• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 44
  • 8
  • 5
  • 5
  • 5
  • 5
  • 5
  • 1
  • 1
  • 1
  • Tagged with
  • 53
  • 53
  • 32
  • 31
  • 17
  • 17
  • 16
  • 16
  • 15
  • 14
  • 13
  • 11
  • 10
  • 10
  • 9
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
31

Abastecimento de materiais numa linha de montagem final multiproduto /

Rodrigues, Márcio Garcia. January 2016 (has links)
Orientador: Marcela Aparecida Guerreiro Machado / Coorientador: Bruno Chaves Franco / Banca: Antonio Wagner Forti / Banca: José Luz Contador / Resumo: A crescente variedade de produtos nos sistemas atuais de produção é um grande desafio para a logística interna de abastecimento de materiais numa linha de montagem final, o abastecimento logístico precisa estar em concordância com a programação de produção de forma a disponibilizar para montagem o material necessário, no momento certo e na quantidade correta. A linha de montagem objeto do estudo acompanha esta tendência. Nela são montados modelos variados de chassis. Desta forma, o objetivo geral da pesquisa é desenvolver um modelo de abastecimento para linha de montagem multiprodutos, onde o ponto principal do trabalho é a definição do conceito mais adequado de acordo com o tipo e quantidade do material a ser abastecido. Através de uma pesquisa-ação foi proposto um modelo de abastecimento de linha que demonstrou uma redução de aproximadamente 50% da área ocupada na borda de linha, em consequência da redução de materiais, e aumento de 3% da produtividade, em virtude das reduções das indisponibilidades e perdas por set-up de abastecimento / Abstract: The increasing variety of products in current production systems is a big challenge for internal logistics supply of materials to a final assembly line, the logistic supply must be in step with the production program, in order to provide the necessary material for assembly at the right time and in the correct quantities. The assembly line which is the object of this study follows the trend. On it, several models of chassis are assembled. Therefore, the general objective of this research is to develop a supply model for a multi-product assembly line, with the main focus of the work on determining the most suitable concept in terms of the type and amount of material to be supplied. Through research-action, a model to supply the line has been proposed, which demonstrated a reduction of approximately 50% of the area occupied alongside the line, due to the reduction in materials, and an increase of 3% in productivity, owing to the reductions in outages and losses during supply set-up / Mestre
32

Scheduling projects in operating systems: an application on assembly line balancing / Programação de projetos em sistemas em operação: uma aplicação em balanceamento de linhas de montagem

Sikora, Celso Gustavo Stall 19 April 2017 (has links)
Fundação Araucária; RENAULT; Seti / A Pesquisa Operacional investiga as (melhores) formas de se configurar e coordenar sistemas ou operações usando técnicas de otimização. Geralmente, a otimização de um sistema é modelado com base no estado final almejado. Porém, como atingir ou implementar tal estado final em sistemas é pouco retratado na literatura. Esta dissertaçãode mestrado propõe uma nova classe de problema de otimização: a programação das operações entre o estado inicial e o final de um sistema, o Problema de Implementação. A programação das operações é especialmente importante para linhas de montagem. A indústria automobilística é fortemente baseada em linhas de produção que podem ser usadas até 24 horas por dia. Assim, as oportunidades de intervenções para mudar ou otimizar o sistema produtivo são poucas. As condições de implementação aplicadas ao balanceamento de linhas produtivas são discutidas, e as características observadas resultam no proposto Problema de Implementação de Linhas de Montagem (PILM). Na dissertação, um guia de modelagem baseado em Programação Linear Inteira Mista (PLIM) é desenvolvido para a formulação de diversas variações do Problema de Implementação. As instruções de modelagem são usadas para desenvolver um conjunto de modelos PLIM para o Problema de Implementação de Linhas de Montagem. Para a obtenção de resultados, um conjunto de instâncias é proposto. Assim, uma análise de sensibilidade em função de cada um dos parâmetros formadores das instâncias é realizada. As formulações são comparadas, junto com as diferentes formas de apresentar e resolver o problema. Ademais, um método de decomposição é usado para resolver um problema industrial real. A modelagem mostrase correta para a divisão da implementação de mudanças em linhas de montagem. Os resultados mostram que a divisão do esforço de implementação resulta em apenas poucas mudanças a mais (cerca de 7% para os casos pequenos e médios) comparadas com a implementação em uma fase. A possibilidade de programar a implementação em etapas menores aumenta a aplicabilidade de projetos, que, de outra forma, requeririam grande paradas de produção. / Operations Research investigates the (best) ways to configure and coordinate systems or operations with optimization procedures. Usually, the optimization of a system is modeled based on the aimed final configuration. However, little is published about how to reach or implement such optimal configurations in the systems. This master thesis proposes a new class of optimization problem: a scheduling of operations between initial and final states of a system, the Implementation Problem. The scheduling of operations is especially important to assembly lines. The automotive industry strongly relies on production lines that can operate 24 hours a day. Thus, the intervention opportunities to change or optimize the production system are very few. The implementation conditions of balancing on assembly lines are discussed, and the observed characteristics result in the proposal of the Assembly Line Implementation Problem (ALIP). The master thesis proposes a Mixed-Integer Linear Programming (MILP) modeling guide for the formulation of several variations of Implementation Problems. The modeling instructions are used to develop a set of MILP models for the Assembly Line Implementation Problem. For the results, a dataset is proposed and a sensitivity analysis on each of the consistent parameters of the dataset is performed. The proposed formulations are compared, along with the different forms of presenting and solving the problem. Furthermore, a decomposition method is used to solve a real-world industrial problem. The modeling correctly represents the division of the implementation of changes in assembly lines. The results show that the division of the effort in multiple stages only need a few more changes (around 7\% for the small and medium cases) comparing to a straightforward implementation. The possibility of scheduling the implementation in smaller steps increases the applicability of projects that otherwise would require a large system's stoppage time.
33

Scheduling projects in operating systems: an application on assembly line balancing / Programação de projetos em sistemas em operação: uma aplicação em balanceamento de linhas de montagem

Sikora, Celso Gustavo Stall 19 April 2017 (has links)
Fundação Araucária; RENAULT; Seti / A Pesquisa Operacional investiga as (melhores) formas de se configurar e coordenar sistemas ou operações usando técnicas de otimização. Geralmente, a otimização de um sistema é modelado com base no estado final almejado. Porém, como atingir ou implementar tal estado final em sistemas é pouco retratado na literatura. Esta dissertaçãode mestrado propõe uma nova classe de problema de otimização: a programação das operações entre o estado inicial e o final de um sistema, o Problema de Implementação. A programação das operações é especialmente importante para linhas de montagem. A indústria automobilística é fortemente baseada em linhas de produção que podem ser usadas até 24 horas por dia. Assim, as oportunidades de intervenções para mudar ou otimizar o sistema produtivo são poucas. As condições de implementação aplicadas ao balanceamento de linhas produtivas são discutidas, e as características observadas resultam no proposto Problema de Implementação de Linhas de Montagem (PILM). Na dissertação, um guia de modelagem baseado em Programação Linear Inteira Mista (PLIM) é desenvolvido para a formulação de diversas variações do Problema de Implementação. As instruções de modelagem são usadas para desenvolver um conjunto de modelos PLIM para o Problema de Implementação de Linhas de Montagem. Para a obtenção de resultados, um conjunto de instâncias é proposto. Assim, uma análise de sensibilidade em função de cada um dos parâmetros formadores das instâncias é realizada. As formulações são comparadas, junto com as diferentes formas de apresentar e resolver o problema. Ademais, um método de decomposição é usado para resolver um problema industrial real. A modelagem mostrase correta para a divisão da implementação de mudanças em linhas de montagem. Os resultados mostram que a divisão do esforço de implementação resulta em apenas poucas mudanças a mais (cerca de 7% para os casos pequenos e médios) comparadas com a implementação em uma fase. A possibilidade de programar a implementação em etapas menores aumenta a aplicabilidade de projetos, que, de outra forma, requeririam grande paradas de produção. / Operations Research investigates the (best) ways to configure and coordinate systems or operations with optimization procedures. Usually, the optimization of a system is modeled based on the aimed final configuration. However, little is published about how to reach or implement such optimal configurations in the systems. This master thesis proposes a new class of optimization problem: a scheduling of operations between initial and final states of a system, the Implementation Problem. The scheduling of operations is especially important to assembly lines. The automotive industry strongly relies on production lines that can operate 24 hours a day. Thus, the intervention opportunities to change or optimize the production system are very few. The implementation conditions of balancing on assembly lines are discussed, and the observed characteristics result in the proposal of the Assembly Line Implementation Problem (ALIP). The master thesis proposes a Mixed-Integer Linear Programming (MILP) modeling guide for the formulation of several variations of Implementation Problems. The modeling instructions are used to develop a set of MILP models for the Assembly Line Implementation Problem. For the results, a dataset is proposed and a sensitivity analysis on each of the consistent parameters of the dataset is performed. The proposed formulations are compared, along with the different forms of presenting and solving the problem. Furthermore, a decomposition method is used to solve a real-world industrial problem. The modeling correctly represents the division of the implementation of changes in assembly lines. The results show that the division of the effort in multiple stages only need a few more changes (around 7\% for the small and medium cases) comparing to a straightforward implementation. The possibility of scheduling the implementation in smaller steps increases the applicability of projects that otherwise would require a large system's stoppage time.
34

Montagem assistida por realidade aumentada (A3R). / Assembly assisted by augmented reality (A3R).

Nishihara, Anderson 20 July 2016 (has links)
Processos de montagem em geral necessitam de instruções para serem executados, desde a montagem de simples brinquedos até máquinas complexas. Tradicionalmente, essas instruções vem na forma de manuais em papel ou meio digital. Seja qual for o modo, os manuais de instruções utilizam desenhos, diagramas ou fotos, além de instruções textuais para indicar a sequência de montagem do início até o estado final. Procurando mudar esse paradigma, esse trabalho propõe um sistema para auxílio à montagem que utiliza realidade aumentada para guiar o usuário no processo. Através de processamento de imagens capturadas por uma câmera o sistema reconhece cada peça e por meio de sinais gráficos é indicado ao usuário qual a peça a ser manipulada e onde deve ser posicionada. Em seguida é feito a verificação do posicionamento das peças e o usuário é alertado quando a tarefa de montagem atinge o estado final. Muitos trabalhos na área utilizam algum tipo de dispositivo customizado como \"head mounted display\" (HMD) e marcadores para auxiliar o rastreamento da câmera e identificação das peças, limitando a popularização dessa tecnologia. Tendo esse último ponto em vista, propõe-se um sistema que não utiliza qualquer dispositivo customizado ou marcadores para rastreamento. Além disso, todos os processos do sistema são executados em software embarcado, não necessitando de comunicação com outros computadores para o processamento de imagens. Como o sistema não faz uso de marcadores para a identificação das peças, inicialmente é proposto a implementação do sistema para guiar o usuário na resolução de um quebra-cabeças plano. O sistema proposto é denominado como MARA (Montagem Assistida por Realidade Aumentada). / Assembly processes for simple toys or complex machines usually requires instructions to be executed. Traditionally, these instructions are written in the form of paper or digital manuals. These manuals contains descriptive text, photos or diagrams to guide the assembly sequence from the beginning to the final state. To change this paradigm, it is proposed in this work an augmented reality system to guide assembly tasks. The system recognizes each assembly piece through image processing techniques and guides the piece placement with graphic signals. Later, the system checks if the pieces are properly assembled and warns the user when the assembly have been finished. In the field of assembly assisted by augmented reality systems, many works use some kind of customized device, like head mounted displays (HMD). Furthermore, markers have been used to track camera position and identify assembly parts. These two features restrict the spread of the technology, thus in the proposed work customized devices and markers to track and identify parts shall not be used. Besides, all the processing are executed on embedded software without the need of communication with other computers to help image processing. The first implementation of the proposed system assists the user on the assembly of a planar puzzle, as the proposed system do not use markers to recognize assembly pieces. This system is being called A3R (Assembly Assisted by Augmented Reality).
35

Exact and heuristic methods for heterogeneous assembly line balancing problems of type 2. / Métodos exatos e heurísticos para problemas de balancemento de linhas de montagem heterogêneas do tipo 2

Borba, Leonardo de Miranda January 2018 (has links)
A diferença entre estações de trabalho é considerada desprezível em linhas de montagem tradicionais. Por outro lado, linhas de montagem heterogêneas consideram o problema de indústrias nas quais os tempos das tarefas variam de acordo com alguma característica a ser selecionada para a tarefa. No Problema de Balanceamento e Atribuição de Trabalhadores em Linhas de Montagem (do inglês Assembly Line Worker Assignment and Balancing Problem, ALWABP), os trabalhadores são responsáveis por estações de trabalho e de acordo com as suas habilidades, eles executam as tarefas em diferentes quantidades de tempo. Em alguns casos, os trabalhadores podem até ser incapazes de executar algumas tarefas. No Problema de Balanceamento de Linhas de Montagem Robóticas (do inglês Robotic Assembly Line Balancing Problem, RALBP), há diferentes tipos de robôs e o conjunto de tarefas de cada estação deve ser executada por um robô. Robôs do mesmo tipo podem ser usados múltiplas vezes. Nós propomos métodos exatos e heurísticos para a minimização do tempo de ciclo destes dois problemas, para um número fixo de estações. Os problemas têm características similares que são exploradas para produzir limitantes inferiores, métodos inferiores, models de programação inteira mista, e regras de redução e dominância. Para a estratégia de ramificação do método de branch-and-bound, entretanto, as diferenças entre os problemas forçam o uso de dois algoritmos diferentes. Uma estratégia orientada a tarefas tem os melhores resultados para o ALWABP-2, enquanto uma estratégia orientada a estações tem os melhores resultados para o RALBP-2. Nós mostramos que os limitantes inferiores, heurísticas, modelos de programação inteira mista e algoritmos de branch-and-bound para estes dois problemas são competitivos com os métodos do estado da arte da literatura. / The difference among workstations is assumed to be negligible in traditional assembly lines. Heterogeneous assembly lines consider the problem of industries in which the task times vary according to some property to be selected for the task. In the Assembly Line Worker Assignment and Balancing Problem (ALWABP), workers are assigned to workstations and according to their abilities, they execute tasks in different amounts of time. In some cases they can even be incapable of executing some tasks. In the Robotic Assembly Line Balancing Problem (RALBP) there are different types of robots and each station must be executed by a robot. Multiple robots of the same type may be used. We propose exact and heuristic methods for minimizing the cycle time of these two problems, for a fixed number of stations. The problems have similar characteristics that are explored to produce lower bounds, heuristic methods, mixed-integer programming models, and reduction and dominance rules. For the branching strategy of the branch-and-bound method, however, the differences among the problem force the use of two different algorithms. A task-oriented strategy has the best results for the ALWABP-2 while a station-oriented strategy has the best results for the RALBP-2. The lower bounds, heuristics, MIP models and branch-and-bound algorithms for these two problems are shown to be competitive with the state-of-the-art methods in the literature.
36

Montagem assistida por realidade aumentada (A3R). / Assembly assisted by augmented reality (A3R).

Anderson Nishihara 20 July 2016 (has links)
Processos de montagem em geral necessitam de instruções para serem executados, desde a montagem de simples brinquedos até máquinas complexas. Tradicionalmente, essas instruções vem na forma de manuais em papel ou meio digital. Seja qual for o modo, os manuais de instruções utilizam desenhos, diagramas ou fotos, além de instruções textuais para indicar a sequência de montagem do início até o estado final. Procurando mudar esse paradigma, esse trabalho propõe um sistema para auxílio à montagem que utiliza realidade aumentada para guiar o usuário no processo. Através de processamento de imagens capturadas por uma câmera o sistema reconhece cada peça e por meio de sinais gráficos é indicado ao usuário qual a peça a ser manipulada e onde deve ser posicionada. Em seguida é feito a verificação do posicionamento das peças e o usuário é alertado quando a tarefa de montagem atinge o estado final. Muitos trabalhos na área utilizam algum tipo de dispositivo customizado como \"head mounted display\" (HMD) e marcadores para auxiliar o rastreamento da câmera e identificação das peças, limitando a popularização dessa tecnologia. Tendo esse último ponto em vista, propõe-se um sistema que não utiliza qualquer dispositivo customizado ou marcadores para rastreamento. Além disso, todos os processos do sistema são executados em software embarcado, não necessitando de comunicação com outros computadores para o processamento de imagens. Como o sistema não faz uso de marcadores para a identificação das peças, inicialmente é proposto a implementação do sistema para guiar o usuário na resolução de um quebra-cabeças plano. O sistema proposto é denominado como MARA (Montagem Assistida por Realidade Aumentada). / Assembly processes for simple toys or complex machines usually requires instructions to be executed. Traditionally, these instructions are written in the form of paper or digital manuals. These manuals contains descriptive text, photos or diagrams to guide the assembly sequence from the beginning to the final state. To change this paradigm, it is proposed in this work an augmented reality system to guide assembly tasks. The system recognizes each assembly piece through image processing techniques and guides the piece placement with graphic signals. Later, the system checks if the pieces are properly assembled and warns the user when the assembly have been finished. In the field of assembly assisted by augmented reality systems, many works use some kind of customized device, like head mounted displays (HMD). Furthermore, markers have been used to track camera position and identify assembly parts. These two features restrict the spread of the technology, thus in the proposed work customized devices and markers to track and identify parts shall not be used. Besides, all the processing are executed on embedded software without the need of communication with other computers to help image processing. The first implementation of the proposed system assists the user on the assembly of a planar puzzle, as the proposed system do not use markers to recognize assembly pieces. This system is being called A3R (Assembly Assisted by Augmented Reality).
37

Exact and heuristic methods for heterogeneous assembly line balancing problems of type 2. / Métodos exatos e heurísticos para problemas de balancemento de linhas de montagem heterogêneas do tipo 2

Borba, Leonardo de Miranda January 2018 (has links)
A diferença entre estações de trabalho é considerada desprezível em linhas de montagem tradicionais. Por outro lado, linhas de montagem heterogêneas consideram o problema de indústrias nas quais os tempos das tarefas variam de acordo com alguma característica a ser selecionada para a tarefa. No Problema de Balanceamento e Atribuição de Trabalhadores em Linhas de Montagem (do inglês Assembly Line Worker Assignment and Balancing Problem, ALWABP), os trabalhadores são responsáveis por estações de trabalho e de acordo com as suas habilidades, eles executam as tarefas em diferentes quantidades de tempo. Em alguns casos, os trabalhadores podem até ser incapazes de executar algumas tarefas. No Problema de Balanceamento de Linhas de Montagem Robóticas (do inglês Robotic Assembly Line Balancing Problem, RALBP), há diferentes tipos de robôs e o conjunto de tarefas de cada estação deve ser executada por um robô. Robôs do mesmo tipo podem ser usados múltiplas vezes. Nós propomos métodos exatos e heurísticos para a minimização do tempo de ciclo destes dois problemas, para um número fixo de estações. Os problemas têm características similares que são exploradas para produzir limitantes inferiores, métodos inferiores, models de programação inteira mista, e regras de redução e dominância. Para a estratégia de ramificação do método de branch-and-bound, entretanto, as diferenças entre os problemas forçam o uso de dois algoritmos diferentes. Uma estratégia orientada a tarefas tem os melhores resultados para o ALWABP-2, enquanto uma estratégia orientada a estações tem os melhores resultados para o RALBP-2. Nós mostramos que os limitantes inferiores, heurísticas, modelos de programação inteira mista e algoritmos de branch-and-bound para estes dois problemas são competitivos com os métodos do estado da arte da literatura. / The difference among workstations is assumed to be negligible in traditional assembly lines. Heterogeneous assembly lines consider the problem of industries in which the task times vary according to some property to be selected for the task. In the Assembly Line Worker Assignment and Balancing Problem (ALWABP), workers are assigned to workstations and according to their abilities, they execute tasks in different amounts of time. In some cases they can even be incapable of executing some tasks. In the Robotic Assembly Line Balancing Problem (RALBP) there are different types of robots and each station must be executed by a robot. Multiple robots of the same type may be used. We propose exact and heuristic methods for minimizing the cycle time of these two problems, for a fixed number of stations. The problems have similar characteristics that are explored to produce lower bounds, heuristic methods, mixed-integer programming models, and reduction and dominance rules. For the branching strategy of the branch-and-bound method, however, the differences among the problem force the use of two different algorithms. A task-oriented strategy has the best results for the ALWABP-2 while a station-oriented strategy has the best results for the RALBP-2. The lower bounds, heuristics, MIP models and branch-and-bound algorithms for these two problems are shown to be competitive with the state-of-the-art methods in the literature.
38

Exact and heuristic methods for heterogeneous assembly line balancing problems of type 2. / Métodos exatos e heurísticos para problemas de balancemento de linhas de montagem heterogêneas do tipo 2

Borba, Leonardo de Miranda January 2018 (has links)
A diferença entre estações de trabalho é considerada desprezível em linhas de montagem tradicionais. Por outro lado, linhas de montagem heterogêneas consideram o problema de indústrias nas quais os tempos das tarefas variam de acordo com alguma característica a ser selecionada para a tarefa. No Problema de Balanceamento e Atribuição de Trabalhadores em Linhas de Montagem (do inglês Assembly Line Worker Assignment and Balancing Problem, ALWABP), os trabalhadores são responsáveis por estações de trabalho e de acordo com as suas habilidades, eles executam as tarefas em diferentes quantidades de tempo. Em alguns casos, os trabalhadores podem até ser incapazes de executar algumas tarefas. No Problema de Balanceamento de Linhas de Montagem Robóticas (do inglês Robotic Assembly Line Balancing Problem, RALBP), há diferentes tipos de robôs e o conjunto de tarefas de cada estação deve ser executada por um robô. Robôs do mesmo tipo podem ser usados múltiplas vezes. Nós propomos métodos exatos e heurísticos para a minimização do tempo de ciclo destes dois problemas, para um número fixo de estações. Os problemas têm características similares que são exploradas para produzir limitantes inferiores, métodos inferiores, models de programação inteira mista, e regras de redução e dominância. Para a estratégia de ramificação do método de branch-and-bound, entretanto, as diferenças entre os problemas forçam o uso de dois algoritmos diferentes. Uma estratégia orientada a tarefas tem os melhores resultados para o ALWABP-2, enquanto uma estratégia orientada a estações tem os melhores resultados para o RALBP-2. Nós mostramos que os limitantes inferiores, heurísticas, modelos de programação inteira mista e algoritmos de branch-and-bound para estes dois problemas são competitivos com os métodos do estado da arte da literatura. / The difference among workstations is assumed to be negligible in traditional assembly lines. Heterogeneous assembly lines consider the problem of industries in which the task times vary according to some property to be selected for the task. In the Assembly Line Worker Assignment and Balancing Problem (ALWABP), workers are assigned to workstations and according to their abilities, they execute tasks in different amounts of time. In some cases they can even be incapable of executing some tasks. In the Robotic Assembly Line Balancing Problem (RALBP) there are different types of robots and each station must be executed by a robot. Multiple robots of the same type may be used. We propose exact and heuristic methods for minimizing the cycle time of these two problems, for a fixed number of stations. The problems have similar characteristics that are explored to produce lower bounds, heuristic methods, mixed-integer programming models, and reduction and dominance rules. For the branching strategy of the branch-and-bound method, however, the differences among the problem force the use of two different algorithms. A task-oriented strategy has the best results for the ALWABP-2 while a station-oriented strategy has the best results for the RALBP-2. The lower bounds, heuristics, MIP models and branch-and-bound algorithms for these two problems are shown to be competitive with the state-of-the-art methods in the literature.
39

Melhoria do processo de montagem de motores diesel através de um sistema automático para controle e rastreabilidade de falhas / Improving the assembly process of diesel engines through of automatic system for failure control and traceability

Nikititz, Laércio 19 August 2018 (has links)
Orientador: Iris Bento da Silva / Dissertação (mestrado profissional) - Universidade Estadual de Campinas, Faculdade de Engenharia Mecânica / Made available in DSpace on 2018-08-19T06:21:52Z (GMT). No. of bitstreams: 1 Nikititz_Laercio_M.pdf: 4752044 bytes, checksum: 849738f911f24b0ca9fae4423c9406f7 (MD5) Previous issue date: 2011 / Resumo: O presente trabalho consiste em uma análise do sistema de controle e rastreabilidade de processo usado para o funcionamento da linha de montagem de motores diesel HS (high speed) na fábrica da MWM International Motores na planta de Canoas/Brasil. O objetivo da análise é detectar as oportunidades de melhorias a serem implementadas no processo, através de mudanças nesse sistema, tornando o processo mais confiável em termos de qualidade do produto fabricado. A metodologia usada para desenvolvimento deste trabalho é a de pesquisa-ação, na qual foi selecionada uma linha de montagem como alvo de estudo. O levantamento de dados inclui a descrição do sistema utilizado, o fluxo do processo em estudo, dados de ocorrências de interrupções e desvios de fluxo normal de processo o histórico de implantação do atual sistema, um comparativo entre versões inicial, nova versão e versão futura, um mapeamento do processo conectado ao sistema e coleta e estratificação de dados de entradas e saídas do processo em cada estação de trabalho. É realizado um estudo de modos e efeitos potenciais de falha com uso da ferramenta PFMEA (análise dos modos e efeitos de falha potencial de processo) e uma pesquisa sobre fundamentos de sistemas poka-yoke e TI em linhas de montagem direcionado à indústria automobilística. O resultado é uma lista de melhorias implementadas, melhorias piloto e suas discussões e oportunidades de melhoria futura a fim de reduzir a vulnerabilidade, em termos de qualidade, do processo produtivo de montagem de motores diesel na linha HS e também de rastreabilidade de dados e aproveitamento de relatórios diversos / Abstract: This study aims an analysis of the process control system and traceability for the assembly line of diesel engines HS (high speed) in the MWM plant at Canoas / Brazil. The goal of analysis is to identify opportunities for improvements to be implemented in the process through changes in the system making the assembly process more reliable in terms of quality of manufactured product. The methodology used for this work is the development of an action research, in which were selected an assembly line as the subject of study. The survey includes a description of the system used, the process flow in the study, data instances of interruptions and deviations from the normal flow of the historical process of implementing the current system. An initial comparison between versions, the new version and future version, a process mapping system and connected to the collection and stratification of data inputs and outputs of the process on each workstation. It is a study of modes and the potential effects of failure with use of the tool PFMEA (process failure mode and effects analysis) and a survey concerning the base of error proofing systems and IT on the assembly lines steering to automobile industry. The result is a list of improvements implemented, improved pilot and his discussions and opportunities for improvement in order to reduce vulnerability in terms of quality of the production process diesel engine assembly line in HS and also the traceability of data and utilization data several reports / Mestrado / Manufatura / Mestre em Engenharia Automobilistica
40

Modelo de referência para implantação de novos processos de montagem no setor automotivo. / Reference model for the implementation of new assembly processes in the automotive sector.

Baraldi, Emilio Carlos 23 August 2017 (has links)
Existem muitos estudos e publicações focadas no planejamento e desenvolvimento de novos produtos. Porém, o mesmo não é notado em estudos relativos à implantação destes novos produtos e seus processos na área de manufatura. Para tal, é desenvolvido neste trabalho um modelo de referência consistente para a implantação de novos processos de montagem no setor automotivo. O citado modelo contém a descrição das etapas, as verificações de qualidade, as ações e as necessárias validações do produto produzido no processo de produção em série. O teste da consistência e relevância dessa metodologia ocorre por meio da aplicação do modelo proposto, no desenvolvimento de um processo da montagem de componentes na montagem final. Para a sua avaliação, compararam-se os indicadores de um processo existente em dois momentos: um primeiro, com o processo desenvolvido utilizando-se o método tradicional, e em segundo, com o desenvolvimento e implantação deste mesmo processo, utilizando-se o método proposto de desenvolvimento do processo produtivo, somado a uma avaliação qualitativa do modelo de referência, por meio de uma pesquisa, com especialistas reconhecidos do meio automotivo, validando-se assim o modelo proposto. / Currently, there are many studies and publications focused on the planning and development of new products. However, the same is not noted in studies related to the implementation of these new products and their processes in manufacturing area. For this, a consistent reference model is developed for implementation of new assembly processes in the automotive sector. This model contains a description of steps, quality checks, actions and validations required by the product manufactured in the serial production process. The test of consistency and relevance of this methodology occurs through the application of the proposed model, in the development of a process of component assembly in the final assembly. For its evaluation, the indicators of an existing process were compared in two time points: with the process developed using the traditional method, and secondly, with the development and implementation of this same process, using the proposed development method of the production process. This occurred alongside a qualitative evaluation of the reference model through a survey with recognized experts of the automotive environment, thus validating the proposed model.

Page generated in 0.0784 seconds