Challenges for the Construction Equipment Industry to Shift Towards Zero-Emission MachinesHansen, Sam, Sjöström, Rasmus January 2023 (has links)
Sweden has set a goal to become the first fossil-free country and by 2045, they aim to achieve net zero emissions of greenhouse gases into the atmosphere. Construction equipment accounts for approximately 3.3 million tons of CO2 equivalents in Sweden. Volvo Construction Equipment is a world-leading manufacturer of articulated haulers and wheel loaders, excavation equipment, road development machines and compact construction equipment. The majority of their machine products are fueled by diesel, but to be in line with the Paris Agreement 2030 and being emissions-free, they are looking to develop sustainable and emissions-free machines. The purpose of this thesis is to understand the implications of the transition to fossil-free fuels for construction equipment manufacturers, and all actors in the value chain, by investigating the challenges and opportunities of adopting existing and potential sustainable machinery solutions in the construction equipment industry. Managing change in a relationship can be challenging; however, there are strategies that can help businesses cope with this process. Focusing on comprehending the network logic that underlies the relationship between the parties involved is an effective strategy. To accomplish this, it is necessary to consider how these connections fit into a broader context beyond the parties’ immediate activity links, resource ties, and actor bonds. To aid the analysis, an analytical framework is introduced. The analytical framework can serve as both a conceptual framework for analysing the effects of changes within a relationship and as a practical tool for managers to make decisions and solve problems related to managing relationships in a business context. The method used in this thesis was a case study. The study exploited experienced staff competencies: their insights and experience are the foundation for a qualitative approach where the data collection consists of interviews. The study concludes that there are several challenges and obstacles ahead for the construction equipment industry to transition to zero-emission machines, including changes in competence, business models, productivity, demand, and availability. To facilitate this transition, the construction equipment manufacturer has several actions, including understanding network dynamics, changing business models, closer relationships with clients, and new partnerships to offer an end-to-end solution.
|
2 |
Uppskattningar av utsläpp från anläggningsmaskiner : En förstudie / Estimating emissions from construction equipment : A prestudyHalldin, Fredrik January 2023 (has links)
Byggbranschens resurs och energianvändning är en av de främsta orsakerna till global uppvärmningoch står i Sverige för 20% av de totala utsläppen under ett år. För att minska utsläppen frånbyggarbetsmaskiner kan bland annat energieffektivare maskiner användas på byggarbetsplatser.Examensarbetet har utförts på Skanska Rental i syfte att i framtiden kunna synliggöra utsläppen fråndessa maskiner. Detta genom att ta fram hur uppskattningar av utsläppen kan utföras, samt presenterasför kunder som hyr maskiner. I denna förstudie genomfördes en gruppintervju med kunder, enlitteraturgranskning av fem olika beräkningsmetoder samt två individuella intervjuer angåendedatainsamling. Gruppintervjun visade att kunder gärna vill ta del av hur mycket utsläpp en maskinproducerar, och att de med informationen kan fatta mer hållbara beslut än de gör idag.Litteraturgranskningen visade att alla fem beräkningsmetoder kan användas för att uppskattautsläppen i drift för en anläggningsmaskin, men att de har olika för- och nackdelar. Europeiskamiljöbyråns nivå tre beräkning anses vara bäst lämpad för Skanska Rental. Detta eftersom den utgårfrån en hög detaljnivå vilket ger möjlighet att jämföra specifika maskiner mot varandra. Den användersig även främst av information som är tillgänglig från tillverkare och standardvärden från EEAshandbok för utsläppsberäkningar (Winther & Dore, 2019). Den data som kan behöva samlas in ärtiden en maskin spenderar i drift samt vilket arbetsmoment maskinen utfört under den tiden. Detta kanöka träffsäkerheten av uppskattningen, eftersom mer representativa belastningsfaktorer kan användasför maskinens arbetstid. I de individuella intervjuerna lyfts bland annat sensorer som ett alternativ tillatt samla den typen av data. Avslutningsvis uppmuntras tillverkare att ta fram livscykelanalyser avsina maskiner, samt att fler studier utförs med livscykelperspektivet inkluderat. Detta eftersomelektriska maskiner identifierats som en framtida utveckling inom branschen. / The construction industry's use of resources and energy is one of the main causes of global warming,and is responsible for 20% of Sweden's annual emissions. In order to reduce the emissions fromconstruction equipment, more energy efficient equipment can be used on construction sites. Thisbachelor's thesis was carried out at Skanska Rental in the purpose of, in the future, being able to showthe emissions of their products. This work was done to find out how emissions from constructionequipment can be estimated and presented to customers. In this prestudy, one group interview withcustomers was conducted, as well as a literature review of five different calculation methods foremissions, and two individual interviews regarding data collection. The group interview showed thatcustomers would like to know how much emissions the equipment produces, and that their sustainabledecision making can improve with that information. The literature review showed that all fivecalculation methods can be used to estimate the emissions, but that they have different pros and cons.The European environment agency’s tier 3 calculation is seen as the best suited for Skanska rental.The main reason for this is the high level of detail, which allows specific equipment to be compared toeach other. The method mainly uses information which can be acquired from manufacturers andstandard values from the EEA handbook for calculating emissions (Winther & Dore, 2019). The datawhich might need to be collected is the operating time of the equipment, and what work is being doneduring that time. This can be used to increase the accuracy of the estimate, since more representativeload factors can be used for the operating time of the equipment. In the individual interviews, sensorsare brought up as an alternative for gathering this data. Finally, more studies are encouraged to becarried out with the life cycle perspective included, and that manufacturers should produce life cycleanalyses of their equipment. This is because electric equipment has been identified as a futuredevelopment within the field.
|
3 |
A study investigating the factors that causes delays in construction equipment projects in UX/HMI area / En studie som undersöker de faktorer som orsakar förseningar i byggutrustningsprojekt i UX/HMI-områdetShivalika, Shivalika January 2023 (has links)
This research study investigates the factors contributing to delays in construction equipment projects, specifically in the User Experience (UX) and Human-Machine Interface (HMI) area, with a particular focus on projects conducted at the company Volvo Construction Equipment. The study incorporates a literature review, a mixed-methods approach combining qualitative and quantitative analysis, and in-depth discussions. Through the analysis of existing literature, the study identifies various factors associated with delays in construction equipment projects, including unclear project requirements, challenges in integrating systems and technologies, communication and collaboration issues, inadequate project management practices, and external influences. Building upon this foundation, qualitative interviews and quantitative surveys were conducted to gather insights from project managers, engineers, and other stakeholders at Volvo Construction Equipment. The findings from the data analysis highlight the frequency and average duration of delays in the UX/HMI area of construction equipment projects. Key contributing factors include communication issues, changes in project requirements or scope, insufficient resources or manpower, delays in component/material delivery, and lack of coordination among teams. These factors significantly impact project performance. Participants in the study reported employing various strategies to mitigate these delays, such as improving communication channels, enhancing cross-functional collaboration, investing in training and skill development, and closely monitoring project requirements. The research outcomes provide valuable insights into the relationships between identified factors and project delays in the UX/HMI area at Volvo Construction Equipment. The results emphasize the importance of addressing these factors through improved planning, effective communication, collaboration, and resource management to enhance project efficiency. Furthermore, the study contributes to the field of UX/HMI in construction equipment projects by shedding light on the specific challenges faced by the company and providing recommendations to improve project management practices and minimize delays. Recommendations to future research directions include longitudinal studies to assess the long-term impact of implemented strategies, exploration of emerging technologies in the UX/HMI domain, and evaluation of different project management methodologies for their effectiveness in addressing delays. By addressing these research gaps, further advancements can be made to optimize the UX/HMI area of construction equipment projects, ensuring successful project outcomes. / Denna forskningsstudie undersöker faktorer som bidrar till förseningar i produktutvecklingsprojekt av arbetsmaskiner, specifikt inom användarupplevelse (UX) och människa-maskin-gränssnitt (HMI), med särskilt fokus på projekt som genomförs vid företaget Volvo Construction Equipment. Studien innefattar en litteraturöversikt, en blandad metodansats som kombinerar kvalitativ och kvantitativ analys samt fördjupade diskussioner. I analysen av befintlig litteratur identifieras olika faktorer som är förknippade med förseningar i denna typ av projekt, inklusive oklara projektkrav, utmaningar att integrera system och teknik, kommunikations- och samarbetsproblem, otillräckliga projektledningsmetoder och externa påverkningar. Med denna grund genomfördes kvalitativa intervjuer och kvantitativa enkäter för att samla insikter från projektledare, ingenjörer och andra intressenter vid Volvo Construction Equipment. Resultaten från dataanalysen belyser frekvensen och genomsnittlig varaktighet av förseningar inom UX/HMI-området för denna typ av projekt. Nyckelfaktorer inkluderar kommunikations-problem, ändringar i projektkrav eller omfattning, otillräckliga resurser eller arbetskraft, förseningar i leverans av komponenter/material och brist på samordning mellan team. Dessa faktorer påverkar projektets prestanda avsevärt. Deltagarna i studien rapporterade att de använder olika strategier för att mildra dessa förseningar, såsom att förbättra kommunikations-kanaler, förbättra tvärfunktionellt samarbete, investera i utbildning och kompetensutveckling samt noggrant övervaka projektkrav. Resultaten ger värdefulla insikter i sambanden mellan identifierade faktorer och projekt-förseningar inom UX/HMI-området på Volvo Construction Equipment. Vikten av att hantera dessa faktorer genom förbättrad planering, effektiv kommunikation, samarbete och resurshantering för att förbättra projekteffektiviteten betonas särskilt. Vidare bidrar studien till fältet UX/HMI inom denna typ av projekt genom att belysa de specifika utmaningar som Volvo Construction Equipment står inför och ge rekommendationer för att förbättra projektlednings-metoder och minimera förseningar. Framtida forskningsriktningar som rekommenderas inkluderar longitudinella studier för att bedöma den långsiktiga effekten av implementerade strategier, utforskning av framväxande teknik inom UX/HMI-domänen och utvärdering av olika projektledningsmetodiker gällande deras effektivitet i att hantera förseningar. Genom att ta itu med detta kan ytterligare framsteg göras för att optimera UX/HMI-området för produktutvecklingsprojekt av arbetsmaskiner och säkerställa framgångsrika projektresultat.
|