• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 12
  • 1
  • Tagged with
  • 13
  • 13
  • 4
  • 3
  • 3
  • 3
  • 3
  • 3
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
11

Sistema de escalonamento de processos baseado em casos

Santos, Ronaldo Camilo dos 06 February 1998 (has links)
Orientadores: Juan Manuel Adan Coello, Mauricio Ferreira Magalhães / Dissertação (mestrado) - Universidade Estadual de Campinas, Faculdade de Engenharia Eletrica e de Computação / Made available in DSpace on 2018-07-23T15:18:06Z (GMT). No. of bitstreams: 1 Santos_RonaldoCamilodos_M.pdf: 5946892 bytes, checksum: 938141058a2a0a14ce347627d933937c (MD5) Previous issue date: 1998 / Resumo: A necessidade de se ter tarefas processadas em uma planta de manufatura, clientes de banco aguardando para serem atendidos pelos caixas, aeronaves esperando autorização para pousar e unidades de programa para serem executadas em um computador têm em comum o problema de escalonamento que surge quando há necessidade de se escolher a ordem na qual as tarefas devem ser executadas e a atribuição de tarefas aos servidores para processamento. O problema de escalonar processos computacionais pode ser resolvido automaticamente por um algoritmo dedicado. Encontrar uma solução no menor tempo possível é um dos objetivos pretendidos. A metodologia Raciocínio Baseado em Casos (RBC), que é uma abordagem para representação de conhecimento e utilização deste conhecimento para auxiliar na resolução de novos problemas, toma possível reduzir o tempo gasto para se encontrar uma solução à medida que os problemas ficam maiores. Este trabalho apresenta a proposta e implementação de um sistema baseado no método RBC para a resolução de problemas de escalonamento de processos, em sistemas de tempo real crítico estático e centralizado em um ambiente monoprocessado. Esses processos devem respeitar restrições de tempo de pronto, tempo de execução e prazo de término, além das relações de precedência. O Sistema de Escalonamento de Processos Baseado em Casos (SEBC), implementado neste trabalho, possui como característica principal a idéia de simplificação de um problema através de substituições de seus subproblemas similares a problemas armazenados em uma base de casos e adaptação das soluções destes problemas na busca de uma solução para o problema apresentado. Os resultados obtidos pelo SEBC para os problemas estudados mostram que à medida que tratamos com problemas maiores, a reutilização de soluções de problemas passados pode reduzir substancialmente o tempo necessário para resolver esses problemas, ou detectar que os mesmos não têm solução / Abstract: Multiple jobs that should be processed in a manufacturing plant, bank customers waiting to be served by tellers, aircrafts waiting for landing c1earances,and program tasks to be run on a computer have in common the scheduling problem that emerges whenever there is a choice concerning the order in which tasks can be performed and the assignment of tasks to servers for processing. The scheduling problem of computer processes can be automatically solved with a dedicated algorithm. One of the goals is to find a solution whenever one exists in a minimum time. The Case-Based Reasoning methodology (CBR), an approach for knowledge representation and problem solving, makes it possible to reduce processing time to get a solution when the problems become large. This work implements and evaluates a CBR-based algorithm for solving the problem of process scheduling, in critical real time systems with a monoprocessor environment. These processes must respect restrictions of ready time, computation time and deadline, besides precedence relations. The Case-Based Reasoning Real-Time Scheduler system (CBR-RTS), implemented in this work, holds, as main characteristic, the idea of simplification of a problem. This is made by substitutions of parts of the problem, that are in a case base, and adaptation of that problems aiming a solution for the presented problem. The experiments described in this work suggest that the CBR-RTS system can contribute to an expressive reduction in processing times required to schedule complex problems. In the tested examples, our algorithm performed better than the dedicated algorithm for large problems / Mestrado / Mestre em Engenharia Elétrica
12

Análise da dinâmica e da prática do planejamento e controle da produção: uma abordagem combinada de estudo de caso e modelagem de sistemas dinâmicos / Analysis of the dynamics and practice of the production planning and control: an approach combining case study and system dynamics modeling

Sagawa, Juliana Keiko 01 October 2013 (has links)
Os paradigmas de mercado e produção têm-se alterado sensivelmente nos últimos cinquenta anos. Nesse novo contexto, para que as empresas tenham um desempenho competitivo, deve-se considerar fatores como integração, qualidade da informação e incertezas do ambiente. Um dos objetivos principais deste trabalho é analisar as inter-relações entre esses três fatores citados, no âmbito do Planejamento e Controle da Produção (PCP), bem como avaliar seu impacto no desempenho do PCP e da empresa. O desempenho do PCP foi avaliado considerando-se o nível de reprogramações, ou seja, o nível de modificações na programação da produção, e considerando-se o atendimento das metas definidas para os indicadores dessa função. Essa pesquisa qualitativa e descritiva foi feito por meio da metodologia de estudo de casos múltiplos. Como resultados, foram observadas evidências da existência de relações positivas entre os constructos analisados, ou seja, integração, incerteza, qualidade da informação e desempenho. Além disso, foram identificados diferentes mecanismos de integração utilizados nas empresas, e foram observadas diferentes causas para as reprogramações. O segundo objetivo principal deste trabalho é o desenvolvimento de um modelo dinâmico para controle da produção de múltiplos produtos, capaz de responder às incertezas que afetam estabilidade dos sistemas produtivos. O objeto da modelagem foi um sistema com fluxo job shop destinado à produção de embalagens de polipropileno, pertencente a uma empresa dos setores têxtil e petroquímico. O modelo foi desenvolvido com base na Modelagem de Sistemas Dinâmicos e na Teoria de Controle. Para obtenção do equacionamento matemático, utilizou-se a metodologia dos Grafos de Ligação. A implementação e simulação do modelo foi realizada com o auxílio do módulo Simulink®, do software Matlab®. O objetivo de controle consiste no ajuste da frequência de operação das máquinas de forma a atender as demandas previstas e, simultaneamente, manter os níveis estabelecidos de estoque em processo. No presente trabalho, focou-se na análise da resposta do sistema com controle no regime transiente, com os estoques iniciais nulos. Os melhores resultados foram observados com a utilização de um controlador híbrido, que estabelece uma produção constante em um período inicial e passa posteriormente a atuar como um controlador proporcional. O modelo dinâmico desenvolvido neste trabalho é coerente com resultados obtidos na pesquisa qualitativa e com prática do PCP, pois está alinhado aos indicadores de desempenho desta função, promove a melhoria da qualidade das informações disponíveis ao planejamento e é capaz de responder a incertezas que afetam o fluxo de produção. / The production paradigm has considerably changed over the last fifty years. In this new context, factors such as integration, information quality and ability to respond to uncertainties must be pursued by companies that want to remain competitive. Thus, one of the main objectives of this research is to analyze the relationships among these three factors mentioned, in the level of the Production Planning and Control (PPC) function, as well as to assess their impact on the performance of the PPC function and on the overall business performance. The performance of the PPC function was measured by means of the rescheduling frequency, i.e., the frequency with which the production activities have to be rescheduled, and by means of the degree of accomplishment of organizational goals, that is, the extent to which the PPC metrics are accomplished. This qualitative and descriptive research was carried out as a multiple case study. Evidences of the existence of a positive relationship among the analyzed constructs, i.e., integration, uncertainty, information quality and performance, were found. In addition, different integration mechanisms and different rescheduling causes were observed on the studied cases. The second main objective of this work is the development of a dynamic model for the production control of multi-product systems, i.e, a model that could respond to the environmental and internal uncertainties that affect the production flow. A job shop production system of propylene bags from a manufacturing company of the textile and petrochemical industry was modeled. The model was developed using Control Theory, System Dynamics modeling, and, more specifically, the Bond Graph technique. The mathematical formulation of the system was derived from the Bond Graphs. System implementation and simulation was performed with the aid of Simulink® and Matlab® software. The control objective was to adjust the operation frequency of the machines to attend the required demand while simultaneously keeping the work in process at the desired levels. In this current work, the focus of the analysis was placed on the transient response of the controlled system, with initial inventory levels set to zero. The best results were achieved with a hybrid controller, which leads the machines to operate at constant frequency in the initial period and, later on, starts to perform as a proportional controller. The proposed dynamic model is compatible with the findings of the qualitative research and with the PPC practice, since it is aligned with the PPC metrics, it improves the quality of information available for planning and it can respond to the uncertainties that may affect the production flow.
13

Análise da dinâmica e da prática do planejamento e controle da produção: uma abordagem combinada de estudo de caso e modelagem de sistemas dinâmicos / Analysis of the dynamics and practice of the production planning and control: an approach combining case study and system dynamics modeling

Juliana Keiko Sagawa 01 October 2013 (has links)
Os paradigmas de mercado e produção têm-se alterado sensivelmente nos últimos cinquenta anos. Nesse novo contexto, para que as empresas tenham um desempenho competitivo, deve-se considerar fatores como integração, qualidade da informação e incertezas do ambiente. Um dos objetivos principais deste trabalho é analisar as inter-relações entre esses três fatores citados, no âmbito do Planejamento e Controle da Produção (PCP), bem como avaliar seu impacto no desempenho do PCP e da empresa. O desempenho do PCP foi avaliado considerando-se o nível de reprogramações, ou seja, o nível de modificações na programação da produção, e considerando-se o atendimento das metas definidas para os indicadores dessa função. Essa pesquisa qualitativa e descritiva foi feito por meio da metodologia de estudo de casos múltiplos. Como resultados, foram observadas evidências da existência de relações positivas entre os constructos analisados, ou seja, integração, incerteza, qualidade da informação e desempenho. Além disso, foram identificados diferentes mecanismos de integração utilizados nas empresas, e foram observadas diferentes causas para as reprogramações. O segundo objetivo principal deste trabalho é o desenvolvimento de um modelo dinâmico para controle da produção de múltiplos produtos, capaz de responder às incertezas que afetam estabilidade dos sistemas produtivos. O objeto da modelagem foi um sistema com fluxo job shop destinado à produção de embalagens de polipropileno, pertencente a uma empresa dos setores têxtil e petroquímico. O modelo foi desenvolvido com base na Modelagem de Sistemas Dinâmicos e na Teoria de Controle. Para obtenção do equacionamento matemático, utilizou-se a metodologia dos Grafos de Ligação. A implementação e simulação do modelo foi realizada com o auxílio do módulo Simulink®, do software Matlab®. O objetivo de controle consiste no ajuste da frequência de operação das máquinas de forma a atender as demandas previstas e, simultaneamente, manter os níveis estabelecidos de estoque em processo. No presente trabalho, focou-se na análise da resposta do sistema com controle no regime transiente, com os estoques iniciais nulos. Os melhores resultados foram observados com a utilização de um controlador híbrido, que estabelece uma produção constante em um período inicial e passa posteriormente a atuar como um controlador proporcional. O modelo dinâmico desenvolvido neste trabalho é coerente com resultados obtidos na pesquisa qualitativa e com prática do PCP, pois está alinhado aos indicadores de desempenho desta função, promove a melhoria da qualidade das informações disponíveis ao planejamento e é capaz de responder a incertezas que afetam o fluxo de produção. / The production paradigm has considerably changed over the last fifty years. In this new context, factors such as integration, information quality and ability to respond to uncertainties must be pursued by companies that want to remain competitive. Thus, one of the main objectives of this research is to analyze the relationships among these three factors mentioned, in the level of the Production Planning and Control (PPC) function, as well as to assess their impact on the performance of the PPC function and on the overall business performance. The performance of the PPC function was measured by means of the rescheduling frequency, i.e., the frequency with which the production activities have to be rescheduled, and by means of the degree of accomplishment of organizational goals, that is, the extent to which the PPC metrics are accomplished. This qualitative and descriptive research was carried out as a multiple case study. Evidences of the existence of a positive relationship among the analyzed constructs, i.e., integration, uncertainty, information quality and performance, were found. In addition, different integration mechanisms and different rescheduling causes were observed on the studied cases. The second main objective of this work is the development of a dynamic model for the production control of multi-product systems, i.e, a model that could respond to the environmental and internal uncertainties that affect the production flow. A job shop production system of propylene bags from a manufacturing company of the textile and petrochemical industry was modeled. The model was developed using Control Theory, System Dynamics modeling, and, more specifically, the Bond Graph technique. The mathematical formulation of the system was derived from the Bond Graphs. System implementation and simulation was performed with the aid of Simulink® and Matlab® software. The control objective was to adjust the operation frequency of the machines to attend the required demand while simultaneously keeping the work in process at the desired levels. In this current work, the focus of the analysis was placed on the transient response of the controlled system, with initial inventory levels set to zero. The best results were achieved with a hybrid controller, which leads the machines to operate at constant frequency in the initial period and, later on, starts to perform as a proportional controller. The proposed dynamic model is compatible with the findings of the qualitative research and with the PPC practice, since it is aligned with the PPC metrics, it improves the quality of information available for planning and it can respond to the uncertainties that may affect the production flow.

Page generated in 0.0712 seconds