• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 340
  • 163
  • 95
  • 37
  • 30
  • 23
  • 20
  • 17
  • 15
  • 3
  • 2
  • 2
  • 2
  • 1
  • Tagged with
  • 803
  • 297
  • 295
  • 255
  • 214
  • 178
  • 171
  • 170
  • 119
  • 113
  • 106
  • 93
  • 90
  • 79
  • 74
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
91

Zaměření a vyhotovení stavební dokumentace

VOZANDYCH, Petr January 2019 (has links)
This thesis adresses the geodetic survey and execution of building documentation of buildings in VelkýBor 31 near Netolice. Procedures that are in accordance with the creation of a building information model (BIM) are used to meet the objective. In the theoretical part, you can acquaint yourself with the legislation and regulations related to the construction documentation.Requirementsof the documentation and factual construction activities needed during its creationare described. In the practical part, the accompanying report, technical report, situational drawings and drawing documentation in the adequate form are prepared. The result of the work is a drawing documentation that can be utilized to create a model according to the BIM rules. As part of the debate, positives and negatives of such model are proposed and outlined.At the same time, the question of the possibility of utilizing the BIM in context with construction documentation is answered.
92

Feasibility Analysis of BIM Based Information System for Facility Management at WPI

Liu, Zijia 29 April 2010 (has links)
The traditional two-dimensional (2D) delivery system in construction industry creates communication gaps among owners, architects, and contractors. These gaps exist in all phases of project, but are more evident in operation and maintenance. Owners, especially colleges, are now starting to explore and implement new methods to receive more valuable as-built information. Building Information Modeling (BIM) is an emerging information technology that promotes a collaborative process for the Architectural, Engineering, Construction and Facilities Management (AECFM) industry; it can facilitate the exchange and interoperability of information management, and therefore could provide enhanced benefits to colleges and universities¡¯ physical plant. The objective of this thesis is to determine the feasibility of using BIM concepts, principles and tools to support and enhance the informational needs for planning, design, procurement, construction, operation and maintenance of the physical plant of WPI. The methodologies used in this research include literature review of previous research conducted by WPI students; case study analysis; interview with managers at Department of Facilities, review other universities and owners¡¯ experience with BIM, and the review of material documented on the subject. The thesis provides a conceptual guideline for implementation of BIM for WPI that can be extended to other college campuses. The proposed guideline identifies the scope of information that needs to be included in the model, establishes a process for identify specific ways in which the information can be managed to meet the needs of the facility management at WPI.
93

Projektering av träprefabricerade byggelement : Jämförelse mellan 2D-CAD och BIM

Forss, Arvid January 2018 (has links)
Träbyggnadsindustrin   har stora möjligheter att utvecklas. Idag består beskrivningarna till   produkten av 2D-ritningar och från dessa kan endast 50-70 % av informationen   som behövs hämtas. Inom byggbranschen blir det idag vanligare med digitala   modeller av byggnader kallat byggnadsinformationsmodeller, förkortat BIM.   Flera studier pekar på att BIM kan minska projektkostnaderna med 10-20 %.   Detta examensarbete kommer undersöka om projektering med BIM jämfört med   2D-CAD kan effektivisera och höja kvaliteten av träprefabricerade   byggelement. Examensarbetet har genomförts på ett konstruktionsföretag som   tar fram ritningar till prefabricerade byggnadselement i trä. Företagets   arbetssätt att ta fram 2D-ritningar i AutoCAD har undersökts genom   observationer vid deltagande av projekteringen. Därefter har en undersökning   gjorts för hur projektering kan ske med BIM verktyget Revit genom studier av   litteratur till programmet. En jämförelse har slutligen gjorts för att se   skillnader mellan de två projekteringsmetoderna. Med BIM är alla ritningar   beroende av varandra vilket bidrar till mindre ritningsfel. BIM-modellen kan   ge högre informationsinnehåll i färdiga ritningar. BIM ger 3D-modeller som   blir tillgängliga för alla. Samarbete med andra projektörer kan underlättas   med BIM genom bland annat kollisionskontroller. Nackdelen med BIM är att   modelleringen är mer tidskrävande och avancerad jämfört med 2D-CAD.   Slutsatsen är att projektering med BIM kan effektivisera och höja kvaliteten   av träprefabricerade byggelement. Detta genom bland annat att 3D modellering   ger ökad kontroll på det som projekteras, färdiga ritningarna har högre   informationsinnehåll och samarbete med andra projektörer kan underlättas. / The wood engineering industry has   great potential for development. Today the descriptions of the product   consists of 2D-CAD, but they only contain 50-70 % of the necessary   information. Digital building models called “building information modeling”   (BIM) have become more common in the building industry. Several studies   indicate that BIM can reduce the project cost by 10-20 %. In this study BIM   will be compared with 2D-CAD in order to find out if BIM can lead to   increased efficiency and quality of the construction design. The study is   conducted at a construction company that works with prefabricated wooden   building elements. The method of how the company produces the 2D-CAD using   AutoCAD is being explained trough observations. Later an investigation was   made concerning the company’s possibility to design the construction using   the BIM tool, Revit. Finally a comparison to examine the two different   methods was made. Making models using BIM is more advanced than using 2D-CAD   because of the added dimension and sometimes unexpected automatic   displacement of objects. In Revit, building elements can be made to an   assembly which creates unlimited drawing views without having to draw them   one by one. Cutting lists can be made automatically in Revit whilst in   AutoCAD they need to be manually calculated. Revit projects can also be   exported to IFC format which enables improved collaboration. The conclusion   is that using BIM leads to increased efficiency and quality of prefabricated   wooden elements. 3D modeling leads to increased control. The drawings done   with BIM have more information and collaboration is being facilitated.   However, it takes longer time to make the models using BIM. / <p>Betyg 2018-06-05</p>
94

Information- och kommunikationsteknik : Implementering av dokumenthanteringssystem hos en mindre entreprenad

Aronsson, Alexander January 2009 (has links)
<p>Idag produceras, utväxlas och lagras fler och fler dokument elektroniskt i samma takt som ledtiderna blir kortare och kortare. Detta ställer högre krav på hur den stora mängd dokument som strömmar genom ett projekt ska hanteras; dels för att datorn som hjälpmedel inte ska väljas bort på grund av dålig struktur, säkerhet och användarvänlighet och dels för att inblandade aktörer skall ha möjlighet till rätt information vid rätt tillfälle.</p><p>Denna rapport ger grundläggande kunskaper om vilka system som finns för lagring och utväxling av information, vilka filformat för utväxling av information det förekommer inom byggbranschen samt ett exempel på ett eget utvecklat dokumenthanteringssystem enligt de krav som ställs.</p><p>De system som redogörs i rapporten är Electronic Document Management tillsammans med projektnätverk, Product Document Management, Product Life Cycle Management och Byggnads Informations Modell.</p><p>Slutligen redovisas exemplet vilket är ett projektverktyg utvecklat i programmet Microsoft Sharepoint.</p>
95

BIM vid installationsprojektering / Planning HVAC systems using BIM

Louise, Kollberg January 2009 (has links)
No description available.
96

Kvalitetsfel i byggbranschen : Orsaker och åtgärder

Bäckman, Tomas, Fredriksson, Johan January 2008 (has links)
<p>Inom byggbranschen uppstår dagligen fel och problem. Tidigare studier har visat att kostnaderna för att åtgärda dessa uppgår i genomsnitt till 4,4 % av produktionskostnaden. Dessa felkostnader är endast de som upptäcks under produktionsfasen. Ska man även räkna in de som upptäcks och åtgärdas under brukstiden kan siffran uppgå till hela 10 % av produktionskostnaden.</p><p>Syftet med detta examensarbete var att få större förståelse för varför fel uppstår i byggprocessen och vad som ligger till grund till dessa, samt ta reda på vilka nya metoder det finns inom planering och projektering. Arbetet har skett i samarbete med Peab Karlstad och innefattade undersökningar av tre olika byggprojekt. Byggprojekten bestod av två stycken nybyggnationer av bostäder samt en om- och tillbyggnad av ett vattenverk. Undersökningen visade att de inblandade parternas syn på den största felkällan stämde överens med ursprungskällan för många av de fel som uppstått. De största problemen låg vid planeringen och projekteringen, och tidspressen ansågs vara den största faktorn till att felen uppstår. De felen som uppstått i de tre olika projekten och som vi studerat i denna rapport var följande (orsaken inom parentes):</p><p>*Leveransfel (Leverantören levererar felaktiga produkter)</p><p>*Felbedömning av markarbete (Fel uppskattad mängd sprängning)</p><p>*Ändring av placering och utformning ändras utifrån bygglovet (Beställaren ändrar sig efter projekteringen)</p><p>*Felaktiga handlingar lämnas vidare (Otillräcklig granskning av handlingarna)</p><p>*Installationer missas vid betonggjutning (Otillräcklig granskning av handlingarna eller att lösningarna inte är tillräckligt genomtänkta)</p><p>*Fel vid projektering (Tidspress)</p><p>*Fel placering av öppningar (Dålig markering av placering)</p><p>*Porer i betongen vid platsgjutning (Finns många möjliga orsaker, t.ex för mycket formolja, kalla formar, dålig vibrering)</p><p>*Inga närliggande fixpunkter (Kommunen sätter ut efter behov)</p><p>Det finns de som menar att på grund av att kraven från kunderna successivt höjs och att ökad internationell konkurrens så måste tiderna kortas. Om inte tiden för projekten kan förändras måste sättet man arbetar på förändras för att minimera uppkomsten av fel. För att förbättra och effektivisera planering och projektering finns två nya metoder som kallas visuell planering och BIM, Building Information Model eller Building Information Modeling. Visuell planering kommer från början från fordonsbranschen och Peab testade som första svenska byggföretag metoden i tre olika projekt 2005. Metoden har gjort stor succé hos bl.a. Volvo och positiva röster hörs även från de svenska byggföretagen. Visuell planering har människan i fokus och lägger stor vikt på att förbättra engagemanget och intresset hos de inblandade.</p><p>BIM syftar till att man samordnar all information och ser till att den är lagrad och tillgänglig för samtliga parter, både under hela byggprocessen och efter det att byggnaden är klar. Skillnaden mellan BIM och 3D-CAD är att 3D-CAD innebär att informationen objektifieras i det verktyg som används, medan BIM innefattar mycket mer än bara visualiseringar och tredimensionella ritningar.</p><p>Båda metoderna växer starkt i byggbranschen och har gett positiva resultat. Att införa nya metoder i byggbranschen är en process som tar lång tid och det innebär att det kan dröja innan vi i en större skala kommer att märka av de positiva effekterna som exempelvis mindre fel i byggprojekten.</p> / <p>In the building industry errors and problems occur on a daily basis. Former studies has shown that the average cost to attend these errors amount to 4,4 % of the production cost. These costs are only those which are discovered during the production phase. If the costs that are discovered during the utilization life span are included the number can reach up to 10 % of the production cost.</p><p>This degree thesis includes an investigation of three building projects where Peab Karlstad was the main contractor. Two of the projects were constructions of new apartment buildings and one was a conversion and extension of a water treatment works.</p><p>The study showed the main problems in the projects can be deduced to the planning of the projects, which also the involved parties agreed in.</p><p>The time-limit in the projects is by many said to be the biggest cause for errors to occur. Other sources mean that the time-limits will be shorted as a result of increased demands from the clients and the increased international competition. If the time-limit can’t be changed then the industry must change their ways to plan and implement their projects to minimize the problems.</p><p>There are two new methods to improve and make more efficient planning. The first is called visual planning and is focused on the human beings in the project. The other one is called BIM, Building Information Model or Building Information Modeling, and is based on coordination of the information under the entire building process.</p><p>Both methods are growing strongly in the industry and have proven to be more efficient. It takes time to implement new methods and that means that it can take time before these methods are used in a larger scale and improvement can be noticed.</p>
97

Information- och kommunikationsteknik : Implementering av dokumenthanteringssystem hos en mindre entreprenad

Aronsson, Alexander January 2009 (has links)
Idag produceras, utväxlas och lagras fler och fler dokument elektroniskt i samma takt som ledtiderna blir kortare och kortare. Detta ställer högre krav på hur den stora mängd dokument som strömmar genom ett projekt ska hanteras; dels för att datorn som hjälpmedel inte ska väljas bort på grund av dålig struktur, säkerhet och användarvänlighet och dels för att inblandade aktörer skall ha möjlighet till rätt information vid rätt tillfälle. Denna rapport ger grundläggande kunskaper om vilka system som finns för lagring och utväxling av information, vilka filformat för utväxling av information det förekommer inom byggbranschen samt ett exempel på ett eget utvecklat dokumenthanteringssystem enligt de krav som ställs. De system som redogörs i rapporten är Electronic Document Management tillsammans med projektnätverk, Product Document Management, Product Life Cycle Management och Byggnads Informations Modell. Slutligen redovisas exemplet vilket är ett projektverktyg utvecklat i programmet Microsoft Sharepoint.
98

Assessing the Potential of Developing a Tool for Residential Facility Management Using Building Information Modeling Software

Madhani, Himanshu 1986- 14 March 2013 (has links)
Building Information Modeling (BIM) has changed the ways buildings are designed and constructed. Along with design and construction, operation and maintenance of the built facility is also gaining importance in the Architecture-Engineering-Construction industry. Facility management (FM) is widely adopted by industrial, healthcare and other types of commercial facilities for better maintenance and management of assets. BIM is being adopted in the field of Facility management and has become one of the most important tools for better application of operation and maintenance. Facility management is performed by professionals with training and experience in the related fields of building operation, maintenance, upgrade and repair. BIM is a professional tool which requires intense training and knowledge. This tool cannot be used and is hard to understand for non-professionals and people who do not have training to use it. Management of residences is as important as management of commercial, industrial and healthcare facilities for the life and smooth running of such facilities. Residential facilities are properties with one or more residential units or buildings. These buildings could be low rise, high rise or individual units. This thesis will help in analyzing the scope of using BIM and Application Programming Interface (API) for management of maintenance in residences by the owner who are not professionally trained. The research analyzes a single, basic function of a BIM tool to determine the potential for such a tool to help non-expert, first time user to be able to understand their residential facilities maintenance requirements. It is an attempt to propose a system which provides alerts to the owners regarding required maintenance and which shows the location of the work in a 3D model. The system was designed and tested in Microsoft Windows 7 operating system by using Autodesk® Revit building information software to make the 3D model, a Revit API plug-in to craft the alerts and show the location of work and Open Database Connectivity (ODBC) to export the model to a web browser. The system worked through Revit program, but the concept of applying the system to work through web browser failed.
99

BIM i produktionsskedet / BIM in the production stage

Olsson, Lovisa, Arnäs-Nielsen, Henrik January 2013 (has links)
This thesis treats Building Information Modeling, BIM, in the production stage. Briefly described BIM is virtual model of a building object where all information about the object is gathered. All the involved operators in the construction project have access to the model and can gather or share information about the project. There are several ways to apply BIM in the production stage. This thesis primarily deals with visualization of the object, preparation and planning, the ability to take amounts from the model and coordination and clash control. The basic issue was highlighted by Byggdialog AB. The company has a vision about how they want to use BIM in all the different stages in a building project. Byggdialog want their partnering entrepreneurs to develop their BIM usage in the production stage in order to fulfill this vision. Goodtech is one of Byggdialogs partnering entrepreneurs and is the company that has been studied during this thesis. The goal with this thesis was to develop proposals as to how the BIM usage in the production stage can improve. The purpose was to make the partnering entrepreneurs understand why it is important and helpful to use BIM. The intention was also that other partnering entrepreneurs should be able to use this thesis while working with BIM in the production stage. The methods to collect information have been visits to construction sites, literature search, and interviews. The interviewees represented different operators that can affect the usage of BIM in the production stage. This thesis resulted in concrete proposals as to how the partnering entrepreneur can improve their BIM usage. Proposals as to how Byggdialog can ensure that their entrepreneurs are using BIM correct have also been developed. Today the partnering entrepreneur uses BIM to visualize the building object. As a suggestion the entrepreneur should also use the BIM model while preparing and planning their work and in order to calculate material amounts . It’s important that the entrepreneur understand how the model can be used and what kind of information it contains in order to enable these applications. It’s also important that the design phase is carefully executed. Proposals as to how this can be achieved is to educate the staff in BIM and how it should be used, that the partnering entrepreneur participates in the coordination meetings and that the partnering entrepreneur place greater demands on their electrical consultant. In order for Byggdialog to ensure that their partnering entrepreneurs are using BIM correct they should offer them education about BIM and how it works, make the BIMmodel more user-friendly and place demands on how they want BIM to be used in the project specifications. / Detta examensarbete handlar om byggnadsinformationsmodellering, BIM, i produktionen. Kort förklarat är BIM en virtuell modell av ett byggobjekt, där all information som rör byggnaden samlas. Alla aktörer i ett byggprojekt har tillgång till denna modell och kan, genom denna, samla in eller dela ut information som rör objektet. Det finns olika tillämpningar av BIM i produktionen, denna studie behandlar främst visualisering, arbetsberedning och planering, mängdavtagning och samordning och kollisionskontroller. Grundproblematiken lyftes fram med hjälp av uppdragsgivaren Byggdialog AB. Företaget har en vision om hur BIM ska användas i byggprocessens olika skeden. Byggdialog upplever att deras partneringentreprenörer, PE, bör utveckla sin BIManvändning i produktionen för att denna vision ska kunna uppfyllas. Goodtech är en av Byggdialogs partneringentreprenörer och är det företag som studerats i detta examensarbete. Målet med arbetet var att, med utgångspunkt från teorier samt Byggdialogs vision, ge förslag till hur partneringentreprenören kan utveckla BIM-användningen i produktionen. Syftet var att få partneringentreprenören att förstå nyttan med att använda BIM i produktionsskedet. Avsikten har också varit att andra partneringentreprenörer ska ha nytta av denna studie vid användning av BIM i produktionen. De metoder som användes var studiebesök, litteraturstudie och intervjustudie. Intervjuobjekten representerade olika yrkeskategorier som alla kan påverka användningen av BIM i produktionen. Detta examensarbete resulterade i konkreta förslag till hur partneringentreprenören kan förbättra BIM användningen. Även förslag till hur Byggdialog kan säkerställa att deras PE använder BIM korrekt togs fram. Idag använder partneringentreprenören BIM främst för att visualisera byggobjektet. Förslagsvis bör de även använda BIM vid arbetsberedning/planering av arbetet. Partneringentreprenören har också förutsättningar för mängdavtagning ur modellen. För att möjliggöra dessa tillämpningar är det viktigt att partneringentreprenören förstår hur 3D - modellen kan användas, samt vilken information som finns i den. Det är även viktigt att modellen är noggrant projekterad. Förslag till hur detta kan uppnås är genom att partneringentreprenören utbildar sig inom BIM och hur det används, att de deltar i BIM-samordningsmötena samt att de ställer högre krav på sin elprojektör. Byggdialog kan säkerställa att deras PE använder BIM korrekt genom att erbjuda utbildningstillfällen, anpassa BIM-modellen efter användaren och ställa krav i förfrågningsunderlaget.
100

An Examination of Processes based on Open Standards in Support of Service Location

Cheresna, Mark January 2013 (has links)
A private telecom carrier partnered with the University of Waterloo to examine opportunities to improve their asset management processes. A reliance on traditional CAD technology made it difficult to generate an enterprise view of operational assets, such as poles and cables, since CAD documents were limited to neighbourhood scale coverage. The CAD documents had to communicate logical and locational properties of these assets. These requirements were often at odds since the elements in these CAD documents were occasionally moved to clarify logical aspects, the most common being connectivity with other telecommunications hardware. Elements within the drawings were also restricted to two dimensions, a legacy of early adoption of CAD technology within the telecom carrier. Developments in GIS and architectural technology that have occurred since the introduction of CAD offer opportunities to manage assets using enterprise geospatial systems with three dimensional content. Prominent technologies and standards, such as CityGML and Oracle, will be examined to develop a model to support requirements related to service location. A service location for this paper is a site that requires the deployment of specific resources to meet the needs of a service request. Additionally, as location displacement is an issue that needs to be addressed, an evaluation of data quality processes related to location will be presented. The results from this evaluation will then be used to construct a final standards based 3D geospatial service location model, one that should address the needs of the partner carrier.

Page generated in 0.0341 seconds