• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 393
  • 16
  • 4
  • 4
  • 4
  • 4
  • 4
  • 4
  • 4
  • 3
  • 3
  • 1
  • 1
  • 1
  • 1
  • Tagged with
  • 416
  • 195
  • 103
  • 83
  • 81
  • 70
  • 70
  • 67
  • 67
  • 65
  • 60
  • 58
  • 56
  • 53
  • 50
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
181

Cancelamento de eco em telefonia IP

Rachid, Euler Mendes 10 June 2004 (has links)
Orientador: Luis Geraldo Pedroso Meloni / Dissertação (mestrado) - Universidade Estadual de Campinas, Faculdade de Engenharia Eletrica e de Computação / Made available in DSpace on 2018-08-04T02:46:47Z (GMT). No. of bitstreams: 1 Rachid_EulerMendes_M.pdf: 1437725 bytes, checksum: e88d0768ef33c7387ecf6f58db481b45 (MD5) Previous issue date: 2004 / Resumo: Este trabalho teve como objetivo o estudo do cancelamento do eco em telefonia IP, onde foi proposto um novo metodo mais efetivo que o atualmente utilizado nos gateways, que leva em consideraçao a variação do atraso da rede IP. No inicio de apresentado o conceito relacionado a filtros adaptativos. Posteriormente, de apresentado um estudo sobre o cancelamento do eco na rede de telefonia publica comutada, explicando o funcionamento do atenuador, do supressor de eco e do cancelador de eco. O controle do eco é tratado como uma tecnica empregada em VoIP para melhoria da qualidade do sinal de fala. A analise do desempenho do cancelador de eco tradicional de testada atraves de modelos de caminhos de ecos apresentados na recomendacao G.168 do ITU-T. Como metrica de utilizada uma medida baseada no valor da melhoria da perda de retorno de eco (ERLE) e do tempo de convergencia do cancelador. Resultados de simulacoes do metodo proposto sao apresentados e discutidos no anal / Abstract: The objetive of this thesis is the study about echo cancellation in a IP telephony, providing a new technique better than the actual one employed in gateways. This technique takes account the fact that the delay in an IP network is variable. This work presents an overview on adaptive filter subject, following an study about echo cancellation in a PSTN network, it explains the functionality of some devices such as attenuators, echo suppressors and echo cancellers. The relation between echo control and the measured voice quality is presented. The echo path models presented in ITU-T G.168 recommendation are used to test the conventional echo canceller performance. For this purpose the ERLE (Echo Return Loss Enhancement) and the convergency time are measured. Finally, simulation results for the new cancellation method are presented and discussed in details / Mestrado / Telecomunicações e Telemática / Mestre em Engenharia Elétrica
182

Analise de qualidade de serviço em redes corporativas

Silva, Dinailton Jose da 17 December 2004 (has links)
Orientador: Paulo Licio de Geus / Dissertação (mestrado) - Universidade Estadual de Campinas, Instituto de Computação / Made available in DSpace on 2018-08-04T12:24:50Z (GMT). No. of bitstreams: 1 Silva_DinailtonJoseda_M.pdf: 1346629 bytes, checksum: ee67df75eb0d753fa08389979d3b6a8e (MD5) Previous issue date: 2004 / Resumo: Desde sua origem, o protocolo IP (Internet Protocol ¿ Protocolo Internet) foi desenvolvido e implementado como um protocolo de comunicação com controle de tráfego utilizando a regra do ¿melhor esforço¿, pois não provê nenhum mecanismo de qualidade de serviços e, conseqüentemente, nenhuma garantia de alocação de recursos da rede. Naquela época, ninguém imaginava que a Internet tornar-se-ia a grande rede mundial, como o é atualmente. Esse rápido crescimento impulsionou também as redes corporativas e fez com que novos serviços como voz (telefonia), vídeo-conferência e dados trafegassem em uma única infra-estrutura de redes de pacotes, a rede IP. Essa emergente e crescente demanda por novos serviços fizeram com que os fabricantes de equipamentos de redes desenvolvessem funcionalidades que provissem certos níveis de garantias de serviços, a qual se deu o nome de QoS (Quality of Service ¿ Qualidade de Serviço). O objetivo principal deste trabalho é analisar os modelos de QoS que se adequam às redes corporativas, de forma que as aplicações de maior interesse de tráfego da corporação obtenham garantias de recursos na transmissão de dados com o uso das técnicas de QoS. Assim, são apresentadas, por meio de teoria e prática, as funcionalidades e as características dos modelos de QoS, tendo como escopo uma análise estratégica quanto à aplicabilidade dos modelos para as redes corporativas / Abstract: Since its conception, the IP protocol was developed and implemented as a communication protocol whose traffic control uses a "best effort" rule, for there is no provision for quality of service and, as such, no guarantees regarding the assignment of network resources. By that time nobody would have imagined the Internet becoming today's ubiquitous worldwide network. This rapid growth bolstered corporate networks and made new services, such as telephony and videoconference, to be carried together with data on a single packet network infrastructure---the IP network. This emerging and growing demand for new services caused network equipment manufacturers to develop new facilities to provide some service guarantee levels, named Quality of Service (QoS). The main goal of this work is to analyze QoS models in the context of corporate networks to check their adequacy towards ensuring proper resource assignment for the applications of most interest to the corporation. As such, features and facilities of QoS models are presented through theory and practice, keeping in mind their applicability in a corporate scope / Mestrado / Redes de Computadores / Mestre em Ciência da Computação
183

Metodo de implementação de sistema de gestão da qualidade para o setor espacial / Implementation method of quality management systems for the space segment

Brito, Alirio Cavalcanti de 30 June 2005 (has links)
Orientador: Ettore Bresciani Filho / Dissertação (mestrado profissional) - Universidade Estadual de Campinas, Faculdade de Engenharia Mecanica / Made available in DSpace on 2018-08-04T18:07:40Z (GMT). No. of bitstreams: 1 Brito_AlirioCavalcantide_M.pdf: 5994231 bytes, checksum: b8b67932c980a006c869161470ce7792 (MD5) Previous issue date: 2005 / Resumo: O objetivo do trabalho é apresentar um método de implementação de um sistema de gestão da qualidade para o setor espacial, baseado na norma de sistema da qualidade NBR 15100. A referida norma é a tradução da norma AS 9100 do setor aeroespacial internacional, para a língua portuguesa, baseada na ISO 9001:2000. É apresentada, também, uma análise das inter-relações existentes entre as duas normas com o intuito de compreender melhor o processo de implementação. A análise inclui, também, o histórico da criação da AS 9100, a sua aplicabilidade e importância nos diversos tipos de organizações do segmento espacial e, ainda, uma comparação dos requisitos normativos segundo a ótica dos principais autores da qualidade. O método de implementação do sistema de gestão da qualidade baseada na NBR 15100 utiliza questionário que pontua o sistema implantado, verifica a sua adequação, a sua aplicabilidade, define as estruturas necessárias do sistema e as etapas do processo de implementação. Concluindo o processo de implementação é apresentado também o processo de certificação por organismo de terceira parte de um sistema de gestão da qualidade baseado na norma aeroespacial. A eficácia do método foi verificada, mas, poderá ser aperfeiçoado havendo organizações interessadas no setor espacial. O método aqui apresentado foi adaptado de um método de implementação de sistema de gestão da qualidade proposto para o setor de telecomunicações / Abstract: The aim of the work is to introduce a method of implementation of a quality management system for the space segment based on the quality system standard NBR 15100. The referred standard is the translation from AS 9100 of the intemational aerospace segment into Portuguese language, based on ISO 9001:2000. It is also presented an analysis of the interrelationship among the standards with the intention of a better understanding of the implementation process of the referred standard. The analysis of this standard inc1udes a history report of the AS 9100, its applicability and importance in the several types of organizations of the space segment, and, a comparison of the normative requirements according to the main authors of the quality. The method of implementation of the management system based on NBR 15100 uses questionnaire that punctuates the implanted system, verifies its suitability and applicability, and defines the necessary structures of the system and the stages of the implementation process. Concluding the implementation process, it is also presented the certification process by a certification/registration board of a quality management system based on the aerospace standard. The effectiveness of the method was verified, but it can be improved by organizations interested in the space segment. The method herein was adapted from the proposed implementation method of quality management system for the telecommunication segment / Mestrado / Gestão da Qualidade Total / Mestre Profissional em Engenharia Mecanica
184

Impactos da implantação de sistema da qualidade em empresa siderurgica / Application and results of the norms NBR ISO 9000 implanted in a steel company

Ferraz, Jose Lazaro 28 September 2001 (has links)
Orientador: Ademir Jose Petenate / Dissertação (mestrado) - Universidade Estadual de Campinas, Faculdade de Engenharia Mecanica / Made available in DSpace on 2018-07-31T18:21:25Z (GMT). No. of bitstreams: 1 Ferraz_JoseLazaro_M.pdf: 7414451 bytes, checksum: 2cf3a83becec29eb1295484b19d687ca (MD5) Previous issue date: 2001 / Resumo: O presente trabalho estuda a aplicação de Sistema de Qualidade aderente aos Padrões das Normas NBR ISO 9000 no desenvolvimento e implementação de um programa de gestão da qualidade total, adequado às necessidades de uma grande empresa nacional e os impactos que esta implementação causou na performance operacional desta organização. A aplicação das normas é apresentada por meio de estudo de caso, onde se demonstram todas as etapas realizadas pela empresa, para obter a certificação de seu sistema da qualidade de acordo com os critérios estabelecidos e condicionados pela ISO. Os resultados verificados no estudo permite-nos afirmar que a implementação séria e eficaz de um sistema de qualidade aderente aos critérios e diretrizes das normas NBR ISO 9000 podem contribuir de maneira efetiva para o desenvolvimento de um programa de qualidade total em uma empresa siderúrgica e impactar positivamente em sua performance organizacional, envolvendo melhorias de importância relevante para a competitividade empresarial / Abstract: The present work studies the application of the norms NBR ISO 9000 in the development and implementation of a quality management system, adapted to the needs and peculiarities of a large National Steel Company. Besides this, this work also aims to analyze the influences and results of this norms application in the quality system of the organization and the consequences in the general operation performance of this company. The application of a series of norms NBR ISO 9000 is demonstrated through a case study, in which, al1 the steps carried out by the company are presented. Such steps were taken in order to improve the quality of the company products and services and to get the ISO 9000 Quality System Certificate. For the obtained results in this study, we are able to assure that, since there is an affective and responsible application of the criteria of quality adherent to the guidelines of the NBR ISO 9000 norms, the company can develop and implant a total qua1ity system adapted to its reality and particularities. The results also show that these norms can cause positive impacts in the company performance, involving economic and organization improvements of relevant importance to business competitiveness in general / Mestrado / Gestão da Qualidade Total / Mestre Profissional em Engenharia Mecanica
185

Procedimento objetivo para a garantia da qualidade de dados observacionais de vento em superfície no litoral do Rio Grande do Norte

MORAES, Camila Freitas Wanderley de Carvalho Bezerra 27 February 2015 (has links)
Submitted by Fabio Sobreira Campos da Costa (fabio.sobreira@ufpe.br) on 2017-07-17T16:14:10Z No. of bitstreams: 2 license_rdf: 811 bytes, checksum: e39d27027a6cc9cb039ad269a5db8e34 (MD5) Dissertação_Camila F. Wanderley de C. B. Moraes_versão Final.pdf: 2535411 bytes, checksum: d1c049b373557622907f11095871b5d0 (MD5) / Made available in DSpace on 2017-07-17T16:14:11Z (GMT). No. of bitstreams: 2 license_rdf: 811 bytes, checksum: e39d27027a6cc9cb039ad269a5db8e34 (MD5) Dissertação_Camila F. Wanderley de C. B. Moraes_versão Final.pdf: 2535411 bytes, checksum: d1c049b373557622907f11095871b5d0 (MD5) Previous issue date: 2015-02-27 / O crescimento da energia eólica no Mundo vem fomentando a geração de uma grande quantidade de dados observacionais oriundos de torres anemométricas. Tais dados são imprescindíveis a várias aplicações, entre as quais se destacam: a análise de viabilidade com respeito à implantação de centrais eólicas (na fase de prospecção) e avaliação do desempenho dos aerogeradores (na fase de operação da central eólica). Por exemplo, os dados observacionais do vento em superfície são empregados para a parametrização, calibração e validação dos modelos utilizados na avaliação do recurso eólico. Portanto, a análise de viabilidade para implantação de centrais eólicas é fortemente dependente da qualidade dos dados observacionais. Porém, apesar da importância de tais dados, são ainda extremamente escassas as publicações sobre garantia e controle de qualidade aplicados a dados anemométricos. De maneira a tentar mitigar esta lacuna do setor eólico, propõe-se, neste trabalho, um procedimento objetivo (automático) para a garantia da qualidade que permita o tratamento de quantidades massivas de dados observacionais, quantidades para as quais se tem como inviável o emprego de procedimentos subjetivos (baseados, por exemplo, no “olho treinado” de um meteorologista) ou mesmo semiobjetivos (semiautomáticos). O procedimento objetivo proposto está baseado em uma sequência de testes organizados em duas grandes classes: testes globais (que avaliam a qualidade de uma série temporal como um todo) e testes locais (que avaliam a qualidade de conjuntos de dados e mesmo dados individuais), sendo 3 as principais inovações deste trabalho: a introdução de uma análise paramétrica objetiva no teste do limite, a realização de um teste objetivo de consistência espacial para a verificação de dados individuais e (a mais relevante) a aplicação de um método objetivo para inferir os parâmetros dos testes. O procedimento objetivo proposto para a garantia da qualidade foi experimentado sobre os dados observacionais de velocidade média do vento (integrados em 10 min) oriundos de quatro torres anemométricas localizadas no litoral do Rio Grande do Norte. Tanto o procedimento como os resultados são aqui apresentados e discutidos. / The world wind power growth has been responsible for the generation of a huge amount of observational data from anemometrical masts. Such data are essential to several applications, being highlighted some of them: the feasibility analysis with respect to the deployment of wind farms (in the exploration phase) and the performance evaluation of wind turbines (during the wind farms operation phase). For example, surface wind observational data are used for parameterization, calibration and validation of models used for the wind resource assessment. Therefore, the feasibility analysis concerning the installation of wind farms is strongly dependent on the observational data quality. However, despite the importance of such data, publications on quality assurance and quality control applied to observational wind data are extremely scarce. In order to try to mitigate this gap in the wind sector, this work aims to establish an objective (automatic) procedure for quality assurance which addresses the treatment of a massive amount of observational data considering that for such amount it is unfeasible the employment of subjective procedures (for example, based on the "trained eye" of a meteorologist) or even a semi-objective (semi-automatic) procedure. The proposed objective procedure is based on a sequence of tests organized into two classes: the global tests (which evaluate the quality of a time series as a whole) and the local tests (which evaluate the quality of data clusters and even individual data), being the main innovations the addition of a parametric analysis in the range test, the addition of an objective spatial consistency test for verifying individual data and the (most important) the employment of an objective method to infer parameters of the tests. The proposed objective procedure for quality assurance was tested on 10 min-averaged wind speed observational data from four anemometrical masts located in the coastal region of the state of Rio Grande do Norte, Brazil. Both the procedures and the results are presented here.
186

Analyses of a management quality systematic for purchased parts with focus on results and its effectiveness / Análise de uma sistemática de gestão da qualidade para peças compradas com foco em resultados

Gilson Paula Lopes de Souza 19 February 2005 (has links)
The related work tells about the implementation of a Quality Management Systematic for Purchased Parts (SG) with focus on results and its effectiveness at an Automobile Company. The objective was to analyze the gains achieved through the purchased parts performance management applied in the assembly process of a national vehicle using a new Management Systematic, comparing results before and after the SG implementation, through the indicators: Qualitative Approval Index (IAQ), Quality Cost (QK), Product Quality in Process Index (IQPP), Customer Satisfaction Index (ISC) and the Field Failures Index (IFC). The methodology applied to emphasize the evolutions occurred by the organization with the SG implementation took in account samples analyses related to 48 consecutives months following the indicators, divided in two parts equivalents to 24 months before and after the total SG implementation. As result, the organization improved its performance as the higher values of the Quality Approval and Costumer Satisfaction Indicators, additionally the reduction in the loses indicators as the Quality Cost, Product Quality in Process, and Field Failures, allowing to the company increases its competitiveness in terms of quality costs, development and exportation capacities, as well a new products launching timing reduction. / O presente trabalho descreve a implementação da Sistemática de Gestão da Qualidade para Peças Compradas (SG) focada em resultados e a sua efetividade em uma empresa do segmento automobilístico. O objetivo foi analisar os ganhos obtidos pelo gerenciamento do desempenho das peças compradas aplicadas na montagem de um veículo de fabricação nacional utilizando-se de uma nova Sistemática de Gestão, comparando-se os resultados antes e após a sua implementação, por meio dos indicadores: Índice de Aprovação Qualitativa (IAQ), Custo da Qualidade (QK), Índice da Qualidade do Produto no Processo (IQPP), Índice de Satisfação do Cliente (ISC) e o Índice de Falhas no Campo (IFC). A metodologia aplicada para evidenciar as melhorias obtidas pela organização com a implementação da SG considerou a coleta de dados relativos há 48 meses consecutivos de acompanhamento dos indicadores, estratificados em dois períodos equivalentes de 24 meses antes e após a implementação plena da SG. Como resultado, a organização obteve ganhos expressivos por meio do aumento dos Índices de Aprovação Qualitativa e Satisfação do Cliente, além da redução nos indicadores de perdas como o Custo da Qualidade, Índice da Qualidade do Produto no Processo, e Índice de Falhas no Campo, permitindo a empresa maior competitividade em qualidade, custos, capacidades de desenvolvimento e exportação, bem como a redução no tempo de lançamento de novos produtos.
187

[en] MODELING UNCERTAINTIES AND FLEXIBILITIES IN PPP PROJECTS / [pt] UM MODELO GERAL PARA TOMADA DE DECISÃO SOB INCERTEZA E FLEXIBILIDADE EM PARCERIAS PÚBLICO-PRIVADAS

19 June 2017 (has links)
[pt] As flexibilidades observadas em contratos de Parcerias Público-Privadas (PPPs) para projetos de infraestrutura rodoviária podem também ser compreendidas como opções contratuais. O modelo desenvolvido no presente estudo teve como principal foco o estabelecimento do nível ótimo de garantia governamental a ser ofertada à iniciativa privada em uma concessão de rodovia por PPP, utilizando a teoria de opções reais de forma integrada à métrica de performance Ômega, a qual obteve melhor resposta entre demais métricas VaR e CVaR propostas. Ainda de forma original, o modelo contemplou o apreçamento de garantias de receita mínima, como parte integrante do apreçamento de opções do tipo collar europeia (calls e puts) com caps, integrado ao apreçamento da opção americana de expansão (call) do projeto. O valor presente (VP) do projeto, considerando a opção de expandir a capacidade, foi calculado em 2,73 bilhões de Reais, que comparado ao valor esperado de 2,65 bilhões de Reais sem flexibilidade, representa um aumento de 73 milhões de Reais ao valor do projeto no caso base. O valor presente do projeto com a flexibilidade de expansão (call americana) e com garantia de receita mínima (put europeia) com cap 10 por cento do Capex permite atingir o valor de 3,33 para a medida Ômega, que é muito superior ao valor anterior de 0,996 obtido somente com a modelagem de opções tipo collar. / [en] The flexibilities observed in Public-Private Partnership (PPP) contracts for road infrastructure projects can also be taken as contractual options. The model developed in the present study had as main focus the establishments of the optimal level of government guarantee to be provided to private initiative in a PPP highway concession, using real option theory integrated with Omega measure, in which had a better response among other proposed VaR and CVaR metrics. Also in an original way, the model contribute to set a minimum revenue guarantees, as part of the european collar option (call and put), integrated to an expansion american call option. The project s present value (PV), considering an option for capacity expansion, was calculated at BRL 2.73 billion, which compared to the expected value of BRL 2.65 billion without flexibility, represents an increase of BRL 73 million to the value of the project in the base case scenario. The present value of the project with the flexibility of expansion (call) and with a minimum revenue guarantee with cap 10 percent of Capex, allows to reach the value of 3.33 for the Omega measure, which is much higher than the previous value of 0.996, obtained only with the european collar option.
188

Crédito habitacional no Brasil: avanços institucionais nos contratos de crédito imobiliário / Real estate credit in Brazil: Impact of institutional improvements in the real estate credit

Cotarelli, Natalia Quiroga 18 December 2014 (has links)
Embora o mercado de crédito imobiliário no Brasil tenha se expandido nos últimos anos, sua participação no Produto Interno Bruto (PIB) está muito abaixo do percentual encontrado em outros países em desenvolvimento. Com isso, o país continua apresentando déficits habitacionais significativos, problema este que tem maior impacto nas famílias de menor renda. Este estudo pretende analisar o impacto da Lei no 10.931, de agosto de 2004, que incluiu a figura jurídica de alienação fiduciária do bem imóvel no ordenamento jurídico nos contratos de financiamento habitacional do Brasil, avaliando a evolução destes para diferentes grupos de mutuários. É consenso na literatura que o mercado de crédito apresenta certas particularidades, como os problemas de informação e comprometimento limitado, especificidades estas que podem gerar racionamento de crédito. Avanços institucionais que alterem os parâmetros dos contratos, e que aumentem a segurança jurídica dos credores podem ajudar no desenvolvimento do mercado de crédito, amenizando estes problemas, e tornando o crédito mais acessível para todos os tipos de mutuários, / Although the real estate market in Brazil has been expanding in recent years, its share in Gross Domestic Product (GPD) is significantly below the percentage found in other developing countries. Because of this, the country continues to present significant housing deficits. This study aims to analyze the impact of the Law no 10.931, from august 2004, which included the legal concept of fiduciary property in the legal system in contracts for the real estate market, comparing the evolution of these contracts for different groups of borrowers. There is a consensus that the credit market has certain peculiarities, such as information problems and limited commitment, which can generate credit rationing. Institutional improvements that alter the parameters of the contracts, and increase legal certainty for creditors may help in the development of the credit market, mitigating these problems, and making credit more accessible for all kinds of borrowers,
189

Da Cédula de Produto Rural : qualificação, regime jurídico e questões polêmicas /

Assis, Franciano Sabadim. January 2019 (has links)
Orientador: Kelly Cristina Canela / Resumo: O Brasil tem um vasto território, sendo mundialmente conhecido por suas riquezas naturais, de modo que isto favorece o desenvolvimento de diversas atividades agropecuárias. Assim, o Agronegócio representa aproximadamente 21,6% do Produto Interno Bruto (PIB) brasileiro. Desse modo, a Cédula de Produto Rural (CPR) se firmou como uma das principais formas de financiamento desse setor da economia, bem como ganhou relevância como um instrumento de circulação da produção rural. Com isso, o presente trabalho analisará, com fundamento: na doutrina, na legislação e na jurisprudência, questões relevantes ligadas à CPR. Dessa maneira, partiremos da análise do referido título com questões ligadas ao Código Civil brasileiro e à Lei nº. 8.929/94 (Lei da CPR), abordando suas principais características, bem como a sua natureza jurídica. Além disso, serão abordadas as questões relevantes ligadas às garantias cedulares presentes no título de crédito, bem como sobre a possiblidade de utilização das garantias fidejussórias. Ademais, analisaremos as implicações das referidas garantias cedulares e questões polêmicas relacionadas a elas, além das implicações do endosso da referida cédula. Por fim, trataremos das possibilidades e do modo como o Poder Judiciário tem interpretados as garantias cedulares, a validade da cédula e a possiblidade de endosso dela. A despeito disso, a pesquisa analisará as decisões judiciais proferidas pelo Superior Tribunal de Justiça (STJ) com relação à CPR, bem como anali... (Resumo completo, clicar acesso eletrônico abaixo) / Abstract: Brazil is a country with a vast territory, being known worldwide for its natural riches, which favors the development of several agricultural activities. For this reason, Agribusiness represents approximately 25.7% of the Brazilian Gross Domestic Product (GDP). In this way, the Cédula de Produto Rural (CPR) [Rural Product Bond] was established as one of the main ways of financing of this sector of the economy, as well as gaining relevance as an instrument of circulation of rural production. With this, the present work will analyze, based on doctrine, legislation and jurisprudence, relevant issues related to the CPR. Therefore, we will start from the analysis of this title with issues related to the Brazilian Civil Code and Law No. 8.929/94 (CPR Law), addressing its main characteristics as well as its legal nature. Also, relevant issues related to collateral in the security will be addressed, as well as the possibility of using the personal guarantee. Moreover, we will analyze the implications of these schedular guarantees and controversial and important issues related to them, in addition to the implications of the endorsement of mentioned bond. Finally, we will deal with the possibilities and the form in which the Judiciary has interpreted the schedular guarantees, its validity and the possibility of endorsement. Despite this, the research will analyze the judicial decisions pronounced by the Superior Court of Justice about the CPR, as well will analyze some decisions of the... (Complete abstract click electronic access below) / Mestre
190

[pt] PARCERIA PÚBLICO-PRIVADA PARA OBRAS DE REFORMA E MODERNIZAÇÃO DO COMPLEXO DO MINEIRÃO: UMA ANÁLISE POR OPÇÕES REAIS / [en] PUBLIC-PRIVATE PARTNERSHIP FOR REFORM AND MODERNIZATION WORKS OF MINEIRÃO COMPLEX: AN ANALYSIS BY REAL OPTIONS

ROBERTO SILVA DOS SANTOS 28 September 2015 (has links)
[pt] Diante do comprometimento do Brasil com a FIFA (Federação Internacional de Futebol) para realização de eventos esportivos, mais precisamente a Copa das Confederações em 2013 e a Copa do Mundo em 2014, o Governo do Estado de Minas Gerais utilizou o modelo de Parcerias Público-Privadas (PPP) para promover as obras de reforma e modernização do Complexo do Mineirão, em Belo Horizonte. A PPP tem como objetivo a viabilização de projetos de infraestrutura que exigem grandes aportes financeiros. No entanto, a incerteza sobre a demanda de público de jogo de futebol é elevada e isso pode fazer com que algumas empresas que poderiam estar interessadas na realização da obra, não participem da concessão. Assim, uma das formas para reduzir esse risco é o governo oferecer uma garantia de demanda, na qual é garantida uma receita pré-determinada sempre que os resultados do investidor forem abaixo do esperado. Essa garantia é vista como uma opção de Put para a Minas Arena, empresa privada, e como uma Call para o governo. Nesse contexto, este trabalho desenvolveu um modelo respaldado na teoria de opções reais com o objetivo de valorar as opções presentes do projeto e estabelecer os limites de risco para cada um dos stakeholders. O resultado da análise mostrou que a estratégia de associar uma garantia de demanda a um teto de desembolsos (proposta vencedora do processo licitatório) tem valor positivo para o governo e negativo para o concessionário. Foi utilizada a média de público mensal histórica, na qual a demanda média não ultrapassa 50 porcento da capacidade do estádio. Além disso, algumas sensibilidades dos principais parâmetros do modelo sugeriram uma alta sensibilidade do valor da opção para pouca variação desses parâmetros. Esses resultados revelam que a empresa privada poderia ter assinado o projeto sem a necessidade da opção de garantia de público, uma vez que os principais jogos do estádio do Mineirão são altamente concentrados no time Cruzeiro, que possuem um comportamento estável de jogos ao longo do ano, com exceção dos dias de clássico. / [en] Given the commitment of Brazil with FIFA (International Football Federation) to perform sporting events, specifically the Confederations Cup in 2013 and World Cup in 2014, the Government of the State of Minas Gerais used the Public-Private Partnership model (PPP) to promote the works of reform and modernization of Mineirão Complex in Belo Horizonte. The PPP aims at enabling infrastructure projects that require large financial investments. However, uncertainty about the football game public demand is high and this may cause some companies that might be interested in doing the work, not participate in the award. Thus, one way to reduce this risk is the government offer a warranty claim, which is guaranteed a predetermined recipe whenever the investor s results are below expectations. This guarantee is seen as a put option for the Minas Arena, a private company, and as a call for the government. In this context, this paper developed a model supported the theory of real options with the objective of evaluating these design options and establish risk limits for each of the stakeholders. The analysis showed that the strategy of associating a warranty claim to a ceiling disbursements (winning bid of the bidding process) has positive value to the government and negative for the dealer. Average monthly historical square was used, in which the average demand does not exceed 50 percent of the capacity of the stadium. In addition, some sensitivities of the main model parameters suggested a high sensitivity of the option value to little variation of these parameters. These results reveal that private enterprise could have signed the project without the need for public assurance option, since the main games of the Mineirão stadium are highly concentrated in Cruzeiro team, who have a stable behavior of games throughout the year with the exception of classical days.

Page generated in 0.0549 seconds