• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 125
  • 2
  • Tagged with
  • 131
  • 131
  • 72
  • 56
  • 51
  • 51
  • 40
  • 38
  • 35
  • 27
  • 24
  • 22
  • 22
  • 18
  • 16
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
21

Propuesta de diseño de pavimento drenante para la captación de agua de lluvias en zonas urbanas del norte del Perú / Design proposal for drainage pavement for the capture of rainwater in urban areas of northern Peru

Esquerre Garcia, Michell Mauricio, Silva Silva, Hector Williams 10 March 2019 (has links)
Perú, en los últimos años presenta diversos problemas por la falta de evacuación de aguas pluviales, esto se asocia con el crecimiento poblacional, puesto que la zona urbanizada al incrementar su tamaño produce una necesidad de contar cada vez con mejores infraestructuras y fundamentalmente con pavimentos para el buen tránsito. En la actualidad, se necesitan construcciones innovadoras para disminuir los problemas causados por las fuertes precipitaciones pluviales o el déficit que existe en la captación de aguas. El concreto drenante es un concreto especial, que permite el paso del agua a través de su estructura gracias al alto porcentaje de vacíos que posee a diferencia del concreto tradicional. Esta cualidad contribuye a culminar con la falta de permeabilidad en las estructuras tradicionales de concreto, evitando fallas estructurales debido al encharcamiento y escurrimiento del agua. Esta investigación realizó el diseño de once mezclas de concreto drenante, dentro de las cuales se escogió una de ellas para ser aplicada como alternativa de solución de pavimento rígido. Dicho diseño asegura una resistencia a la compresión de 280 kg/cm2 y un módulo de rotura de 42 kg/cm2, este innovador concreto puede llegar a filtrar hasta 60 litros/m2/min. Para validar estas tres características principales del concreto drenante, se extrajo testigos a un prototipo construido en laboratorio. Permitiendo que el concreto drenante se desempeñe sin ningún inconveniente como pavimento rígido en una vía urbana de tránsito moderado en el norte del Perú. / Peru, in recent years has various problems due to the lack of rainwater evacuation, this is associated with population growth, since the urbanized area to increase its size produces a need to have increasingly better infrastructure and mainly with pavements for good traffic. At present, innovative constructions are needed to reduce the problems caused by heavy rainfall or the deficit that exists in the collection of water. The draining concrete is a special concrete, which allows the passage of water through its structure thanks to the high percentage of voids it has, unlike traditional concrete. This quality contributes to culminate in the lack of permeability in traditional concrete structures, avoiding structural failures due to waterlogging and runoff. This investigation carried out the design of eleven draining concrete mixtures, within which one of them was chosen to be applied as an alternative of rigid pavement solution. This design ensures a compressive strength of 280 kg / cm2 and a breaking module of 42 kg / cm2, this innovative concrete can reach up to 60 litres / m2 / min. To validate these three main characteristics of the draining concrete, a prototype constructed in the laboratory was extracted. Allowing the draining concrete to perform without any inconvenience as a rigid pavement in a moderated urban road in northern Peru. / Tesis
22

Los costes de la calidad en el diseño de proyectos de construcción: un enfoque de procesos

Dzul López, Luis Alonso 26 October 2009 (has links)
Los costes de la calidad representan una herramienta eficaz que permite medir la mejora continua de un programa de gestión de la calidad. Hasta hoy existen diversos modelos genéricos de costes de la calidad que se han propuesto y desarrollado desde que fueron definidos por los trabajos de Juran y Feigenbaum en la década de los cincuentas del siglo XX; sin embargo, el modelo empleado con mayor frecuencia, sigue siendo el enfoque tradicional PEF (costes de prevención, evaluación y fallos). Debido al número y complejidad de actividades en un proyecto típico de construcción, los modelos de medición y seguimiento de costes de calidad se han venido desarrollando apenas desde los años 1980. De esta manera, se realizó un análisis de los éxitos de modelos que hasta ahora han dado resultados en proyectos de construcción. Se realizó una revisión bibliográfica y discusión de las publicaciones actuales sobre los costes de la calidad; inicialmente se revisaron los modelos genéricos de los costes de la calidad y a continuación los modelos de medición de costes de la calidad aplicados actualmente a proyectos de construcción (QPTS, QPMS, QCM, CQCQS, PCM y PROMQACS). Estos últimos modelos, muestran un aspecto común referente a la fase de aplicación de los mismos; la aplicación de los modelos propuestos hasta ahora, se realiza a partir de la fase de ejecución del proyecto. Es decir, se hacen referencia al diseño, solamente como causa de fallo, ya que no toman en cuenta los costes de gestión de la calidad y de fallos dentro de los procesos de diseño.Por lo que, actualmente es necesario un enfoque sistemático en el proceso de diseño para proyectos de construcción, así como el desarrollo de herramientas que permitan controlar los costes de la calidad de manera eficiente y gestionar la mejora continua en dicha fase. En este trabajo se propone una metodología para la medición y seguimiento de los Costes de la Calidad en el Diseño de Proyectos de Construcción (CCDPC), basada en el Modelo de Costes por Procesos (PCM) y la metodología de diseño de proyectos de la Universidad Politécnica de Cataluña (MDP-UPC). De igual manera, se describen cinco casos de estudio empleando la propuesta metodológica CCDPC, para lo cual se planificó una serie de procedimientos para la obtención de los datos, aplicando criterios de validez y fiabilidad. Los resultados obtenidos definieron de manera cuantitativa, el coste de una mala calidad en los procesos de diseño. De igual manera, los casos de estudio permitieron mostrar la metodología como viable y versátil. La propuesta CCDPC está en línea con los conceptos de la Gestión Total de la Calidad (TQM), así como con el enfoque de procesos y mejora continua de la norma ISO 9000 para la gestión de la calidad. De esta manera, el enfoque propuesto se adapta a las actividades de los procesos de construcción, enfocándose en el factor que hasta ahora los modelos de costes de la calidad desarrollados en proyectos de construcción no habían tomado en cuenta, el proceso de diseño. Este trabajo plantea la búsqueda de un conocimiento más innovador, ya que pretende obtener una herramienta para la gestión de la calidad, tomando las necesidades actuales (medición de la calidad en el diseño) y metodologías validadas y en continua mejora (el modelo de Costes de la Calidad por Procesos, Metodología de Diseño de Proyectos de la Universidad Politécnica de Cataluña). De esta manera, se pretende aplicar por primera vez al diseño de proyectos, que como se ha mencionado es la fase que reclama el desarrollo de metodologías y herramientas de gestión, en un sector con necesidades de herramientas que permitan potenciar recursos, la industria de la construcción. Utilizando los datos y resultados que el control de costes de la calidad proporciona en el diseño, se podrían dirigir los esfuerzos y medir los resultados alcanzados, para idear estrategias de mejora. / The quality costs are an effective tool to measure the continual improvement in a quality management program. There are generic models of quality costs that have been proposed and developed since the work of Juran and Feigenbaum in the fifties of the twentieth century; the model most frequently used, it is the traditional approach PAF (prevention, appraisal and failure costs). Due to the number and complexity of activities in a typical construction project, models for measuring and monitoring quality costs have been developed only since the 1980s.It was made a bibliographical revision and discussion of present publications on the generic models of quality costs and the applied ones to construction projects (QPMS, QPTS, QCM, CQCQS, QCPCM y PROMQACS). It was observed that the approaches developed and applied in construction projects it is made from that construction started on site, and they do not take into account the failures and quality management costs within the processes of design. Thus it is required a systematic approach in the design process for construction projects. It is also necessary to develop tools to control efficiently the quality cost and to manage the continual improvement in design. Thereby, this doctoral thesis proposes an approach for measuring and tracking Quality Costs in Design of Construction Projects (QCDCP), based on the Process Cost Model (PCM) and on the Projects Design Methodology of the Technical University of Catalonia (MDP-UPC), in a context where the number of publications on quality costs is limited. Similarly, this work describes five case studies using the QCDCP approach, which it allowed to define data in a quantitative manner about the cost of poor quality in the design process. The case studies revealed that the methodology is viable and versatile. The CCDPC is in line with the concepts Total Quality Management (TQM) and with the process approach and continual improvement of ISO 9000 quality management system.So, the proposed approach fits the activities of the construction processes, focusing on the factor that so far the models developed quality cost in construction projects had not taken into account, the design process. This work searches an innovative knowledge, as it proposes a tool for quality management taking the current needs (to measure the quality of design) and using validated methodologies and on continuous improvement (PCM model and the MDP-UPC). Thus, it intends to apply it for the first time on the design of projects in construction sector that needs tools to boost resources. Using the data and results of control of quality costs in design, it could direct the efforts and measure results to design strategies for improvement.
23

Gestión de los stakeholders como base para la planificación de las comunicaciones del proyecto “Estación Base Celular – Pariacoto”

Alfonso Cuadros, Sebastián 16 December 2013 (has links)
En el presente trabajo aplicativo final se expone una guía para gestionar los stakeholders o involucrados del proyecto y así abordar el tema de las comunicaciones en forma adecuada. Se presenta la etapa en el proceso de iniciación de las comunicaciones, como paso previo al plan de comunicaciones. En primer lugar se identifican los stakeholders, luego se registran, se clasifican, y todo esto sirve para de poder determinar las necesidades de información de los involucrados en el proyecto y definir cómo abordar las comunicaciones con ellos. En consecuencia, se genera la Matriz de comunicaciones, que sirve como base para la gestión de la comunicación, de igual manera esta el mapeo de stakeholders y la matriz de influencia de stakeholders. La metodología utilizada se basa en la Guía de los Fundamentos para la Dirección de Proyectos (Guía del PMBOK, 4ta. Edición, 2008) del Project Management Institute, la cual constituye un documento formal que describe normas, métodos, procesos y prácticas establecidos en la profesión de la dirección de proyectos
24

Construcción de una presa con materiales sueltos

Gibaja Valdivia, Raúl, Siucho Dextre, Iván 19 March 2013 (has links)
No description available.
25

Impacto positivo del Control de calidad en obras de edificaciones de vivienda

Romero Álvarez, Nestor Javier, Pérez Garavito, Gian Franco 19 March 2013 (has links)
No description available.
26

Influencia de los proyectos de infraestructura vial en las condiciones de tráfico de la intersección av. Perú con av. Próceres de la Independencia ubicada en el distrito de San Juan de Lurigancho

Chalco Condorhuamán, Karen Eugenia 09 November 2013 (has links)
El tema de investigación es la influencia de los proyectos de infraestructura vial en las condiciones de tráfico de la intersección de las avenidas Perú y Próceres de la Independencia ubicada en el distrito de San Juan de Lurigancho. La hipótesis sostiene que el mejor análisis es la aplicación de la metodología HCM (Highway Capacity Manual) en el estudio del comportamiento del flujo vehicular y peatonal para determinar los niveles de servicio y la semaforización adecuada de las intersecciones afectadas, y lograr la satisfacción de la demanda vehicular. / Tesis
27

Dirección del proyecto construcción de túnel de exploración Mantaro

Chuquivilca Lopez, Pavel, Palacios Almendro, Ezequiel Daniel, Vargas Rodriguez, Francis Harold 01 June 2017 (has links)
Minera Yauli S.A. contempla la construcción de un túnel de exploración para comprobar la existencia de minerales, así como para dimensionar el cuerpo mineralizado, dicho túnel cuenta con un recorrido de 815m aproximadamente, cuyo ingreso y facilidades se encuentran ubicadas en el nivel 3750 dentro del tajo abierto existente. El proyecto, objeto del trabajo de investigación, se encuentra localizado en la mina Yauli, ubicada en el noreste del Perú aproximadamente a unos 25 Km del norte de Cajamarca, Distrito, Provincia y Departamento de Cajamarca. El ingreso al portal del túnel de exploración proyectado se encuentra a una altitud de 3750 m.s.n.m. La construcción de este proyecto, en todas las disciplinas, como civil, minera, electromecánica e instrumentación estará a cargo de Minería y Construcción S.A. (MYC) para lo cual cuenta con un plazo de 270 días calendario para ejecutar el proyecto. La empresa Minería y Construcción S.A. desarrollará el papel de constructora dentro de este proyecto. La estrategia de desarrollo del proyecto estará fundamentada en la alta especialización y la disponibilidad de recursos en las disciplinas constructivas: Civil, Minera, Mecánica, Eléctrica e Instrumentación de la empresa constructora. El cliente solicita a MYC que utilice las buenas prácticas de la guía del PMBOK® 5ta Edición como herramienta de Dirección del Proyecto. MYC, ve ésta solicitud como una oportunidad para mejorar los procesos de la compañía, mejorar sus márgenes, adquirir know how y capacitar a todos los líderes de sus proyectos que se encuentran alrededor del país. Los principales requisitos técnicos del producto y el alcance del proyecto se encuentran en el estudio de Ingeniería de detalle elaborado por BISA, los demás requisitos fueron brindados por los interesados del proyecto, tanto del cliente como internos de MYC. El proyecto fue exitoso en términos de Alcance, Tiempo, Costo y Calidad. El cliente quedó conforme con el producto del proyecto y la compañía tuvo los márgenes esperados. Además, MYC ganó un cliente a futuro. / Tesis
28

Proyecto de inversión inmobiliario de un conjunto residencial en Lima las Torres de El Agustino

Luna García, Róger, Prieto Melgar, Pedro 2013 March 1919 (has links)
Tesis
29

Modelo de gestión de costos por fases que permita identificar y corregir desviaciones que impacten en los márgenes de utilidad en la construcción de edificaciones: caso de Estudio Freak Constructores y Consultores S.R.L

Carbajal Lovatón, Deysi, Conislla Rocca, Yesenia Lizvette, Lazo Vera, Náthaly, Lazo Vera, Náthaly 01 March 2017 (has links)
La propuesta de un modelo preventivo de gestión de costos por fases nace de la necesidad de tener una herramienta de Control que permita gestionar los Costos de Producción en la ejecución de Edificaciones, para lograr que las fases (agrupación de partidas) sean ejecutadas, como mínimo, dentro del Presupuesto Planificado para asegurar la rentabilidad de los proyectos, contribuyendo así con la rentabilidad de la empresa. Este modelo de gestión de costos al ser desarrollado en Obra (Centro de Producción), se enfoca en la gestión de los Costos Directos e Indirectos (gasto general) del Proyecto y toma como FASE las agrupaciones de las partidas del presupuesto por naturaleza del trabajo, buscando identificar las desviaciones y analizar las causas positivas o negativas que la producen, permitiendo así hacer gestión, es decir tomar medidas operativas de corrección para mejorar los resultados obteniendo como resultado específico el componente o recurso de cada partida que presenta la desviación, ya sea material, mano de obra o subcontratos, y el momento exacto de ocurrencia durante la ejecución del proyecto. El objetivo principal de la tesis es contribuir a la mejora de la gestión de proyectos y de los resultados de las empresas de construcción mediante la propuesta de un modelo de gestión preventivo de costos para Freak Constructores y Consultores S.R.L. para lo cual se tomará como caso de estudio el Proyecto “Mejoramiento del Servicio Educativo de la Institución Educativa Integrada de Sorcco, de la Comunidad de Sorcco, Distrito de Coyllurqui – Cotabambas- Apurímac”, en el cual se aplicará dicho modelo y se identificarán las partidas que presenten desviaciones cuyas causas y acciones correctivas sirvan de precedente para futuros proyectos de la empresa.
30

Desarrollo de una guía para la planificación de colegios sostenibles privados de Lima a través del Método Delphi

Alvarado Lezama, Alejandro Ahmed, Saenz Villaorduña, Antony Frank 06 February 2018 (has links)
La investigación se enfocó en colegios privados, puesto que estas instituciones cuentan con mayor oferta e infraestructura a diferencia de las escuelas públicas que presentan deficiencias como la “brecha en infraestructura”. Inicialmente se realizó un mapeo del universo de criterios de sostenibilidad para identificar los criterios viables de acuerdo a las características propias de Lima y que criterios resultan inviables. Esta selección se realizó a través del método delphi. Así mismo, se identificó las recomendaciones necesarias para la implementación de los criterios seleccionados los cuales se deben tener en consideración durante la planificación del proyecto.

Page generated in 0.1009 seconds