• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 11
  • 6
  • 3
  • 1
  • 1
  • 1
  • Tagged with
  • 34
  • 8
  • 5
  • 4
  • 4
  • 4
  • 4
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
11

Considerações sobre o descomissionamento do reator de pesquisa IEA-R1 e futuro de suas instalações após o seu desligamento / Considerations about decommissioning of the IEA-R1 research reactor and the future of its instalations after shutdown

FRAJNDLICH, ROBERTO 25 February 2015 (has links)
Submitted by Maria Eneide de Souza Araujo (mearaujo@ipen.br) on 2015-02-25T13:57:02Z No. of bitstreams: 0 / Made available in DSpace on 2015-02-25T13:57:02Z (GMT). No. of bitstreams: 0 / Tese (Doutorado em Tecnologia Nuclear) / IPEN/T / Instituto de Pesquisas Energeticas e Nucleares - IPEN-CNEN/SP
12

Desenvolvimento do plano preliminar de descomissionamento do reator IPEN/MB-01 / Preliminary decommissioning plan of the reactor IPEN/MB-01

VIVAS, ARY de S. 20 February 2015 (has links)
Submitted by Maria Eneide de Souza Araujo (mearaujo@ipen.br) on 2015-02-20T15:58:48Z No. of bitstreams: 0 / Made available in DSpace on 2015-02-20T15:58:48Z (GMT). No. of bitstreams: 0 / Em todo mundo, muitas instalações nucleares foram construídas e necessitarão serem desligadas em um determinado momento por estarem próximas do seu tempo recomendado de utilização que é de aproximadamente 40 anos. A AIEA (Agência Internacional de Energia Atômica) busca orientar e recomendar uma série de diretrizes para a realização de atividades de descomissionamento de instalações nucleares, com atenção especial aos países que não possuem um quadro regulatório legal que ampare as atividades de descomissionamento. O Brasil, até o momento, não possui uma norma específica que oriente as etapas de descomissionamento de reatores de pesquisa. Entretanto, em março de 2011 foi constituída uma comissão de estudo com a atribuição principal voltada às questões de descomissionamento das instalações nucleares brasileiras, culminando na resolução 133, de 8 de novembro de 2012, um projeto de norma que dispõe sobre o Descomissionamento de Usinas Nucleoelétricas. O Instituto de Pesquisas Energéticas e Nucleares (IPEN) possui dois reatores de pesquisa sendo um deles o reator IPEN/MB-01. O objetivo dessa dissertação de mestrado é elaborar um plano preliminar de descomissionamento desse reator de pesquisa, considerando a documentação técnica da instalação (RAS-Relatório de Análise de Segurança), as normas existentes da CNEN (Comissão Nacional de Energia Nuclear), assim como as recomendações da AIEA. Em termos de procedimentos de descomissionamento para reatores de pesquisa, este trabalho se baseou no que existe de mais moderno em experiências, estratégias e lições aprendidas realizadas e documentadas nas publicações da AIEA que abrangem técnicas e tecnologias de descomissionamento. Considerando estes conhecimentos técnicos e às peculiaridades da instalação, foi selecionada a estratégia de desmantelamento imediato, que corresponde ao inicio das atividades de descomissionamento assim que a instalação for desligada, dividindo-a em setores de trabalho. Como recurso de gerenciamento e acompanhamento do projeto de descomissionamento do reator e manutenção de registros, foi desenvolvido um banco de dados utilizando o programa Microsoft Access 2007, no qual contêm todos os itens e informações referentes ao plano preliminar de descomissionamento. O trabalho aqui descrito busca atender os requisitos, critérios técnicos e institucionais, incorporando o que se tem de mais atual em procedimentos de descomissionamento, podendo servir como guia para as demais instalações brasileiras. / Dissertação (Mestrado em Tecnologia Nuclear) / IPEN/D / Instituto de Pesquisas Energéticas e Nucleares - IPEN-CNEN/SP
13

Considerações sobre o descomissionamento do reator de pesquisa IEA-R1 e futuro de suas instalações após o seu desligamento / Considerations about decommissioning of the IEA-R1 research reactor and the future of its instalations after shutdown

FRAJNDLICH, ROBERTO 25 February 2015 (has links)
Submitted by Maria Eneide de Souza Araujo (mearaujo@ipen.br) on 2015-02-25T13:57:02Z No. of bitstreams: 0 / Made available in DSpace on 2015-02-25T13:57:02Z (GMT). No. of bitstreams: 0 / O Reator Nuclear de Pesquisa IEA-R1 em operação desde 1957 no Instituto de Pesquisas Energéticas e Nucleares (IPEN-CNEN/SP) é um dos reatores mais antigos do mundo em operação. Em algum momento no futuro, a exemplo de outros reatores, será desligado definitivamente. Antes de chegar este momento a organização operadora precisa planejar o futuro de suas instalações e definir o destino que pretende dar aos equipamentos e materiais radioativos e não radioativos que se encontram no interior das instalações. Estas questões devem estar contidas no chamado \"Plano de Descomissionamento Preliminar da Instalação\" que é o tema deste trabalho. O trabalho apresenta inicialmente uma visão geral sobre este tema e relaciona os objetivos gerais e específicos para sua realização, descrevendo a seguir, as diretrizes que a organização operadora deve considerar para formulação de um plano de descomissionamento. A estrutura atual do setor nuclear brasileiro enfatizando principalmente as normas utilizadas no gerenciamento do rejeito radioativo é apresentada. Uma descrição dos principais equipamentos do reator IEA-R1 que constituem o seu inventário radioativo e não radioativo é apresentada. O trabalho enfatiza também a experiência adquirida pelo corpo técnico do reator com as reformas e modificações realizadas na instalação durante sua vida útil. Esta experiência pode ser de grande valia por ocasião do descomissionamento do reator no futuro. Um experimento usando o método de espectrometria gama de alta resolução e cálculo computacional através da teoria de Monte Carlo foi realizado com o objetivo de se obter uma estimativa do volume de rejeito radioativo gerado pelo desmantelamento das paredes de concreto da piscina do reator. O custo do descomissionamento em função da estratégia escolhida é determinado utilizando o código CERREX. Por fim, é realizada uma discussão sobre as diferentes estratégias consideradas. Na base destas discussões conclui-se que a estratégia mais vantajosa a ser adotada no caso deste reator é aquela que preserva o seu prédio e instalações anexas, tendo em vista o grande volume de rejeito radioativo e custos sensivelmente maiores que resultariam com o seu desmantelamento. É sugerida a preservação de parte das equipes de operação, manutenção, proteção radiológica e física da instalação e utilização do prédio do reator e anexos para divulgação da energia nuclear através de sua transformação em um museu, uma vez que este foi o primeiro reator nuclear construído no Brasil e, desde sua inauguração, tem sido utilizado como forma de divulgação da energia nuclear no país. / Tese (Doutorado em Tecnologia Nuclear) / IPEN/T / Instituto de Pesquisas Energeticas e Nucleares - IPEN-CNEN/SP
14

Programação de parada de plataforma marítima utilizando o método da corrente crítica. / Offshore platform shutdown using critical chain method.

Jose Finocchio Junior 12 February 2009 (has links)
A presente dissertação investiga a adequação do método da Corrente Crítica para a programação dos projetos de parada de plataformas marítimas de exploração de petróleo, que envolvem processos de tomada de decisões em condições de risco. O método da Corrente Crítica (Critical Chain Project Management - CCPM), baseado na Teoria das Restrições (TOC), se propõe a oferecer instrumentos de controle mais precisos e focados que os tradicionalmente utilizados no método do Caminho Crítico (Critical Path Method - CPM), indicando em que momento agir, onde e como deve ser direcionada a ação. A hipótese subjacente à pesquisa é a de que a Corrente Crítica (CCPM) traduz, de forma mais adequada que o Caminho Crítico (CPM), a incerteza existente na parada de plataforma, permitindo a elaboração de um cronograma a um só tempo mais realista e mais desafiador, no sentido de atender metas de menor interrupção na produção. Com base nessa hipótese, as duas principais perguntas que nortearam toda a investigação foram: 1. O método da Corrente Crítica é adequado à programação da parada de plataformas marítimas de exploração de petróleo? 2. Que vantagens poderia trazer em comparação aos métodos tradicionais de programação de projetos em uso nas paradas de plataformas? Para responder a tais perguntas, além de revisar a bibliografia existente sobre o assunto, optou-se por coletar depoimentos de diversos especialistas do setor, por meio de três abordagens qualitativas: pesquisa-ação, entrevistas semi-estruturadas e grupo focal. A análise e interpretação dos dados revelaram que, devido aos seus instrumentos de controle de restrição de recursos serem mais afinados, o Método da Corrente Crítica (CCPM) é mais adequado ao problema da parada de plataformas marítimas - caracterizado pelo ambiente de alta limitação de recursos e por grande paralelismo de atividades. O presente estudo leva a concluir que a implantação do novo método, por oferecer aos gestores ferramentas mais precisas de controle, resulta em melhores chances de cumprimento do prazo dos projetos. / The present study discusses the adequacy of the Critical Chain Project Management Method (CCPM) - also known as the Critical Chain Method - for scheduling projects involving shutdowns on oil platforms, as such projects involve decision-making processes under risk conditions. The CCPM is based on the Theory of Constraints and aims at providing more precise and more clearly focused control instruments than those traditionally used in the Critical Path Method (CPM). The CCPM also indicates the best moments to act and where and how the action should be directed. The hypothesis underlying the research is that the CCPM portrays, more adequately than the CPM, the uncertainty that exists in a platform shutdown. This characteristic also makes it possible to draw up a schedule that is both more realistic and more challenging, as it addresses the goal of causing less interruption of production. On the basis of this hypothesis, the two main questions that oriented the entire investigation were: 1) Is the CCPM suitable for scheduling the shutdown of an offshore oil platform and, 2) What advantages might it have over the traditional scheduling methods in use on platform shutdown? To answer these questions the authors reviewed the existing bibliography on the topic and made direct on-site observations during an actual shutdown. In addition, interviews were held with a number of specialists in the area using qualitative approaches, namely, semi-structured interviews, focus groups, and action research. The Data analysis revealed that the instruments used in the CCPM for controlling the constraints of resources are more refined, so the method has been proven to be more adequate than others for facing problems that come up in offshore platform shutdowns, which are characterized by strict constraints on resources and considerable parallelism of activities. The results have led to the conclusion that the implementation of the CCPM provides managers with more precise tools for control than the CPM, and may thus increase the chances for complying with the timeframes set down for projects.
15

Strategies for Identifying and Transferring Displaced Manufacturing Workers' Skills for Nonmanufacturing Sectors

Jackson, Pamela Stanfield 01 January 2018 (has links)
Between 2000 and 2011, the United States suffered the loss of manufacturing jobs 6 times faster than the rate in the 20 years prior. North Carolina ranked first in manufacturing employment in 1992; however, in 2012 it ranked fourth. The loss of manufacturing jobs created a trend away from manufacturing industries to services industries. The purpose of this study was to explore strategies that nonmanufacturing managers use to facilitate the transferable skills of displaced manufacturing workers to nonmanufacturing industries. To address the problem, a purposeful sample of 3 nonmanufacturing managers in service industries was obtained from a major manufacturing city in North Carolina. The human capital theory was used as a conceptual framework. Data for this case study were collected from face-to-face, semistructured interviews and review of company documents. Data were coded and analyzed using a qualitative analysis software to identify recurring themes. The 4 prominent themes that emerged were: (a) characteristics that displaced manufacturing workers possessed for employment in service industries, (b) workers' willingness to obtain training and education, (c) managers' specific strategies, skills, and experience for hiring displaced manufacturing workers, and (d) workers' transferable skills. The findings from this study could contribute to social change by defining strategies nonmanufacturing leaders could use to identify and transfer skills from displaced manufacturing workers to nonmanufacturing labor sectors, thereby introducing transferable skills for diverse labor sectors for increasing employment and increasing the standards of living for employees and families.
16

Automation, Annunciation, and Emergency Safety Shutdown of a Laboratory Microgrid Using a Real-Time Automation Controller (RTAC)

Vo, Do 01 May 2021 (has links) (PDF)
Over the last decade, microgrid deployments throughout the world have increased. In 2019, a record number of 546 microgrids were installed in the United States [1]. This trend continues upward to combat extreme weather conditions and power shortages throughout the country. To better equip students with the necessary skillsets and knowledge to advance in the microgrid field, Cal Poly San Luis Obispo's Electrical Engineering Department and the Power Energy Institute have invested resources to develop a laboratory microgrid. This thesis sets to improve the laboratory microgrid's existing automation using the Schweitzer Engineering Laboratory SEL-3530 Real-time Automation Controller (RTAC). The improved automation features a new load-shedding scheme, LCD annunciator and meter panel, and emergency safety shutdown system. The load shedding scheme aims to enhance the grid's frequency stability when the inverter-based power output declines. The LCD annunciator and meter panels provide real-time oversight of the microgrid operating conditions via the RTAC Human Machine Interface (HMI). The emergency safety shutdown enables prompt de-energization and complete isolation of the laboratory microgrid in hazardous conditions such as earthquake, fire, arcing, and equipment malfunction and activates an audible siren to alert help. This safety system provides safety and peace of mind for students and faculties who operate the Microgrid. Lastly, this thesis provides an operating procedure for ease of operation and experiment.
17

Tubulin-binding dibenz[c,e]oxepines. Part 2. 1 Structural variation and biological evaluation as tumour vasculature disrupting agents

Rossington, S.B., Hadfield, J.A., Shnyder, Steven, Wallace, T.W., Williams, K.J. 19 January 2017 (has links)
Yes / 5,7-Dihydro-3,9,10,11-tetramethoxybenz[c,e]oxepin-4-ol 1, prepared from a dibenzyl ether precursor via Pd-catalysed intramolecular direct arylation, possesses broad-spectrum in vitro cytotoxicity towards various tumour cell lines, and induces vascular shutdown, necrosis and growth delay in tumour xenografts in mice at sub-toxic doses. The biological properties of 1 and related compounds can be attributed to their ability to inhibit microtubule assembly at the micromolar level, by binding reversibly to the same site of the tubulin αβ-heterodimer as colchicine 2 and the allocolchinol, N-acetylcolchinol 4.
18

Improving the Energy Efficiency of IEEE 802.3az EEE and Periodically Paused Switched Ethernet

Mostowfi, Mehrgan 02 July 2010 (has links)
It is estimated that networked devices consumed about 150 TWh of electricity in 2006 in the U.S. which has cost around $15 billion and contributed about 225 billion lbs of CO 2 to greenhouse gas emissions. About 13.5% of this energy is consumed by network equipment such as switches and routers. This thesis addresses the energy consumption of Ethernet, and designs and evaluates improvements on existing methods to reduce the energy consumption of Ethernet links and switches. Energy Efficient Ethernet (EEE) is an emerging IEEE 802.3 standard which allows Ethernet links to sleep when idle. In this thesis, a performance evaluation of EEE is completed. This evaluation replicates previous work by Reviriego et al. in an independent manner. The performance evaluation shows that EEE overhead results in less energy savings than expected. A new method based on Packet Coalescing is developed and evaluated to improve the energy efficiency of EEE. Packet Coalescing bursts packets such that EEE overhead is minimized. The results show that EEE with Packet Coalescing for 10 Gb/s Ethernet can achieve very close to ideal (or energy proportional) performance at the expense of an insignificant added per packet delay. Periodically Paused Switched Ethernet (PPSE) was previously proposed and prototyped by Blanquicet and Christensen in 2008. PPSE uses periodically sent notification packets to halt packet transmission into a LAN Switch and thus allowing the switch to sleep periodically. In this thesis, a first performance evaluation of PPSE is completed. The evaluation in this thesis shows that a PPSE for 10 Gb/s Ethernet LAN Switches achieves either significant energy savings at the expense of an excessive packet delay, or less than expected savings with a less than human response time added per-packet delay. An improvement to PPSE (Adaptive PPSE) is proposed and developed based on an adaptive policy. The adaptive policy considers past traffic load to determine whether to put the switch to sleep or not. The evaluation shows that Adaptive PPSE can achieve very close to ideal performance at the expense of an added average per packet delay which is less than half of the human response time.
19

Despacho otimo de unidades geradoras em sistemas hidreletricos via heuristica baseada em relaxação lagrangeana e programação dinamica / Optimal dispatch of generating units in hydroelectric systems by heuristic based on langrangean relaxation and dynamic programming

Arce Encina, Anastacio Sebastian 27 January 2006 (has links)
Orientadores: Secundino Soares Filho, Takaaki Ohishi / Tese (doutorado) - Universidade Estadual de Campinas, Faculdade de Engenharia Eletrica e de Computação / Made available in DSpace on 2018-08-06T02:53:29Z (GMT). No. of bitstreams: 1 ArceEncina_AnastacioSebastian_D.pdf: 1529112 bytes, checksum: a6a22a9ce6cd536449dd06144205c2e5 (MD5) Previous issue date: 2006 / Resumo: A Programação diária de um sistema de energia elétrica busca obter um despacho de geração para o próximo dia, que seja compatível com as metas definidas pelo Planejamento energético e que sirva como referência operativa para a operação em tempo real. Assim, a modelagem do sistema deve ser detalhada levando em consideração as características dos sistemas de geração, de transmissão, requisitos do mercado, critérios de segurança e custos associados à operação. Este trabalho apresenta um modelo de despacho ótimo de unidades geradoras hidrelétricas que adota como critério de desempenho um modelo que avalia as perdas no sistema de geração, ocasionadas pela elevação do nível de canal de fuga, pela variação do rendimento do conjunto turbina-gerador e pelo atrito do fluxo d¿água nas tubulações do sistema hidráulico. Além das perdas no sistema de geração também forma parte do critério de desempenho o custo associado à partida e parada das unidades geradoras. Na formulação do problema, verifica-se a presença de variáveis inteiras, não lineares; restrições de atendimento à demanda, de meta de geração oriunda do Planejamento energético e restrições de capacidade de geração. Isto caracteriza o problema do despacho de unidades geradoras como sendo um problema de programação misto inteiro-não linear, combinatório e de grande porte quando considerado um sistema de geração como o do Sistema Elétrico Brasileiro. Como técnica de solução foi adotada uma heurística que combina Relaxação Lagrangeana e Programação Dinâmica. A metodologia foi aplicada a uma parte do sistema de geração do Sistema Elétrico Brasileiro, composta por 78 usinas hidrelétricas e o total de 398 unidades geradoras. Tomando como referência os dados de programação de um dia típico de operação, os resultados apontam ganhos significativos pela diminuição de perdas. Verifica-se também a importância de se considerar o custo das partidas e paradas no despacho das unidades geradoras / Abstract: The daily scheduling operation of the electrical energy system has by target to find the dispatch generation to the next day which must be compatible with the daily generation target defined by the energy planning models and to be an operational guide. Because of its proximity with the real time operation the modeling must represent the main characteristic of the generation and transmission systems, requirements market¿s, security criterion and operational costs. This work is concerned with the dispatch of hydro generating units. The performance criterion adopted takes into account variations in tailrace elevation, penstock head losses, turbine-generator efficiencies and start-up and shutdown costs. In the hydro generating units dispatch problem formulation there are integer, non-linear variables, constraints concerned with the generation capacity, load attainment and daily generation target, this last defined by the energy planning models. According above mentioned the dispatch of hydro generating units is a combinatorial and mixed integer non-linear programming problem whose solution can be quite complex for large hydroelectric system such as the Brazilian¿s generation system. A heuristic procedure based on Lagrangian Relaxation and Dynamic Programming is adopted as solution methodology. The approach has been tested on a hydro system composed of seventy and eight hydro plants with three hundred and ninety eight generating units of the Brazilian power generation system. The generation scheduling verified on a typical day was considered for comparison with the solution provided by the approach and the results show significant improvement in term of minimization looses and the importance of to consider the start-up and shut-down costs of hydro generating units / Doutorado / Energia Eletrica / Doutor em Engenharia Elétrica
20

222 Days of Platform Lockdown : Circumvention Culture, Digital Activism and Internet Censorship

Amaraizu, Iheanyi Genius January 2022 (has links)
This work investigates internet censorship in Nigeria, describing experiences and citizens’ led circumvention practices following the ban of Twitter by the Nigerian government. Based on a quantitative survey and qualitative interview of active Twitter users in Lagos and Abuja Nigeria, the research realizes and categorizes circumvention practices embraced within the period of effecting the ban into technology, self-censorship, and platform jumping. This study further investigates how circumvention culture has become a form of digital activism and how the social media environment in democracies has experienced censorship within the last few decades.  Citizenry experiences and the complexities of the fight against platform lockdown and the role of digital activism prior to censorship are also analyzed. Internet censorship is new in Nigeria and has bred uncertainties among user practices and government censorship perseverance. This study contributes to a broader understanding of how circumvention practices have become cultural practices and experiences that emerge as embodied internet war against censorship and the preemptive and predictive conditions of the inefficiency of internet censorship policies in established democracies.

Page generated in 0.0453 seconds