Adaptar la herramienta de gestión Cuadro de Mando Integral para lograr una mejor implementación de la metodología Lean Construction en el grupo de procesos de planificación de la gestión del tiempo en proyectos de oficinas del sector privado de Lima / Adapt the management tool Balance Scorecard on office to achieve the successful implementation of the Lean Construction methodology in the planning process group of the Time Management for office building projects of Lima private sectorCaceres Olivos, Joaquín Daniel, Toda Luna, Alejandra Gianella 07 January 2020 (has links)
La metodología Lean Construction (LC) en numerosas literaturas internacionales, ha demostrado grandes beneficios en la planificación de proyectos de construcción. Sin embargo, recientes investigaciónes y casos de proyectos emblemáticos en Perú mencionan que esta metodología ha tenido dificultades al momento de ser implementada. Una serie de factores, que han sido identificados en la presente investigación, son responsables de una implementación lenta e ineficiente en la obtención de los objetivos esperados.
La presente tesis identifica los factores que impiden la correcta implementación de LC en el grupo de procesos de planificación de la gestión del tiempo tomando en cuenta el análisis de tres proyectos de oficinas del sector privado en la ciudad de Lima. En dicho análisis, se recopila información y se realizan encuestas en cada uno de los proyectos analizados para poder identificar dichos factores, los cuales mayormente mencionan problemas de comunicación y desconocimiento de las herramientas LC por el equipo del proyecto. El objetivo del presente estudio es mejorar la implementación de Lean Construction en el grupo de procesos de planificación de la gestión del tiempo en proyectos de oficinas del sector privado en Lima, a través del uso del Cuadro de Mando Integral adaptado a fin de reducir costos y plazos adicionales en los proyectos. Esta herramienta fue evaluada y validada por ingenieros civiles y expertos en la materia. / International literature evidences a broad range of benefits to construction project planning through the adoption of the Lean Construction methodology, however recent research and case studies suggest its implementation has been problematic. Several factors, identified in this study, have contributed to the implementation of Lean Construction being slow and ineffective in achieving the intended objectives. Given the importance of the planning phase of office construction projects, and current situation facing the identified challenges, it was considered as the basis for the ensuing literature and fieldwork-based study.
This thesis identifies the factors, predominantly poor communication and a lack of awareness, which impede the correct implementation of Lean Construction in the time management planning process group. To support the identification of these factors, analysis was undertaken on three private sector office projects under construction in the City of Lima, with each of the projects being analyzed through collected information and the conduction of targeted surveys.
The primary objective of this study is to reduce cost and deadline project overrun preented during the execution of strucure framing in projects of private sector offices in Lima with an adequeate implemetation of Lean Construction methodology in the group of time management planninf processes using the Balance Scorecard management tool adapted. / Tesis
|
22 |
Diseño de un sistema de control de gestión y revisión de un caso práctico en la Empresa CAP Minería S.A.Díaz Viñales, Orlando 06 1900 (has links)
Tesis para optar al grado de Magíster en Control de Gestión / Autor no autoriza el acceso a texto completo de su documento. / En un contexto de interconexión globalizado de economías cada vez más abiertas
como es el actual, los directivos de empresas públicas y privadas se ven
enfrentados a tomar decisiones en entornos cada vez más complejos.
En este escenario, se plantea una metodología para el diseño e implementación
de un Sistema de Control de Gestión basado en la herramienta de gestión
denominada Cuadro de Mando Integral y muestra una aplicación práctica del
modelo propuesto en la empresa CAP Minería, perteneciente al grupo siderúrgico
nacional CAP S.A.
El objetivo principal de este sistema es facilitar el complimiento de los objetivos
estratégicos generales, para lo cual primeramente se hace análisis crítico de las
declaraciones estratégicas actuales y de los elementos internos y externos que
influyen en la organización, para derivar en una propuesta de valor actualizada,
que este alineada con el propósito de generar valor sustentable para los
accionistas y demás grupos de interés. Luego se desarrolló un Cuadro de Mando
Integral, siguiendo el modelo de Kaplan y Norton, basado en un mapa estratégico
que consta de tres ejes estratégicos definidos por los atributos de la nueva
propuesta de valor. Con esto se logra visualizar de manera sencilla y gráfica la
estrategia y los objetivos de la empresa.
Para hacer llegar la estrategia a los áreas operativas de la unidad, se hace una
bajada en cascada mediante el desdoblamiento de objetivos hacia dos gerencias
de segunda línea (operacional y desarrollo minero), este ejercicio permite hacer
operativa la estrategia y definir con claridad las distintas áreas de responsabilidad
de los gerentes.
Finalmente y en base a los tableros de control de cada una de las gerencias
responsables (operacional y desarrollo minero), se diseñó un esquema de
incentivos económicos para alinear sus comportamientos en dirección al
cumplimiento de la Estrategia General definida para la Unidad Estratégica de
Negocios elegida.
|
23 |
Implementación del Balance Scorecard en las unidades básicas operativas de la V Comandancia Departamental del Cuerpo General de Bomberos Voluntarios del Perú (CGBVP) / Scorecard balance implementation in the operating basic units of the fitfth command headquarters of the Volunteering Fire Department of PeruAvilés Pacheco, Miguel, Espinoza Castillo, Felipe Santiago 17 July 2018 (has links)
El Cuerpo General de Bomberos Voluntarios del Perú es la organización nacional que presta respuesta a emergencias ad honorem en el Perú (incendios, rescates, respuesta a emergencias por materiales peligrosos, emergencias médicas, rescate animal y otros) esta depende de la Intendencia Nacional de Bomberos del Perú, Organismo Público Descentralizado que administra: la planificación, asignación, nivel de ejecución y calidad del gasto del presupuesto de la Republica para la atención de emergencias en el país. Esta Intendencia está adscrita al Ministerio del Interior. Con la finalidad de efectuar una asignación correcta y oportuna de los fondos presupuestarios, estos se deben priorizar en base a un análisis a conciencia que permita conocer que nivel de inversión revertirá de manera más eficiente en los servicios de respuesta a emergencias, con el consiguiente beneficio directo para el ciudadano que necesita con urgencia el servicio. Debido a lo anteriormente señalado, el presente trabajo de investigación explora la aplicabilidad de un conjunto de indicadores claves de desempeño basados en la metodología del Balance Score Card, los cuales facilitaran al Estado Peruano destinar prioritariamente sus escasos recursos públicos presupuestarios de la manera más eficiente y, de otro lado, al Cuerpo de Bomberos tomar acciones correctivas a fin de ingresar en un circulo virtuoso de mejora continua de su altruista actividad. / The General Corps of Volunteer Firefighters of Peru is the national organization that responds to emergencies "ad honorem" in the country (fires, rescues, emergency response due to hazardous materials, medical emergencies, animal rescue and others) this depends on the National Intendency of Firefighters of Peru, Decentralized Public Organism that administers: the planning, assignment, level of execution and quality of the expense of the budget of the Republic for the attention of emergencies in the country. This Intendency is attached to the Ministry of the Interior. In order to make a correct and timely allocation of budgetary funds, these should be prioritized based on a thorough analysis that allows to know what level of investment will revert more efficiently in emergency response services, with the consequent benefit direct for the citizen who urgently needs the service. Due to the aforementioned, this research work explores the applicability of a set of key performance indicators based on the methodology of the Balance Score Card, which will enable the Peruvian State to prioritize its scarce budgetary public resources in the most efficient manner and , on the other hand, to the Fire Department take corrective actions in order to enter a virtuous circle of continuous improvement of their altruistic activity. / Tesis
|
24 |
Mejoramiento de la Gestión de la Ingeniería de un Proyecto de Inversión Pública / Improvement of the Engineering Management of a Public Investment ProjectSegovia Alvarez, Jesús Alberto 17 November 2018 (has links)
El tema desarrollado en el trabajo de investigación es la aplicación de buenas prácticas del estándar de la Guía del PMBOK® 5ta Edición en la Gestión de la Ingeniería de un Proyecto de Inversión Pública del sector Salud.
La hipótesis que planteamos es que la aplicación de los estándares globales, descritos en la guía de los fundamentos para la dirección de proyectos, ayudará a la mejor planificación y futura estandarización de los procesos en la etapa de ingeniería de un Proyecto de Inversión Pública para el servicio de salud de mediana y alta complejidad.
En la actualidad las Empresas Contratistas, proveedoras de servicios para el Estado, aplican gestión de ingeniería de proyectos análoga, guiándose de experiencias anteriores lo que significa que la gestión y ejecución se desarrollen de manera empírica. En la actualidad existen muchos casos en los que la gestión del alcance, cronograma, riesgos y costos del proyecto no se cumplen según lo programado, lo que no permite tener un control sobre el presupuesto para poder lograr un promedio mínimo de rentabilidad en cada servicio de consultoría de obras.
Elaborar el Expediente Técnico a nivel estudio definitivo para el Establecimiento de Salud de Quillabamba, proyecto que mejorará la capacidad resolutiva de los establecimientos de salud y coadyuvar a cerrar las brechas en infraestructura de Salud, tomando como base la alternativa seleccionada en el estudio de Preinversión declarado viable: “Mejoramiento y Ampliación de los Servicios de Salud del Hospital Quillabamba” / The theme developed in the research work is the application of good practices of the standard of the Guide of the PMBOK® 5th Edition in the Engineering Management of a Public Investment Project of the Health sector.
The hypothesis that we propose is that the application of the global standards, described in the guide of the foundations for the direction of projects, will help to the best planning and future standardization of the processes in the engineering stage of a Public Investment Project for the health service of medium and high complexity.
At present, the Contractor Companies, suppliers of services for the State, apply analogous project engineering management, guided by previous experiences, which means that management and execution are developed empirically. Currently there are many cases in which the management of the scope, schedule, risks and costs of the project are not met as scheduled, which does not allow having control over the budget to achieve a minimum average profitability in each service. works consultancy.
Prepare the Technical File at the final study level for the Health Facility of Quillabamba, a project that will improve the resolutive capacity of health facilities and help close gaps in health infrastructure, based on the alternative selected in the Preliminary Study. declared viable investment: "Improvement and Expansion of Health Services of Quillabamba Hospital" / Tesis
|
25 |
Diseño de un cuadro de mando integral y su despliegue estratégico para VItalsalud I.P.S.Silvera González, Stephanie 04 1900 (has links)
TESIS PARA OPTAR AL GRADO DE MAGÍSTER EN CONTROL DE GESTIÓN / El presente estudio examina a Vital Salud IPS – empresa prestadora de servicios de baja y
mediana complejidad ambulatoria que opera desde 2001 en la ciudad de Barranquilla, Colombiacon
un crecimiento sostenido en los últimos cinco años, lo cual, ha sobrepasado su capacidad
instalada, tanto en recursos físicos, tecnológicos como en talento humano. Esto se ha traducido en
procesos ineficientes y la insatisfacción en los Usuarios, no cumpliéndose con los atributos de
calidad establecidos por la institución.
Por ende, el objetivo de esta investigación es diseñar un cuadro de mando integral y su
despliegue estratégico, con el propósito de reducir los problemas de desalineación interna que
presenta la organización. Para cumplir con estos objetivos, se desarrollaran las tres primeras etapas
del modelo de ciclo cerrado propuesto por Kaplan y Norton (2008).
Al diseñar las tres primeras etapas se encontraron oportunidades en el entono -como el
crecimiento de mercado- que inciden positivamente en su gestión. Esto se da a partir de una serie
de factores que se vienen presentando en el país, como lo son la cobertura universal en salud, mayor
flujo de recursos económicos, y aumento enfermedades crónicas.
Adicionalmente, la institución se encuentra en un sector donde la rivalidad entre los
competidores y el poder de negociación de los consumidores es alto, mientras que el poder de
negociación de los proveedores es medio-alto y la amenaza de productos sustitutos es baja.
Asimismo, a partir de un análisis interno se pudo determinar una alta rotación en los últimos
años, una planta física insuficiente, como también falta de control y seguimiento. Además, de
debilidades tipo financiera, como lo es la dependencia de un solo servicio.
De esta forma podemos concluir que el diseño de las tres primeras etapas del modelo de ciclo
cerrado de Kaplan y Norton (2008) es efectiva, al proporcionar una herramienta formal de control
de gestión que permite alinear la estrategia de Vital Salud IPS con sus operaciones. Asimismo, este
modelo identificó las múltiples relaciones que afectan directamente a la institución, facilitando así
la toma de decisiones y definiendo los ejes estratégicos que las guiarán para cumplir con las
estrategias de la empresa, como lo son el crecimiento de mercado y calidad en servicios de salud.
A partir de esto se podrá establecer un rumbo en el mediano y largo plazo con el fin de poder
cumplir con su misión, visión y propuesta de valor.
|
26 |
Diseño de un cuadro de mando integral y su despliegue estratégico a través de cascada para la empresa Impordenim Importadora TextilCarrillo, María José 04 1900 (has links)
TESIS PARA OPTAR EL GRADO DE MAGÍSTER EN CONTROL DE GESTIÓN / En los últimos años el sector textil ha tenido una alta participación en la economía del Ecuador. Las
empresas ligadas a esta industria se encuentran actualmente en un entorno cambiante que requieren la
toma de decisiones oportunas sobre el impacto de variables que generan gran incertidumbre y que afectan
en su desempeño.
Una de las empresas que ha contribuido y ha agenerado crecimiento en esa industria ha sido Impordenim
Importadora Textil, que se dedica a la venta y distribución al por mayor y menor de materia prima para
la confección de jeans en Ecuador. A pesar de que ha mantenido el aumento en sus ingresos, se ha vuelto
necesario establecer y desarrollar un sistema de control de gestión que permitan disuadir problemas de
agencia y mejorar su desempeño organizacional.
Es por esto que el presente proyecto tiene como propósito el diseño de un sistema de control de gestión
a la empresa Impordenim, en donde se desarrollará específicamente un cuadro de mando integral y su
aplicación en cascada. Para lograr esto, en primer lugar, se requiere previamente un análisis de carácter
estratégico de la compañía, partiendo por definir la visión, misión y valores.
Asimismo, se realizó un análisis interno y externo que permitió identificar sus fortalezas, debilidades,
oportunidades y amenazas las cuáles permitieron definir tres ejes estratégicos importantes que guiarán
el camino para cumplir la estrategia con éxito: crecimiento, atención personalizada y la eficiencia
operacional. Posteriormente, se incorporaron objetivos estratégicos, metas, indicadores e iniciativas o
acciones para lograr cumplir con el plan establecido.
Para lograr cumplir con los resultados propuestos es fundamental que la alta administración sea capaz
de comunicar la estrategia de manera clara y formal a todos los niveles y colaboradores. Para esto fue
también necesario diseñar un esquema de incentivos para el área Comercial y el área de Logística, de
esta manera se podrá lograr una participación activa para el cumplimiento de la misión, visión y los
objetivos estratégicos establecidos por la organización.
|
27 |
Diseño de un sistema de control de gestión para Codelco División El TenienteAraya Olivares, Daniel 08 1900 (has links)
TESIS PARA OPTAR AL GRADO DE MAGÍSTER EN CONTROL DE GESTIÓN / El alcance de este proyecto de grado, plantea la utilización de herramientas que contribuyan a definir un sistema de control de gestión para División El Teniente, perteneciente a la Corporación Nacional del Cobre de Chile – CODELCO, con el objetivo de obtener una organización más dinámica y estratégicamente alineada y así afrontar los nuevos desafíos que le permitirán mantener sus niveles productivos por los próximos 50 años.
Para lo anterior, en una primera parte, se presentará el contexto en el cual se desenvuelve la empresa y un análisis crítico de sus declaraciones estratégicas vigentes (misión, visión, valores), además de un análisis del entorno interno y externo de División El Teniente, con la finalidad de definir una propuesta de valor la cual plantee un enfoque con que la compañía satisfacerá los deseos y necesidades de su cliente.
Posteriormente, se presentarán las herramientas con las que se llevará a cabo la estrategia, como lo son el Modelo de Negocios, desarrollado a través de la metodología Canvas, el mapa estratégico el cual será la ruta a seguir y permitirá orientar las decisiones de los directivos para lograr el cumplimiento de la estrategia y un Cuadro de Mando Integral (CMI), que permitirá bajar la estrategia elaborada a cada una de las áreas Gerencia Mina y Gerencia de Proyectos), a través de tableros de gestión y control.
Finalmente se presentarán las definiciones y conceptos claves para que a través de la definición de esquemas de incentivos para la Gerencia Mina y Gerencia de Proyectos, se logre el alineamiento organizacional y que contribuya el cumplimiento de la estrategia.
|
28 |
Implementando el balanced scorecard : área de operaciones - supermercados RositaSerrano Melitón, Carlos Eugenio, Medina La Plata, Edison Humberto, Bermúdez García, Javier Eduardo, Rossi Urenda, José Luis 08 June 2009 (has links)
El presente trabajo va dirigido a profesionales, estudiantes o empresarios quienes estén interesados en conocer el significado de un Balanced Scorecard y su aplicación en cualquier organización Su aplicación se orienta a las personas que están estrechamente relacionadas en crear, difundir y hacer cumplir estrechamente el Plan Estratégico en sus organizaciones El objetivo específico es difundir una metodología de aplicación del Balanced Scorecard en una organización del sector Retail, específicamente nuestro trabajo se centró en una importante cadena de supermercados en nuestro país, a la que para efectos de salvaguardar el nombre, la hemos denominado Supermercados Rosita
|
29 |
Propuesta de implementación del balanced scorecard en la empresa comercial "Químicos del Perú SA"Cayetano Poma, Peter, Valverde Ponte, Julio 08 June 2009 (has links)
El presente trabajo aplicativo intitulado PROPUESTA DE IMPLEMENTACIóN DEL BALANCED SCORECARD EN LA EMPRESA COMERCIAL DE QUíMICOS PERú SA, se convierte en un elemental instrumento aplicativo concerniente a una propuesta de mejora que corresponde al desarrollo de la gestión emprendida por la empresa Químicos Perú SA durante los dos últimos años
|
30 |
Aplicación del Balance Scorecard en la Municipalidad de Pueblo LibreAranda Abad, Edwin Alexander, León Rivera, Sonia Mily, Maggiorini Barboza, Roberto Antonio 02 February 2011 (has links)
La inevitable necesidad de afrontar entornos más competitivos en un contexto de globalización creciente, está propiciando que las organizaciones busquen nuevas formas de incrementar su productividad y competitividad, recurriendo a estrategias que utilicen al máximo sus recursos, necesitando de herramientas de administración altamente dinámicas que nos permitan estar siempre al frente de los cambios del entorno; herramientas integradas, con la capacidad de obtener un entendimiento total de la estrategia y con mecanismos sencillos de comunicación y difusión a toda la organización En este escenario, los gobiernos locales tienen el enorme reto de gobernar a una ciudadanía con más educación democrática, exigente, que no sólo demanda mejores y más amplios servicios, que exigen seguridad, que se garanticen mejores políticas sociales, una mejor transparencia de recursos y crecimiento económico sostenido, sino además deben ser hábiles e innovadores a fin de responder a las crecientes expectativas y necesidades de los ciudadanos
|