of incurring expenses that do not generate value to the final deliverable. / Tesis
54

Análisis y propuesta de mejora del método de excavación con presencia de agua para fundaciones de puentes en la costa de la región Arequipa

Santillana Rivero, Aheleli Aileen, Silva Trebejo, Letzy Johanny 17 November 2018 (has links)
El método de excavación con presencia de agua para fundaciones de puentes en el Perú, caisson de concreto, bajo su procedimiento constructivo convencional Well foundation presenta desplome durante su ejecución, siendo un agravante la existencia de agua subterránea, como en el caso de la región Arequipa. La presente investigación busca mejorar y elaborar un manual preliminar del procedimiento constructivo de caissons para la fundación de puentes en la costa de la región Arequipa. Adicionalmente, se propuso el procedimiento constructivo ‘Bajo la superficie’, basado en la construcción de caissons de concreto en Colombia, sistema constructivo en el que se excava para luego armar las paredes de caisson. A partir de entrevistas a especialistas, concluimos que el rango aproximado de variación positiva considerada mejora económica es de 16% a 20% con respecto al costo directo de un sistema constructivo convencional. Finalmente, se concluyó que la propuesta de mejora ‘Bajo la superficie’ tiene una optimización económica de 17.55% respecto del procedimiento constructivo Well foundation, y aumenta 0.88% cuando se considera encofrado metálico como reemplazo del encofrado de madera, ascendiendo la mejora económica hasta un promedio de 18.79% según lo evaluado en los puentes Pampa Blanca y Río Tambo. Además, el tiempo de ejecución se optimizó en un 14.29% para el puente Pampa Blanca y 8.33% para el puente Río Tambo lo que demostró que la geometría de los elementos es un factor importante para medir el impacto de la mejora. / The method of excavation with presence of water for foundation of bridges in Peru, caisson of concrete, under its conventional constructive procedure Well foundation has a collapse during its execution, being an aggravating the existence of groundwater, as in the case of the Arequipa region. The present investigation seeks to improve and elaborate a preliminary manual of the constructive procedure of caissons for the foundation of bridges in the coast of the Arequipa region. Additionally, the constructive procedure 'Under the surface' was proposed, based on the construction of concrete caissons in Colombia, constructive system in which it is excavated to then build the caisson walls. From interviews with specialists, we conclude that the approximate range of positive variation considered economic improvement is from 16% to 20% with respect to the direct cost of a conventional construction system. Finally, it was concluded that the 'Under the surface' improvement proposal has an economic optimization of 17.55% with respect to the Well foundation construction procedure and increases 0.88% when considering metallic formwork as a replacement for the wooden formwork, the economic improvement amounting to average of 18.79% as evaluated in the Pampa Blanca and Río Tambo bridges. In addition, the execution time was optimized by 14.29% for the Pampa Blanca bridge and 8.33% for the Río Tambo bridge, which showed that the geometry of the elements is an important factor in measuring the impact of the improvement. / Tesis
55

Guía para la implementación de un Área de Infraestructura estandarizada en colegios privados de distritos de nivel socioeconómico medio/alto de Lima Metropolitana para reducir la variabilidad negativa / Guide for the implementation of a standardized Infrastructure Area in private schools of middle/upper socioeconomic class districts in Metropolitan Lima to reduce the negative variability.

Galarza Berrospi, Kevin Roosevelt, Olano Alvarado, Sebastián Alonso 28 February 2019 (has links)
Actualmente, se mantiene un gran crecimiento poblacional y de la clase media en Lima Metropolitana. Debido a esto, los padres de familia de estos grupos deciden llevar a sus hijos a colegios privados cada vez de mayor nivel, incrementando la demanda en los colegios. Esto genera cambios en los colegios: académicos, como la inclusión de enseñanza mixta en colegios que enseñaban a un solo género; y de su infraestructura, como ampliaciones o construcción de pabellones. A partir de ello, se identificó problemas en la construcción de estos ambientes especiales (definición dentro de la presente tesis) que generaron grandes incrementos en los presupuestos iniciales de obra y dificultaban su elaboración. La presente tesis tiene como fin sustentar y desarrollar la propuesta de solución a estos problemas: Implementación de un Área de Infraestructura estandarizada en los colegios privados de nivel socioeconómico medio/alto de Lima Metropolitana. Se realizaron entrevistas a los encargados por parte de los colegios de supervisar las obras con el fin de recaudar y analizar la información sobre los problemas, plantear soluciones y validar la propuesta de solución de esta tesis. Así mismo, las propuestas de solución se sustentaron con base en el libro de gestión de proyectos PMBOK. Finalmente, se tuvo como resultado la validación de la propuesta de solución, por parte de los expertos (personas entrevistadas) y con la ayuda de indicadores en el caso de un colegio, concluyendo que es una herramienta de gran ayuda para los colegios. / Nowadays, there is a huge population growth in Lima city and the middle-class people has also increase. Because of this, the parents in Lima that belong to this class prefer to take their children to private schools with better prestige increasing their demand. This produces changes in these schools: academic like the inclusion of teaching for male and female students (in case of school with one gender teaching) and infrastructure like construction or extension of buildings or creation of new study sites. After that, problems in special areas (defined in this thesis) that creates big increases in the initial budget and difficult their construction were identified. This thesis aims to support and develop the solution proposal to the problems: Implementation of Standardized Infrastructure Department in private schools with medium/high socioeconomic level in Lima Metropolitan. To achieve this, interviews were carry out to the people in charge of supervise the construction for the schools (4 schools were selected for this sample). The aim was to collect and analyze the problems information, propose solutions and validate the solution proposal of this thesis. This solution proposals were based on the PMBOK project management book. Finally, the results were the validation of the solution proposal by the experts (people interviewed) and with the help of indicators in the case of a school, concluding that it is a helpful tool for the schools. / Tesis
56

Propuesta de Viabilidad de un Proyecto Inmobiliario para el sector socio económico “C” en el distrito de Comas Caso de estudio: Urb. El Retablo

Dextre León, Wilder, Fabián Santivañez, Caroll Johana, Guzmán Moya, Jaime Alfonso, Lavado Terrel, Rudy Edison, Ortega Menzala, Eliana 20 December 2018 (has links)
El presente trabajo de investigación, centró la propuesta de proyecto, dentro del distrito de Comas, uno de los distritos de Lima Metropolitana de mayor población, dirigiendo nuestro proyecto a un sector de la población (segmento C), que ahora se muestra como el más dinámico económicamente, es un segmento que demanda mayor número de viviendas, con exigencias de mayor confort y calidad. Por ende nuestra investigación buscó determinar la viabilidad de un proyecto inmobiliario de departamentos, ubicado en la urbanización El Retablo, en un terreno estratégicamente ubicado cerca de vías principales, centros comerciales, educativos y de esparcimiento, que por su área (4,407.30 m2) aparentemente no resulta muy atractivo para los inversionistas. Se desarrolló la investigación en un contexto de veracidad de variables económicas y financieras. Se verificó la disponibilidad real del terreno, evaluando la factibilidad del mismo y en función a la normativa del sector, se desarrolló un proyecto inmobiliario de departamentos acorde a los ingresos factibles para el poblador del segmento C (en áreas mínimas confortables y precios de departamentos acorde al mercado). Se empleó del mismo modo un análisis de sensibilidad con variables en velocidad de ventas y variación de costos de construcción por ser los de mayor impacto económicamente, con escenarios pesimista, probable y optimista, a fin de tener en claro la rentabilidad del proyecto. Finalmente luego de los análisis desarrollados y los indicadores obtenidos, se determinó que el proyecto inmobiliario “Condominio Primavera”, era rentable económica y financieramente, obteniéndose una utilidad superior al 15% después de impuestos. Del mismo modo el proyecto ayuda a cubrir una demanda de viviendas no satisfecha del segmento C, déficit de oferta que se constituye como un potencial nicho de inversión, tanto para las empresas privadas como públicas. / This research work based its project proposal on the district of Comas. Comas is one of the districts of Metropolitan Lima with the largest population. We directed our project to a sector (segment C) of the population, which is now shown to be the most economically dynamic sector, and it is a segment that demands a greater number of houses, with demands for greater comfort and quality. Therefore, our investigation sought to determine the viability of a real estate project of apartments, located at "Urbanization El Retablo", on a land strategically located near main avenues, commercial, educational and leisure centers which, due to its area (4,407.30 m2), is apparently not very attractive for investors. The research was carried out in a context of veracity of economic and financial variables. The actual availability of the land was verified. The feasibility of the land was evaluated and, based on the sector's regulations, a real estate project was developed for apartments according to the feasible income for the population of segment C (with comfortable minimum areas, and apartment prices according to the market). Likewise, a sensitivity analysis was used with variables in sales speed and variation of construction costs because they were the ones with the greatest economic impact, with pessimistic, probable and optimistic scenarios, in order to have a clear idea of the project's profitability. Finally, after the analyses developed and the indicators obtained, it was determined that the real estate project "Condominio Primavera", was economically and financially profitable, obtaining a profit higher than 15% after taxes. Similarly, the project helps to cover an unsatisfied demand for housing of segment C, and a supply deficit that constitutes a potential investment niche for both private and public companies. / Trabajo de investigación
57

Optimización De La Gestión Municipal Para El Desarrollo De Los Proyectos De Construcción De Conexiones Peatonales En Zonas Vulnerables De Lima Metropolitana

Llerena Mamani, Fernando Andre, Mendiola López, Miguel Edmundo 13 July 2018 (has links)
La presente tesis permite conocer el funcionamiento de la gestión de Proyectos Sociales para las Conexiones de Vías Peatonales en los Asentamientos Humanos de Lima Metropolitana, en los que se busca obtener la mayor cantidad de proyectos ejecutados al servicio de la población beneficiada. Asimismo, para los procesos que se llevan a cabo se ha obtenido un listado completo de las áreas comprometidas para la realización de estos proyectos y las responsabilidades de cada una, se han utilizado herramientas como la WBS estructura detallada de trabajo por el PMI (Project Management Institute), y diagramas de flujo para indicar el funcionamiento de las áreas encargadas de la Municipalidad Metropolitana de Lima. Se está dejando un precedente de cómo llevar a cabo proyectos sociales en Lima Metropolitana y mejorar la cantidad de proyectos exitosos, para que el gasto de la municipalidad sea cumplido como se indicó en el PMI (Plan Multianual de Inversión) que actualmente tiene mayor relevancia por el cambio del sistema de aprobación de proyectos INVIERTE.PE. y que será utilizado para los siguientes años. El sistema de proyectos sociales en el Perú debe satisfacer necesidades básicas de la población de menores recursos, sin embargo, se hace necesario un reordenamiento del sistema de crecimiento de la ciudad de manera sostenida que siguiendo un plan estratégico de desarrollo cuente con mayor respaldo y control para que se cumpla en los años que se le tiene programado a pesar el cambio de autoridades y cambio de planes de crecimiento. / This thesis allows to know the operation of the management of Social Projects for the connections of pedestrian routes in the Human Settlements of Metropolitan Lima, in which it is sought to obtain the greater number of projects executed at the service of the benefited population. Likewise, for the processes that are carried out, a complete list of the areas committed to the realization of these projects and the responsibilities of each one has been obtained, tools such as the WBS have been used. Detailed work structure by the PMI (Project Management Institute), and flow charts to indicate the operation of the areas in charge of the Metropolitan Municipality of Lima. It is leaving a precedent of how to carry out Social Projects in Metropolitan Lima and improve the number of successful projects for the expenditure of the municipality is completed as indicated in the PMI (Multi-Year Investment Plan) currently has more relevance for the change of the system of approval of projects INVIERTE.PE. and that will be used for the following years. The system of social projects in Peru must meet the basic needs of the population with fewer resources, however, it is necessary to reorder the city's growth system in a sustained manner that following a strategic development plan has greater support and control so that it will be fulfilled in the years that it is scheduled, despite the change of authorities and change of growth plans. / Trabajo de investigación
58

Propuesta de sistema de gestión enfocado en los lineamientos del PMBOK 5ta edición, en el área de conocimiento de la gestión del alcance para proyectos de construcción por la microempresa: AYH Ingenieros SCRL en la ciudad del cusco

Llerena Torreblanca, Katherine Astrid, Villafuerte Condori, Henry Engels 26 May 2018 (has links)
La presente tesis busca implementar un sistema de gestión enfocado en los lineamientos del PMBOK 5ta edición en el área de conocimiento de la Gestión del Alcance del proyecto, el cual permita a la microempresa AYH INGENIEROS SCRL mejorar su eficiencia en la ejecución de sus proyectos, dado que el mundo de la construcción está cambiando, innovando y las microempresas en el sector construcción no efectúan una gestión a partir de una integración de procedimientos, desde la concepción hasta el cierre del proyecto, cabe destacar que las microempresas usan los procesos de gerencia de proyectos en estimaciones de recursos, en estimar la duración, determinar el presupuesto, controlar el cronograma de acuerdo a sus valorizaciones o término del contrato, el gestionar a los interesados, pero no es hecho desde un enfoque y esquema organizado y lógico, sino, actividades dispersas y puntuales en cada proyecto, teniendo así al finalizar los proyectos perdidas en sus utilidades y/o proyectos sin terminar, contratos resueltos; por tales razones la importancia de la aplicación del PMBOK en la gestión de los proyectos para que permita compatibilizar y adoptar las buenas prácticas de otras organizaciones con la cual se desarrolle un marco común para los siguiente proyectos de la empresa. Finalmente cabe señala que la presente tesis se desarrolló en un caso estudio, en la ejecución de la obra “Mantenimiento Periódico del Camino Vecinal: TRAMO: YANAOCA - PONGOÑA Y CHOSECANI – PAMPARQUI, LONG.=13.996 KM DEL DISTRITO DE YANAOCA-PROVINCIA CANAS”, se realizó la Gestión del Alcance de este proyecto realizando el Plan para la Gestión del Alcance, creado así el Proyect Charter, definiendo el Enunciado del Alcance, el cual tiene los alineamiento del proyecto, el desarrollo de la propuesta, el contexto del proyecto, para la Gestión del Alcance también se realizó la creación del EDT y su Diccionario del EDT, los cuales llevan las descripciones de los trabajos, referencias técnicas, requisitos y criterios de aceptación, los hitos, realizando su control y validación mediante las valorizaciones, informes mensuales, los cuales son medidos en base al contrato de obra contractual y a los precios unitarios realizados por la empresa con la cual se adquiere el costo real de la obra; teniendo como resultado una eficiente Gestión, reflejándose así en el desempeño del proyecto , terminando el proyecto en el plazo previsto sin observaciones al momento de suscribir el Acta de entrega de Obra, el cumplimiento del Alcance fue al 100%, teniendo una utilidad del 28.63% sobre el presupuesto de obra, dicha tesis busca ser una propuesta guía de la aplicación de los lineamientos del PMBOK para la gerencia de los proyectos de la empresa en la ejecución de sus proyectos garantizando así el éxito de estos y la satisfacción de todos los involucrados en ello. Demostrando así, que, un proyecto ejecutado por una microempresa tiene otros resultados, ejecutándolo de forma tradicional que ejecutándolo con una metodología de gestión que se aplique en orden, con los lineamientos y procesos propuestos por la Guía del PMBOK en el área de conocimientos de la Gestión del Alcance. / This thesis seeks to implement a management system focused on the guidelines of the PMBOK 5th edition in the area of knowledge of the Project Scope Management, which allows the microenterprise AYH INGENIEROS SCRL to improve its efficiency in the execution of its projects, given that the world of construction is changing, innovating and the microenterprises in the construction sector do not carry out a management based on an integration of procedures, from the conception to the closing of the project, it is worth noting that micro-companies use the processes of project management in estimates of resources, in estimating duration, determining the budget, controlling the schedule according to its valuations or term of the contract, managing the interested parties, but it is not done from an organized and logical approach and scheme, but rather, scattered activities and punctual in each project, thus having at the end of projects lost in their utilities and / or pro Unfinished projects, resolved contracts; for these reasons, the importance of the application of PMBOK in the management of the projects so that it makes compatible and adopts the good practices of other organizations with which a common framework for the following projects of the company is developed. Finally it should be noted that the present thesis was developed in a case study, in the execution of the work "Periodic Maintenance of the Neighborhood Road: SECTION: YANAOCA - PONGOÑA AND CHOSECANI - PAMPARQUI, LONG. = 13.996 KM OF THE YANAOCA-CANAS PROVINCE DISTRICT" , the Scope Management of this project was carried out making the Plan for the Management of the Scope, thus creating the Charter Project, defining the Scope Statement, which has the alignment of the project, the development of the proposal, the context of the project, for the Management of the Scope, the creation of the EDT and its EDT Dictionary were also created, which contain the descriptions of the works, technical references, requirements and acceptance criteria, the milestones, carrying out their control and validation through the appraisals, monthly reports , which are measured based on the contract of contract work and unit prices made by the company with which the cost is acquired real of the work; resulting in efficient management, thus reflecting the performance of the project, finishing the project within the deadline without observations at the time of signing the Act of delivery of work, compliance with the scope was 100%, having a utility of 28.63% on the work budget, this thesis seeks to be a guiding proposal for the application of the PMBOK guidelines for the management of the company's projects in the execution of their projects, this guaranteeing the success of these and the satisfaction of all those involved in the project. Demonstrating that, a project executed by a microenterprise has other results, executing it in a traditional way than executing it with a management methodology that is applied in order, with the guidelines and processes proposed by the PMBOK Guide in the knowledge area of the Scope Management / Tesis
59

Propuesta de un manual de procedimientos para el mejoramiento de procesos constructivos de instalaciones sanitarias de viviendas multifamiliares del sector C a través de la evaluación post ocupación mediante la aplicación del “Lean Construction” / Proposal of a procedure manual for the improvement of construction processes of sanitation facilities of multifamily apartment buildings of socio – economic status C through the evaluation after occupancy by means of “Lean Construction”

Berrú Medina, Kimberly Daffne 17 January 2019 (has links)
La mayoría de los edificios de viviendas multifamiliares del nivel socioeconómico C de la ciudad de Lima, sufren la aparición de daños en la infraestructura que van en detrimento de la vida útil del proyecto. Esta es una variable muy frecuente, en la evaluación post venta y ocupación de los inmuebles, a pesar de la concurrencia de profesionales y especialistas para la prevención de los mismos, por lo cual se hace imperiosa la investigación de las causas y maneras de evitar reincidencias de este tipo de fallas. La propuesta de solución inicia con la recolección de los reclamos registrados en la oficina post venta y los testimonios de los clientes encuestados para tener un conocimiento conciso de la situación problemática que permitirá determinar la herramienta de “Lean Construction” más afín al mejoramiento de los procesos constructivos de las instalaciones sanitarias. El “Last Planner System” propone un sistema de planificación basado en indicadores de control, los cuales revelaran las causas que permitan optimizar los procesos constructivos de las instalaciones sanitarias. Con los resultados de la investigación se elaborara la propuesta: un manual de procedimientos para el mejoramiento de procesos constructivos de instalaciones sanitarias, donde el cambio más significativo es el uso de polipropileno copolímero random (PPR) en lugar de policloruro de vinilo (PVC). Además, muestra las ventajas y desventajas de este nuevo material ante el tradicional PVC. Así como, formatos que permitirán llevar un control de calidad adecuado para las instalaciones sanitarias. / The majority of multifamily apartment buildings directed to the socio-economic status C of Lima city suffer the appearance of infrastructure damage at the expense of useful project life. This one is a very frequent variable in the after-sale evaluation and occupancy of the property, although the influx of professionals and specialists who work in order to prevent them, motive for which, make the compelling necessity of the investigation of the causes and ways of avoiding relapses in this type of damages. The settlement proposal starts with the collection of complaints recorded in the after sale and the testimonies of surveyed clients to have a concise real knowledge about the problematic situation which allow to determinate what is the best tool of “Lean Construction” more akin to the improvement of construction processes of sanitation facilities. “Last Planner System” propose a planification system based on control indicators would reveal the causes which allow to optimize construction processes of sanitation facilities. Research results are used to elaborate a procedure manual to the development of construction processes of sanitation facilities, where the most significant change is the use of random copolymer propylene (PPR) instead of vinyl polychloride (PVC). In addition, show the advantages and disadvantages of this new material to the traditional PVC. As well as, formats that will allow to take a suitable quality control for the sanitation facilities / Tesis
60

Propuesta para disminuir el déficit de vivienda del segmento D: caso de análisis en el Distrito de Juliaca, Provincia de San Román y Departamento de Puno, adecuando el mecanismo de obras por impuestos

Cari Checa, Wilfredo, Coasaca Curaca, Nestor Alan Manuel, García Feliciano, Guadalupe, Villanueva Gonzales, Freddy Cesar 01 July 2018 (has links)
La investigación fue desarrollada a partir de la problemática del déficit habitacional actual de la ciudad de Juliaca, provincia de San Román en el departamento de Puno; esta alcanza el nivel más elevado de la región correspondiente al 14%, incidiendo en los niveles de pobreza, en la calidad de vida y otros indicadores de desarrollo humano. En este contexto, se necesita implementar políticas públicas para mitigar brechas existentes, como la que permite a la empresa privada financiar y ejecutar Proyectos de Inversión Pública como forma de pago de impuestos a la renta. El objetivo fue aplicar el mecanismo de Obras por Impuestos para un proyecto de interés social que logré disminuir el déficit habitacional de los demandantes efectivos del NSE D. Se revisó y analizó la documentación técnica-legal relacionada, posteriormente se realizó el análisis situacional para plantear la Propuesta como alternativa de solución; esta consta de un perfil de proyecto para una habilitación urbana, mediante OxI y la alianza estratégica con la Municipalidad Provincial de San Román para lograr la donación del terreno. La propuesta consta de 149 lotes distribuidos en 09 manzanas, a costo social y tendrá un bono por parte del MPSR; logrando disminuir el déficit habitacional en un 11.4%; se analizó la viabilidad económica con un VAN de S/.33,445.60 y un TIR de 10.92%. Finalmente, los aportes recaudados tendrán como objetivo la futura construcción de los aportes de la propuesta, a través de la estructura de fideicomiso. / The research was developed from the problems of the current housing deficit in the city of Juliaca, province San Román in the Department of Puno; this reaches the highest level of the region corresponding to 14%, affects directly on the levels of poverty, quality of life and other indicators of human development. In this context, is needed to implementing public policies and strategies to find a way to mitigate existing gaps, which allows to private enterprise finance and execute activities over Public Investment Projects as a form of payment of income taxes. The purpose of this research was to apply the investment projects based on taxes mechanisms to a project of social interest and to reduce the housing deficit of the effective applicants of NSE D. The technical and legal documentation related was reviewed and analyzed, later, a situational analysis was carried that allowed the adequate proposal as an alternative to the identified problem; which consists of a project profile for an urban habilitation, through OxI and the strategic alliance with the Provincial Municipality of San Roman for the donation of the vacant lot. The proposal consists of 149 lots distributed in 09 blocks, social cost and will have a bonus from the MPSR; managing to reduce the housing deficit by 11.4%; the economic viability with of S/.33,445.60 and a TIR of 10.92% was also analyzed. Finally, the contributions collected will have as objective the future construction of the social components, the conditions that will be applied to it and the model of trust agreement. / Trabajo de investigación

Page generated in 0.4178 seconds