• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 125
  • 2
  • Tagged with
  • 131
  • 131
  • 72
  • 56
  • 51
  • 51
  • 40
  • 38
  • 35
  • 27
  • 24
  • 22
  • 22
  • 18
  • 16
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
11

Análisis comparativo del proceso constructivo y propuesta de mejora de productividad en las partidas de concreto y encofrado de muros anclados mediante cartas de balance de dos proyectos ubicados en el distrito de Miraflores

Quispe Castillo, Doris 2015 December 1921 (has links)
La presente investigación se desarrollará en el marco del proceso de construcción de muros anclados, haciendo uso de las cartas de balance. El levantamiento de datos realizados fue realizado en dos proyectos ubicados en el distrito de Miraflores y realizados por la empresa constructora e inmobiliaria Edifica. El objetivo es realizar un análisis comparativo de los niveles de productividad obtenidos en las partidas de encofrado y concreto con encofrados metálicos a los cuales se le llamarán Tipo A y Tipo B. De este modo, el proceso de evaluación se desarrollará con una metodología cuantitativa teniendo la siguiente secuencia: primero, se deberá conocer los pasos que se siguen para la construcción de las partidas de concreto y encofrado de muros anclados; segundo, se deberá clasificar de acuerdo con el tipo de trabajo realizado, TP, TC y TNC y el proceso finaliza con la comparación y análisis de los porcentajes obtenidos de los dos proyectos, con la finalidad de dar a conocer cuál de las dos marcas de encofrado resulta ser más productiva y a su vez realizar propuestas de mejoras de productividad. / Tesis
12

Propuesta de Guía Metodológica para la planificación y control de tiempo aplicada a la construcción de proyectos de edificaciones multifamiliares

Huari Wilson, Luis Rodrigo, Rojas Reyes, Renato Javier 01 January 2012 (has links)
La economía peruana en los últimos años ha progresado notablemente y junto con ella el sector construcción, donde se ha registrado crecimientos del PBI en proporciones alrededor de 50% mayores que el PBI Global. A partir de la actividad económica y sector construcción en el Perú, se puede afirmar que, una de las actividades de mayor influencia con el crecimiento es la actividad edificadora de edificios multifamiliares. Sin embargo, el desarrollo de la construcción de estos proyectos, en particular el proceso de estimación del tiempo de ejecución, se ve amenazado por la ausencia de la planificación del tiempo o por las deficiencias que presenta uno de los enfoques más empleados para esta labor: el tradicional. Adicionalmente, se presentan restricciones que podrían generar inestabilidad y pérdida de convicción en los supuestos empleados inicialmente en dicho proceso, dando como resultado un proceso extremadamente complejo en el que la mínima variación en este generaría retrasos en el proyecto y aumentaría la posibilidad de que el proyecto incumpla el plazo. Cuando este escenario se presenta, el proceso de estimación del tiempo de ejecución se convierte en un problema. Frente a esto, se presenta una propuesta que buscará solucionar el problema de la estimación del tiempo de ejecución mediante la simplificación de dicho proceso: la Guía Metodológica. El presente trabajo titulado “Propuesta de Guía Metodológica paras la Planificación y Control de Tiempo aplicada a la Construcción de Proyectos de Edificaciones Multifamiliares” se resume en la creación de una propuesta, en base a lineamientos teóricos y prácticos, cuyo propósito principal es brindar pautas, claras y sencillas, que permitan estimar y gestionar el tiempo de ejecución de un proyecto de construcción de edificaciones multifamiliares en Lima Metropolitana.
13

Optimización de la eficiencia del proceso constructivo en la partida de encofrado de vigas mediante la aplicación de cartas balance y líneas de balance, bajo un enfoque Lean, para optimizar la mano de obra en el centro comercial “Paso 28 de Julio” en la ciudad de Lima

Gabillo Zapata, Silvio Mauricio, Mejía Ortiz, Francisco 11 August 2015 (has links)
El objetivo general es el siguiente: mostrar de que, mediante la aplicación de cartas balance y líneas balance se pueden optimizar los procesos constructivos en la obra Centro Comercial Paso 28 de Julio, ubicada en la ciudad de Lima. La hipótesis es la siguiente: la eficiencia de los procesos constructivos es optimizada mediante el uso de cartas balance y líneas balance.
14

Diseño y planeamiento de una intersección vial urbana no semaforizada simulando interacción con el área de influencia

Padilla de la Cruz, César Reynaldo, Ulloa Marchena, Alvaro Nicanor 12 January 2016 (has links)
Identifica las alternativas de solución más adecuadas para la congestión vehicular de una intersección vial urbana ubicada entre Av. Del Parque Sur y la Calle Copérnico, intersección ubicada en San Borja límite con San Isidro, tomando en cuenta el área de influencia de la misma para encontrar una solución eficiente y sustenta en el tiempo. Para ello se recopiló información en campo sobre la red vial urbana (aforos vehiculares, encuestas de intención de viaje, velocidad media espacial, etc.). Este estudio se llevó a cabo debido a la identificación del inadecuado diseño geométrico de la intersección vial en mención y la incorrecta planificación de la red vial urbana que genera problemas de circulación en la vía. La presente tesis tiene planteado dar las pautas para un adecuado sistema de planificación y diseño de intersecciones viales urbanas conflictivas.
15

Propuesta de mejora del control de costos aplicando el Método de Valor Ganado en un proyecto de infraestructura

Olarte Mescco, Kyralina, Sotomayor Morales, Hubeer Cristian, Valdivia Begazo, César Álvaro 12 January 2015 (has links)
Se desea plantear la mejora del control de costos aplicando el Método de Valor Ganado, como herramienta para la toma de decisiones en la planificación y control de obras de infraestructura, para contar con un sistema eficiente, efectivo y práctico que integre el alcance, tiempo, y costo, que permita medir el rendimiento de los proyectos, detectar las desviaciones que se presenten, que genere información necesaria para la toma de decisiones y permita la acción correctivas que se apliquen proporcionen los resultados esperados. La gestión del valor ganado EVM (del inglés Earned Value Management) es probablemente uno de los sistemas más importantes, y al mismo tiempo menos comprendidos de la Dirección de Proyectos. Es importante, porque ha demostrado ser una técnica fundamental de seguimiento y control, y que no ha podido ser reemplazada con éxito por otra metodología similar. EVM (Earned Value Management) constituye parte de lo más puro de la Dirección de Proyectos. Permitirá al líder rastrear problemas desde el mismísimo comienzo del proyecto, permitiéndole tomar decisiones de una manera oportuna. Los altos ejecutivos de la empresa podrán con esa información, tomar las decisiones más críticas y estrategias para la empresa.
16

Aplicación de la metodología Top Down en la construcción de estaciones de metro / Application of the methodology Up Down in the construction of metro stations

Chiri Reyes, Luis Alexander, Mendoza Carreño, Paul, Poma Anccasi, Edison 22 March 2019 (has links)
El presente trabajo permitirá dar a conocer sobre la metodología Top – Down y sus beneficios, la cual se utiliza actualmente en la Construcción de Estaciones para la Línea 2 del Metro de Lima. Planteamos la investigación, considerando la utilización de esta nueva metodología como consecuencia del caos vehicular que presenta el país, lo cual conllevó a la construcción de la Línea 2 del Metro, buscando nuevas tecnologías que causen el menor impacto social, reduciendo el plazo de ejecución y reduciendo el tiempo de restablecimiento de la vía intervenida. La investigación se realizó a través de consultas, recolección de información de diferentes tipos de proyectos sobre esta nueva metodología Top Down, comparando con el proceso constructivo tradicional Bottom Up, considerando diferentes criterios como plazos, costos, TIR, VAN, tiempo de restablecimiento vehicular, seguridad para la construcción de una de las estaciones (E-23 Hermilio Valdizán) evaluando cuál es más favorable. / This work will make known about the Top - Down methodology and its benefits, which is currently used in the Construction of Stations for Line 2 of the Lima Metro. We propose the investigation, considering the use of this new methodology as a consequence of the vehicular chaos that the country presents, which led to the construction of Line 2 of the Metro, looking for new technologies that cause the least social impact, reducing the execution period and reducing the restoration time of the intervened road. The research was carried out through consultations, gathering information on different types of projects on this new Top Down methodology, comparing with the traditional Bottom Up construction process, considering different criteria such as terms, costs, TIR, VAN, vehicle restoration time, security for the construction of one of the stations (E-23 Hermilio Valdizán) evaluating which is more favorable. / Tesis
17

Análisis y planteamiento de alternativas a la pérdida de volumen de agua por colmatación – Embalse Gallito Ciego / Analysis and approach of alternatives to the water volume loss by clogging – Gallito Ciego Reservoir

Api Trelles, Jorge Rolando Terence, Horna León, David Enrique 20 March 2019 (has links)
El presente trabajo tiene por finalidad identificar la alternativa de solución más adecuada a la pérdida de capacidad de volumen útil de agua por la colmatación de sedimentos, dicha alternativa se aplicará al caso del embalse Gallito Ciego (cuenca del río Jequetepeque). Para ello se recopiló información de diferentes autores sobre los métodos existentes, adicionalmente información sobre el embalse; entre datos estadísticos, geográficos, hidrológicos, procesos constructivos, etc. Este estudio se llevará a cabo debido a que el embalse en cuestión es uno de los más importantes en el territorio peruano, debido a que su volumen de vida útil inicial fue de 426.80 MMC, en el último estudio batimétrico realizado en el año 2017 el volumen útil actual es de 366.08 MMC, habiéndose perdido un total de 60.72 MMC. Finalmente, se optará por la mejor alternativa para el caso en estudio. / The finally of this paper work is to identify alternatives of solution to the loss of water volume capacity by clogging of sediments, these alternatives would be applied on the case of the Gallito Ciego reservoir (river Jequetepeque basin). For this purpose we have compiled information from different authors about the existing methods, additionally information about the reservoir; including statistical, geographical, hydrological data, construction processes, etc. This study will be carried out because the reservoir in matter is one of the most important reservoirs in the Peruvian territory, since its initial volume of useful life was 426.80 millions of cubic meters; and now, in the last bathymetric survey made in 2017 the actual volume is 366.08 millions of cubic meters, having a total loss of 60.72 millions of cubic meters. Finally, the group will propose the best alternative for this study case. / Tesis
18

Formulación de cimentación superficial para un centro comercial de 3 pisos en una zona con suelos licuables en La Encantada – Chorrillos / Shallow foundation formulation for a 3-story shopping center in an area with liquefiable soils in La Encantada - Chorrillos

Farina Bravo, Henry, Huapaya Farfán, Oscar Manuel 17 January 2019 (has links)
En el año 1964 los estudios al fenómeno de licuación tomaron gran importancia debido a lo acontecido en Niigata. Así mismo, suelos como los de Pisco, Villa El Salvador y Chorrillos son muy susceptibles al fenómeno, donde el primero de los mencionados sufrió dichos efectos en el 2007. En el caso de Chorrillos, La Encantada es probablemente un suelo con potencial de licuación. La urbanización La Encantada en Chorrillos cuenta con las características necesarias para que se licue. Por ello, es necesario tomar medidas de mejoramiento del suelo y luego formular una cimentación adecuada. Del mismo modo, la presencia de un centro comercial en una zona residencial revalorizaría la zona y sería de provecho de los que viven en las cercanías. Para solucionar este problema se empleó la metodología de la “Society of Japanese Mechanics and Foundation Engineering” el cual propone una evaluación de 3 grados. Como resultado de la investigación el potencial de licuación nos da un valor de 0.856, lo que indica que el suelo es potencialmente licuable y debe mejorarse o reemplazarse. Se eligió el reemplazo de suelo por material gravoso. Luego, una vez cumplidas las verificaciones sobre el material gravoso, la elección de la cimentación superficial depende del aspecto económico. Así mismo, se formuló una zapata con ancho de B = 2.40 m. y un desplante de Df= 0.8 m. Y, además, se listó una serie de anchos diferentes, para diferentes profundidades de desplantes que también funcionarían, pero incrementarían su valor económico. / In 1964, studies of the phenomenon of liquefaction took great importance because of Niigata events. Also, soils such as Pisco, Villa El Salvador and Chorrillos are susceptible to the phenomenon, where the first of these suffered such effects in 2007. In the case of Chorrillos, La Encantada is probably a potentially liquefiable soil. La Encantada in Chorrillos has the necessary characteristics to liquefy. Therefore, is necessary to take measures to improve the soil and then, when the soil has better conditions, formulate an appropriate foundation. Similarly, the presence of a shopping center in a residential area revalues this and would be benefial from those who live nearby. To solve this problem the methodology of the "Japanese Society of Mechanics and Foundation Engineering" which proposes an evaluation of 3 degrees was used. As a result of research potential liquefaction gives a value of 0.856, indicating that the ground is potentially liquefiable and must be improved or replaced. The best choice was a soil replacement by burdensome material with a friction angle of 36 ° and 62.8% of gravels. Then, once the requirements have been met about the gravel material the choice of the shallow foundation depends on the economic aspect. As well, the width of the footing that was formulated is 2.40 meters and depth is 0.80 meters. Also, a series with different widths for different depths that works too was listed. / Tesis
19

Desarrollo de un sistema de monitoreo de desgaste de dientes para excavadoras Caterpillar modelo 336D orientada a la industria de la construcción.

Callirgos Lira, Carlos Andrés, Pons Mogrovejo, Fernando Javier 26 January 2018 (has links)
El proceso de extracción de los minerales o de construcción requieren de maquinaria pesada de gran dimensión entre ellos están las excavadoras. Siendo la marca Caterpillar con el modelo 336 la más utilizada del mercado. Con este equipo se realizan tareas de movimiento de material, carguío en camiones, perfilado de cerros entre otras actividades. La excavadora ataca el terreno con el cucharon y se necesita de dientes metálicos que faciliten el proceso de separar o romper el material para lograr realizar la carga. Los dientes son consumibles que se desgastan hasta llegarse a romperse por el constante uso. Sobre un cálculo de 25,000 horas de operación del equipo, el consumo de dientes puede llegar a ser aproximadamente el 70% del valor del equipo. Este trabajo propone, desarrollar e implementar un sistema electrónico que permita mejorar la eficiencia del monitoreo del desgaste de los dientes de las excavadoras orientadas a la construcción. Al mejorar el proceso de monitoreo del desgaste de los dientes los usuarios del sistema se podrá tener información objetiva del desgaste y podrán gestionar la duración y cambio oportuno de los consumibles buscando que extender su vida útil y reducir los costos operativos. En el capítulo 1 se presentan aspectos introductorios del proyecto. El marco teórico se presenta en el capítulo 2. En el capítulo 3 se realiza una descripción del equipamiento utilizado. Los algoritmos de procesamiento se explican en el capítulo 4 y por último en el capítulo 5 se presentan las pruebas y resultados obtenidos. The process of extracting minerals or construction requires heavy machinery, among them excavators. Being Caterpillar, with their 366 model, the most used in the market. These machines are used to move material, load trucks and profile hills among other activities. The excavator attacks the terrain with its bucket for what it need metallic teeth to ease the process of separating and braking the material to manage getting its load. The teeth are considered consumables that wear out until they break due to constant use. Considering a total use of 25,000 equipment hours of operation, the teeth consumption can mount up to 70% of the initial cost of the machine. This project proposes to develop and implement an electronic system which allows to increase the efficiency in monitoring the wear of the excavator’s teeth used in construction. When improving the monitoring of the teeth’s wear, users will be have objective data of the wear and they will be able manage the duration and timely change of the consumables, searching to extend its duty cycle and reduce operations costs. Chapter 1 presents introductory concepts of the project. The theoretical framework is presented on chapter 2. Chapter 3 has a description of the equipment used. Image processing algorithms are explained on chapter 4 and finally chapter 5 presents tests and results. / Tesis
20

Optimización del planeamiento y control de un proyecto inmobiliario, a través de LPS y un modelo BIM para el secuenciamiento e identificación de restricciones / Optimization of the planning and control of a real estate project, through LPS and a BIM model for the sequencing and identification of restrictions

Chávez Ñaupari, Fernando Pros`t Deninson, Toledo Pineda, Julio Alfredo 15 November 2018 (has links)
Mediante el presente trabajo se demuestra la viabilidad de poder integrar la metodología Lean Construction, a través de su principal herramienta (el Last Planner), con el BIM (Building Information Modeling) generando una mejora de productividad enfocada a las etapas de diseño y construcción de un proyecto inmobiliario. La integración se resume en el soporte tecnológico de los modelos virtuales desarrollados por el BIM en conjunto con la manera como se trabaja la información brindando un soporte efectivo y que suma valor a los procesos ejecutados por el Last Planner. A través de un análisis de interferencias e incompatibilidades que pueden ser consideradas como restricciones de obra, al ejecutarse la planificación del avance, se pudo determinar una liberación de restricciones no identificadas que podrían ser considerables a la hora de ejecutar el proyecto y que no se hubieran detectado de manera temprana trayendo consigo retrasos. Además, se tiene un soporte visual de lo ejecutado y de lo planificado, en conjunto con la posibilidad de dar soluciones a problemas de constructabilidad del proyecto. Se considera un ahorro en trabajos rehechos a través de la integración de ambos elementos y se traduce en una mejora de PPC y de SPI, demostrando que tanto en planeamiento como en el control del proyecto se puede optimizar la productividad con el análisis descrito. / Through this work we demonstrate the feasibility of being able to integrate the Lean Construction methodology, through its main tool (the Last Planner), with the BIM (Building Information Modeling), generating an improvement in productivity focused on the design and construction stages of a real estate project. The integration is summarized in the technological support of the virtual models developed by the BIM together with the way in which the information is worked providing an effective support that adds value to the processes executed by the Last Planner. Through an analysis of interferences and incompatibilities that can be considered as work restrictions, when executing the progress planning, it was possible to determine a release of unidentified restrictions that could be considerable at the time of executing the project and that would not have been detected early, bringing with it delays. In addition, there is a visual support of the executed and the planned, together with the possibility of giving solutions to problems of constructability of the project. It is considered a saving in reworked works through the integration of both elements and results in an improvement of PPC and SPI, demonstrating that both in planning and in the control of the project, productivity can be optimized with the analysis described. / Tesis

Page generated in 0.1136 seconds