• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 50
  • 30
  • 6
  • 1
  • Tagged with
  • 87
  • 28
  • 27
  • 18
  • 18
  • 17
  • 16
  • 16
  • 14
  • 14
  • 14
  • 13
  • 12
  • 12
  • 11
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
71

De los Centros de Despacho Económico de Carga al Coordinador del Sistema Eléctrico Nacional : institucionalidad y certidumbre

Pérez Cea, María Francisca January 2018 (has links)
Memoria (licenciado en ciencias jurídicas y sociales) / De acuerdo al artículo 72°-1 de la Ley General de Servicios Eléctricos, la operación de las instalaciones eléctricas interconectadas deberá ser coordinada. Durante más de 30 años, tal actividad coordinadora de los distintos sistemas eléctricos ubicados a lo largo del país estuvo a cargo de unos organismos denominados Centros de Despacho Económico de Carga, los cuales nacieron durante la segunda mitad de la década de 1980, como consecuencia de las nuevas políticas privatizadoras propias del sistema neoliberal instaurado por el régimen de la época , a partir de la dictación Decreto Supremo N° 6 de 1986, llamado Reglamento de Coordinación de la Operación de Unidades Generadores y Líneas de Transporte. Desde su creación, los Centros se desarrollaron como entes sui generis y durante su vigencia fueron objeto de muchas críticas y de múltiples modificaciones, a medida que las necesidades del sistema fueron cambiando, hasta que fueron finalmente derogados a través de la Ley N° 20.936, de 2016, norma que intenta hacerse cargo de estas críticas a través de la creación de un organismo único, con personalidad jurídica de derecho público, independiente, autónomo y con patrimonio propio, llamado Coordinador Independiente del Sistema Eléctrico Nacional, en adelante, CISEN, lo que sin duda constituye un cambio de paradigma en las políticas energéticas del país.
72

Estratégia de contratação ótima de geradores hidroelétricos considerando os impactos dos procedimentos operativos de curto prazo. / Optimal level of energy contracting strategy of the hydroelectric generators considering the influence of short term operating procedures.

Almeida, Rafael Ribeiro de 21 August 2012 (has links)
O trabalho apresenta uma discussão sobre o nível de contratação ótima dos geradores hidroelétricos participantes do Mecanismo de Realocação de Energia (MRE), considerando a influência dos Procedimentos Operativos de Curto Prazo (POCP). O assim denominado POCP é um conjunto de procedimentos realizados pelo Operador Nacional do Sistema (ONS) para proporcionar mais segurança no atendimento à carga do Sistema Interligado, sendo realizado no período de abril a novembro, durante o Programa Mensal de Operação (PMO). O gerador hidráulico, em função do despacho centralizado e normativo adotado no Brasil, dependendo da quantidade de água que aflui aos reservatórios e do consequente despacho das usinas determinado pelo ONS, fica sujeito às exposições no mercado de curto prazo, decorrentes da diferença entre os contratos de venda do gerador e o montante de garantia física (GF) alocada mensalmente após a realização do MRE. Como o POCP não está incorporado nos modelos de despacho das usinas do setor elétrico, uma alternativa de simulação foi construída e, a partir dos seus resultados, pode-se perceber a interferência do mecanismo em tela nas exposições no mercado de curto prazo e no patamar de risco incorrido. A aplicação do POCP traz um efeito líquido de redução da geração hidrelétrica, pois se diminui a possibilidade de utilizar a capacidade de regularização dos reservatórios, evitando riscos de eventual não recuperação dos reservatórios no período chuvoso. Por outro lado, o procedimento conservador hoje utilizado pode gerar um volume muito maior de vertimentos durante o período úmido, limitando a chance de recuperação financeira dos geradores hidrelétricos que tiveram sua geração reduzida no período seco devido ao despacho antecipado de termelétricas, fatalmente com rebatimentos traduzidos por exposições ao PLD. Por conta de todos os fatores de risco citados, os agentes geradores precisam ajustar sua estratégia ótima de contratação, mantendo a função objetivo de maximizar a receita, condicionado a critérios de risco, que ponderem os fatores citados. Nessa perspectiva, foi analisada a aplicação do POCP no ano de 2010 e seus impactos, além de simular a receita esperada e o risco futuro com e sem a aplicação deste mecanismo. Os resultados mostram o quanto o POCP interfere na receita esperada dos agentes, agregando maiores riscos e alterando-se o nível de contratação ótima. Sendo assim, dependendo do risco que cada agente gerador está disposto a assumir, uma revisão de seu nível de contratação torna-se imperiosa. / This work presents a discussion about the optimal level of energy contracting of the Hydroelectric Generators participants of the Energy Reallocation Mechanism, (MRE - Mecanismo de Realocação de Energia), considering the influence of Short Term Operating Procedures (POCP - Procedimentos Operativos de Curto Prazo). The POCP is a set of procedures performed by the National System Operator (ONS - Operador Nacional do Sistema) to provide more security in the Interconnected System, being carried out from April to November, during the Monthly Programme Operation (PMO - Programa Mensal de Operação). Hydro plants are subject to exposure in short-term market due to the centralized dispatch adopted in Brazil, which depends on the amount of water that flows to the reservoir and on the subsequent dispatch of plants determined by the ONS. The exposure in short-term market, arises from the difference between the Generator sales contracts and the amount of assured energy (GF - Garantia Física) monthly allocated after the MRE. As the POCP is not incorporated into the dispatch models of the electricity sector, an alternative simulation was built and, from its results, we can notice the interference of the mechanism displayed in the short-term market and in the incurred risk level. The application of the POCP brings a net reduction in hydropower generation, because it decreases the possibility of using the regularization capacity of the reservoirs, avoiding any risk of non recovery of the reservoirs during the rainy season. On the other hand, the conservative procedure used today can generate a much larger volume of spilling water during the wet season, limiting the chance of financial recovery of hydroelectric dams that had their generation reduced in the dry season due to the anticipated dispatch of thermoelectric plants, inevitably with repercussions represented by exposure to the PLD (SPOT). Considering all risk factors mentioned, the generating agents have to adjust their optimal strategy for contract level, retaining the objective function to maximize revenue, conditional to risk criteria, which consider the factors mentioned. From this perspective, we analyzed the application of the POCP in 2010 and its impacts, as well as simulated the expected revenue and the future risk with and without the application of this procedure. The results show how the POCP interferes in the expected revenue of the agents, adding greater risks and changing the optimal level of energy contracting. Thus, depending on the risk that each generating agent is willing to take, a review of their contracting level becomes imperative.
73

¿Esta habilitada la Superintendencia de Electricidad y Combustibles para disponer que un Centro de Despacho Económico de Carga proceda a suspender a una empresa generadora morosa como participante en los balances de inyección y retiros de energía y potencia?. Análisis del caso particular de Central Campanario

Molina Zúñiga, Heidi Paola January 2015 (has links)
Memoria (licenciado en ciencias jurídicas y sociales)
74

[en] ENERGY AND RESERVE SCHEDULING WITH POST-CONTINGENCY TRANSMISSION SWITCHING: A SMART GRID APPLICATION / [pt] UMA APLICAÇÃO DE SMART GRID: DESPACHO ÓTIMO - ENERGIA E RESERVA - COM SWITCH NA TRANSMISSÃO PÓS-CONTINGÊNCIA

GUSTAVO ALBERTO AMARAL AYALA 26 March 2018 (has links)
[pt] Esta tese de doutorado é composta de dois artigos científicos com contribuições na área de Smart Grid. Além disso, a tese também contribui para o desenvolvimento de soluções computacionais eficientes para problemas de programação linear mista e inteira. Outra importante contribuição é o desenvolvimento de método de decomposição benders com segundo estágio inteiro e não convexo aplicado ao problema de Transmission Switching. O primeiro artigo científico mostra os benefícios com o advento de uma rede inteligente e o aumento da capacidade do operador do sistema de energia elétrica em tomar ações corretivas em face de ocorrências de contingências. O artigo também analisa consequências práticas na capacidade de self-healing da rede pós-contingência. Em nosso contexto, uma rede self-healing é uma rede com total flexibilidade para ajustar a geração e as linhas de transmissão antes e depois da ocorrência de alguma contingência. Resultados numéricos mostram significantes reduções no corte de carga para cada contingência e no total. Foi considerado um único período que representa a demanda de pico do sistema, comparou-se o novo método com os utilizados em publicações anteriores. O segundo artigo contribui também para a aplicação da tecnologia de Smart Grid, em particular a teoria de Transmission Switching. De fato, desenvolvemos uma estratégia de solução para lidar com a complexibilidade NP-Hard criada pelas variáveis de transmission switching e unit commitment do problema de otimização. Foi desenvolvida uma solução algorítmica baseada na teoria dos grafos. Estudou-se a estrutura topológica desses problemas. Além disso, a maior contribuição foi o desenvolvimento de um novo método de decomposição de benders aplicado para o problema de transmission switching com o segundo estágio inteiro e não convexo. Para lidar com este problema de não convexidade, foi desenvolvido um método de convexificação sequencial, implícito a decomposição de benders. / [en] This PhD Thesis is composed by two papers with contributions on operations research applied to smart grid theory. The first paper highlights the economic and security benefits of an enhanced system operation with the advent of a smart grid technology by introducing a novel model, which is a joint energy and reserve scheduling that incorporates the network capability to switch transmission lines as a corrective action to enhance the system capability to circumvent contingency events. The main goal is to reduce operating costs and electric power outages, by adjusting the network connectivity when a contingency occurs. In such a framework, results show that, with a limited number of corrective switches, the system operator is able to circumvent a wider range of contingencies, while resulting in lower operational costs and reserve levels. In our context, a grid that is capable to adjust its generation and also its topology through post-contingency line switching is called a self-healing grid, and its importance in network security and operating costs is demonstrated in this work. The graph structure is explored in the algorithmic solution of the post-contingency transmission switching problem. Numerical results demonstrate a significant reduction in total load shedding and operating cost. It has been also illustrated an expressive improvement in terms of security and operating cost, in comparison to the transmission switching models previously published. The second paper is an application of a modified Benders decomposition to the post-contingency transmission switching problem. The decomposition is an attempt to deal with the NP-hard optimization problem created by the transmission switching and unit commitment variables. The major contribution is the application of a new benders decomposition approach to the problem of transmission switching, in which the first and second stages problems are a mixed-integer program. To deal with this issue, it is used a Branch and Bound (B&B) procedure for the first-stage problem and a sequential convexification procedure for the second-stage problem.
75

Modelo adaptativo fuzzy genético, preditivo e multiobjetivo para despacho de AGVs

Caridá, Vinicius Fernandes 14 June 2011 (has links)
Made available in DSpace on 2016-06-02T19:05:50Z (GMT). No. of bitstreams: 1 3678.pdf: 5394148 bytes, checksum: 4abd3e7ce4acac9d5890eae3620c06d3 (MD5) Previous issue date: 2011-06-14 / Financiadora de Estudos e Projetos / In recent years, most companies apply techniques of industrial automation with the goal of increasing its efficiency. Increasingly Automated Guided Vehicles (AGVs) are used to transport work in factories and warehouses. The management of these AGV is the key to an efficient transport system. One of the main problems encountered in the management of AGV is the dispatching decision. This work proposes a method of dispatching of AGV with the ability to optimize the performance of flexible manufacturing systems (FMS) in real time. In the dispatching deciding can be chosen to optimize two objectives: makespan or tardiness. When the goal is to optimize the makespan are evaluated variables: distance, number of nodes, the input buffer and output buffer of the workstation. When the goal is to optimize the tardiness are evaluated variables: distance, number of nodes, task chaining, date of delivery. In both cases are also considered the time of the AGVs and the processing times of the workstations, so you can anticipate some decision-making. To perform the tests we used the softwares: Matlab, CPNtools and Automod, which allow simulations of how the method works dispatching AGVs before the method is implemented in factories. Based on the tests, we analyzed the improvement in makespan and tardiness compared to other studies, but also the flexibility of the method in which it is possible to exchange goals in operating time. / Nos últimos anos, mais empresas aplicam técnicas de automação industrial com o objetivo de aumentar sua eficiência. Cada vez mais Veículos Auto Guiados (AGVs) são usados para tarefa de transporte em indústrias e armazéns. O gerenciamento desses AGVs é a chave para um sistema de transporte eficiente. Um dos principais problemas encontrados no gerenciamento dos AGVs é a decisão de despacho. Esse trabalho propõe um método de despacho de AGV com capacidade de otimizar o desempenho de Sistemas Flexíveis de Manufatura (FMS) em tempo real. Na tomada de decisão do despacho podem ser escolhidos dois objetivos para otimização: makespan ou tardiness. Quando o objetivo é otimizar o makespan são avaliadas as variáveis: distância, número de nós, buffer de entrada e buffer de saída das estações de trabalho. Quando o objetivo é otimizar o tardiness são avaliadas as variáveis: distância, número de nós, encadeamento de tarefas, data de entrega do produto. Em ambos os casos também são considerados os tempos dos AGVs e os tempos de processamento das estações de trabalho, para que seja possível adiantar algumas tomadas de decisões. Para realizar os testes foram usados os softwares MatLab, CPNtools e Automod, os quais permitem que simulações do funcionamento do método de despacho de AGVs antes que o método seja implementado em fábricas. Com base nos testes realizados, analisou-se as melhoras no makespan e tardiness em comparação com outros trabalhos, como também a flexibilidade do método no qual é possível a troca de objetivos em tempo de operação.
76

Impacto da representação da rede elétrica no planejamento da operação de médio prazo

Souza, Heverton Reis 28 February 2014 (has links)
Submitted by Renata Lopes (renatasil82@gmail.com) on 2016-02-11T12:29:20Z No. of bitstreams: 1 hevertonreissouza.pdf: 2039435 bytes, checksum: 82a19bf494e9ac400021280fb64ec1ae (MD5) / Rejected by Adriana Oliveira (adriana.oliveira@ufjf.edu.br), reason: Renata, bom dia! Por favor, confirme se não tem acento no Júnior: Silva Junior, Ivo Chaves da on 2016-02-26T11:58:58Z (GMT) / Submitted by Renata Lopes (renatasil82@gmail.com) on 2016-02-26T12:02:02Z No. of bitstreams: 1 hevertonreissouza.pdf: 2039435 bytes, checksum: 82a19bf494e9ac400021280fb64ec1ae (MD5) / Approved for entry into archive by Adriana Oliveira (adriana.oliveira@ufjf.edu.br) on 2016-03-03T13:38:08Z (GMT) No. of bitstreams: 1 hevertonreissouza.pdf: 2039435 bytes, checksum: 82a19bf494e9ac400021280fb64ec1ae (MD5) / Made available in DSpace on 2016-03-03T13:38:08Z (GMT). No. of bitstreams: 1 hevertonreissouza.pdf: 2039435 bytes, checksum: 82a19bf494e9ac400021280fb64ec1ae (MD5) Previous issue date: 2014-02-28 / CAPES - Coordenação de Aperfeiçoamento de Pessoal de Nível Superior / O Sistema Interligado Nacional (SIN) possui características peculiares que o torna diferente de qualquer outro no mundo, como por exemplo, predominância de usinas hidrelétricas e uma extensa rede de transmissão. Estas características, aliadas a incerteza nas afluências futuras, conduz a necessidade da realização de vários estudos na área de planejamento da operação. O planejamento da operação energética tem por objetivo determinar metas de geração hidráulica e térmica, de forma a atender o mercado consumidor de energia, com confiabilidade e economicidade, utilizando da melhor forma possível os recursos energéticos disponíveis. Para este propósito são utilizados modelos matemáticos que buscam a minimização do custo total esperado de operação do sistema, dentro de um determinado horizonte de planejamento, utilizando diferentes níveis de detalhamento. O objetivo principal deste trabalho é avaliar alguns impactos da modelagem do sistema elétrico no problema de planejamento da operação de médio prazo. Neste sentido, o sistema de transmissão é representado em sua forma completa, através de equações não lineares que modelam os fluxos de potência ativa e reativa em cada circuito que compõe o sistema elétrico. Além disso, são considerados os limites de tensão nas barras, assim como o limite de carregamento dos circuitos para cada patamar de carga. As usinas hidrelétricas e termelétricas são representadas de forma individualizada, e a função de produtibilidade é modelada através de polinômios de quarto grau. O modelo proposto utiliza Funções de Custo Futuro (FCF) pré-calculadas por um programa de planejamento da operação de médio/longo prazo, baseado em sistemas equivalentes de energia. Neste trabalho foram utilizadas as FCF produzidas pelo programa Modelo de Despacho Hidrotérmico (MDDH), desenvolvido pela UFJF. Entretanto, é importante destacar que outro modelo de decisão estratégica, baseado em sistemas equivalentes de energia, poderia ser adotado para gerar as FCF utilizadas neste trabalho. A metodologia proposta neste trabalho foi avaliada através do estudo de casos tutoriais e de médio porte, objetivando demonstrar os impactos da representação do sistema de transmissão no custo total esperado de operação do sistema e diferenças na estratégia de operação do mesmo. / The Brazilian Interconnected System has unique characteristics that make it different of any other in the world, such as predominance of hydroelectric power plants and an extensive transmission system. These features, combined with uncertainty in future inflows, leads to necessity of conducting several studies on planning of the operation. The energy operation planning aims to determine targets for hydraulic and thermal generation to meet the consumer energy market with reliability and economy, as well as possible using the available energy resources. For this purpose mathematical models that aims to minimize the expected total cost of the system operation, within a given planning horizon, using different levels of detail are used. The main objective of this work is to evaluate some impacts of the transmission system modeling in the long-term operation planning problem. In this sense, the transmission system is included in its complete form, using nonlinear equations that model the active and reactive power flow in the electrical system. In addition, some operation limits are considered, such as bus voltage limits and power flow limits in the transmission lines and transformers, for each load level. The hydroelectric and thermoelectric plants are represented in an individual form and the producibility function is modeled by fourth degree polynomials. The proposed model uses cost-to-go functions calculated from a long term operation planning program based on equivalent energy systems. In this work the cost-to-go functions produced by MDDH program were used. This program was developed by the Federal University of Juiz de Fora (UFJF). However, it is important to point out that any other model of strategic decision, based on equivalent energy systems, could be used to generate the cost-to-go functions. The proposed methodology is evaluated and validated through the study of medium scale systems and tutorial systems. The main objective is to demonstrate the impact of the detailed transmission system modeling in the total system operating expected total cost and identify differences in operation strategy.
77

PRÉ-DESPACHO DE POTÊNCIA ATIVA CONSIDERANDO AS ÓTICAS DOS AGENTES GERADORES E DO OPERADOR DO SISTEMA / PRE-ORDER IN ACTIVE POWER CONSIDERING THE OPTICIANS OF AGENTS GENERATORS AND SYSTEM OPERATOR

Pereira Neto, Aniceto de Deus 25 July 2008 (has links)
Made available in DSpace on 2016-08-17T14:52:49Z (GMT). No. of bitstreams: 1 Aniceto_de_Deus_Pereira_Neto.pdf: 1168768 bytes, checksum: adc4488efe00f3201345ff8a783ac6bb (MD5) Previous issue date: 2008-07-25 / The restructuring and deregulation of electricity markets has caused signi¯cant changes in electrical power systems in several countries. This process has result in a market-based competition by creating an open market environment. In this new environment each generation company runs the Unit Commitment to maximize their pro¯ts, and have no obligation to meet the energy and spinning reserve demands, as happened in the past. With this new structure, the Unit Commitment problem has received special attention, since generation companies in actual model always seek the maximum pro¯t without concern to serve all demands. On the other hand, there is the system operator, which always seeks to optimize overall system at the lowest cost. So, there are two di®erent situations into this competitive market environment: generators seeking the maximum bene¯t without concern to the system security operating, and independent system operator seeking always operate the system safely and at less cost. This work presents the mathematical models and the solution Unit Commitment problem, which was implemented considering two view points: the generation companies and the system independent operator views. Moreover, an auction model is extended to PRD in a horizon of 24 hours. This auction model simulates the interaction between generators and system operator to meet demands and security of the system. The idea is to stimulate the players to o®er products to energy (primary) and reserve (Ancilar Service) markets using only prices o®ered by market operator for each product. This iterative process is ¯nalized when generators supply su±cient to meet demand, and not cause any violation on °ow limits in transmission lines. The solution method proposed for Unit Commitment is based on evolution strategies and Lagrange Relaxation, resulting in a robust hybrid algorithm. The method have been validated in a test system composed of 6 buses, 7 transmission lines and 10 generating units. The results showed the e±ciency of the hybrid model proposed, which was able to solve the unit commitment problem in its various models considered here. / A reestruturação dos mercados de energia elétrica provocou mudanças significativas nos sistemas elétricos de potência de diversos países. Neste novo ambiente, cada empresa de geração executa individualmente o Pré-Despacho para maximizar seus benefícios financeiros, e não têm a obrigação em atender suas demandas de potência e reserva girante, como acontecia no modelo tradicional. Por outro lado existe o operador do sistema, o qual sempre busca a otimização global do sistema ao menor custo. Assim, têm-se duas situações distintas neste ambiente competitivo: os geradores buscando o máximo benefício sem preocupação com a segurança operativa do sistema, e o operador independente buscando sempre operar o sistema de forma segura e ao menor custo. Este trabalho apresenta as modelagens matemáticas e a solução do Pré- Despacho executado sob os dois pontos de vista: dos agentes de geração e do operador independente do sistema. Além do mais, um modelo de leilão é estendido para o PRD num horizonte de 24 horas. Este modelo simula a interação entre os agentes de geração e o operador do sistema na busca por uma solução única que concilie o interesse de ambos. A idéia é estimular os agentes geradores a ofertarem os produtos para os mercados de energia (primário) e de reserva (Serviço Ancilar) mediante oferta de preços pelo operador do mercado para os respectivos produtos. Esse procedimento iterativo é finalizado quando a oferta dos geradores for suficiente para atender completamente a demanda e, não provocar violações em nenhum limite de fuxos na malha de transmissão. O método de solução proposto para o Pré-Despacho é baseado em estratégias evolutivas e Relaxação de Lagrange, resultando em um modelo híbrido robusto. Os modelos e técnicas foram validados em um sistema teste composto por 6 barras, 7 linhas de transmissão e 10 unidades geradoras. Os resultados obtidos demonstraram a eficiência do método de solução, o qual se mostrou capaz de resolver o problema de Pré-Despacho nas suas diversas modelagens utilizadas.
78

Otimização natural multiobjetivo como ferramenta para desvio mínimo de pontos de operação considerando restrições de segurança

Freire, Rene Cruz 29 June 2017 (has links)
Submitted by Patrícia Cerveira (pcerveira1@gmail.com) on 2017-06-13T15:56:56Z No. of bitstreams: 1 Rene_Cruz_Freire.pdf: 5170376 bytes, checksum: 8c6b6dd8986d23b53ae99ba90dd69ef5 (MD5) / Approved for entry into archive by Biblioteca da Escola de Engenharia (bee@ndc.uff.br) on 2017-06-29T16:38:47Z (GMT) No. of bitstreams: 1 Rene_Cruz_Freire.pdf: 5170376 bytes, checksum: 8c6b6dd8986d23b53ae99ba90dd69ef5 (MD5) / Made available in DSpace on 2017-06-29T16:38:47Z (GMT). No. of bitstreams: 1 Rene_Cruz_Freire.pdf: 5170376 bytes, checksum: 8c6b6dd8986d23b53ae99ba90dd69ef5 (MD5) / Coordenação de Aperfeiçoamento de Pessoal de Nível Superior / Um dos temas de alta relevância para a sociedade atual é a qualidade do suprimento de energia elétrica, que deve ser ininterrupto, seguro e econômico. Para tal, é primordial que o sistema de potência esteja preparado para um possível defeito de algum equipamento da rede, mantendo a operação dentro dos patamares seguros, evitando os blecautes e todas as suas consequências para a sociedade. Isso pode ser feito através do redespacho das unidades geradoras, de modo a encontrar um ponto de operação que concilie segurança e economicidade, dois objetivos conflitantes, enquanto busca se afastar o mínimo possível do ponto de operação previamente estabelecido, via planejamento eletroenergético, para o sistema de potência em questão. Trata-se de uma abordagem multiobjetiva do Fluxo de Potência Ótimo com Restrições de Segurança (FPORS) que pode ser solucionada com uma abordagem de Computação Evolucionária (CE) com viés multiobjetivo. Neste trabalho, foram implementadas e comparadas duas meta-heurísticas evolutivas multiobjetivo: Nondominated Sorting Genetic Algorithm II (NSGA-II) e o Multi-objective Evolutionary Particle Swarm Optimization (MOEPSO). Os resultados dessas heurísticas também foram comparados com a abordagem mono-objetivo do mesmo problema. Os algoritmos foram implementados no MATLAB® e testados em um sistema-teste que simula as condições do Sistema Interligado Nacional (SIN). As heurísticas multiobjetivo foram comparadas através da metodologia de análise da Fronteira de Pareto (FP), onde é analisado qual método concilia melhor os objetivos de economia e segurança. Na primeira análise o NSGA-II saiu-se melhor, entretanto após a implementação de melhorias no algoritmo, o MOEPSO mostrou desempenho superior na segunda análise. Nas duas análises, o viés multiobjetivo mostrou-se superior ao mono-objetivo, na comparação através do critério de agregação de objetivos. Em relação ao tempo de simulação de cada método, o MOEPSO foi superior na primeira análise, já na segunda análise foi implementado um refinamento baseado no Fluxo de Potência Linearizado no FPORS, que baixou o tempo de simulação das duas heurísticas multiobjetivas em comparação com a primeira análise, e o MOEPSO teve o menor tempo de simulação. Na comparação com o viés mono-objetivo, apenas o NSGA-II teve tempo médio de simulação maior que o método mono-objetivo na primeira análise. Na segunda análise, todas as heurísticas multiobjetivo possuíam tempo de simulação menores que o método mono-objetivo. / One of the topics of high relevance to the today’s society is the quality of electric power supply, which must be uninterrupted, safe and economical. To this end, it is essential that the power system be prepared for a possible defect of some equipment from the network while maintaining operation within safe levels, avoiding blackouts and all its consequences for society. This can be done by redispatch of generating units, in order to find an operation point which conciliate security and economy, two conflicting objectives, while seeking to depart as little as possible of the operation point previously established in the energy planning for the power system in question. This is a multi-objective approach to Security Constrained Optimal Power Flow (SCOPF) that can be solved with an approach of Evolutionary Computation with multi-objective bias. In this work we were implemented and compared two multi-objective evolutionary meta-heuristics: Nondominated Sorting Genetic Algorithm II (NSGA-II) and Multi-objective Evolutionary Particle Swarm Optimization (MOEPSO). The results of these heuristics were also compared with mono-objective approach to the same problem. The algorithms were implemented in MATLAB® and tested in a test-case that simulates the conditions of the Brazilian Sistema Interligado Nacional (National Interconnected System). The multi-objective heuristics were compared using the analysis methodology of the Pareto Frontier, where is analyzed which method is better to conciliate the economy and security objectives. In the first analysis the NSGA-II fared better, but after the implementation of improvements in the algorithm, the MOEPSO showed superior performance in the second analisys. In both analyzes, the multi-objective bias was superior to the mono-objective bias, in the comparison through objectives aggregation criteria. Concerning the simulation time of each method, the MOEPSO was superior in the first analysis, but in the second analysis was implemented a refinement based on DC Load Flow, which lowered the simulation time of the two multi-objective heuristics compared with the first analysis, and the MOEPSO had the shortest time simulation. Compared to the mono-objective bias, only the NSGA-II had an average time simulation greater than the mono-objective method in the first analysis. In the second analysis, all multi-objectives heuristics had simulation time smaller than the mono-objective method.
79

Propuesta de reducción del costo de despacho de cereales a granel

Dávila Rabanal, Carolina, Sánchez Aranda, Danilo Edwards January 2015 (has links)
La presente investigación denominada “Propuesta de reducción del costo de despacho de cereales a granel” tiene el objetivo de determinar una propuesta de reducción del costo de despacho de cereales a granel de la empresa objeto de estudio. Se realizó un estudio de causa - efecto, análisis de datos cuantitativos y observaciones instantáneas para identificar la actividad donde se tiene un sobre costo en el servicio de despacho. Identificando como problemas los altos costos que significan las actividades de liberación de paneles y barredura de silos metálicos que se realizan de manera manual. Se presentó el estudio económico de dos propuestas de solución, de las cuales se optó que la mejor propuesta tiene una inversión que asciende a S/.232,700.49 nuevos soles; el cual será asumido al 100% por la misma empresa. La evaluación económica muestra un Valor Actual Neto (VAN) mayor a cero y una Tasa Interna de Retorno (TIR) mayor al costo de oportunidad del accionista por lo que se concluye que el proyecto genera valor y es económicamente viable, al implementar dicha propuesta las actividades de liberación de paneles y barredura de silos metálicos se realizaran de manera semiautomática. This research entitled "Proposal for reducing the cost of bulk grain exports" aims to determine a method for reducing the cost of bulk grain dispatch of the company under study. A cause and effect study was conducted using quantitative analysis of data and instant feedback to identify where the activity has a cost overrun on the dispatch service. As problems identifying significant than the high costs brought Activities Liberation panels and metal silo sweep carried out manually. An economic study of two proposed solutions, of which it was decided that the best proposal is an investment amounting to S/. 232,700.49 was presented; which shall be provided 100% by the same company. The economic assessment shows a higher Net Present Value (NPV) of zero and a Internal Rate of Return (IRR) greater than the opportunity cost of shareholders. Therefore, it is concluded that the project creates value and is economically feasible to implement this proposal, the proposal to implement activities and sweep release panels were held metal silo semi-automatically.
80

Análise dos parâmetros de risco para o cálculo de garantia física

Mizuta, Marcio Alberto Hitoshi January 2018 (has links)
Orientador: Prof. Dr. Thales Souza / Dissertação (mestrado) - Universidade Federal do ABC, Programa de Pós-Graduação em Engenharia Elétrica, Santo André, 2018. / Atualmente, no Brasil, a matriz elétrica é composta predominantemente por fonte hidráulica e térmica, na proporção de 70% e 30%, respectivamente. Nesse sentido, para a segurança do Sistema Interligado Nacional, o mesmo é considerado um sistema hidrotérmico, onde a disponibilidade de armazenamento das bacias hidráulicas e de combustíveis representa a quantidade de energia elétrica disponível para atendimento a demanda. Assim, os critérios para cálculo de Energia Assegurada representam as Garantias Físicas das Usinas Hidrelétricas e Usinas Térmicas, que são calculadas através das médias de gerações dos empreendimentos disponíveis no Sistema Interligado Nacional com a previsão de 15 anos. Contudo, a expansão dos aproveitamentos de usinas com reservatório encontra-se no limite de exploração no sul e sudeste/centro-oeste, havendo apenas na região Norte potenciais a serem avaliados. Entretanto, devido às restrições ambientais, não há previsão de construção de novas Usinas Hidrelétricas com reservatório na região Norte, o que indica a necessidade de viabilização de outras fontes de energia elétrica. Nesse sentido, a Garantia Física é utilizada para balizar qual o risco de déficit futuro considerando o balanço de demanda e oferta no sistema. Dessa forma, o presente trabalho propôs a análise dos parâmetros de risco da Garantia Física do sistema imputados no modelo de projeção elétrico NEWAVE. Por fim, com objetivo de validar a análise proposta, as projeções de Garantias Físicas das Usinas Hidrelétricas e Usinas Térmicas que fazem parte do Sistema Interligado Nacional foram avaliadas, a partir do método de escolha do risco de déficit. / Currently, in Brazil, the electrical matrix is mainly composed of hydraulic and thermal sources, in the proportion of 70% and 30%, respectively. In this sense, for the safety of the National Interconnected System, it is considered a hydrothermal system, in which the storage capability of the hydraulic basins and fuel availability represent the amount of electrical energy available to meet demand. Thus, the criteria for calculation of Assured Energy represent the Physical Guarantees of the Hydroelectrical Power Plant and Thermal Power Plants, which are calculated through the average of generations of the enterprises available in the National Interconnected System with a forecast of 15 years. However, the expansion of uses of power plants with reservoirs is at the exploration limit in the South, Southeast/Center-West, with only the North region with potential to be evaluated. Still, due to environmental restrictions, there is no prevision of construction of new Hydroelectrical Power Plant with reservoir in the North region. Being so, the Physical Guarantee is used to identify the future deficit risk by making a balance of supply and demand in the system. In this way, the present work proposed an analyze of Physical Guarantee system risk parameters imputed in the electrical projection model NEWAVE. So, to validate the methodology proposed the Physical Guarantee projection of the Hydroelectrical Power Plant and Thermal Power Plants that are part of the National Interconnected System were evaluated consdering the method of choosing the risk of deficit.

Page generated in 0.0538 seconds