Spelling suggestions: "subject:"spaghetti diagram"" "subject:"spaghettis diagram""
1 |
Optimalizace procesu servisních oprav turbomolekulárních vývěv ve firmě Atlas CopcoPrášek, Milan January 2018 (has links)
This thesis deals with the optimization of the service repair process of turbomolecular pumps at Atlas Copco. The thesis is divided into three parts. In the first theoretical part, the author tries to acquaint the reader with the philosophy of a lean enterprise, the issue of spa-tial arrangement workplace mapping and process mapping methods. The practical part contains an introduction to Atlas Copco. In the project part there is an analysis of the current state and a proposal of a new solution, includ-ing calculation of savings.
|
2 |
Návrh na zlepšení výrobní linky BS Unit ve výrobní společnosti / The Proposal of BS Unit Production Line Improvement in the Production CompanyTesař, Michal January 2017 (has links)
The thesis focuses on the analysis of the current production system on the production line BS Unit in the company Daikin Device Czech Republic, s.r.o. in terms of material flow and move of worker. The main outcome is the proposal of precaution for improvement of the currently production of proces.The first part of the thesis describes the basic terms and methods from the field of industrial engineering. These findings are then used for data analysis and for the solution proposal in the analytical part.
|
3 |
Návrh zlepšení řízení obalového materiálu ve vybraném podniku / The Proposal of Management Improvement of Packaging Material in a Selected CompanyGlonek, Andrej January 2021 (has links)
This diploma thesis deals with packaging materials in company Frauenthal Automotive Hustopeče, s. r. o., specifically proposals to improve the storage, flow and use of packaging material with limited storage capacity. The first part contains the theoretical basis of the work. The second part includes a presentation of the company and an analysis of the current situation. In the last part, own solutions to current shortcomings in the company are proposed.
|
4 |
Štíhlé řízení výrobního systému / Lean Management of Production SystemNejdlová, Anna January 2020 (has links)
This thesis is focused on lean management of the production system in the company ASSA ABLOY Czech & Slovakia s. r. o. The main outcome is the proposal of a new layout and process balancing with the use of lean manufacturing methods. The first part describes the theoretical basics which are used for analysis afterwards. The results of these analyses are then used as a main basis for the proposal of changes in the chosen part of the production process.
|
5 |
Návrh materiálových toků ve výrobním procesu / Design of Material Flows in the Production ProcessJurásková, Anna January 2021 (has links)
This diploma thesis deals with the issue of material flow and lean manufacturing in a given section of a selected manufacturing company. The diploma thesis focuses on the weaknesses of the current state of the selected workplace and defines the areas for improvement. The first part presents the theoretical basis of the work. The second part of the work is focused on analyzing the current state of the workplace. There are provided solutions for better material flow and to implement selected elements of lean manufacturing in the last part.
|
6 |
Návrh interního zásobování výroby ve společnosti Walter s.r.o. / The Proposal of Internal Production Supply in Walter s.r.oMotyčka, Jan January 2016 (has links)
The diploma thesis is focused on proposal of internal production supply in the Walter Ltd. The company is undergoing changes in the production layout and therefore it is necessary to design a new system of production supply. The theoretical part focuses on Toyota production system and methods used in this system. Next part of the theoretical part is dedicated to lean management and lean manufacturing. The last point of theoretical part are supplying and material handling. The theoretical part is basis for analytical part in which is mapped the current state of supplying production lines. The last point of diploma thesis are solution proposals based on analytical data’s.
|
7 |
Reducering av ledtiden vid utleverans hos EJOT Sverige ABIdrizovic, Namik January 2020 (has links)
Denna rapport utreder möjligheterna till att reducera ledtiden, med en uppskattning av minst 10%, för plockprocessen på den utlevererande avdelningen som kallas den ”avgående avdelningen” hos EJOT Sverige AB i Örebro. Företaget vill i dagsläget skapa sig en tydlig helhetsbild av processen samt få underlag, för eventuell framtida implementering, i form av förbättringsförslag för en ledtidsreducering. Under arbetets gång beskrivs nuläget utifrån datainsamling, intervjuer och observationer, i kombination med ett spagettidiagram som presenteras. De möjliga rotorsakerna till problemen kartläggs genom att skapa ett fiskbensdiagram som sedan analyseras. Analyserna visar på att processen är komplex och därmed även problemen. Orsaker som valts för vidare analys är: layout, körslinga och placering av låga gods. Tre förbättringsförslag har tagits fram utifrån analyserna och dessa handlar om att skapa en ny optimerad layout, en ny optimerad körslinga samt att eliminera placeringen av låga gods. Det fortsatta arbetet bör vara att optimera en ny lagerlayout samt se över och standardisera en ny körslinga. Företaget bör också se över möjligheterna att eliminera placeringen av gods på markplan. / This report investigates the possibilities of reducing the lead time, with an estimate of at least 10%, for the picking process at the delivery unit called the “outgoing department” at EJOT Sverige AB in Örebro. The company currently wants to create an overall picture of the process and get a basis, for possible future implementation, in the form of improvement proposals for a lead time reduction. During the work, the current situation is described based on data collection, interviews and observations, in combination with a spaghetti diagram that is presented. The possible root causes of the problems are mapped by creating an Ishikawa diagram which is then analyzed. The analyses show that the process is complex and thus also the problems. Reasons chosen for further analysis are: layout, driving loop and placement of low goods. Three improvement proposals have been developed based on the analyses and these are about creating a new optimized layout, a new optimized driving loop and eliminating the placement of low goods. The continued work should be to optimize a new warehouse layout and review and standardize a new driving loop. The company should also review the possibilities of eliminating the placement of goods on the ground floor.
|
8 |
Lean healthcare : aplicação do diagrama de espaguete em uma unidade de emergência / Lean healthcare: implementation of spaghetti diagram in a sector of emergency (Master’s in Nursing)Deguirmendjian, Samira Candalaft 23 February 2016 (has links)
Submitted by Regina Correa (rehecorrea@gmail.com) on 2016-09-21T12:53:38Z
No. of bitstreams: 1
DissSCD.pdf: 13379841 bytes, checksum: 23a8da869239ebb577af2585763a307d (MD5) / Approved for entry into archive by Marina Freitas (marinapf@ufscar.br) on 2016-09-23T18:31:51Z (GMT) No. of bitstreams: 1
DissSCD.pdf: 13379841 bytes, checksum: 23a8da869239ebb577af2585763a307d (MD5) / Approved for entry into archive by Marina Freitas (marinapf@ufscar.br) on 2016-09-23T18:31:56Z (GMT) No. of bitstreams: 1
DissSCD.pdf: 13379841 bytes, checksum: 23a8da869239ebb577af2585763a307d (MD5) / Made available in DSpace on 2016-09-23T18:32:01Z (GMT). No. of bitstreams: 1
DissSCD.pdf: 13379841 bytes, checksum: 23a8da869239ebb577af2585763a307d (MD5)
Previous issue date: 2016-02-23 / Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES) / Every day we are faced with constant waste and activities that do not add any
value in hospitals. Aspects related to communication, unnecessary movement of
professionals, patients, materials and information, useless protocols although well
written are increasingly observed in health services. For improvements related to
handling flow and continuous elimination of waste and activities that do not add value
in the hospital, this study aimed to assess the implementation of spaghetti diagram
tool in an emergency room of a small hospital in the state of São Paulo. The
healthcare lean methodology and spaghetti diagram tool was used. It was identified
the current situation and opportunities for improvement, relating to proposition good
spaghetti diagram practices in hospitals. The main movement of wastes were
mentioned and it was noted that the application of the tool was successful. The
importance of the method for reducing the waste stream related to movement flow in
a hospital environment has been proved. It is expected that the flow of tasks become
efficient, always seeking less time to perform activities using less effort, less cost and
reducing the waiting time of the patients in the unit by reorganizing the movement
flow in the workplace. / A cada dia percebem-se constantes desperdícios e atividades que não
agregam valor algum nos hospitais. Aspectos relacionados à comunicação,
movimentação desnecessária de profissionais, pacientes, materiais e informações,
protocolos inúteis, apesar de bem escritos, são cada vez mais observados nos
serviços de saúde. Visando melhorias relacionadas ao fluxo de movimentação e a
eliminação contínua de desperdícios e atividades que não acrescentam valor no
ambiente hospitalar, esta pesquisa teve como objetivo a avaliação da aplicação da
ferramenta diagrama de espaguete em uma unidade de emergência de um hospital
de pequeno porte do interior do estado de São Paulo. Foi utilizada a metodologia
lean healthcare e a ferramenta diagrama de espaguete. Identificou-se a situação
atual e as oportunidades de melhorias, relacionando-se a proposição de boas
práticas de diagrama de espaguete em ambiente hospitalar. Foram apontados os
principais desperdícios de movimentação encontrados e percebeu-se que a
aplicação da ferramenta pôde ser realizada com êxito. Comprovou-se a importância
do método para a redução dos desperdícios relacionados ao fluxo de movimentação
em ambiente hospitalar. Espera-se que o fluxo de tarefas torne-se eficiente,
buscando sempre menor tempo para realização das atividades, utilizando menos
esforços, com menor custo e diminuindo o tempo de espera do paciente na unidade
por meio da reorganização dos fluxos de movimentação do ambiente de trabalho.
|
9 |
Štíhlé řízení vybrané části výrobního systému / Lean Management of a Selected Part of a Production SystemSchwarz, Adam January 2020 (has links)
The work is focused on improving the concept of lean management in a selected engineering company, where analyzes are performed with the help of selected methods and tools to reveal current problems. The data are then processed and based on them, measures for change are proposed with an emphasis on minimizing the rate of waste of time and costs and increasing production efficiency.
|
10 |
Flow Optimisation for Improved Performance of a Multivariant Manufacturing and Assembly LineSævar Guðbjörnssonn, Alexander, Mohammed Yassin, Haider January 2019 (has links)
Stoneridge, Inc. is an independent designer and manufacturer of highly engineered electrical and electronic components, modules and systems principally for the automotive, commercial vehicle, motorcycle, agricultural and off-highway vehicle markets. A subsidiary of Stoneridge, Inc. is the company Stoneridge Electronics. They specialise in instrument clusters and tachographs which are manufactured in high quantityin their production plant in Örebro, Sweden. This master thesis focuses on the production line of an instrument cluster called Angela. In close collaboration with Stoneridge Electronics, the goal was to find ways to improve the output of the Angela line by at least 10% compared to the three best months in terms of output from the year before. The Angela line was analyzed thoroughly and from different perspectives using lean tools such as value stream mapping, spaghetti diagram and continuous improvement. Finally, the simulation software ExtendSim was used in order to simulate and analyse different suggestions. The results show that various steps can be taken to improve the efficiency and output of the manufacturing line by as much as 16.3%. Due to the fact that other production lines within the production are similar to the one that the project was carried out on, the project results could be applicable for the other lines as well. / Stoneridge, Inc. är en oberoende designer och tillverkare av högteknologiska elektriska och elektroniska komponenter, moduler och system huvudsakligen för fordonsmarknaderna. Ett dotterbolag till Stoneridge, Inc. är företaget Stoneridge Electronics. De är specialiserade på instrument kluster och färdskrivare som tillverkas i produktionsanläggning i Örebro. Denna examensarbete fokuserar på produktionslinje av ett instrumentkluster som heter Angela. I nära samarbete med Stoneridge Electronics,målet var att hitta sätt att förbättra produktionen av Angela linje med minst 10 % jämförtmed de tre bästa månaderna när det gäller produktion från året innan. Angela-linjen analyserades grundligt och från olika perspektiv med lean verktyg som värdeflödesanalys, spaghetti diagram och kontinuerlig förbättring. Slutligen användes simuleringsprogrammet ExtendSim för att simulera och analysera olika förslag. Resultaten visar att olika steg kan vidtas för att förbättra effektiviteten och produktionen av produktionslinjen med så mycket som 16.3%. På grund av att andra produktionslinjer inom produktionen liknar den som projektet genomfördes på, kan projektresultaten vara tillämpliga för andra linjer också.
|
Page generated in 0.0828 seconds