• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 631
  • 15
  • 4
  • 4
  • 2
  • 1
  • Tagged with
  • 667
  • 226
  • 226
  • 226
  • 226
  • 226
  • 168
  • 135
  • 126
  • 121
  • 104
  • 104
  • 92
  • 92
  • 90
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
581

Propuesta de un plan de seguridad, salud y medio ambiente para una obra de construcción y la estimación del costo de su implementación

Rosales Rosales, Luis, Vilchez Vallejos, Dante Rafael 23 January 2013 (has links)
El tema de tesis, ―Propuesta de un Plan de Seguridad y Salud para una Obra de Construcción y la Estimación del Costo de su Implementación‖, ha sido desarrollado tomando como modelo una obra de edificación de altos estándares, ejecutada en la ciudad de Lima por la constructora GyM S.A. Este proyecto fue desarrollado en el ámbito de la filosofía Lean Construction, en función a ésta han sido propuestos los mecanismos técnicos, administrativos y recursos del Plan de Seguridad y Salud. Siendo necesario sintetizar la obra sólo a la etapa de estructuras, con el objetivo de lograr una metodología de estimación del costo de implementación del Plan de Seguridad y Salud propuesto. El Plan propuesto cumple con la reglamentación vigente, garantizando la integridad física y salud de los trabajadores durante la ejecución de actividades previstas en el contrato de obra. La metodología para la estimación del costo de implementación del Plan de Seguridad y Salud ha sido elaborada en función a datos reales de obra, base de datos del contratista ejecutor, e investigación de mercado. Cumpliendo los requerimientos de la ―Norma Técnica, Metrados para Obras de Edificación y Habilitaciones Urbanas‖. Esto permite conseguir un monto global para la partida Seguridad y Salud que será parte, en adelante, del expediente técnico de oferta y del presupuesto de costo directo presentado por los ejecutores del sector construcción.
582

Análisis, diseño e implementación de un sistema de cotizaciones para servicios de control de inmuebles

Yacarini Blua, Renzo 07 September 2012 (has links)
En estos momentos en que la tecnología es primordial para el desarrollo y el progreso de las grandes empresas, aumenta la cantidad de compañías que buscan automatizar tareas y procesos buscando ahorros en costos y tiempo y así obtener mayores ganancias. Dentro de este conjunto de automatizaciones se considera también el manejo correcto y eficiente de los sistemas para el control de edificios donde se desarrolla la compañía. Para desplegar estos sistemas las empresas solicitan cotizaciones de implantación a diferentes proveedores especializados buscando así obtener la mejor alternativa para su edificio, sin embargo, este tipo de cotizaciones sigue un proceso largo y trabajoso en el cual se toman en cuenta detalles como los componentes, los costos y el armado. Muchas veces este proceso no cuenta con una herramienta que automatice las tareas para obtener estas cotizaciones.
583

Diseño de un sistema de agua potable para la comunidad nativa de Tsoroja, analizando la incidencia de costos siendo una comunidad de difícil acceso

Meza de la Cruz, Jorge Luis. 09 May 2011 (has links)
El presente trabajo de tesis consiste en el diseño de un sistema de abastecimiento de agua potable por gravedad para la Comunidad Nativa de Tsoroja, perteneciente al distrito de Río Tambo, Provincia de Satipo, Departamento de Junín. Localidad que no cuenta con acceso terrestre ni fluvial. Lo que implica un incremento en los costos de transporte al lugar de la obra, de materiales de construcción y personal, por el alquiler de helicópteros como medio de transporte aéreo. Hecho que hace necesario el análisis de alternativas de solución contemplando la minimización de costos, considerando el factor transporte como crítico dentro del presupuesto. En primera instancia se diseñó el sistema de abastecimiento de agua potable, considerando toda estructura de concreto armado, al que se denominó, Sistema Convencional. Se observó que era posible optimizar el uso de materiales de construcción utilizando estructuras de materiales alternativos, por lo que se elaboró un nuevo diseño del sistema de abastecimiento al que se denominó, Sistema Optimizado.
584

Evaluación del proceso de generación de propuestas de precio fijo para la implementación de software empaquetado

López-Vera Flórez, Pedro Pablo 09 May 2011 (has links)
Esta tendencia ha generado una importante oportunidad de negocio para compañías de Servicios de Información que se dediquen a la implementación de este tipo de Software, especialmente para aquellas dispuestas a presentar propuestas de precio fijo. Este tipo de propuesta es la más requerida por las compañías pertenecientes a este segmento de mercado ya que les permite transferir al proveedor el riesgo de asumir costos inesperados durante la implementación del software. El presente estudio pretende brindar a estas compañías, especialmente aquellas que no cuentan con metodologías y procedimientos sofisticados, una herramienta que sirva como marco referencial para optimizar el proceso de generación de una propuesta de precio fijo; minimizando la ocurrencia de errores por defecto, lo que significaría una subestimación de costos, o de errores por exceso, lo que representaría perder negocios por sobreprecio. Al elevar la calidad en sus propuestas de precio fijo, mejorando la definición del alcance y la estimación del precio del servicio, estas compañías estarán en una mejor posición para obtener negocios rentables.
585

Estudio de factibilidad para la implementación de una red de fibra óptica entre Desaguadero y Moquegua

Gutiérrez Villagómez, Edwin Gabriel 29 October 2014 (has links)
Este trabajo intenta determinar la factibilidad económica de la construcción de un tramo de fibra óptica que atravesara territorio Peruano con el objetivo de brindar una alternativa rentable de interconexión de datos al mercado boliviano. De este modo diversificar la oferta de servicios de transporte internacional de datos permitiendo reducir el costo de acceso a internet para la población boliviana. La velocidad de penetración de Internet de Banda Ancha y su difusión en la región se deben a varios factores uno de ellos es el costo por el servicio y su asequibilidad. Otro factor está relacionado con la calidad de las conexiones de banda ancha. En ambos casos un elemento común que juega un papel crucial son los enlaces internacionales de interconexión. Esto influye en la calidad de conexión tornándolos en retrasos para acceder a contenido local o externo, con el subsecuente impacto en el costo de los servicios, en la medida en que los enlaces internacionales pueden significar entre el 20% y el 40% de la tarifa de acceso [9] el despliegue de estos es fundamental y necesario en toda la región. Desde otro punto de vista se puede considerar a estos enlaces como los elementos que aproximen a los proveedores de internet (ISP) a los puntos de Interconexión (IXP) utilizando cables de fibra óptica de alta capacidad. En el caso de países mediterráneos como Bolivia el problema se multiplica ya que la capacidad de interconexión de los proveedores de servicios de internet (ISPs Bolivianos) depende de la infraestructura desplegada en los países vecinos para acceder a estos IXPs. Como se podrá observar en los siguientes capítulos hasta el día de hoy no hay suficientes alternativas para proveer de capacidad de transporte de interconexión +internacional que cubra la demanda actual pero sobretodo futura de Bolivia. Para ello en los siguientes apartados se desarrollan diferentes ángulos de afrontar el problema y una serie de estrategias para brindar una alternativa económicamente factible, de este modo multiplicar el acceso internacional de datos en Bolivia. Dando mayor importancia al despliegue de fibra entre dos puntos (Desaguadero – Moquegua) en territorio Peruano para solventar la escases de oferta de interconexión previamente comentada. Después de detallar la tecnología y describir el estado actual de las redes de interconexión y capacidad de transmisión de datos tanto peruana como la boliviana. Se presenta una propuesta de diseño de un enlace Punto a Punto con tecnología de Multiplicación WDM que permitirá integrar esta conexión con el resto de la red troncal de proveedores de capacidad establecidos en el Perú. En los capítulos finales del documento se encuentra el análisis económico que intenta en su desarrollo justificar la inversión desde varias escenarios. Finalmente en el último apartado se pueden leer las conclusiones, recomendaciones y trabajos futuros relacionados con el despliegue de este backhaul de interconexión. / Tesis
586

Análisis comparativo entre el mortero tradicional y el mortero premezclado para uso en albañilería en la ciudad de Chiclayo

Quesquen Custodio, Luiz Junior January 2024 (has links)
La presente investigación tiene como fin realizar un análisis comparativo entre el mortero tradicional y el mortero premezclado, así mismo busca evaluar cómo influye el mortero premezclado en la mejora de los costos. Se evaluaron indicadores como tiempo de fraguado, peso unitario, variación de volumen, grado de absorción, fluidez, compresión del mortero, compresión axial de pilas, compresión diagonal de muretes y el análisis de costos. Se concluyo que el mortero premezclado ofrece una eficiencia del 111.1% en cuanto a la resistencia a la compresión según lo requerido por la NTP 399.610. Una eficiencia en cuanto al a resistencia a la compresión axial de pilas de 105.1% y al corte de 110.8% de acuerdo con lo requerido por la RNE E070. Posee un tiempo de fraguado de 514 min, también el mortero premezclado posee un peso unitario de 2193.76 kg/m3, así pues, el mortero premezclado tiene una variación de volumen de 0.005% y en cuanto al grado de absorción posee un índice de 1.724 mm. La influencia del mortero en los costos radica en el ahorro en mano de obra que genera y el mayor rendimiento, siendo así que el mortero premezclado genera un 53.2% de ahorro en mano de obra y proporciona un 50 % más que el rendimiento generado por el mortero tradicional. Esto genera que el mortero tradicional 1:3 resulte 12% más costoso que el mortero premezclado, el mortero 1:4 es 10% más costoso y el mortero 1:5 es 8.5% más costoso. / he purpose of this research is to carry out a comparative analysis between the traditional mortar and the premixed mortar, as well as to evaluate how the premixed mortar influences the improvement of costs. Indicators such as setting time, unit weight, volume variation, degree of absorption, fluidity, mortar compression, axial compression of piles, diagonal compression of low walls and cost analysis were evaluated. It was concluded that the premixed mortar offers an efficiency of 111.1% in terms of compressive strength as required by NTP 399.610. Efficiency in terms of resistance to axial compression of piles of 105.1% and shear of 110.8% in accordance with the requirements of RNE E070. It has a setting time of 514 min, also the premixed mortar has a unit weight of 2193.76 kg/m3, thus, the premixed mortar has a volume variation of 0.005% and in terms of the degree of absorption it has an index of 1,724 mm. The influence of the mortar on the costs lies in the savings in labor that it generates and the higher performance, being that the premixed mortar generates a 53.2% savings in labor and provides 50% more than the performance generated by the traditional mortar. This makes traditional 1:3 mortar 12% more expensive than pre-mixed mortar, 1:4 mortar is 10% more expensive, and 1:5 mortar is 8.5% more expensive.
587

Propuesta de un método para el diseño de edificios con disipadores pasivos de energía utilizando registros sísmicos peruanos

Anccasi Huayra, Rubén 17 January 2020 (has links)
La presente investigación se ha desarrollado siguiendo los lineamientos planteados por la Sociedad Americana de Ingenieros Civiles (ASCE) y por la Agencia Federal para el Manejo de Emergencias (FEMA). El método de diseño consiste en realizar un análisis dinámico no lineal tiempo historia, para lo cual se empleó el software SAP2000, basado en la filosofía de diseño por desempeño propuesto por la Sociedad de Ingenieros Estructurales de California (SEAOC) a través del Comité Visión2000. Con la finalidad de comparar el desempeño estructural y los costos de construcción, se eligió un edificio ubicado en la ciudad de Lima, cuyo uso es esencial. El edificio tiene cuatro niveles y presenta una configuración regular en planta y elevación. El sistema estructural está conformado por pórticos de concreto armado y una losa maciza de 20cm de espesor. El edificio no cumple por desplazamientos laterales, pero sí por resistencia de acuerdo a los límites establecidos en el Reglamento Nacional de Edificaciones (RNE). Como solución se propuso dos alternativas, una solución no convencional que consistió en incorporarle disipadores de energía y una solución convencional que consistió en incrementar el tamaño de las columnas y vigas hasta lograr que el desempeño esperado de ambos edificios sean similares. Ambos edificios llegaron a un desempeño operacional y resguardo de vida para el sismo de 475 y 970 años de período de retorno, respectivamente. Se verificó que la diferencia de costos de construcción es de $1.29/m2, siendo el edificio no convencional el más económico. Ambas soluciones cumplen con el desempeño esperado. / This research has been carried out following the guidelines proposed by the American Society of Civil Engineers (ASCE) and Federal Emergency Management Agency (FEMA). The design method consists in performing a dynamic nonlinear time history analysis, for which the SAP2000 software was used, based on the philosophy of performance design proposed by the Structural Engineers Associations of California (SEAOC) across the Vision2000 Committee. In order to compare the structural performance and the construction costs, a building located in the city of Lima was chosen, its use is essential. The building has four levels and has a regular configuration in plan and elevation. The structural system consists of reinforced concrete frames and a slab of 20cm of thick. The building does not comply with the lateral displacements, but by strength according to the limits established in the Peruvian Code (RNE). As a solution, two alternatives were proposed, an unconventional solution that consisted of incorporating energy damping and a conventional solution that consisted in increasing the size of the columns and beams until the expected performance of both buildings is similar. Both buildings should have an Operational and Life Safety performance for an earthquake of 475 and 970 years of return period, respectively. It was verified that the difference in construction costs is $ 1.29 / m2, with the unconventional building being the most economical. Both solutions fulfill with the expected performance. / Tesis
588

Determinación de los costos de enseñanza en la PUCP

Solís Tovar, Jorge Alberto 24 February 2017 (has links)
El autor de esta tesis, durante su vida profesional, ha desarrollo una metodología de costeo para empresas industriales denominada “costeo en cascada”. Esta tesis se refiere a la adaptación de dicha metodología al caso de la Pontificia Universidad Católica del Perú, para obtener el costo de la enseñanza de pre y posgrado y la composición de dicho costo según la naturaleza del gasto, es decir, la proporción en que intervienen en el costo de la enseñanza, la docencia, la investigación, los servicios, la infraestructura, la proyección social y la administración. El sistema de costos de la enseñanza se ha diseñado para recolectar periódicamente, al final de cada ciclo semestral regular, información proveniente de los sistemas administrativos, financieros y estadísticos que conforman la plataforma informática de la universidad, y calcular, en base a ellos y a las tablas y parámetros que se definen en el propio sistema, los costos por hora profesor, por aula utilizada, por crédito académico, por ciclo y por carrera. Para efectuar este cálculo es indispensable una correcta definición de las unidades operativas (centros de costo) de la universidad y de los parámetros que sirven para efectuar entre ellas la redistribución de los gastos indirectos y calcular los resultados finales. En esta tesis, que se debe considerar como una primera etapa en la implementación del sistema, los costos de la enseñanza se han determinado a nivel de departamentos académicos y de facultades. En una segunda etapa se podría hacer un análisis más detallado, a nivel de cada especialidad (en las facultades) y de cada sección (en los departamentos). Sin embargo antes de abordar una segunda etapa se recomienda tener en uso la versión actual del sistema por lo menos durante dos años seguidos, con el fin de afinar criterios y parámetros. / Tesis
589

Estudio de productividad mediante cartas balance de una obra de instalación de los sistemas de abastecimiento de agua potable en Lima Metropolitana, 2023

Tapia Huertas, Italo Francesco 01 September 2024 (has links)
Esta investigación tiene como objetivo describir la productividad de la mano de obra en un proyecto de abastecimiento de agua potable en Lima, específicamente en sus dimensiones de costo, horas – hombre y velocidad de producción. La justificación de este estudio radica en la necesidad de aumentar la productividad en este tipo de proyectos, dado que el saneamiento es el segundo rubro con mayor déficit por cubrir según el Plan Nacional de Infraestructura 2019. Para lograr el objetivo, se emplearon como herramientas las cartas balance de cuadrilla, recurso de Lean Construction, útil para realizar un diagnóstico de la productividad de una cuadrilla de una actividad específica, dividiendo sus tipos de trabajo en Productivo, Contributorio y No Contributorio. En ese sentido, la hipótesis de investigación plantea que el trabajo productivo global de la obra debería ser 28% o más, tomando como referencia el estudio de 50 obras en Lima llevado a cabo por Virgilio Ghio en el año 2000. Así, se realizaron muestreos de 384 mediciones en intervalos de 30 segundos, para cada uno de los integrantes de las cuadrillas analizadas en las 05 actividades más incidentes en costo del proyecto. Los resultados finales globales dan un Trabajo Productivo del 32.1%, un Trabajo Contributorio de 29.2% y un Trabajo No Contributorio del 38.7%, comprobándose la validez de la hipótesis planteada. En base a este resultado, se concluye que potencialmente se pierde un total de 9165.3 hh, equivalente a S/. 178 615.5. De igual modo, también se concluye que casi el 50% de las pérdidas globales se deben al proceso “Esperas”, ligándose estas, en gran medida, a la actividad de “Excavación de zanja en terreno normal”. Por lo tanto, dicha actividad representa un cuello de botella para las actividades concatenadas, siendo la más crítica y en la que debe enfocarse el mejoramiento.
590

Propuesta de optimización de rutas de distribución en la empresa DD & D S. A. C. para reducir costos operativos

Villanueva Malca, Mariela Donatila January 2024 (has links)
El presente estudio tiene como objetivo determinar el impacto de la propuesta de optimización de rutas de distribución en los costos operativos en la empresa DD & D S. A. C. para ello se realizó el diagnóstico del proceso de distribución actual, aplicando la observación directa, la revisión de registros documentados y entrevistas, se descubrió que los altos costos operativos se componen en un 67,4% de los costos asociados al consumo de combustible (34,2%), la reprogramación de rutas (18,4%), y de la mano de obra (14,8%). Asimismo, se detectó que el 93% de los problemas que afectan a los costos operativos se originan por la falta de capacitación del personal, una planificación inadecuada de rutas y la falta de cumplimiento de estas. También se elaboró una propuesta de optimización, evaluando en base a criterios, modelos, heurísticas, y algoritmos, dando como resultados, al modelo, problema de rutas de vehículos (VRP), la heurística de Clarke Wright y el algoritmo de k-opt. Se corrió el software VRP Solver y el VRP Solver Spreadsheet a modo de comparativa, y se redujo la distancia de 124 a 69 km (-44%) para la flota liviana y 366 a 171 km (-63%) para la flota pesada, reduciendo a los costos operativos de S/ 7 180,07 a S/ 4 397,62 (-39%) mensuales. Finalmente, para evaluación económica de la propuesta se obtuvo un VAN de S/ 45 234,93; TIR de 301% y un beneficio/costo de 1,82 que indica que los beneficios son mayores a los costos. / The objective of this study is to determine the impact of the proposed optimization of distribution routes on operating costs in the company DD & D S. A. C. For this purpose, a diagnosis of the current distribution process was made, applying direct observation, review of documented records and interviews, it was discovered that the high operating costs are composed of 67,4% of the costs associated with fuel consumption (34,2%), reprogramming of routes (18,4%), and labor (14,8%). It was also detected that 93% of the problems affecting operating costs are due to lack of personnel training, inadequate route planning and lack of compliance. An optimization proposal was also elaborated, evaluating based on criteria, models, heuristics, and algorithms, giving as results, the model, vehicle routing problem (VRP), the Clarke Wright heuristic and the k-opt algorithm. The VRP Solver software and the VRP Solver Spreadsheet were run for comparison, and the distance was reduced from 124 to 69 km (-44%) for the light fleet and 366 to 171 km (-63%) for the heavy fleet, reducing operating costs from S/ 7 180,07 to S/ 4 397,62 (-39%) per month. Finally, for the economic evaluation of the proposal we obtained an NPV of S/ 45 234,93; IRR of 301% and a benefit/cost ratio of 1.82, which indicates that the benefits are greater than the costs.

Page generated in 0.0718 seconds