• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 14
  • 2
  • Tagged with
  • 16
  • 8
  • 5
  • 4
  • 4
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 2
  • 2
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Utveckling av nödöppningssystem för loftgångar vid rökbildning / Development of emergency opening for exterior corridors in case of smoke

Forsling, Robert, Ericsson, Linus January 2016 (has links)
Arbetets syfte är att undersöka och arbeta fram ett nytt koncept för öppningsmekanismen vid nödöppningssystem av loftgångar. Målet är att ta fram ett koncept som är flexibelt så att detta ryms inom höjden av fönsterluckorna. Detta för att det nya konceptet ej skall vara beroende av loftgångspartiets totalhöjd vilket medför att systemet kan användas inom fler användningsfall. Arbetet är utfört genom att relevanta metoder att arbeta efter valts för att sedan utarbeta de teorier som ansetts vara nödvändiga för att lösa problemet. Därefter har flertalet produktutvecklingsprocesser utförts för att arbeta fram koncept som kan användas för att lösa problemet. Resultatet av arbetet är två koncept som båda uppfyller de kriterier som krävs för en säker och fullständig öppning av fönsterluckorna. Resultatet har sedan analyserats och författarna har jämfört konceptens för- och nackdelar mot varandra samt gett förslag på vidare utveckling.
2

Renovering av utanpåliggande balkonger / Renovation of an external balcony

Renman, Josefine January 2014 (has links)
Balkonger har funnits i Sverige i över 200 år och är nu på modet. De är i allmänhet utsatta för stora påfrestningar och orsakar ofta en vanlig typ av köldbrygga. I synnerhet de balkonger som byggdes till flerbostadshus i betong under miljonprogrammet måste renoveras. De är byggda med dåtidens teknik vilket innebär att de bildar en köldbrygga. Denna rapport är till för att vägleda fastighetsägare vid en renovering av utanpåliggande balkonger i betong. Metoder på marknaden har undersökts med hjälp av intervjuer och litteraturstudier. Kvalitativa intervjuer genomfördes med en kunnig konstruktör, en betongexpert, en beläggningsexpert, en rutinerad förvaltare samt en expert på balkongräcken. Rapporten beskriver betong och armering, dess uppbyggnad och egenskaper. Balkongers olika skador beskrivs. De skador som kan uppkomma är frostsprängningar, armeringskorrosion, kemiska angrepp, sprickor samt nötning. Balkongers varierande uppbyggnad från sent 1800-tal till dagens teknik förklaras med hjälp av text och figurer. Beskrivningar ges på balkongers betong, räcken, eventuell köldbrygga samt bärande funktion. Balkongers konstruktion har förändrats, allt från genomgående stålbalkar till isolerade balkonganslutningar. Balkongers kontroller beskrivs, allt från okulära inspektioner till olika prover i laboratorium. Slutligen beskrivs balkongers reparationer beroende på skada. En balkong kan vara för skadad för att repareras. Rapporten ger därför exempel på nya konstruktioner, bland annat genom användning av dragstag och pelare. Arbetets slutsats är att analysen för en balkong ska utgå från enkla frågor angående skadorna samt materialen. Dessa frågor i samråd med kunskap om skador, kontroller och åtgärder är ett lämpligt sätt att bestämma vilka åtgärder som bör tas för en balkong. Det mest väsentliga är att kontrollera balkongens bärande delar så risk för ras eller nedfallande betongbitar kan undvikas. / Balconies have been built in Sweden for over 200 years and are now very popular. They are generally exposed to a lot of strains and are often a common thermal bridge. The balconies at concrete multifamily building from the 1960-1970s need to be renovated, among others. They were built with the technology of the past which means that they have a thermal bridge. The report is made for guiding property owners through the renovation process of an external concrete balcony. It summaries the markets methods based on interviews and literature studies. The interviews where qualitative with the help of: a skilled constructor, a concrete expert, a paving expert, an experienced building manager and a balcony railing expert. The thesis describe concrete and reinforcement; their structure and their properties. A balcony’s different damages are describes. For example, the damages that can occur on concrete are frost weathering, reinforcement corrosion, chemical attrition, cracks and abrasion. Balconies varying construction from late 1800s to today’s technology are explained with text and figures. Descriptions are given on their concrete, rails, any thermal bridge and load baring function. The construction has changed from constant steel beams to isolated balcony connections. How balconies can be checked is described; ranging from ocular inspections to taking different samples to a laboratory. Finally, balconies different repairs due to damage are described. In case the balcony is too damaged to be able to be repaired, there are several examples of how a new construction can be applied. This is often with traction rods and columns. The conclusion of this work is that an analysis for a balcony should proceed from simple questions about the damages and the materials. These questions in consultation with knowledge about damages, controls and corrections are a suitable way to decide which action to make for a balcony. The most important thing is to check the balcony's structural parts so there is no risk of collapse and also that no falling concrete can occur.
3

Stol och bord för balkong bruk : Utfällbara balkong möbler

Pålsson, Sebastian, Hansson, Filiph January 2011 (has links)
Balcony Art is an idea for a new kind of furniture group for those who have limited space on their balcony. This report will discuss conceptual and part of primary construction of the chair and table for use on balconies, how the products developed from an idea to primary, preliminary products.In the conceptual design part, the report will discuss how product requirements and specifications are developed and how these controls the design.In the primary construction, the report will discuss the products journey from sketch to functional CAD models and how the products of individual parts are designed and how the durability calculations affect the design.
4

Minimering av köldbryggor vid balkonger hos miljonprogramshus / Minimize thermal bridges at the balconies of Swedish million program houses

Aronsson, Alexander, Gustavsson, Markus January 2015 (has links)
I studien görs en klimatsimulering av en byggnad från miljonprogrammet och jämförs sedan med en klimatsimulering där en ombyggnation av byggnadens indragna balkonger har gjorts. Studien ger konstruktionslösningar på hur en ombyggnation skulle kunna se ut. Resultatet visar att det går att minska energibehovet om balkongväggarna rivs och nya väggar konstrueras i liv med fasaden.
5

Branddimensionering på inglasade balkonger : Underlag för provning av balkonger

Lindberg, Emanuel January 2020 (has links)
Nybyggnationer i Sverige utgår från två olika regelverk, Boverkets byggregler och Boverkets konstruktionsregler (EKS). Boverkets byggregler reglerar idag hur byggnaden får utformas och EKS anger kraven som ställs på bärighet för vissa byggelement. Bärigheten dimensioneras enligt temperaturkurvor, detta gäller de flesta byggelementen. Fokus för denna rapport har varit branddimensionering för enkelinglasade balkonger. Enkelinglasade balkonger är balkonger där glasningen endast består av ett glas till skillnad från klimatiserade balkonger där glasen består av fler glas. Enkelinglasade balkonger liknar enbart ett skydd mot vind och regn medan klimatiserade balkonger är mer likt ett vanligt rum och har även andra krav kopplade till brandskyddet. Innan införandet av EKS provades både inglasade och öppna balkonger i Sverige med fasadtestmetoden SP Fire 105. Efter införandet av EKS framgår det i föreskrifttexten och det allmänna rådet att olika balkongtyper skall dimensioneras olika. EKS är ett regelverk som infördes för att få standardiserade tester och regelverk för Europa. Öppna balkonger skall dimenisoneras enligt den utvändiga brandkurvan och enkelinglasade balkonger skall dimensioneras med standardbrandkurvan. Brandkurvorna anger enligt vilken temperatur byggnadsdelarna skall dimensioneras efter. Standardbrandkurvan är konstruerad för vanliga rumsbränder och den utvändiga brandkurvan är konstruerad för att simulera en brand utomhus. Brandbelastningen är dock oftast låg på balkonger vilket ger lägre temperaturer vid brand än de rum som standardbrandkurvan är tänkt att simulera. Detta gör att standardbrandkurvans relevans för enkelinglasade balkonger bör utredas vidare eftersom bärighetskraven kommer att vara högre jämfört med om den tidigare föreskrivna metoden SP Fire 105 använts. Om byte från nuvarande dimensioneringsmetod till någon annan provningsmetod genomförs, exempelvis SP Fire 105, krävs också att provningstiden för den metoden är tillräckligt lång för att kunna verifiera kraven. Detta innebär att provningstiden för SP Fire 105 som endast uppgår till ca 15-20 minuter inte räcker till för att verifiera kraven i EKS eftersom provningstiden kan behöva uppgå till 30 eller 60 minuter enligt EKS. Brandlasten och lufttillgången vid bränder på balkonger är relativt begränsade vilket leder till sannolikheten för övertändning är låg. Detta gör att relevansen för dagens provningsmetod med standardbrandkurvan bör diskuteras.
6

Momentinspänning av konsolbalkar i limträ och korslimmat trä : En jämförelse mellan två semistyva förband

Oregren, Daniel, Pettersson, Mårten January 2019 (has links)
En vital del att ta hänsyn till i lastbärande stommar i trä är knutpunkterna där olika typer av förband sammanfogar två eller flera träelement. Dessa knutpunkter tenderar att vara svagare än de träelement som sammanfogas, vilket innebär att stor vikt behöver läggas på utformning av dessa knutpunkter. Knutpunkterna vid balkonger kan utföras på ett flertal sätt men arkitekten föredrar som oftast en infästning där träbalkongen är inspänd i byggnadsstommen, detta på grund av att de övriga infästningarna bidrar till skymmande sikt från balkongen. Denna infästning leder till att förbandet behöver uppta momentkrafter vilket kan innebära utmaningar vid konstruktioner i trä, genom att trä som material är eftergivligt och har vissa materialegenskaper som begränsar kapaciteten med avseende på så väl styvhet som styrka. Alternativen för bärande element i en inspänd infästning i trä är korslimmat trä och limträ. Korslimmat trä används i dagsläget som stora planelement. På grund av dess uppbyggnad med vartannat skikt korslagt, tillsammans med att deformationerna i momentbelastade förband beror av vilken riktning till fibrerna som belastas, ger att en balk av korslimmat trä skulle kunna vara ett fördelaktigt alternativ till limträ vid utformning av momentinspända balkelement. Denna studie genomfördes i syfte att undersöka hur två balkar; en i limträ och en i korslimmat trä, förhåller sig till varandra i ett förband där de är mekaniskt sammanfogade med övrig byggnadsstomme. Metoden för arbetet har varit att genom provning mäta den relativa rotationen i förbandet samt nedböjningen av en balk av korslimmat trä samt en balk av limträ med samma dimensioner, förbandsutförande samt påverkan från yttre last för att utvärdera vilken av dessa som innehar högst rotationsstyvhet samt lägst nedböjning av balk och således med fördel kan användas vid momentinspänning av lastbärande träelement. Beräkningar enligt Eurokod 5 har även utförts för att jämföra med resultat från experimentella försök och därigenom fastställa huruvida de teoretiska beräkningarna överensstämmer med det praktiska utslaget. Studien visar på att balken i korslimmat trä är fördelaktigt då den får en lägre nedböjning orsakad av den relativa rotationen i förbandet tillsammans med en lägre nedböjning orsakad av balkens böjning. Brottet för limträbalken karakteriserades som ett sprött brott där sprickbildning uppkom plötsligt utan förvarning, vilket inte är ett fördelaktigt brott vid balkonginfästningar, medan brottet i balken av korslimmat trä karakteriserades som ett segt brott med synliga deformationer i förbandet. Detta visar på att det finns potential i att utföra balkar av korslimmat trä som komplement till de större planelementen av korslimmat trä. Teoretiska beräkningar stämmer till stor del stämmer överens med praktiskt utslag för limträbalken dock så visas på variationer i jämförelse av teoretiskt och praktiskt utslag för balken av korslimmat trä. Andra studier har visat på att en konstruktions styvhet kan vara tillförlitliga i vissa tester och opålitliga i andra, vilket innebär att studier på ett större antal provkroppar behöver utföras för att säkerställa användandet av formlerna vid beräkning av korslimmat trä. / A vital part to take care of in a load-bearing framework in a wooden material is the joints where different types of connections merge two or more elements. Those joints tend to be weaker than the elements that’s being merged, which means that great importance must be attached to the design of these joints. The joints at balconies can be carried out in a number of ways, but the architect usually prefers an attachment where the wooden balcony is clamped in the building frame, this is because the other attachments contribute to obscure views from the balcony. This attachment means that the joint needs to take up torque forces, which can entail challenges in wood constructions, because wood as a material is resilient and has certain material properties that limit the capacity with regards to both rigidity and strength. The alternatives for load-bearing elements in a clamped joint in wood is cross laminated timber and glue laminated timber. Cross laminated timber is currently used as a large planar element. Due to its build up with every other layer crossed, together with that the deformations in torque-loaded joints depends on the direction to the fiber being loaded, a beam of cross laminated timber could be an advantageous alternative to glued laminated timber when designing joints exposed to torque forces. This study was conducted in order to investigate how two beams; one in glue laminated timber and one in cross laminated timber is related to one another in a joint where they are mechanically joined with the building frame. The method for the work has been to measure, by testing, the relative rotation in the joint and the deflection of a beam of cross laminated timber and a beam of glue laminated timber with the same dimensions, joint design and influence of external load to evaluate which of these beams has the highest rotational stiffness and lowest deflection of beam and thus advantageously can be used in torque clamping of load-bearing wooden elements. Calculations according to Eurocode 5 have also been carried out to compare with the experiments in the study and thereby state whether the theoretical calculations correspond with the practical outcome. The present study shows that the beam in cross laminated timber is advantageous since it causes a lower deflection of the relative rotation in the joint, together with a lower deflection of the beam's resilience. The failure of the glue laminated beam was characterized as a brittle failure where cracking suddenly occurred without warning, which is not an advantageous failure at balcony attachments, while the failure in the beam of cross laminated timber was characterized as a tough failure with visible deformations in the joint. This shows that there is potential in perform beams of cross laminated timber as a complement to the larger planar elements of cross laminated timber. Theoretical calculations are, to a large extent, consistent with the practical outcome of the glue laminated beam, however, it shows variations in the comparison of theoretical and practical results for the beam of cross laminated timber. Other studies have shown that the rigidity of a construction can be reliable in some tests and unreliable in others, which means that studies on a larger number of test specimens need to be carried out in order to ensure the use of the formulas in calculating cross laminated timber.
7

Framtagning av ett dimensioneringsverktyg för balkonginfästningar enligt Eurocode och ETAG. / Development of a design tool for the balcony fixings according to Eurocode and ETAG.

Oksiuta, Michal, Mijatovic, Dusan, Jantarang, Phanyod January 2012 (has links)
The purpose of this paper is to standardize and simplify the design work on a few specific types of storage brackets for balconies. The company Balco AB had the wish to simplify the design work in the preparation of attachments to their balcony structures. This would be done by a calculation matrix that could be produced which then in turn could be used for each new project by the company. The design work behind the development of these fittings at each new project is costly both in terms of time devoted by each calculation but also the cost of the time. The purpose of this report is that in a systematic manner, a calculation matrix can be created that then the company instead may follow from each new project. In carrying out the project used HILTI calculation program, which was provided by the company HILTI. Balco AB operates in the current situation with this software when designing work related attachments are made. Determining of the calculation matrix was achieved by 896 different calculations were made on a total of 4 different types of consoles in HILTI computing applications. In the program, we have used varied dimensioning-parameters as shear force, eccentricity, steel grade, bracket height, bracket width, and position of the cantilever in terms of concrete edge. We have when the results would be presented to the company worked with a hierarchal division, with each cantilever has its subfolders where the division is made after the given parameters, in order to get the structure that the company wants to work with.
8

Att dimensionera balkonger : Svårigheter, begränsningar och dimensionsskillnader för trä och stål / To dimension balconies : Difficulties, limits and dimension differences for timber and steel

Isaksson, Frida, Dahlberg, Julia January 2021 (has links)
During 1965 - 1974, Sweden had a project which included constructions of real estates, called the million program. In total Sweden produced over a million different dwellings and some of them are now in need of different types of renovations, there among the balconies. Also, a way to increase the value for real estates is to add a balcony. This bachelor thesis will examine two constructions of balconies, one made of timber and the other of steel. The purpose with this work is to dimension two constructions and state the difficulties, dimension differences and possible restrictions considering the choice of material. Beside from the dimensioning process, the material costs will be compared. Furthermore, the report will examine if a building and demolition permit is required for the new constructions. The aim with the report is to state the pros and cons for each contructions and state the price differences. The dimensioning is made by hand based calculations, according to EKS 11 and Eurocode. To estimate the cost differences the program Bidcon is used. The balconies are designed in two different sizes but the dimensioning process is based on the larger balcony which is 7x2 m. The construction made of timber is designed with columns. To the columns, two joists are connected to hold the secondary beams. The floor decking is connected directly to the beams and the maximum height is 370 mm. The deflection can be challenging due to the material properties for timber. Timber is to prefer when it is exposed for compression load instead of tension, also due to the variety of the material properties. Except for the deflection, difficulties with the material is that it is sensitive to water and needs a specific surface treatment. The steel construction is designed with three columns connected directly to the facade. A UPE-profile is connected to the columns and represents the balcony’s shorter side. On top of the UPE-profile’s flange a L-profile is placed and will complete the frame of the balcony. Inside the frame HEA-profiles are placed which the floor decking will be connected to. The construction will have a total height of 140 mm. An advantage for steel is that it is a homogeneous material with the same capacity in all directions. Although steel is usually heavier and more expensive than timber. Steel also needs a surface treatment because it is sensitive to water and fire. However, the steel construction is to prefer when larger span is used and with limited space between the floors. The result shows that the construction made of timber is more cost effective, 45 % compared to the steel construction. For these constructions both building and demolition permit is required.
9

Energiförluster från vs-rör med intilliggande balkong : Parameterstudie i Comsol Multiphysics / Heat losses from hot water pipes with adjacent balcony : Parametric study in Comsol Multiphysics

Åberg, Adam January 2023 (has links)
Energy issues are today in high priority nationally and internationally as its impact on the environment and climate has become increasingly apparent. The real estate sector accounts for 34 % of Sweden's total energy consumption, where 70 % goes to heating apartment buildings. In order to create a more energy-efficient and climate-smart society, the EU Commission has set the goal of reducing greenhouse gas emissions by at least 55 % relative to levels from 1990. Furthermore, Sweden's Riksdag decided to reduce energy use in buildings by 50 % by 2050 relative to 1995 levels. In order to reach the goals, technical solutions that can reduce energy losses in buildings are required, among other things. Furthermore, there is an undesirable energy transport via cold bridges that occur in the building's climate shell. The study deals with the combination of cast-in vs-pipes with an adjacent balcony where linear thermal bridges occur.  The purpose of the study was to gain an increased understanding of the heat release from vs pipes with an adjacent balcony slab. The goal is to produce temperature profiles over the system, the vs pipes' heat output and how large a proportion the building can absorb, energy losses via the balcony plate and its climate impact in the form of carbon dioxide equivalents. Measures such as pipe insulation, use of egcobox and the laying of the pipes were investigated. Using the simulation tool Comsol Multiphysics, the study has modeled a transient system where temperature and wind data are retrieved for Karlstad. Four basic cases (egcobox+ with/without insulation, without egcobox + with/without insulation) were examined where the placement of the pipes was varied relative to the inside wall. Outdoor temperature and wind speed were obtained from SMHI on an hourly basis and the supply temperature of the pipes was varied with respect to the outdoor temperature where the return flow received a 10 ᵒC lower temperature. The results of the study showed that heat release for uninsulated and insulated pipes maintained an effect of 49 W/m and 11 W/m at 55 ᵒC where the difference was shown for the energy losses via the balcony plate. Going from uninsulated to insulated pipes could reduce energy losses via the balcony slab by up to 36%. By moving the pipes further into the room, the losses could be reduced by up to 57%. By increasing the laying of the pipes from 2 - 12 dm, the change in relation to other measures made a big impact. At a laying of approximately 3 m, the energy losses via the balcony plate were of a similar order of magnitude as if the pipes had not been in the joist. To further reduce losses, insulation or egcobox had to be used. The percentage of credited energy from the heat output of the pipes without egcobox was as low as 72 and 80% for insulated and non-insulated pipes, respectively, to approach 100% with increasing installation. With the help of measures such as insulation and egcobox, energy savings for a property can reach up to 5.4 percentage points, which increases the energy performance of apartments with a balcony. When using egcobox, the percentage landed at 84 and 88% for individual and non-insulated pipes, respectively, and then rose in step with increased installation. The climate impact had a linear relationship with energy savings, where an increased location could reduce a property's emissions by up to 1 ton of CO2-eq/year. By taking measures for the thermal bridge problem, the real estate sector can reduce its energy consumption and its climate impact for future projects
10

Kulturarvets mosaiklandskap i ny tappning för trädgårdar och balkonger : En litteraturstudie med designförslag som bidrag för bevarandet av mångfalden för solitära bins överlevnad

Appel, Madeleine January 2015 (has links)
Abstrakt.Syftet med denna studie är att ta reda på vad som kan göras i trädgårds- och balkongmiljöer för solitära bins överlevnad, då arter redan gått förlorade eller är rödlistade på grund av dåliga förutsättningar i fråga om habitat. Hur kan utformningen av designförslag se ut för trädgård och balkong? Vad innehåller lämpliga habitat samt hur ser hotbilden ut för solitära bin? Målet med denna litteraturstudie var att finna svar på mina frågeställningar. Utifrån de fakta som framkommit från resultaten har sedan designförslag utformats för trädgårds- och balkongmiljöer. Ökad biotopyta från forna tiders mosaiklandskap kan i ny tappning utformas som trädgårds- och balkongmiljöer i form av giftfria och blomrika små ängar, blommande kantzoner, diken och rabatter, krukväxter, blommande träd och buskar. Solitära bin behöver husrum, vatten att dricka och mat att äta i form av nektar- och pollenrika växter. De behöver blommande växter från tidig vår till sen höst för att överleva. Viktigt att sprida kunskap och förståelse för hur solitära bin lever sina liv så att människor kan samarbeta för att nå långsiktiga hållbara habitatlösningar. Solitära bin behöver många blommande växtytor som kan fungera som spridningskorridorer in i de urbana miljöerna där varenda liten kvadratmeter blommande yta har betydelse. Solitära bin ökar i antal med ökad biotopyta är fakta som designförslagen baserats på. Förödande hot för solitära bin är bland annat blombrist i urbana miljöer, besprutning med olika gifter, tambin som sprider sjukdomar, människans rädsla för små kryp samt förändrade livsmiljöer. / Abstract. The purpose of this study is to find out what can be done in gardens and balconies for solitary bees survival, species have already been lost or are red-listed because of poor conditions in terms of habitat. What can design-proposals look like for gardens and balconies? What do suitable habitats contain and what do threats look like for solitary bees?The goal with this literature study was to find answers to my questions. Based on facts that emerged from the results, design proposals have been made for gardens and balconies. Increased biotope-surface from ancient times mosaic-landscape can in modern environments like gardens and balconies be designed as non-toxic and flower-rich meadows, flowering border zones, ditches and flower beds, potted plants, flowering trees and shrubs. Solitary bees need shelter, water to drink and food to eat as in nectar and pollen-rich plants. They need flowering plants from early spring to late autumn to survive. It´s important to spread knowledge and understanding how solitary bees live their lives, that people can cooperate to achieve long-term sustainable habitat solutions. Solitary bees need many flowering plant-surfaces that can act as dispersal corridors in to urban environments, where every single square meter flowering-surface is of importance. Solitary bees increase in number with increasing biotope-surfaces which are facts that design proposals are based on. Devastating threats for solitary bees are floral shortage in urban areas, spraying with various poisons, domestic bees spreading diseases, human fear of small insects and altered habitats.

Page generated in 0.0462 seconds