• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 87
  • 84
  • 2
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • Tagged with
  • 178
  • 178
  • 44
  • 40
  • 37
  • 37
  • 37
  • 37
  • 37
  • 34
  • 33
  • 24
  • 24
  • 24
  • 23
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
151

O trabalho do dirigente da pequena empresa: estudo do setor da construção civil no contexto de obras públicas / The owner-manager\'s work in small business: a study in the public civil construction sector

Luiz Adalberto Philippsen Junior 10 December 2015 (has links)
O objetivo desta pesquisa é analisar o trabalho do dirigente da pequena empresa a partir da teoria das abordagens dos papéis proposta por Mintzberg e sua possibilidade de descrever o trabalho do dirigente, tendo como unidade de análise o setor da construção civil e o contexto de obras públicas. A pequena empresa é vital para a economia dos países. Da mesma forma, a indústria da construção civil contribui com significativo percentual do Produto Interno Bruto (PIB) do Brasil e de diversos países, sejam desenvolvidos ou em desenvolvimento. Embora apresentem-se como relevantes áreas de estudo - a pequena empresa e a indústria da construção civil - carecem de uma melhor análise integrada de suas inter-relações. Na primeira etapa da pesquisa foi realizado um mapeamento sistemático (MS), em uma base de dados de periódicos indexados, para levantar o estado da arte do tema da pesquisa: o dirigente da pequena empresa. Para explorar a questão da pesquisa foi desenvolvido questionário estruturado dividido em duas partes fundamentais. A primeira para obter dados qualitativos (nominais e ordinais) e quantitativos (discretos e contínuos). A segunda parte para identificar a incidência de cada um dos dez papéis propostos por Mintzberg, utilizando modelo categórico de resposta - escala Likert de cinco pontos. A amostra da pesquisa é composta por 39 dirigentes (n = 39) de empresas que entre 2013 e 2015 executaram obras civis - subsetor edificações - para empresa pública da esfera Federal via licitação pública. A análise dos dados foi realizada por meio das médias de frequência obtidas e testes de análise de variância (ANOVA) entre as variáveis (primeira parte do questionários e papéis desempenhados pelo dirigente - segunda parte). Como resultado constata-se que dirigentes de empresas de construção civil inseridos no contexto de obras públicas desempenham atividades fundamentalmente relacionadas aos níveis de atuação interpessoal e decisório. Os papéis de líder e contato, ao nível interpessoal, e os papéis de alocador de recursos e negociador, ao nível decisório, são desempenhados com maior frequência pelo dirigente da amostra, representando grande parte do seu dia a dia de atuação. Das variáveis analisadas, a idade do dirigente (para os papéis de contato e disseminador), a estrutura organizacional da empresa (para o papel de disseminador), o percentual de contratos firmados com a Administração Pública em relação ao total de contratos firmados no período de um ano (para o papel de porta-voz) e a capacidade financeira da empresa (para o papel de porta-voz) apresentaram significância estatística, indicando a associação com a variável resposta da pesquisa - o papel desempenhado pelo dirigente da pequena empresa de construção civil. Comprova-se que a abordagem dos papéis de Mintzberg é capaz de explicar o trabalho do dirigente da pequena empresa de construção civil, constatado pelas médias de frequência apresentadas nos três níveis de atuação e dos papéis desempenhados, além das significâncias estatísticas apontadas pela ANOVA. As inferências realizadas contribuem para uma melhor compreensão integrada do trabalho do dirigente da pequena empresa de construção civil inserido no contexto de obras públicas e melhoria de sua gestão. / This study\'s aim is to analyze the small business owner-manager\'s work regarding the public civil construction sector grounded on Mintzberg\'s managerial roles and its possibility to describe the owner-manager\'s work. Small businesses are vital to a country\'s economy. Likewise, the civil construction industry contributes to a high GDP percentage in Brazil and other countries as well, whether developed or not. Although these two topics are relevant areas of study - civil construction industry and small business - its integration is not very much understood. A sistematic mapping was conducted in the first phase. The used database, in which the articles are indexed, established the state of art for the research theme: small business owner-manager. To analyze the research question, a structured questionnaire was created. It was divided in two fundamental parts. The first one to obtain qualitative data (nominal and ordinal) and quantitative (discrete and continuous). The second one to indentify the incidence of one of each Mintzberg\'s ten managerial work roles using a categorical response model, the five point Likert scale. The sample consists in 39 (n=39) small business owner-managers who worked in public civil construction in a Federal bureau between the years of 2013 and 2015 by bidding. The data analysis was performed by the mean and frequencies obteined and by comparison between variables - first part of the questionnaire and the owner-managers roles - using an analysis variance (ANOVA). Findings reveal that the small business owner-managers perform roles grounded on interpersonal and decision making levels. The leader and leaison roles, at the interpersonal level, and the resource allocator and negociator roles, at the decision making level, are the ones the owner-managers spend more time performing. The owner-manager\'s age (for leaison and disseminator roles), the organizational configuration (for the disseminator role), the percentage of the signed contratcs within the Public Administration with the total of the signed contracts between a year period (for the spokesperson role) and the business financial capacity (for the spokesperson role) are statistically significant, showing direct relationship with the response variable - the owner-mager\'s work. The results also support that Mintzberg\'s managerial rolles is able to explain the small business owner-manager\'s work, verified by means and frequencies and the ANOVA comparison. This study contibutes to a deeper and integrated understanding about the small business owner-manager in the public civil construction sector.
152

Diretrizes para a gestão de projetos de obras de arquitetura e engenharia na Universidade Federal do Espírito Santo

Fonseca, Luciana Helmer 26 August 2016 (has links)
Submitted by Patricia Barros (patricia.barros@ufes.br) on 2016-11-10T11:42:33Z No. of bitstreams: 2 license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) DISSERTACAO LUCIANA HELMER FONSECA.pdf: 6439824 bytes, checksum: 7754d08ca501d779dc7788342f307c79 (MD5) / Approved for entry into archive by Patricia Barros (patricia.barros@ufes.br) on 2016-11-10T11:43:17Z (GMT) No. of bitstreams: 2 license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) DISSERTACAO LUCIANA HELMER FONSECA.pdf: 6439824 bytes, checksum: 7754d08ca501d779dc7788342f307c79 (MD5) / Made available in DSpace on 2016-11-10T11:43:17Z (GMT). No. of bitstreams: 2 license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) DISSERTACAO LUCIANA HELMER FONSECA.pdf: 6439824 bytes, checksum: 7754d08ca501d779dc7788342f307c79 (MD5) / As universidades passam constantemente por readequações em seu ambiente construído devido ao processo de modernização que ocorre em todo o mundo e em várias áreas do conhecimento. Toda essa dinâmica impõe que as instituições de ensino adaptem-se a essa realidade através da expansão física ou readequação de seus ambientes. A maioria das universidades públicas conta com profissionais técnicos para cuidar do planejamento de sua infraestrutura, agindo no planejamento, execução e gestão de suas edificações. Porém, com a demanda sempre crescente nem sempre é possível atender às expectativas dos usuários e à qualidade pretendida na obra pública. Tal fato ficou evidente durante o período do Programa de Apoio a Planos de Reestruturação e Expansão das Universidades Federais- Reuni, em que foram realizados vários investimentos em um curto período de tempo (5 anos). Assim, essa pesquisa tem como objetivo caracterizar e analisar a gestão do processo de projeto (organização dos processos e gerenciamento das etapas que antecedem à obra) na Universidade Federal do Espírito Santo- Ufes, por meio da sistematização dos métodos utilizados e identificação dos problemas enfrentados nas etapas que antecedem à licitação, com a expectativa de ao final do estudo sugerir diretrizes para melhorar o processo de planejamento das obras dessa universidade. A pesquisa foi realizada a partir de uma revisão bibliográfica sobre o tema, em que se estudou a metodologia de Gestão de Projetos mais adequada a Gestão de Projetos de obras de Arquitetura e Engenharia públicos. Foi realizada uma análise dos processos de obras do Reuni na universidade, buscando dados relativos à quantidade de obras executadas com recursos do programa e à existência e motivação de aditivos de prazo/custo. Também foram realizadas entrevistas e aplicados questionários aos diversos agentes envolvidos (técnicos que atuaram nas fases que antecedem a licitação, os responsáveis pela fiscalização e empresas construtoras que executaram obras com recursos do Reuni no período de 2008 a 2012). A pesquisa permitiu confirmar a necessidade de implantação de uma metodologia de planejamento de Projetos, já que ficou clara a existência significativa de aditivos de prazos e custos na execução das obras na universidade, principalmente devido à deficiências decorrentes das fases preliminar e interna do processo licitatório / Universities constantly undergo adjustments in its built environment due to the modernization process that occurs throughout the world and in various areas of knowledge. This dynamic requires educational institutions to adapt to this reality through physical expansion or readjustment of their environments. Most public universities have professional technicians to take care of planning your infrastructure, acting in the planning, implementation and management of their buildings. However, with the ever increasing demand they can not always meet the expectations of users and the desired quality in public works. This fact was evident during the period of the Support Program for Restructuring Plans and Expansion of Universities Federais- Reuni, where we made several investments in a short period of time (five years). Thus, this research aims to characterize and analyze project management process (organization of processes and management of the steps leading up to the work) at the Federal University of the Espírito Santo (Ufes) through the systematization of the methods used and identify the problems faced in steps prior to bidding. The expectation at the end of the study suggest guidelines to improve the planning process of the work at this university. The research will be conducted from a literature review on the topic, in which it will consider the most appropriate project management methodology to public works projects. Documentary analysis of Reuni, the work processes at the university, supplemented with data from field visits will be held, seeking data on the quantity of works executed with program resources and the existence of term additives / cost as well as their motivations, interviews and questionnaires given to various people involved (technicians who worked in the stages preceding the bid, those responsible for supervision and construction companies that performed works with Reuni resources from 2008 to 2012). The research confirmed the need to implement a Project planning methodology, as it became clear the significant existence of periods of additives and costs in the works at the university, mainly due to deficiencies resulting from primary and internal phases of the bidding process
153

Fiscalização de obras públicas: gestão de segurança na Universidade Federal de Juiz de Fora

Silva, Wellington Coutinho da 08 July 2015 (has links)
Submitted by Renata Lopes (renatasil82@gmail.com) on 2016-04-13T15:04:13Z No. of bitstreams: 1 wellingtoncoutinhodasilva.pdf: 2135073 bytes, checksum: 8db9e202912102fb4be981c75ab1fa05 (MD5) / Approved for entry into archive by Adriana Oliveira (adriana.oliveira@ufjf.edu.br) on 2016-04-24T03:24:31Z (GMT) No. of bitstreams: 1 wellingtoncoutinhodasilva.pdf: 2135073 bytes, checksum: 8db9e202912102fb4be981c75ab1fa05 (MD5) / Made available in DSpace on 2016-04-24T03:24:31Z (GMT). No. of bitstreams: 1 wellingtoncoutinhodasilva.pdf: 2135073 bytes, checksum: 8db9e202912102fb4be981c75ab1fa05 (MD5) Previous issue date: 2015-07-08 / O setor da Indústria da Construção Civil tem um dos maiores índices de acidentes e fatalidades, refletindo o setor que apresenta as piores condições de segurança, em nível mundial. Uma das principais causas para o fato é de que a prevenção de riscos não é priorizada por diversas empresas, devido à falta de conscientização da real importância da Segurança e Saúde do Trabalho por parte dos responsáveis pelo gerenciamento dos empreendimentos. A questão da Segurança e Saúde ganha maior dimensão quando aplicada à obras maiores e mais complexas, como por exemplo, os hospitais. O objetivo deste trabalho é apresentar ferramentas de controle da Gestão de Segurança e Saúde do Trabalho utilizadas na obra de ampliação de um hospital universitário, na Universidade Federal de Juiz de Fora (UFJF) em Juiz de Fora – MG. É apresentada a forma como a empresa construtora, em conjunto com a fiscalização atuaram em relação à segurança do trabalho na execução de uma obra pública. A metodologia utilizada parte de uma revisão bibliográfica e segue com um estudo de caso exploratório. No período de pouco mais de um ano não foi constatado nenhum acidente grave com vítima fatal ou afastamento de colaboradores da produção. O estudo mostra que a existência de um processo de gestão criteriosamente estabelecido, seguido de um monitoramento constante são os fatores determinantes para que a segurança dos trabalhadores seja alcançada ao longo da execução da obra. / Construction is one of the highest rates of accidents and fatalities sector of Industry, showing an industrial sector that has the worst security conditions worldwide. One of the main causes is the fact that risk prevention is not priority of the companies, due to lack of awareness of the real importance of occupational health and safety by those responsible for managing the projects. The issue of health and safety grows in importance when applied to larger and more complex constructions, such as hospitals. The objective of this dissertation is to present control tools for Management of Occupational Health and Safety used in the expansion of a Teaching Hospital of Universidade Federal de Juiz de Fora (UFJF) in Juiz de Fora – MG, Brazil. This study displays how the construction company, along the UFJF inspection, works regarding workplace safety in the execution of a public facility. The methodology begins in a literature review and follows with an exploratory case. In one-year period it was not observed any serious accident with fatality or removal of employees in production. The research shows that the existence of a carefully established management process, followed by constant monitoring is critical for the safety of workers during the building activities.
154

Orçamento de obras : análise na composição do BDI (Bonificação e Despesas Indiretas) e sua influência na exequibilidade dos preços das obras públicas / Building construction budget: analysis od BDI (Bonus and Indirect Expenditures) composition and its feasibility of the price of public works

Cunha Júnior, Gilberto José Carneiro da 01 December 2007 (has links)
Made available in DSpace on 2017-06-01T17:57:23Z (GMT). No. of bitstreams: 1 pre-textuais.PDF: 10285130 bytes, checksum: aceb2505631243bd8b01af593e28c82d (MD5) Previous issue date: 2007-12-01 / Breve / O preço de uma obra é composto de custos diretos, custos indiretos e lucro. É justamente sobre essas despesas indiretas e a bonificação (BDI) que residem as maiores dúvidas e questionamentos em relação à conceituação, aplicação e estimação. O custo direto da construção é facilmente orçável. O problema está na estimativa e controle dos demais elementos formadores do preço, como despesas administrativas, financeiras e custos indiretos no canteiro de obras. Quanto mais o BDI refletir os custos indiretos reais, melhores as possibilidades de se ofertar preços exeqüíveis, competitivos e justos. O objetivo da pesquisa é verificar a influência do BDI (Bonificação e Despesas Indiretas) na exeqüibilidade dos preços das obras públicas, sabendo que este é um incremento percentual aplicado aos custos dos serviços de engenharia para formatação de seus preços. O trabalho procurou comparar os percentuais dos componentes do BDI de algumas obras licitadas pela Empresa de Urbanização do Recife URB, com os seus respectivos valores recomendados pela legislação aplicável e literatura especializada sobre o tema, a fim de levantar a hipótese de que os aditivos de preço contratuais observados nos dados da pesquisa, têm estreita relação com a imperfeita composição da taxa do BDI. Ao final da pesquisa verificou-se uma grande incompatibilidade entre os valores ofertados pelas empresas e os recomendados pela literatura. Essas imperfeições na composição do BDI, colaboraram para a concretização de aditivos para a conclusão das obras estudadas
155

Impacto de la adecuada implementación de la Gestión de Riesgos en la ejecución de obras públicas por contrata. Caso de estudio: “Mejoramiento de la transitabilidad vehicular y peatonal en el Pueblo Tradicional de Pampas Nuevas de San Antonio, distrito de Yarabamba, Arequipa" / Impact of an adequate implementation of Risk Management in the execution of public works under contract. Case study: “Improvement of vehicular and pedestrian traffic in the Traditional Village of Pampa Nuevas de San Antonio, Yarabamba district, Arequipa”

Begazo Guzmán, Manuel Fabricio, Del Carpio Benavente, Hubert, Linares Linares, Henry Juan 16 March 2019 (has links)
Antes de la publicación del Decreto Supremo N° 147 – 2017 – EF, los Expedientes Técnicos elaborados con la finalidad de ejecutar obras públicas, no estaban obligados a incorporar la Gestión de Riesgos en los mismos. Mediante el Decreto Supremo N° 147-2017- EF, publicado en el Diario Oficial “El Peruano” el 20 de mayo de 2017, se modifica el Reglamento de la Ley de Contrataciones del Estado, aprobado por Decreto Supremo N° 350 – 2015 – EF, modificado a su vez por Decreto Supremo N° 056 – 2017 – EF, incorporándose la Décimo Séptima Disposición Complementaria Transitoria que establece disposiciones para la aplicación de la gestión de riesgos. Este decreto supremo se establece en base a la Resolución N° 014-2017-OSCE/CD de fecha 09 de mayo de 2017, en la que se aprueba la Directiva N° 012 – 2017 – OSCE/CD “Gestión de Riesgos en la planificación de la ejecución de obras”. Aún con la incorporación obligatoria de la Gestión de Riesgos en los proyectos públicos a partir de la publicación del Decreto Supremo N° 147-2017- EF se ha determinado que las obras públicas tienden a exceder los plazos y costos; además de modificar el alcance; a consecuencia de una inadecuada implementación de la Gestión de Riesgos. En el presente estudio de caso se compara la ejecución de una obra (actualmente ejecutada físicamente al 100%, en la que hubo ampliaciones de costo, tiempo y alcance) en cuyo Expediente Técnico no se incorporó la Gestión de Riesgos; con una simulación de la misma en un escenario figurado en el que la misma si contaba con una adecuada Gestión de Riesgos. Esta comparación determinará el impacto que la adecuada implementación de la Gestión del Riesgo tiene en el costo, tiempo y alcance del proyecto de ejecución. / Before the publication of the Supreme Decree No. 147 - 2017 - EF, the Technical Files prepared for the purpose of executing public works were not required to incorporate Risk Management. Through Supreme Decree No. 147-2017-EF, published in the Official Newspaper “El Peruano” on the 20th of May of 2017, the Regulations of the State Contracting Law were modified, approved by Supreme Decree No. 350 - 2015 - EF, modified at the same time by Supreme Decree No. 056 - 2017 - EF, incorporating the 17th Transitory Complementary Provision that establishes provisions for the application of risk management. This supreme decree is established based on Resolution No. 014-2017 - OSCE / CD dated May 9th 2017, which approves Directive No. 012 - 2017 - OSCE / CD “Risk Management when planning the execution of works ”. Even with the mandatory incorporation of Risk Management in public projects from the publication of Supreme Decree No. 147-2017-EF, it has been determined that public works tend to exceed deadlines and costs; besides modifying the scope; as a consequence of an inadequate implementation of Risk Management. This case study compares the execution of a work(currently 100% physically executed, in which there were extensions of cost, time and scope) in whose Technical File was not incorporated the Risk Management; with a simulation of the same work in a figurative scenario, in which it did have adequate Risk Management. This comparison will determine the impact that the adequate implementation of Risk Management has on the cost, time and scope of the execution project. / Trabajo de investigación
156

Aplicación de la lógica del Blockchain frente al ineficiente sistema integrado de gestión de la información del mecanismo de obras por impuesto que genera un Alto índice de Proyectos de Inversión Público (PIP) que no logran concluir el proceso de emisión del certificado CIPRL al 100% en la población del distrito de Echarati, durante el período 2017-2019

Frisancho Fasanando, Nylam Renato, Paucar Chappa, Carlos Augusto 11 November 2023 (has links)
El presente proyecto de investigación analiza la problemática con respecto a la ineficiencia en la conclusión de las obras por impuesto en los Proyectos de Inversión Pública (PIP) por parte de las empresas privadas en la población del distrito de Echarate. Al respecto, se han identificado la ineficacia en la emisión del Certificado de Inversión Pública Regional y Local (CIPRL) en el distrito de Echarate siendo uno de los factores relevantes la falta de capacidad institucional, la falta de capacidad técnica de los funcionarios, la baja calidad de los servicios e insatisfacción de la población. Por lo que, en los resultados de la investigación, se ha encontrado una estrecha relación entre la falta de integración automatizada de los procesos de registro y procesamiento de información como una necesidad prioritaria de los actores involucrados y el ineficiente proceso de emisión del CIPRL en la fase de conclusión de las OXI durante el periodo 2015- 2019, siendo esto una de las principales causas para la implementación de un sistema integrado de la gestión de procesos, lo mencionado anteriormente, ha identificado un mayor grado incidencia. Los actores involucrados en el proceso de emisión del certificado CIPRL plantean el desarrollo de un prototipo mediante las técnicas del Design Thinking y la aplicación de la lluvia de ideas. Se concluye como resultado que la aplicación de la lógica del Blockchain hace factible la implementación de un aplicativo, según metodología BLOXI. Además, es factible la ampliación vía facultades legislativas con el fin de simplificar el proceso. Posterior a ello, la viabilidad del prototipo dependerá principalmente del presupuesto asignado y la sostenibilidad económica para los diversos rubros y sectores del Poder Ejecutivo, gobiernos regionales, locales y usuarios finales. / This project analyzes the problem regarding the inefficiency in the conclusion of the works for tax in the Public Investment Projects (PIP) by private companies in the population of the district of Echarati. In this regard, inefficiency in the issuance of the Regional and Local Public Investment Certificate (CIPRL) in the district of Echarate has been identified, one of the relevant factors being the lack of institutional capacity, the lack of technical capacity of officials, the low quality of services and dissatisfaction of the population. There before, in the results of the investigation, a close relationship has been found between the lack of automated integration of the registration processes and information processing as a priority need of the actors involved and the inefficient CIPRL issuance process in the completion phase of the OXI during the 2015-2019 period, this being one of the main causes for the implementation of an integrated process management system, the afore mentioned, has identified a higher degree of incidence. The actors involved in the process of issuing the CIPRL certificate propose the development of a prototype through the techniques of Design Thinking and the application of brainstorming. It is concluded as a result that the application of the Blockchain logic makes the implementation of an application feasible, according to the BLOXI methodology. In addition, expansion viable legislative powers is feasible in order to simplify the process. After that, the viability of the prototype will depend mainly on the allocated budget and economic sustainability for the items and sectors of the Executive Branch, regional and local governments, and end users.
157

En la sombra de la legalidad: las causas de la corrupción en la contratación de obras públicas. El caso del Hospital Antonio Lorena y la Avenida de Evitamiento en el Cusco (2011-2014)

Villena Tagle, Claudia Adriana 01 October 2020 (has links)
El presente estudio tiene como objetivo identificar las causas de la corrupción en la construcción de obras públicas a partir de dos casos de estudio: Vía de Evitamiento y el Hospital Antonio Lorena del Cusco. Se argumenta que corrupción presente en estos dos casos responde a una racionalidad utilitaria y de interacción estratégica presente en las relaciones entre actores públicos y privados (variable independiente 1), y la existencia de deficiencias normativas en el proceso de contratación (variable independiente 2). Para probar la hipótesis planteada se emplea una metodología multimétodo: un experimento por encuesta aplicado a funcionarios públicos que laboraron en el Gobierno Regional del Cusco entre el 2011 al 2014, entrevistas semiestructuradas a actores clave y revisión de fuentes secundarias. En este estudio, el enfoque de políticas públicas permite ponderar el poder y recursos de los actores, los procesos burocráticos politizados y los conflictos de interés dentro del proceso de contratación de obras públicas. Se encuentra que la toma de decisiones responde a un pacto entre las partes que surge de los sobornos ofrecidos por las constructoras. A su vez, las decisiones de los actores se explican por el sesgo cognitivo de aversión a pérdida, es decir, personas prefieran evitar una perdida segura, el no involucrarse en actos de corrupción, en favor de una perdida potencial, perder el trabajo e ir a prisión. / This study analyzes corruption in public construction procurement to identify its causes. This, based on two case studies: “Avenida de Evitamiento y el Hospital Antonio Lorena del Cusco. It is argued that corruption present in these two cases responds to an utilitarian rationality and strategic interaction present in the relationships between public and private actors (independent variable 1), and the existence of regulatory deficiencies in the contract procurement. (independent variable 2). To test the hypothesis, this study uses a multi-method methodology: an experiment by survey applied to public officials who worked in the Regional Government of Cusco between 2011-2014, semi-structured interviews with key actors and review of secondary sources. Likewise, the public policy approach allows to consider the power and resources of the actors, politicized bureaucratic processes and conflicts of interest within the construction public procurement. In that sense, the study proves that decision-making responds to an agreement between the actors involved in the construction public procurement. This agreement arises from the bribes offered by construction companies. Also, it responds to the cognitive bias of aversion to loss, that is, actors avoid a certain loss, not receive a bribe; in favor of a potential loss, lose their job and go to prison.
158

Análisis de las iniciativas privadas cofinanciadas en los procesos de promoción de la inversión privada del Estado peruano: ¿Son herramientas viables para reducir la brecha de infraestructura y/o de servicios públicos?

Luque Sierra de Coronado, Paola Mirella 23 August 2018 (has links)
Desde su concepción las IPC tuvieron como objetivo principal, la atención de las demandas sociales en la provisión de la infraestructura pública y la prestación de servicios públicos mediante una colaboración o asociación público – privado. El Estado soportaría al privado en la financiación de aquellos proyectos de alta rentabilidad social pero escasa o nula rentabilidad económica. No obstante, los altos costos de transacción y demoras que involucra la tramitación de las IPC, ha generado grandes cuestionamientos sobre la idoneidad de la herramienta, más aún si habiendo transcurrido más de 5 años desde su creación formal, hasta el momento no hay ejemplos de proyectos adjudicados mediante IPC. El presente trabajo de investigación analiza las posibles causas de los problemas e inconvenientes que enfrenta las IPC, así como las fortalezas y oportunidades que dispone para lograr su objetivo de reducción de brechas de infraestructura y servicios públicos / Tesis
159

Impacto de los Gabinetes Binacionales Perú-Ecuador en la implementación de políticas públicas de infraestructura en Tumbes

Contreras Vergara, Luis Guillermo 19 January 2018 (has links)
Los Gabinetes Binacionales son un novedoso mecanismo de negociación bilateral que se implementó por primera vez en el 2007 entre el Perú y Ecuador y, desde entonces, se ha venido aplicando por los distintos gobiernos peruanos buscando ampliar su ejecución al resto de sus países vecinos. Por ello, se hace cada vez más importante estudiar esta nueva política de Estado para evaluar su real impacto y el cumplimiento de sus objetivos. En ese contexto, la presente investigación de tesis busca determinar si los Gabinetes Binacionales entre el Perú y Ecuador contribuyeron en el desarrollo de las políticas de infraestructura de la región Tumbes. Para responder a esta pregunta de investigación, se usó la metodología de Barzelay y Cortázar (2004) para estudios de caso haciendo un seguimiento al ciclo de políticas públicas de una obra en particular: el Centro Binacional de Atención Fronteriza (CEBAF) del Eje Vial N° 1. Desagregando éste ciclo por etapas y determinando los actores claves involucrados en cada una, se podrá analizar el rol e influencia de los Gabinetes Binacionales en cada una de las mismas. La conclusión a la que se llegó es que los Gabinetes Binacionales si tuvieron un impacto positivo en la implementación y monitoreo de esta obra, aunque se podrían realizar mejoras futuras en la coordinación de los acuerdos y plazos a los que se llegue en los Gabinetes Binacionales dadas algunas deficiencias en los mecanismos de asignación de recursos, formulación e implementación de la inversión en infraestructura identificadas por los actores.
160

Estado, proyectos binacionales y criterios para su implementación en el Perú: dificultades en la implementación de los ejes de interconección vial Perú – Ecuador 1999 - 2014

Roque Hidalgo, Edwin Ronal 07 March 2018 (has links)
La presente investigación se enfoca en el estudio de las capacidades estatales para la implementación de políticas y proyectos binacionales orientados al desarrollo territorial en zonas de frontera. Así, el objetivo principal es analizar las dificultades que se presentan en los procesos de implementación de proyectos binacionales cuyos componentes nacionales deben ser ejecutados dentro de sus respectivos países. Para esto se toma como estudio de caso la implementación del Proyecto Binacional “Ejes de Interconexión Vial Perú – Ecuador”, entre los años 1999 – 2014. Proponiendo tres objetivos específicos: primero, se busca describir las características principales que presento la Política Binacional de Desarrollo e Integración Fronteriza peruano – ecuatoriana, durante su proceso de formulación. Segundo, se busca determinar las principales dificultades suscitadas en el proceso de implementación de los Ejes de Interconexión Vial Perú – Ecuador, dentro del territorio peruano. Tercero, se busca determinar cuáles han sido las consecuencias derivadas de tales dificultades, tanto para el Estado peruano, como para las poblaciones fronterizas. Desarrollando una metodología cualitativa, a través de la revisión de diversas fuentes y documentos institucionales nacionales e internacionales vinculadas al proceso, se establece que la formulación de la política binacional peruana ecuatoriana se caracterizó por privilegiar el desarrollo de las dinámicas socio económicas transnacionales, por sobre las transfronterizas, lo que repercutió en el avance de los proyectos. También se establece que el Estado peruano presenta una débil capacidad burocrática para articular adecuadamente a las instituciones locales, nacionales e internacionales, inmersas en los procesos de implementación de proyectos binacionales. La priorización en la ejecución de estos proyectos en zonas de frontera, responden a criterios institucionales basados en el uso excesivo de la racionalidad técnica por parte de sus respectivas burocracias, las cuales privilegian sus agendas institucionales por sobre los compromisos binacionales. / The present investigation it focuses in the study of state capacities for the implementation of binational policies and projects orientated to territorial development in border areas. Thus, the main objective is to analyze the difficulties that they present in the implementation processes of binational projects which national components must be executed within their respective countries. For this there taken as a study of case the implementation of the Binational Project "Axes of Road Interconnection Peru - Ecuador", between the years 1999 - 2014. Proposing three specific objectives: first, it seeks to describe the principal characteristics presented by the Peruvian-Ecuadorian Binational Development and integration border Policy, during its process of formulation. Second, it seeks to determine the principal difficulties raised in the process of implementation of the of the Axes of Road Interconnection Peru - Ecuador, inside the Peruvian territory. Third, it seeks determine which have been the consequences derived from such difficulties, so much for the Peruvian State, as for the frontier populations. Developing a qualitative methodology, across the review of diverse sources and national and international institutional documents linked to the process, it is established that the formulation of the Ecuadorian Peruvian binational policy was characterized by privileging the development of transnational socio-economic dynamics, over and above cross-border, which affected the progress of the projects. It also establishes that the Peruvian State presents a weak bureaucratic capacity to adequately articulate the local, national, international institutions immersed in the processes of implementation of binational projects. The prioritization in the execution of these projects in border areas, responds to institutional criteria based on the excessive use of technical rationality by their respective bureaucracies, which privilege their institutional agendas over binational commitments.