• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 105
  • 104
  • 25
  • 18
  • 9
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • Tagged with
  • 302
  • 302
  • 106
  • 105
  • 89
  • 58
  • 55
  • 54
  • 44
  • 38
  • 35
  • 28
  • 26
  • 26
  • 26
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
121

Analyse comparative de l’approche bioclimatique et de la méthode LEED en architecture

Gamboa-H, Jhonny D. 06 1900 (has links)
Motivé par l’évolution de la production architecturale durable dans les pays d’Amérique latine, et plus particulièrement en Colombie, mon projet de recherche porte sur l’adaptation de l’architecture à ce nouveau contexte. L’approche architecturale traditionnelle à la prise en compte de l’énergie et du climat est l’architecture bioclimatique : reproduite à partir de connaissances et techniques ancestrales remontant à la conception de l’abri, cette dernière étudie les phénomènes physiques associés au confort thermique afin de les reproduire dans une nouvelle architecture. De nouvelles méthodes d’évaluation environnementale se sont développées dans les dernières décennies pour améliorer l’intégration environnementale des bâtiments. Ces méthodes privilégient la normalisation des solutions et utilisent des systèmes de certification pour reconnaître la performance environnementale et énergétique des bâtiments. Le résultat visé est la conformité aux standards internationaux de durabilité. Ce mémoire porte sur l’analyse comparative de l’architecture bioclimatique et de la certification environnementale à partir de la structure des sujets abordés par LEED, une des méthodes les plus connues d’une telle certification. Cette comparaison permet de constater que les deux approches sont motivées par les mêmes préoccupations environnementales mais que leurs méthodes d’intégration de ces préoccupations diffèrent, en particulier quant à la prise en compte des facteurs locaux et globaux. / Motivated by the development of sustainable architectural production in the countries of Latin America, particularly in Colombia, my research focuses on the adaptation of architecture to this new context. The traditional approach to the integration of energy and climate is bioclimatic architecture. This way is based on the reproduction of knowledge through the use of ancestral techniques that were acquired over time, and which evolved from shelter design. The bioclimatic architecture studies the physical phenomena in relation to thermal comfort to reproduce in a new architectural style. New environmental assessment methods have been developed in recent decades to improve environmental integration in buildings. These methods give priority to standardization of solutions and use certification systems to recognize the environmental and energy performance of buildings. The expected results are in compliance with international sustainability standards. This thesis focuses on the comparative analysis of bioclimatic architecture and environmental certification using the structure and the topics addressed by LEED, one of the best-known methods of such certification. This comparison shows that the two approaches are motivated by the same environmental concerns but their methods of integration of these concerns differ, particularly with regard to the consideration of local and global factors.
122

Développement d'un indicateur d'exposition des eaux de surface aux pertes de pesticides à l'échelle du bassin versant / Developping an indicator to assess surface water exposure to pesticide losses at a catchment scale

Wohlfahrt, Julie 09 December 2008 (has links)
La pollution des eaux de surface par les pesticides est un problème sérieux. Cette pollution étant en grande partie liée à l’activité agricole, la mise en place de pratiques permettant de limiter les transferts de pesticides vers les eaux de surface représente une solution intéressante. Afin d’apprécier l’efficacité de tels projets il est important de développer des méthodes spécifiques d’évaluation agri-environnementale. Si les méthodes d’évaluation parcellaires sont opérationnelles, celles à l’échelle du bassin versant ne sont pas encore bien adaptées aux besoins des acteurs de terrain. Ce travail a pour objectif de développer un indicateur de risque d’exposition des eaux de surface aux pertes de pesticides par ruissellement à l’échelle du bassin versant. Pour ce faire, nous avons développé deux indicateurs : un indicateur parcellaire évaluant l’impact des pratiques agricoles sur les pertes de pesticides par ruissellement en sortie de parcelle et un indicateur de connectivité estimant la contribution de chaque parcelle au ruissellement global du bassin versant. Le couplage de ces deux indicateurs permet d’obtenir un outil d’évaluation du risque des pratiques phytosanitaires spécifique d’un bassin versant et de comparer des scenarii. Les méthodes de développement des deux indicateurs se distinguent des méthodes classiques par leur fondement sur un couplage indicateur / modèle. L’hypothèse méthodologique principale sur laquelle repose ce travail est qu’à partir des processus décrits par les modèles, il est possible d’explorer une gamme de situations très large et de créer une base de connaissances qui permet de développer nos indicateurs / Surface water pollution by pesticides is a great environmental concern. In order to limit pesticides transfers from agricultural field to surface water, mitigation strategies are implemented. Their effectiveness has then to be assessed by specific tools. Most of pesticide runoff risk assessment tools are simple indicators or simulation models. Both can be performing for field application but most of the available methods are not yet adapted to help catchment managers in their decision process. Simple indicators lack taking into account inherent variability of watersheds structures and mechanistic models demands too many data to be used as routine tools. The aim of this study is then to develop a catchment scale pesticide runoff risk assessment tool to help catchment managers to identify risky situations. We developed two indicators: one to assess agricultural impact on pesticide runoff risk at a field scale and the other field spatial position impact on runoff route from the field to the hydrological network. Aggregating those two indicators lead us to assess catchment fields pesticide runoff risk and allows comparing agronomical or climatic scenarios. We based both indicators on modelling assuming that processes described by model make possible to explore wide factors variation ranges and to build databases on which indicators are developed
123

Addressing water consumption impacts on freshwater ecosystems : development of a regionalized, global habitat-based model for life cycle impact assessment / Prise en compte des impacts de la consommation d'eau douce sur les écosystèmes aquatiques : élaboration d'un modèle d'habitat spatialisé a l'echelle mondiale pour l'évaluation des impacts du cycle de vie

Damiani, Mattia 27 April 2018 (has links)
Environ 65% des eaux intérieures sont menacées modérément ou fortement par l'altération anthropique et le changement climatique. La Terre a perdu environ la moitié de ses habitats d'eau intérieure au cours des cent dernières années et le prélèvement mondial d'eau devrait augmenter de plus de 50% au cours des 20 prochaines années. Dans ce contexte, la concurrence pour les ressources en eau entre les humains et les écosystèmes est appelée à s'intensifier au détriment de la biodiversité d'eau douce. Pour cette raison, il est aujourd'hui impératif de quantifier et de sauvegarder les besoins en eau de ces écosystèmesEn tant qu'outil global d'aide à la prise de décision, plusieurs modèles d'évaluation d'impact de la consommation d'eau sur les écosystèmes ont été proposés dans le cadre de l'analyse du cycle de vie (ACV). L'un des défauts importants des modèles actuels d'ACV, qu'ils soient mécanistes ou non-mécanistes, midpoint ou endpoint, c’est la prise en compte limitée des besoins environnementaux en eau (EWR). Pour cette raison, les approches existantes pour l'évaluation des EWR ont été étudiées, afin d'évaluer les avantages potentiels d'une meilleure prise en compte des principes écohydrologiques dans l’ACV sur les écosystèmesCela a permis de définir le concept d'habitat d'eau douce en ACV et d'élaborer un cadre conceptuel pour l'application des méthodes de simulation d'habitat dans la modélisation. Un indicateur midpoint du potentiel de changement d'habitat (HCP) évaluant l'impact de la modification du débit sur les habitats des poissons et des invertébrés dans les cours d'eau a été élaboré. Le nouveau modèle a été testé sur le réseau fluvial français à l'échelle du tronçon fluvial, en caractérisant le changement d'habitat en saison sèche et humide. Les HCP ont ensuite été agrégés à l'échelle du bassin versant. Après, le nouveau modèle a été généralisé pour permettre une extension globale. Les variables d'entrée du modèle HCP généralisé ont été calculées à partir des bases de données et des modèles existants sur une résolution mensuelle. Les limites, l'incertitude et les perspectives de recherche de la nouvelle approche ont finalement été discutées. / Approximately 65% of inland waters are under moderate or high threat by anthropogenic alteration and climate change. Earth has lost around half of inland water habitats in the last hundred years and global water withdrawal is expected to increase by more than 50% within the next 20 years. In this context, competition for water resources between humans and ecosystems is set to rise at the expense of freshwater-dependent biodiversity. For this reason, nowadays it is imperative to quantify and safeguard water needs of freshwater-dependent ecosystems.As a global tool to support decision-making, in life cycle assessment (LCA) several models for life cycle impact assessment (LCIA) of water consumption on ecosystems have been proposed. One important flaw of current LCIA models, whether they are mechanistic or non-mechanistic, midpoint or endpoint-oriented, is their limited consideration of environmental water requirements (EWR). For this reason, existing approaches for EWR assessment have been investigated to evaluate potential benefits of better including ecohydrological principles in LCIA on ecosystems.This enabled the definition of the concept of freshwater habitat within the boundaries of LCIA and the development of a framework for the application of habitat simulation methods in LCIA modeling. A midpoint habitat change potential (HCP) indicator assessing the impact of flow alteration on instream habitats of fish and invertebrates was developed. The new model has been tested on the French river network at the river reach scale, characterizing habitat change in wet and dry seasons. HCPs were then aggregated at watershed scale. The new model was subsequently generalized to allow global extension. Input variables of the generalized HCP model have been calculated from existing databases and models on a monthly resolution. Limitations, uncertainty and research perspectives of the new approach are discussed.
124

Biodiversidade e planejamento de uso e ocupação do solo: estudo de caso Brotas/SP / Biodiversity and landuse planning: case study Brotas, São Paulo State, Brazil

Angelieri, Cíntia Camila Silva 17 February 2011 (has links)
A conservação da biodiversidade tornou-se uma preocupação mundial devido ao aumento da taxa de extinção de espécies. Mesmo assim a importância da biodiversidade freqüentemente é subestimada, não sendo considerado seu papel chave na evolução e adaptação à mudança de ambientes e no fornecimento de bens e serviços para a humanidade. O Brasil tem importância central na conservação da biodiversidade mundial (é o primeiro em Megadiversidade e em Áreas Selvagens e possui dois Hotspots), sendo indispensável implementar instrumentos que contemplem a inclusão da biodiversidade no planejamento de uso e ocupação do solo. Visto que ainda não foi claramente definido como integrar efetivamente a biodiversidade nesse processo, este estudo investigou instrumentos indicados para esse fim, especialmente o Zoneamento Ambiental (ZA) e a Avaliação Ambiental Estratégica (AAE). O estudo de caso foi realizado no município de Brotas-SP. Primeiramente foram sobrepostos critérios e áreas prioritárias para a biodiversidade em escala nacional, estadual e municipal para a elaboração do mapa das áreas prioritárias para conservação e recuperação da biodiversidade local utilizando o programa IDRISI Andes Edition. Os resultados mostram que princípios e objetivos abordados em diversas escalas e em outros instrumentos de planejamento podem ser integrados ao processo de AAE. Também foram gerados modelos de distribuição de grandes mamíferos Chrysocyon brachyurus (loboguará), Leopardus pardalis (jaguatirica) e Puma concolor (onça-parda) para a região central do Estado de São Paulo (Brotas e municípios do seu entorno). Para isso, foram utilizados dados biológicos do banco de dados do Programa Biota-FAPESP aos quais foi aplicado o modelo MAXENT. As técnicas de Sistemas de Informação Geográfica aplicadas neste estudo permitiram integrar princípios e objetivos relacionados à biodiversidade já abordados em outros instrumentos e estabelecidos em níveis nacionais, estaduais e municipais ao planejamento espacial. A modelagem permitiu a determinação da adequabilidade ambiental das áreas testadas e a inclusão dessas áreas como critérios a serem considerados ao planejamento de uso e ocupação do solo. Os resultados da modelagem mostraram que o território de Brotas abrange áreas altamente adequadas para as três espécies estudadas. Os mapas gerados foram reclassificados para a elaboração dos mapas das áreas prioritárias para conservação de grandes mamíferos na região central do Estado de São Paulo. Tanto o mapa de áreas prioritárias para a conservação da biodiversidade local quanto o mapa de áreas prioritárias para grandes mamíferos elaborados nesse estudo podem ser incluídos no planejamento de uso e ocupação do solo, tanto em ZAs como em AAEs. As técnicas utilizadas nesse estudo podem embasar a escolha de alternativas de uso e ocupação do solo, direcionando a alocação de Reservas Legais - RLs -, subsidiando a elaboração de ações de recuperação da biodiversidade e direcionando estratégias de manejo. / Biodiversity conservation has become a worldwide concern due to the increased rate of species extinction. Nevertheless, the importance of biodiversity is often underestimated and its key role in the evolution, adaptation to changing environments and the supply of goods and services to humanity is not considered. Brazil has a central importance in global biodiversity conservation (its the first in Megadiversity and Wilderness Areas, and it has two hotspots). Therefore, the implementation of tools that address the inclusion of biodiversity in land-use planning is essential. Seeing that how to integrate biodiversity in this process has not been clearly defined, this study investigated tools for integrate the biodiversity in land-use planning, specially the zoning and the Strategic Environmental Assessment (SEA). The case study has been the municipality of Brotas, state of São Paulo, Brazil. Firstly, criteria and priority areas for biodiversity at the national, state and municipal level have been overlapping using the software IDRISI Andes Edition to prepare the map of priority areas for conservation and recovery of local biodiversity. The results indicate that the principles and objectives discussed at various scales and in other planning tools can be integrated by the use of Geographic Information System (GIS). In addition, models of distribution of great mammals - Chrysocyon brachyurus (maned wolf), Leopardus pardalis (Ocelot) and Puma concolor (puma) have been generated for the central region of São Paulo (Brotas and its surrounding cities). For this, biological data from the database of the Biota-FAPESP have been used and the software MAXENT has been applied. Modeling results show that the study area is highly suitable for the three species. The maps of models have been reclassified to prepare maps of priority areas for conservation in the central region of São Paulo. The both final maps developed in this study (map of priority areas for conservation of local biodiversity and maps of priority areas for large mammals) may be included in zoning and SEA process. The techniques applied in this study permit to integrate the principles and objectives relating to biodiversity in land-use planning, supporting the choice of alternatives for use and occupation, basing the allocation of legal reserves, subsidizing the development of management actions and guide decision makers to choose the best alternatives for development.
125

A Avaliação Ambiental Estratégica como ferramenta promotora do encadeamento na Política Estadual de Mudanças Climáticas do Estado de São Paulo - PEMC / The Strategic Environmental Assessment as a promoter of tiering in the São Paulo State Policy on Climate Change - PEMC

Oppermann, Priscila de Almeida 04 September 2017 (has links)
A Avaliação Ambiental Estratégica (AAE) pode ser descrita como um instrumento de caráter pró-ativo que objetiva inserir a variável ambiental no processo de tomada de decisão com enfoque estratégico. No Brasil, a implantação da AAE tem acontecido, principalmente, por motivação das agências multilaterais de desenvolvimento e sem a requerimentos legais em âmbito nacional. Por sua vez, o estado de São Paulo experimenta um contexto inédito para a AAE no Brasil, por meio da Política Estadual de Mudanças Climáticas (PEMC) regulamentada pelo Decreto nº 55.947/2010, que oferece a oportunidade do instrumento ser aplicado em consonância com os aspectos considerados relevantes no campo da Avaliação de Impacto. Dentre as suas premissas está a articulação entre as esferas estratégicas de decisão e de projetos, compatibilizando objetivos de finalidade climática através da AAE (artigo 15, Lei nº 13.798/ 2009). Nesse sentido, o conceito de encadeamento (tiering) ampara a presente investigação no contexto do planejamento estabelecido pela PEMC. Portanto, partindo da premissa de aplicação da AAE na PEMC, essa pesquisa tem como objetivo identificar e analisar os pontos fortes e fracos do encadeamento de diretrizes da PEMC e da consideração das mudanças climáticas, através dos instrumentos de planejamento do setor de transportes do estado de São Paulo (planos e programas). Os resultados alcançados permitiram apontar que a consideração das mudanças climáticas na PEMC para o setor de transportes ocorre de modo limitado, carecendo, principalmente, de elementos que promovam a adaptação às mudanças climáticas e a conservação da biodiversidade. Verificou-se ainda uma fraca ocorrência do tiering no sistema de planejamento dos transportes, sugerindo que a AAE pode ser utilizada nesse contexto para potencializar a promoção do encadeamento a fim de suprir algumas das lacunas encontradas, como por exemplo através do fortalecimento de mecanismos para o desenvolvimento do monitoramento dos planos e programas, proporcionando o encadeamento das questões chave e o acompanhamento dos indicadores pré-definidos. O trabalho conclui pela necessidade da utilização da AAE como promotora do tiering de ações estratégicas a partir dos objetivos estabelecidos pelas políticas de mudanças climáticas no Brasil e no estado de São Paulo. / Strategic Environmental Assessment (SEA) can be described as a proactive instrument that aims to insert the environmental variable in the strategic decision-making process. In Brazil, SEA implementation has been driven mainly by motivation of the multilateral development agencies and without legal requirements at national level. The State of São Paulo, for its part, experiences an unprecedented context for SEA in Brazil, through the State Policy on Climate Change (PEMC), regulated by Decree 55.947/ 2010, which offers the opportunity of applying the instrument in line with the aspects considered relevant in Impact Assessment field. In this sense, the concept of tiering, in which strategic actions connect between spheres of planning through a cascade effect, supports the present investigation in the context of the planning established by the PEMC. Among its premises, is the articulation between the strategic decision and project areas, making compatible with climatic objectives through SEA (article 15, Law 13788/2009). Therefore, based on the premise of SEA application in PEMC, this research aims to identify and analyze strengths and weaknesses of tiering on PEMC guidelines and consideration of climate change, through transportation planning instruments of the state of São Paulo (plans and programs). The results showed that consideration of climate change in PEMC for the transport sector occurs in a limited way, lacking, mainly, elements that promote adaptation to climate change and conservation of biodiversity. There was also a weak occurrence of tiering in transport planning system, suggesting that SEA can be used in this context to enhance the promotion of linkage in order to fill some of gaps found, for example by strengthening mechanisms for development plans and programs monitoring, providing key issues linkage and pre-defined indicators monitoring. The paper concludes by the need to use SEA as a promoter of strategic actions tiering based on objectives established by climate change policies in Brazil and in state of São Paulo.
126

Os conflitos socioambientais do processo de licenciamento ambiental do projeto de ampliação do porto de São Sebastião, SP / The socio and environmental conflicts in the environment assessment about the port expansion project of São Sebastião, SP, Brazil

Matos, Ericka Martins de 08 June 2015 (has links)
A partir da Política Nacional de Meio Ambiente que instituiu a Avaliação de Impacto Ambiental e o Licenciamento Ambiental, e posteriormente, com os regulamentos das Resoluções CONAMA, a participação pública torna-se obrigatória na análise e tomada de decisão sobre a viabilidade ambiental de empreendimentos potencialmente poluidores ou de significativo impacto ambiental. O presente estudo problematiza o papel das Audiências Públicas no processo democrático de tomada de decisão, e como instrumento de proteção dos diferentes interesses envolvidos na construção de grandes empreendimentos de infraestrutura. O objetivo foi identificar e analisar os conflitos socioambientais evidenciados nas Audiências Públicas do projeto de ampliação do Porto de São Sebastião, localizado no litoral norte do Estado de São Paulo. Também buscou-se identificar os principais temas discutidos, os atores sociais envolvidos e a formação dos diferentes grupos de interesse. Utilizando o referencial teórico da ecologia política, pode-se definir a hipótese de que as Audiências Públicas não cumprem seu papel de proporcionar aos diversos segmentos sociais que atuam naquele território, com suas diferentes lógicas culturais, o acesso aos recursos naturais para a manutenção de seu modo de vida, e garantindo a sua sustentabilidade. A partir dos dados obtidos foi possível averiguar que embora as Audiências Públicas se configurem instrumentos democráticos, que se propõem ouvir as partes envolvidas, com seus anseios e preocupações, resultam apenas em um protocolo administrativo no processo de licenciamento ambiental, a serviço única e exclusivamente dos programas de desenvolvimento econômico em curso. Nesse sentido, se faz necessário repensar a instituição Audiência Pública, pois da forma como se evidencia, esta apenas legitima uma decisão já tomada a priori. Do contrário, cabe à sociedade civil organizada estar atenta e atuar de forma participativa, trazendo a si o protagonismo da história. Observou-se também que, para o caso do projeto de ampliação do porto de São Sebastião, os grupos em conflito se mostraram organizados, instruídos e capazes de ser articular politicamente para impedir, até o presente momento, que o processo de licenciamento ambiental seja conduzido sem observadas e legitimadas suas demandas. / After the Brazilian´s National Environmental Policy establishing the Environmental Impact Assessment and the Environmental Licensing, and later with the regulations of the CONAMA Resolutions\', public participation becomes mandatory in the analysis and decision-making on environmental viability of potentially polluting or significant environmental impact projects. This study discusses the role of public hearings in the democratic process of decision-making, and as an instrument of protection of the various interests involved in the construction of large infrastructure projects. The objective was to identify and analyze environmental conflicts evidenced in the hearings expansion project of the Public Port of San Sebastian, located on the northern coast of São Paulo. It also sought to identify the main topics discussed, the actors involved and the formation of different groups of interest. Using the theoretical framework of political ecology, one can define the hypothesis that public hearings do not fulfill their role of providing various social groups that operate in that territory with its different cultural logic, access to natural resources to maintain its way of life, and ensuring their sustainability. From the data obtained it was possible to ascertain that although public hearings to configure democratic instruments, that purport hear the parties involved, with their anxieties and concerns, results only in an administrative arrangement in the environmental licensing process, the only service exclusively of ongoing economic development programs. In this sense, it is necessary to rethink the institution Public Hearing because the way is evident, this only legitimizes a decision already taken a priori. Otherwise, it is up to civil society to be attentive and act in a participatory way, bringing them the role of history. It was also observed that, in the case of São Sebastião, the conflicting groups were organized, educated and able to be articulate politically to prevent, so far, that the licensing process is conducted without observed and legitimized their demands.
127

Timing para uma perspectiva mais estratégica da prática de avaliação ambiental estratégica / Timing for a more strategic perspective of Strategic Environmental Assessment practice

Carvalho, Alexandre Fernandes de 26 September 2014 (has links)
O fornecimento de informações relevantes em momentos que sejam oportunos para influenciar decisões estratégicas de desenvolvimento tem representado, há muito tempo, um grande e árduo desafio para a prática de Avaliação Ambiental Estratégica (AAE). O entendimento apropriado das questões que respondem pelas causas reais de problemas decisórios sugere uma oportunidade para alcançar o papel estratégico potencial da AAE e influenciar as decisões tomadas para a formação de uma ação estratégica. Este trabalho procura entender e discutir como se operacionaliza uma perspectiva mais estratégica de AAE, questionando o papel de procedimentos e mecanismos que observam o timing dos problemas de decisões estratégicos. Para alcançar este objetivo foram analisados processos de AAE, considerando a influencia do problema de decisão que motiva a formulação de ações estratégicas. Como estudo de caso foram selecionados nove relatórios de AAE realizados para ações associadas ao planejamento estratégico de transporte do Brasil e do Reino Unido. Entre os principais resultados foi observado que, ao contrário do Reino Unido, nenhum dos relatórios de AAE brasileiros definiu objetos de avaliação que fossem relevantes para o timing das decisões estratégicas de transporte analisadas. Os resultados encontrados sugerem a existência de três questões principais que influenciam diretamente a prática de AAE brasileira e estão associadas à necessidade de capacitação por parte dos praticantes deste contexto: a falta de entendimento sobre as diferenças que definem o que é uma ação estratégica e o que é um projeto; a falta de entendimento sobre qual é o objeto de uma AAE; e a falta de entendimento sobre quais são as questões que auxiliam a definir o objeto de uma AAE relevante para as tomadas de decisões estratégicas de desenvolvimento. / Relevant options at opportune timing to influence the strategic decision making have been a great and arduous challenge to the Strategic Environmental Assessment (SEA) practice. The proper understanding of issues that account for the real causes of decision problems suggests an opportunity to reach all the strategic role potential of SEA and influence decisions made for formation of a strategic action. This work seeks to understand and discuss how to operationalize a more strategic perspective of SEA, examining the role of procedures and mechanisms that comply with the timing of strategic decisions problems. To achieve this goal were analyzed AAE development processes, considering the influence of the decision problem that motivates strategic actions formulation. As case studies were selected nine SEA reports prepared for actions associated with transport strategic planning in Brazil and the United Kingdom. Among the key findings was observed that, unlike the UK, none of the Brazilian SEA reports has defined objects of assessment that were relevant to the timing of transport strategic decisions analyzed. Among the key findings was observed that, unlike the UK, none of the Brazilian SEA reports has defined relevant objects of assessment to the timing of transport strategic decisions analyzed. The results suggest three main issues that directly influence Brazilian SEA practice and are linked with the need for building capacity of practitioners: the lack of understanding of the differences that defines what is a strategic action and what a project; the lack of understanding of what is the object of an SEA; and the lack of understanding of what are issues that help define the relevant object of an SEA to development strategic decision-making.
128

Avaliação da sustentabilidade do plano de gestão do corredor ecológico Araguaia – Bananal, inserido na bacia do médio Araguaia - Brasil

Szmuchrowski, Mariusz Antoni 15 May 2007 (has links)
O presente trabalho objetivou na avaliação da sustentabilidade do Plano de Gestão do Corredor Ecológico Araguaia - Bananal, inserido na região do Médio Araguaia, entre os Estados de Goiás, Mato Grosso, Pará e Tocantins, cujo cenário de atuação compreende os domínios dos biomas Cerrado e Amazônia. Como instrumentos de avaliação, foram adotados os procedimentos metodológicos da Avaliação Ambiental Estratégica (AAE) proposto pelo Ministério do Meio Ambiente, por este permitir uma análise ampla e sistêmica da ação de Políticas-Planos-Programas (PPP) sobre uma determinada região ou enfoque setorial. Suas etapas de avaliação compreendem as fases descritas a seguir: Screening (Início – Sondagem), cuja função consistiu na exposição do plano, por meio da confirmação da possibilidade e da necessidade em se aplicar a AAE ao plano de gestão do corredor ecológico, em virtude do plano estar inserido em uma, região de grande relevância a conservação da biodiversidade, e por se tratar de uma ação de significativa intervenção regional. O seu grau estratégico conferiu-se neste caso em um plano regional de gestão territorial, onde sua atuação compreende principalmente o mosaico de Unidades de Conservação e as comunidades sob a influência da região. Foram expostas as principais forças motrizes que influenciam os impactos ao ambiente, caracterizadas pelas atividades agropecuárias, pela expansão populacional dos centros urbanos decorrente da concentração fundiária e êxodo rural, dos projetos de desenvolvimento para a logística de transporte e geração energética, e a pressão exercida pela reforma agrária. A etapa seguinte consistiu na definição do escopo (Scoping), cuja função inicial correspondeu na exposição do propósito do plano de gestão do corredor ecológico Araguaia - Bananal, sequenciado pela apresentação dos seus objetivos, os quais após uma análise de compatibilidade confirmaram o seu direcionamento com os objetivos de preconizados pela AGENDA 21 brasileira. Na identificação das Políticas, Planos e Programas (PPP), foram selecionados as que exercem influência na região do corredor ecológico, cujos objetivos passaram pela avaliação de compatibilidade frente os objetivos do plano de gestão, verificando-se a existência de diversos pontos conflitantes, em especial aos que estimulam o desenvolvimento agropecuário e ao setor de infraestrutura. Foram estabelecidos os principais indicadores de sustentabilidade e produção, totalizando 40 indicadores, que auxiliaram no processo de avaliação ambiental e desenvolvimento dos cenários, apoiado pelo modelo de fluxo causal DPSIR (Driving Forces – Pressures – State – Impacts - Response), permitindo identificar simultaneamente a presença de sete forças motrizes e 71 impactos ambientais. A conclusão obtida por este estudo aponta, para um plano de gestão que apresenta objetivos e ações que poderiam ter efetividade na sua aplicação, caso os indicadores levantados e seus cenários, não apontassem para uma realidade desfavorável, expressa pelo baixo grau de desenvolvimento socioeconômico da região, e ausência de conectividade nas ações da esfera pública, ocasionando a individualização da responsabilidade na solução da problemática de desenvolvimento social e da agenda ambiental. / The present study aimed at assessing the sustainability of the Management Plan of the Ecological Corridor Araguaia - Banana plantation, inserted in the Middle Araguaia, between the states of Goiás, Mato Grosso, Pará and Tocantins, whose field of action covers the areas of the Cerrado and Amazon. Evaluation tools, we adopted the methodological procedures of Strategic Environmental Assessment (SEA) proposed by the Ministry of the Environment, by this permit analysis of broad and systemic action policies-Plans-Programs (PPP) over a particular region or sector focus. Their evaluation stages comprise the phases described below: Screening, whose function consisted in the exhibition of the plan, through the confirmation of the possibility and necessity to apply the SEA management plan ecological corridor, under plan to be inserted into a region of great importance to biodiversity conservation, and because it is an action of significant regional intervention. The degree conferred strategy in this case in a regional plan for land management, where its operations mainly comprises the mosaic of protected areas and communities under the influence of the region. Exposed were the main driving forces that influence the impacts to the environment, characterized by agricultural activities, the expansion of the urban population due to land concentration and rural exodus, development projects for the transportation logistics and power generation, and pressure for reform agrarian. The following stage consisted of the definition of Scoping, whose initial function ended up exposing the intention of the ecological corridor management plan Araguaia-Bananal, in its goals identification, which later confirmed to be compatible with the sustainable development goals praised by the Brazilian AGENDA 21. In the politics-plans–programs (PPP) identification, those that apply influence towards performance forces in the ecological corridor region had been chosen, whose goals had passed by the compatibility evaluation with the management plan goals, verifying itself the diverse conflicting points evaluation, in special to those that stimulate the farming development and the infrastructure sector. The main indicators of sustaintability and production had been established, totalizing 40 indicators, that had assisted the ambient evaluation process, where the adopted procedure used the causal flow DPSIR model, allowing simultaneously to identify the 7 driving forces performance and 71 environment impacts. The conclusion obtained by this study indicates to a management plan that has goals and actions that would be effective in its application, if the indicators surveyed and their scenarios, it pointed to a reality unfavorable expressed by the low level of socioeconomic development of the region and lack of connectivity in the actions of the public sphere, leading to the individualization of responsibility in solving the problems of social and environmental agenda.
129

A avaliação ambiental estratégica e o planejamento dos recursos hídricos: a experiência francesa e as contribuições para os Planos de Bacia Hidrográfica do Brasil / The strategic environmental assessment and the water resources planning: the french experience and the contributions to the river basin management plans of Brazil

Santos, Simone Mendonça dos 09 April 2015 (has links)
Na gestão da água, o planejamento é o processo que busca definir as melhores alternativas de utilização dos recursos, orientando a tomada de decisão no alcance dos melhores resultados ambientais, sociais e econômicos Assim, o Plano de Bacia Hidrográfica (PBH), que desempenha o papel de planejamento, adquire relevância crescente em função da escassez dos recursos hídricos. Entretanto, no contexto brasileiro, uma série de condições têm limitado a efetiva implementação e adoção desses planos por parte dos diversos atores e setores usuários. Por outro lado, é cada vez mais frequente em âmbito internacional a utilização da Avaliação Ambiental Estratégica (AAE) no processo de formulação de PBHs, com ênfase no papel que a AAE pode desempenhar na coordenação e integração entre os diferentes níveis de planejamento. Assim, por meio de revisão em literatura específica e análise documental de relatórios de AAEs desenvolvidas no contexto francês de planejamento e gestão de recursos hídricos, foram avaliadas as potenciais contribuições da AAE para os PBHs do Brasil. Os resultados obtidos indicam que, se utilizadas abordagens participativas, ajustadas à estrutura político-institucional existente, sem, contudo, negligenciar os procedimentos básicos que fundamentam esse instrumento de Avaliação Ambiental, a AAE pode agregar valor a todas as etapas do processo de elaboração de PBHs que, desta forma, terão seus resultados ampliados no sentido da efetiva Gestão Integrada dos Recursos Hídricos. / In water management, planning is the process that seeks to define the best alternatives use resources, guide decision-making in order to produce the best economic, social and environmental results. Therefore becomes relevant the role to be played by River Basin Management Plans (RBMPs), one of the instruments of the National Water Resources Policy (Law 9.433/1997). However, in the current context of water management of Brazil, these plans have run into a number of conditions that limit the results, imposing difficulties to the effective implementation and adoption of these plans by the various actors and user sectors. On the other hand, it is increasingly common internationally the use of Strategic Environmental Assessment (SEA) in RBMPs formulation, with emphasis on the role that SEA can play in the process of coordination and integration between the different levels of planning. Thus, through a review of the literature and document analysis of SEA reports, developed in the French context of planning and management of water resources, were evaluated the potentials SEA\'s contributions for RBMPs in Brazil. The results indicated that if used participatory approaches, adjusted to the existing political and institutional framework, without, however, neglecting the basic procedures underlying the instrument, SEA has potential contributions verified in all stages of the RBMPs formulation process that in this way, have expanded their results towards the effective Integrated Water Resources Management in the country.
130

Contribuições da geografia ao licenciamento e ao estudo de impacto ambiental / Contributions of geography to the licensing and the study of environmental impact

Paes, Hélio Garcia 05 July 2010 (has links)
Este trabalho tem o objetivo principal de demonstrar o potencial de atuação dos geógrafos na elaboração de Estudos de Impacto Ambiental (EIAs), a partir da formação multidisciplinar deste profissional, alcançada pelo seu preparo teóricometodológico, técnico, sua formação científica e sua postura crítica, as quais embasam sua participação em diferentes relatórios contidos dentro dos EIAs, bem como na coordenação dos mesmos, ou na produção de mapas que acompanham os diagnósticos. São também demonstrados exemplos práticos dos relatórios passíveis de serem executados pelos geógrafos, além de ter sido realizado um levantamento quantitativo e qualitativo da participação deste profissional neste ramo de atividade, por meio da análise de quarenta EIAs, inseridos no período de 2000 a 2009, tendo como espacialização, o Estado de São Paulo. Assim, objetivou-se também, que este trabalho pudesse servir de subsídio para quem pretende ingressar nesta carreira, indicando caminhos e demonstrando a diversidade de contribuições a serem oferecidas pelos geógrafos. / The aim of this work is to indicate the potential participation of geographers in Environmental Impact Assessments (EIAs), based on the multidisciplinary formation of this professional, achieved by their theoretical-methodological, technical, scientific background and critical stance, which gives support to their participation in various reports contained within the EIA, as well as its coordination, and production of maps that accompany the diagnosis. This work also demonstrates practical examples of reports that can be carried out by geographers, and a quantitative and qualitative survey about the participation of professionals in this field, supported by the analysis of forty EIAs, in the period 2000 to 2009, having the State of Sao Paulo as spatial basis. Therefore, this work also aims to subsidy those willing to join this career, indicating ways and demonstrating the diversity of contributions to be offered by geographers.

Page generated in 0.1355 seconds