• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 3
  • 1
  • Tagged with
  • 4
  • 4
  • 4
  • 3
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Användning av anlagd våtmark för efterpolering av rökgaskondensat : en studie vid Brista kraftvärmeverk i Sigtuna

Elleby, Rasmus January 2015 (has links)
I Brista kraftvärmeverk i Sigtuna förbränns träflis och utsorterat avfall från hushåll och industri för att utvinna och exportera el och fjärrvärme. När rökgasen kyls ner, som en del av återvinningen av energi till fjärrvärmenätet, bildas rökgaskondensat. Direkt efter produktionen har kondensatet en temperatur av cirka 30 °C och innehåller höga halter av bland annat ammoniumkväve och vissa metaller. Efter rening av kondensatvattnet inuti verket efterpoleras det i en nyanlagd våtmark. Syftet med arbetet var främst att undersöka kvävereningen i våtmarken men även om riktvärden för utsläpp uppsatta av miljödomstolen efterlevs med avseende på total- och ammoniumkväve samt As och tungmetallerna Cd, Co, Cr, Cu, Hg, Ni, Pb, Tl och Zn. Arbetet syftade även på att bestämma våtmarkens area, volym och uppehållstid, undersöka eventuella skillnader i vattenföring mellan in- och utlopp samt undersöka vattentemperaturens effekt på kvävereningen. För att undersöka reningen togs veckovisa prover i våtmarkens in- och utlopp under nio veckor under hela oktober och november 2014. Proverna analyserades med jonkromatografi för bestämning av nitrat-, nitrit- och ammoniumhalt. Vidare användes data från Fortum, som driver verket, för att undersöka halter av kväve och olika metaller i våtmarken. Höjdmätningar med avvägningsinstrument användes för att bestämma våtmarkens volym och GPS för att bestämma våtmarkens längd och area. Vattentemperaturmätningar i våtmarkens utlopp genomfördes med hjälp av en logger under en tvåmånadersperiod. Vattenföring ut ur våtmarken räknades ut med hjälp av nivådata från en pumpbrunn vid utloppet. Resultaten visade att halterna av alla de studerade ämnena i både egna prover och från Fortum klarade riktvärdena för utsläpp till recipient. Halterna var även låga i rökgaskondensatet som lämnade Bristaverket vilket tyder på att reningen inuti verket fungerar bra. Våtmarkens area uppmättes till 2300 m2 och volymen till 940 m3. Den beräknade vattenföringen ut var i genomsnitt cirka 100 m3/dygn högre än inflödet. Fel i beräkningsmodellen kunde dock inte uteslutas som orsak till skillnaden. Vid låga lufttemperaturer verkade våtmarken klara av att kyla betydligt högre temperaturer hos rökgaskondensat än vad som vanligtvis skickas ut från verket. Därför rekommenderas att Fortum undersöker möjligheterna för minskad kylning av rökgaskondensatet för att möjliggöra en ökad reningsgrad av temperaturberoende processer i våtmarken, så som kväveavskiljning. / At the Brista combined heat and power plant in Sigtuna, wood chips and municipal and industrial waste are incinerated to generate and export electricity and distric heating. When the flue gas is cooled as a part of recycling its energy for distric heating, condensate is formed. Directly after production, the flue gas condensate has a temperature of approximately 30°C and contains relatively high levels of ammonia and certain heavy metals. After treatment inside the plant, the condensate is post-treated in a newly constructed wetland. The main aim of the study was to investigate the nitrogen removal in the wetland but also if current guideline values for effluents established by the environmental court are fulfilled in regard to levels of total and ammonia nitrogen as well as As and heavy metals Cd, Co, Cr, Cu, Hg , Ni, Pb, Tl  and Zn. The study also aimed to measure the wetland area, volume and retention time, investigate differences in water flow between the inlet and outlet as well as study the effect of water temperature on nitrogen removal. Water samples were taken weekly for nine weeks in October and November 2014 in the inlet and outlet of the wetland. The samples were analysed for nitrate, nitrite and ammonium ions using ion chromatography. Data from Fortum, the company that runs the heat and power plant, were also used to study levels of nitrogen and metals in the wetland. An optical leveling instrument was used to calculate the wetland volume and GPS was used to calculate its length and area. Measurements of water temperature in the outlet of the wetland were conducted using a logger during a two-month period. Water flow out of the wetland was calculated using water level data from a pump well connected to the outlet. The results showed that the levels of the studied compounds in samples collected in this study and by Fortum were all below guideline values. The levels were also low in the flue gas condensate leaving the combined heat and power plant, indicating that the treatment inside the plant is working well. The area of the wetland was measured to 2300 m2 and the volume 940 m3. The calculated water flow out of the wetland was at an average approximately 100 m3/day higher than the inflow, but an error in the calculation model is a possible cause of the difference. At low air temperatures, the wetland showed a capacity of cooling significantly higher temperatures of the flue gas condensate than what is usually released from the plant. Because of this, Fortum is recommended to investigate the possibility of reducing the cooling of the flue gas condensate and thus enabling a higher efficiency of temperature dependent treatment processes in the wetland such as nitrogen removal.
2

Återvinning av rökgaskondensat på Moskogen : Ett investeringsunderlag för minskad vattenkonsumtion på ett kraftvärmeverk

Gunnars, Hans, Magnusson, Gustav January 2020 (has links)
Det här projektet har varit på uppdrag av Kalmar Energi AB och har utförts på kraftvärmeanläggningen Moskogen. Projektet syftade till att undersöka om återvinning av rökgaskondensat till spädvatten var möjlig och ekonomiskt försvarbart. Denna åtgärd skulle potentiellt kunna minska anläggningens råvattenkonsumtion och det skulle leda till en ekonomisk besparing. Åtgärden skulle även bidra till att anläggningen blev mer självförsörjande och mindre känslig vid störningar på det lokala råvattennätet. Mätningar av flöden på rökgaskondensatsproduktionen, halter av föroreningar och råvattenkonsumtionen gav viktiga parametrar för kontakt med leverantör av reningssystem. Samarbete upprättades med Eurowater AB där två olika reningsanläggningar togs fram och delgavs Kalmar Energi AB. Kostnaden för de två olika förslagen och respektive råvattenbesparing gav två avskrivningstider för investeringarna. Slutsatsen som drogs av projektet var att en installation av en reningsanläggning för återvinning av rökgaskondensatet var möjlig. / This project has been commissioned by Kalmar Energi AB and has been carried out at the CHP plant Moskogen. The project aimed to investigate whether recycling of flue gas condensate was possible and economically justifiable. This measure could potentially reduce the plant´s raw water consumption and would result in economic savings. The measure would also help the plant become more self-sufficient and less sensitive to disturbances on the local raw water distribution net.  Measurements of the flow of flue gas condensate, levels of pollution and raw water consumption gave important parameters for contact with the purification supplier. We entered a collaboration with Eurowater AB where two different purification plants were presented to Kalmar Energi AB. The cost of the two different proposals and their respective raw water savings gave two different payback periods in which the initial investment would be recouped by the client. The conclusion drawn from the project is that the installation of a purification plant for recycling of flue gas condensate was possible.
3

Arsenic Removal From Flue Gas Condensate with Ferrihydrite Precipitation.

Waldenström, Louise January 2014 (has links)
At the Idbäcken combined heat and power (CHP) plant waste wood is combusted. The flue gas from the combustion is condensed and heavy metals and other toxic species ends up in the condensate water. Since the condensate water in this way contains many toxic substances it needs to be treated before it is sent to the recipient Kilaån (the Baltic Sea). Arsenic (As) is one substance that needs to be removed, and this thesis aims to find the optimal conditions for As removal by using precipitation with iron(III) chloride (FeCl3). When FeCl3 comes in contact with water it forms ferrihydrite, an efficient sorbent due to its high specific area. The adsorption of As to ferrihydrite is dependent on different variables; pH, Fe(III) dosage, competitive ions et cetera. Lab-scale experiments have shown that a pH value between 3 and 8 is required for efficient As removal. Concerning the Fe(III) dosage further experiments are needed in order to tell what dosage that is the optimal in this case. Further, the removal of metals has also been studied. A comparison between two chemicals (TMT 15 and MP 7) used for metal removal has been made, which showed that TMT 15 is to prefer for metal removal. Also, it was found that efficient removal of metals require pH > 5, preferably in the slightly alkaline pH range.
4

Lokal provtagning och analys på rökgaskondensat för driftövervakning av tungmetallrening med jonbytarmassor

Olofsson, Emelie January 2020 (has links)
I värme- och kraftvärmeverk förbränns olika typer av bränslen för produktion av el och fjärrvärme. Vid förbränningen bildas rökgaser som innehåller föroreningar, till exempel tungmetaller, från bränslet. Anläggningarna har ofta krav på utsläpp både via rökgaserna och avloppsvatten. Rökgaserna renas därmed genom olika tekniker var av en vanlig teknik är rökgaskondensering. Vid rökgaskondenseringen bildas en vätska, kallad rökgaskondensat, som delvis innehåller tungmetaller från bränslet. Rökgaskondensatet måste renas innan det kan lämna anläggningen och det görs bland annat med tungmetalljonbytare. Jonbytarmassan i tungmetalljonbytarkolonnerna behöver bytas ungefär två gånger per driftsäsong då den inte längre kan binda mer tungmetaller. Detta är en kostnad för värme- och kraftvärmeverken som de vill minimera. I denna studie undersöktes om lokal provtagning och analys på ett kraftvärmeverk av ett antal utvalda tungmetaller i rökgaskondensat är en bra metod för att optimering av reningssteget med tungmetalljonbytare. Samt om detta kan säkerställa att miljökraven för tungmetaller i det renade rökgaskondensatet uppfylls. Med optimering avses att jonbytarmassornas fulla kapacitet utnyttjas, d.v.s. att byten av jonbytarmassor kan reduceras utan att riskera otillåtna halter av tungmetaller i de renade rökgaskondensatet till följd av att jonbytarmassorna använts för länge. Även tiden som behöver avsättas för lokal provtagning och analys dokumenterades. I dagsläget sker analyser hos ackrediterade laboratorium där det tar drygt två veckor att få resultatet och under väntetiden kan mycket på anläggningen förändras. En verifiering av resultaten från studien gjordes mot resultat från ett sådant. I denna studie undersöktes lokal provtagning och analys med mätinstrumentet FREEDD som bygger på tekniken kvartskristall mikrobalans (QCM-teknik). Andra alternativ för lokal analys har inte undersökts här.  Resultatet visade att det i dagsläget är svårt att med lokal provtagning optimera reningssteget med jonbytarmassor samt kontrollera utsläppen av tungmetaller via det renade rökgaskondensatet. Korrigeringar hos mätinstrumentet och provpunkterna behöver göras för att få pålitligt resultat. Tiden som behöver avsättas för provtagning och analys beror på vilken metall som ska analyseras då tiden för preparering av prov varierar. Men om det kan möjliggöra att anläggningarna kan använda jonbytarmassorna längre samt får kontroll på utsläppen via det renade rökgaskondensatet kan det vara lönsamt att avvara den tiden. / In heating and combined heat and power plants, different types of fuels are burned to produce electricity and district heating. During the combustion flue gases containing pollutants, such as heavy metals, are formed from the flue. The plants have requirements for low emissions, both from the flue gases and the wastewater. The flue gases are purified by various techniques and a common technique is flue gas condensation. During the flue gas condensation, a liquid called flue gas condensate, is formed, which partly contains heavy metals from the flue. The flue gas condensate must be cleaned before it can leave the plant. A step in the purification of the flue gas condensate is usually heavy metal ion-exchanger. The ion-exchange mass in the heavy metal ion-exchange columns needs to be changed approximately twice per operating season as it no longer has room to bind more heavy metals. This is an expensive cost for the heating and combined heat and power plants that they want to minimize. This study investigated whether local sampling and analysis at a cogeneration plant of a number selected heavy metals in flue gas condensate is a good method for optimizing the purifications step with heavy metal ion-exchangers. And if this can ensure that the environmental requirements for the heavy metals in the purified flue gas condensate are met. Optimization means that the full capacity of the ion-exchange masses is utilized, i.e. that the exchange of ion-exchange masses can be reduced without risking unauthorized levels of heavy metals in the purified flue gas condensate as a result of the ion exchange masses being used for too long.  The time needed for local sampling and analysis was also documented. At present, analyzes are done at accredited laboratories where it takes over two weeks to get the result and during that time much can be changes at the plant. A verification of the result of the study was also made against the result of an accredited laboratory. In this study, local analysis was made with the measuring instrument FREEDD which is based on quartz crystal microbalance (QCM-technology). Other options for local sampling and analysis have not been investigated. The result showed that, in the present, it is difficult to optimize the purification step with ion-exchange masses and check emissions of heavy metals with the purified flue gas condensate. To obtain reliable result, corrections to the measuring instrument and test points need to be made. The time that needs to be set aside for sampling and analysis depends on the metal, as the time for sample preparation varies.  But if it can enable the plants to use the ion-exchange masses longer and gain control of the emissions of heavy metals with the purified flue gas condensate, it can be profitable to save that time.

Page generated in 0.1 seconds