• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 336
  • 14
  • 12
  • 3
  • Tagged with
  • 366
  • 366
  • 251
  • 211
  • 72
  • 56
  • 50
  • 48
  • 41
  • 38
  • 37
  • 35
  • 35
  • 34
  • 32
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
141

Indicadores de projeto para edifícios em alvenaria estrutural / Indicadores de projeto para edifícios em alvenaria estrutural

Freire, Ailton Soares 24 July 2007 (has links)
Made available in DSpace on 2016-06-02T20:09:08Z (GMT). No. of bitstreams: 1 1678.pdf: 2370178 bytes, checksum: fc60ac377bcd9fff487f79b798469dca (MD5) Previous issue date: 2007-07-24 / Financiadora de Estudos e Projetos / This work deals on the identification and quantification of pointers of project of buildings in structural masonry. Several projects of different types are analyzed from which each material is quantified relative to the characteristics of each construction. Project pointers were then assessed. The calculated pointers can propitiate the identification of factors of the construction and criteria of project that contribute for the rise or the reduction in the consumption of materials. The pointers can represent important tool for the designer engineer, as they can serve as reference values for gauging projects in development. Additionally, the consumption pointers also are important for the planning and budget of new enterprises. It is believed that several aspects of this research had been very few referenced before, such as the case of consume rate of steel and concrete in transition structures, the consume of different block types in relation to the floor area, the average floor load, the steel rate in structural masonry, among others / Este trabalho discorre sobre identificação e quantificação de indicadores de projeto de edifícios em alvenaria estrutural. Para desenvolvê-lo, são analisados vários projetos de diferentes tipologias arquitetônicas, a partir dos quais são quantificados dados relativos à caracterização de cada edificação e ao consumo de diferentes materiais. Os índices calculados podem propiciar a identificação de fatores da edificação e critérios de projetos que contribuem para a elevação ou para a redução no consumo de materiais. Dessa forma, os índices podem representar importante ferramenta para o engenheiro projetista, na medida em que podem constituir-se em parâmetros de referência e de aferição de projetos em desenvolvimento. Adicionalmente, os índices de consumo também são importantes, pois servem de base para o planejamento e orçamento de novos empreendimentos. Entende-se que, para o caso de edifícios em alvenaria estrutural, a informação sobre os vários índices identificados e quantificados são escassos, senão inexistentes, dentre os quais podem ser citados os consumos de aço e de concreto em estruturas de transição, o consumo de peças secundárias (meio-bloco, canaletas, blocos especiais) em relação ao consumo de peças inteiras, a carga média nos pavimentos, a taxa de armaduras em alvenarias estruturais, entre outros
142

Diretrizes para seleção de projetistas e avaliação da prestação do serviço de projeto de edificações na visão do contratante

Paula, Nathália de 23 September 2009 (has links)
Made available in DSpace on 2016-06-02T20:09:11Z (GMT). No. of bitstreams: 1 2624.pdf: 3877207 bytes, checksum: 604426ff6d96fec2be3129e41d7b461b (MD5) Previous issue date: 2009-09-23 / Financiadora de Estudos e Projetos / The design-product has great importance in Construction, Engineering and Architecture area, as much for its enterprise success strategic function, as for becoming possible the building materialization. Evaluating the quality of the design service rendering (DSR) can denote improvements in the design-product quality and, therefore, in the final product (building). Questions or systemized quality criteria related to DSR quality, with comments, degrees or grades/weights attribution, elaborated from the contractors of these services can allow the DSR evaluation, making possible the designer selection and the performance evaluation of contracted designers. The aim of this work is to propose a set of direction guidelines to designers selection and DSR evaluation in the contractor view. The literature review and case studies were carried out in four construction and incorporation companies and three design companies from São Paulo city. The results show that the constructors and incorporators have practices for selection and evaluation of designers. Two design companies have practices to evaluation of the contractor client satisfaction. In essence, the types of evaluation mentioned designers evaluation and evaluation of the contractor client satisfaction have the same aim: evaluating the DSR. The observation of these practices and the literature review contributed for the elaboration of guidelines to the designers selection and the evaluation of the design service rendering. / O projeto-produto tem grande importância na área de Arquitetura, Engenharia e Construção, tanto pelo seu papel estratégico para o sucesso do empreendimento, como por tornar possível a materialização da edificação. Avaliar a qualidade da prestação do serviço de projeto (PSP) pode denotar melhorias na qualidade do projeto-produto e, por conseguinte, do produto final edificação. Questões ou critérios sistematizados relacionados à qualidade da PSP, com atribuição de comentários, graus ou notas/pesos, advindos dos contratantes destes serviços, podem permitir a avaliação da PSP, possibilitando a seleção de projetistas e a avaliação do desempenho dos contratados. O objetivo deste trabalho é propor um conjunto de diretrizes para a seleção de projetistas e para a avaliação da PSP, sob a ótica do cliente contratante. Para este fim, foram realizados revisão bibliográfica e estudos de caso envolvendo quatro empresas incorporadoras e construtoras e três empresas de projeto da cidade de São Paulo. Os resultados mostram que as empresas incorporadoras e construtoras possuem suas práticas de seleção e avaliação de projetistas. Duas das empresas de projeto detêm práticas para avaliação da satisfação do cliente contratante. Em essência, os tipos de avaliação mencionados avaliação dos profissionais de projeto e da satisfação do cliente contratante apresentam o mesmo objetivo: avaliar a PSP. A observação destas práticas, somada à revisão bibliográfica realizada, contribuíram para a elaboração das diretrizes para a seleção de projetistas e para a avaliação da prestação do serviço de projeto.
143

Simulação multi-agente em gestão de projetos de software em ambientes de programação extrema

Alves, Flávio de Oliveira January 2009 (has links)
Nesta dissertação, o autor aborda a dificuldade de prever-se o desempenho dos recursos humanos em um processo de desenvolvimento de software em um ambiente de Programação Extrema (XP) (BECK, 2000) e propõe uma solução com potencial para minimizar esse problema. Especificamente, o problema, a ser tratado neste trabalho, consiste em melhorar as previsões dos gerentes de projeto – no âmbito do ambiente mencionado - com relação ao desempenho dos recursos humanos na geração de valor para o negócio. Tal valor para o negócio é alcançado através da implementação, por parte dos programadores, das diversas funcionalidades de um sistema de software. Para a construção da solução proposta neste trabalho, o autor analisou um sistema XP de desenvolvimento de software (composto por ambiente, pessoas e processo), conforme o processo de modelagem proposto por Streit (2006) e apoiado na revisão da literatura relevante. Em seguida, o autor estruturou esse sistema em um modelo conceitual para, finalmente, desenvolver um modelo computacional do sistema analisado, baseado em múltiplos agentes inteligentes modelados conforme a arquitetura Beliefs-Desires-Intentions (BDI), ou Crenças-Desejos-Intenções. O modelo computacional da simulação multi-agente foi desenvolvido com o apoio da ferramenta SeSAm (KLÜGL, 2006). Testado através da experimentação estatística 2k Fatorial (LAW e KELTON, 2000), o modelo de simulação multi-agente de processos de desenvolvimento de software, para ambientes de Programação Extrema, demonstrou eficácia e aplicabilidade prática sobre o problema em questão. / In this research, the author adresses the difficulty to forecast the performance of the human resources in a software development process in an Extreme Programming (XP) (BECK, 2000) environment and proposes a solution that may be suitable to minimize this problem. Specifically, the main problem consists on how to improve the assumptions of the project managers - in the aforementioned environment - related with the human resources performance in generating value for the business. This value generation is reached through the implementation, by programmers, of the various functionalities of a software system. To build the solution proposed in this research, the author analysed a XP software development system (composed of environment, people and process) considering the modeling process proposed by Streit (2006) and also the relevant related works. This system was later structured in a conceptual model and, in sequence, in a computational model based on the Beliefs-Desires-Intentions (BDI) architecture of intelligent agents. The computational model of the multi-agent simulation was build with the support of the SeSAm (KLÜGL, 2006) tool. The tests of the multi-agent simulation of XP software develoment process model used the 2k Factorial statistical experimentation (LAW e KELTON, 2000) and their results demonstrated the effectiveness and practical applicability of the model for the research problem.
144

Fatores-chave para o planejamento de projetos de interação móvel entre empresa e cliente

Machado, Cássio Bobsin January 2009 (has links)
A massificação da comunicação digital móvel é uma das forças tecnológicas recentes mais importantes. Além da rápida disseminação entre as pessoas, as organizações vêm adotando cada vez mais a interação móvel com seus públicosalvo, embora nem sempre considerando todos os aspectos e riscos envolvidos nesse tipo de iniciativa. As interações móveis apresentam características próprias, introduzindo novas dimensões que as diferenciam das interações convencionais, requerendo assim novas considerações durante seu planejamento. A partir disso, o objetivo dessa dissertação é o de identificar os fatores-chave para o planejamento dos projetos de interação móvel entre empresas e seus clientes. A pesquisa foi realizada através de métodos qualitativos, envolvendo extensa análise da literatura sobre mobilidade, entrevistas com especialistas e estudo de caso múltiplo. O resultado obtido compreende uma lista abrangente e relevante dos fatores-chave para esse tipo de projeto, oferecendo aos gestores um instrumento prático para utilizar no planejamento de suas iniciativas de interação móvel com clientes. / Mobile digital communication massification is one of the most important recent technological forces. Besides its fast spreading among people, organizations are widely adopting mobile interactions with its publics, although seldom considering every aspect and risk involved in this kind of interaction. Mobile interactions have their own characteristics, introducing new dimensions that differentiate them from conventional interactions, requiring new considerations during its planning. Thus, the goal of this work is to identify key-issues for the planning of mobile interaction projects between organizations and their clients. Research was done using qualitative methods, involving a broad analysis of mobile literature, specialists’ interviews and multiple-case study. Results achieved comprehend a key-issues’ list for this kind of project, offering managers a practical instrument for their planning of clients mobile interaction initiatives.
145

Projeto de sistemas de produção na construção civil utilizando simulação computacional como ferramenta de apoio à tomada de decisão

Schramm, Fábio Kellermann January 2009 (has links)
Embora comum na indústria, o Projeto do Sistema de Produção (PSP) ainda é pouco realizado na construção civil. Estudos anteriores apontaram para a necessidade de empregar ferramentas capazes de modelar e avaliar os efeitos da interdependência, da complexidade e da variabilidade no desempenho dos sistemas de produção na construção, como a simulação computacional, ainda é pouco usada na construção civil. Desta forma, este trabalho teve como objetivo geral propor um modelo para a elaboração do Projeto do Sistema de Produção de empreendimentos da construção civil a partir da utilização da simulação computacional como ferramenta de apoio à tomada de decisão, tendo como ponto de partida o modelo anteriormente desenvolvido. Como estratégia de pesquisa optou-se pela pesquisa construtiva, caracterizada pela implementação de construções inovadoras para a solução de um problema com relevância prática, através do aprendizado baseado na experimentação e na reflexão teórica. A partir de uma revisão de literatura, este trabalho foi dividido em três fases. A fase exploratória consistiu da análise e seleção do software de simulação e de um estudo exploratório. A fase de desenvolvimento consistiu na realização de quatro estudos de caso nos quais avaliou-se o emprego da simulação no PSP. Na fase de análise e reflexão, discutiu-se quatro funções básicas do PSP: promover discussões e questionamentos; incentivar a adoção de uma visão sistêmica; sistematizar, formalizar e registrar decisões; e estabelecer um estado futuro a ser alcançado. Quanto à simulação, seu emprego permitiu o teste de diferentes cenários relacionados a mudanças na estratégia de ataque do empreendimento, ao dimensionamento da capacidade dos recursos de produção entre outros. Propôs-se, ainda, a estratégia de reutilização de modelos como forma de reduzir o tempo de desenvolvimento dos estudos. O modelo proposto, que tem seu escopo limitado a decisões de caráter operacional, divide o PSP em duas fases que não são estanques, devendo sobrepor-se: a fase estática, baseada no modelo anterior de elaboração do PSP; e a fase dinâmica, na qual são desenvolvidos os modelos de simulação e testados cenários para apoiar a tomada de decisão. / Though common in industry, the Production System Design (PSD) is still seldom used by the construction sector. Previous studies have pointed to the need to use tools to model and evaluate the effects of interdependence, complexity and variability in production system performance, such as computer simulation. Thus, this study aimed to propose a model for designing production systems of construction projects based on the use of simulation as a tool to support decision-making, whose starting point is a previously developed model. The constructive research approach is characterized by implementing innovative constructions to solve a specific and practically relevant problem through learning based on experimentation and theoretical reflection. Based on literature review, this study was divided into three phases. The exploratory phase consisted of the analysis and selection of simulation software and an exploratory study. The development phase consisted of four case studies in which the use of simulation in the PSD was evaluated. At the analysis and reflection phase four basic functions of the PSD were discussed: promoting discussion and questions; encouraging the adoption of a systemic view; formalizing and recording decisions; and establishing a state to be reached. The use of simulation allowed the testing of different scenarios related to project installment strategy changes and in the capacity planning of production resource planning capacity among others. A strategy for reusing models was also proposed in order to reduce the development time of the studies. The proposed PSD model, which has its scope limited to decisions of operational nature, is made up of two overlapping phases: the stochastic phase, based on the previously proposed PSD model, and the dynamic phase, in which simulation models are developed and scenarios are tested to support decision-making.
146

Modelo econômico-probabilístico de análise de risco em projetos de TI

Miorando, Rogerio Feroldi January 2010 (has links)
Esta tese apresenta um modelo econômico-probabilístico de análise de risco para projetos de TI que busca integrar a análise de riscos à análise econômica dos projetos. Este trabalho pretende atender uma carência observada na literatura referente a modelos de análise de risco para projetos de TI que avaliem o impacto econômico dos fatores de risco envolvidos. Para tanto, o modelo busca quantificar o valor e a probabilidade de possíveis desvios do fluxo de caixa, fornecendo uma análise econômico-probabilística dos retornos esperados para o projeto. São identificadas as principais categorias e fatores de risco envolvidos em projetos de TI e os mesmos são associados aos grupos do fluxo de caixa, estabelecendo uma estrutura de avaliação do impacto econômico dos fatores de risco e suas probabilidades de ocorrência. A partir do preenchimento da estrutura de avaliação, é realizado o cálculo dos valores dos grupos do fluxo de caixa e do valor presente líquido do projeto ajustados ao risco, através do uso de simulação estocástica. O modelo fornece como resultado a distribuição de probabilidade para o resultado econômico do projeto. A aplicação do modelo é ilustrada através da análise de um projeto de desenvolvimento de um sistema ERP. O uso do modelo proposto forneceu o retorno econômico do projeto ajustado ao risco, através da distribuição de probabilidades para o seu VPL, e a variabilidade que cada fator de risco analisado provoca no retorno do projeto. Após a avaliação do projeto original, seguindo os princípios de Opções Reais, o modelo também avaliou uma opção alternativa de condução do projeto, que permitiu aumentar seu valor médio e reduzir o risco associado. / This thesis presents an economic probabilistic model of risk analysis for IT projects. The proposed model combines risk analysis and economic analysis of the projects. This work intends to fill in a gap observed in the literature regarding models for IT projects risk analysis that assess the economic impact of the risk factors involved. The proposed model aims to quantify the value and the probability of possible cash flow deviations, providing an economic-probabilistic analysis of returns expected from the project. The main categories and risk factors involved in IT projects are identified and associated with cash flow groups, establishing a structure for the economic impact assessment of risk factors and their probability of occurrence. Supported by the proposed structure of evaluation, the calculation of the values of the cash flow groups and the project net present value (NPV), adjusted to the risk, is performed using stochastic simulation. As a result, the model provides the probability distribution for the economic result of the project. The application of the model is illustrated through the analysis of a project for an ERP system development. The use of the proposed model provided the economic return of the project adjusted to the risk (through the probability distribution of its NPV) and the variability that each risk factor analyzed causes in the return of the project. After the evaluation of the original project, following the principles of Real Options, an alternative option for the conduction of the project was also evaluated using the proposed model. The alternative allowed the increase of its average value and the decrease of the associated risk.
147

Processo de gestão de projetos de design e maturidade em gestão de projetos de empresas da indústria moveleira : estudos de casos no Vale do Taquari/RS / Process of management design projects and project management maturity in the furniture companies: case studies in the Vale do Taquari/RS

Galafassi, Ana Gelsemina January 2010 (has links)
O gerenciamento de projetos tem sido utilizado pelas organizações como ferramenta para estruturar, organizar e aprimorar suas práticas, bem como para alinhar projetos aos seus objetivos estratégicos. Por sua vez, gerir projetos de design significa planejar a gestão do desenvolvimento de novos produtos e deve envolver conhecimentos sobre gestão, assim como das atividades do design. Com foco no setor industrial, o presente estudo tem como objetivo analisar a gestão de projetos de design na indústria moveleira no Vale do Taquari, segmento produtivo que tem relevante destaque na indústria de transformação nacional. O estudo baseia-se na proposição de Borja de Mozota, que considera que a gestão do design está inserida nos três níveis organizacionais: operacional, tático e estratégico. Utiliza, também, modelos de maturidade em gestão de projetos como evidência para análise adicional da pesquisa, uma vez que pretende verificar como as empresas estudadas lidam com a gestão de projetos. Para o desenvolvimento deste trabalho, realizou-se uma pesquisa de abordagem qualitativa, caracterizada como um estudo de casos, cuja coleta de dados ocorreu em visitas e entrevistas com gestores de duas indústrias de móveis. A relação da gestão de projetos de design e a análise do nível de maturidade em gestão de projetos possibilitaram a identificação de pontos fortes e oportunidades de melhoria das empresas estudadas. Infere-se, nesse sentido, que empresas que conhecem, planejam, gerenciam e controlam seus processos e o desenvolvimento de seus produtos estão, em geral, mais preparadas para a competitividade e a inovação. O resultado deste estudo mostrou que, mesmo sem uma sistematização e conhecimento dos conceitos, as empresas pesquisadas tratam da questão da gestão de projetos de design nos seus níveis organizacionais. / Project management has been used by organizations as a tool to structure, organize and improve their practices as well as projects to align their strategic objectives. In turn, managing design projects, means planning the management of new product development and management should involve knowledge of how the activities of design. Focusing on the industrial sector, this study aims to examine the management of design projects in the furniture industry in Vale do Taquari, a productive segment that has significant prominence in the national process industry. The study was based on the proposition of Borja de Mozota, whereby the design management is inserted in the three organizational levels: operational, tactical and strategic. It is intended to apply also maturity models of project management as further evidence of the research. To develop this work, a research of qualitative study, characterized as a study of cases, whose data was collected in personal interviews with managers from two furniture manufacturers. The relation of project management design and analysis of the level of maturity in project management has enabled the identification of substantial points and improvement opportunities within the companies studied. It is inferred, in this sense, that companies that know, plan, manage and control their processes and the development of their products are, generally more prepared for competition and innovation. The result of this study has showed that, even without a systematization and knowledge of the concepts, the researched companies deal with the issue of management of design projects in their organizational levels.
148

Análise da gestão de riscos em projetos de sistemas de informação

Silva, Priscila Coelho da January 2011 (has links)
A gestão de projetos é tema de importância crescente nas organizações, sendo que diversos objetivos organizacionais são realizados por meio de projetos. Na área de Tecnologia da Informação (TI), grande parte das iniciativas são desenvolvidas por meio dessa forma de trabalho. Desenvolvimento, melhorias e adaptações em Sistemas de Informações (SI) fazem parte desse contexto, onde a gestão por projetos é utilizada para cumprir com os objetivos de negócios através dos SIs. Apesar da importância desse tema para as organizações, é conhecido que esses projetos apresentam falhas com alta frequência. Assim, a gestão de riscos é vista como um dos principais componentes para o sucesso dos projetos de SI. Nesse trabalho, realizou-se estudo de casos em projetos de SI, com o objetivo de analisar como a atividade de gestão de riscos é realizada na prática. Foram levantadas as atividades de gestão de riscos propostas pelos padrões de mercado e identificados os temas de risco apontados como relevantes pela literatura. Foram analisados três casos de empresas de portes e contextos diferentes. Os resultados mostraram que: as empresas utilizam padrões de mercado, mas não adotaram as técnicas previstas por esses padrões nos projetos; a maioria dos riscos que ocorreram nos projetos não foram reconhecidos como tal pelos gestores; riscos relativos a custo ou prazo foram os riscos mais reconhecidos; as ações em gestão de riscos ocorreram sobre a probabilidade ou sobre os efeitos; e a dificuldade de comunicação entre a equipe do fornecedor e o cliente foi um elemento comum aos riscos ocorridos nos casos. O trabalho buscou trazer contribuições para o tema gestão de riscos, analisando como essa atividade é realizada nos projetos de SI. Os resultados convidam tanto a academia quanto os profissionais a reflexão sobre o papel das abordagens de mercado na área, já que os mesmos não apontam a melhor decisão a tomar frente a um problema e sobre as competências necessárias para uma efetiva gestão de riscos. / The project management topic is of increasing importance in the organizations, and many organizational objectives are achieved through projects. Most initiatives in the Information Technology (IT) area are developed through this type of work. Development, improvement and adaptation of Information Systems (IS) are part of that context, where project management is used to meet business objectives through ISs. Despite of the importance of this issue for organizations, it is known that IS projects have a high fault rate. Therefore, risk management is seen as a key component to their success. This reserarch conducted case studies in IS projects, aiming on examining how the risk management activity is actually performed. The paper examined the risk management activities proposed by the industry standards to the area, and identified the risk issues pointed as relevant by the literature. Three cases were analyzed, consisting on three companies of different sizes and backgrounds. The results showed that companies do use market standards, but did not adopt the techniques contained in those standards in projects; most risks that occurred in the projects were not acknowledged as such by management; risks related to cost or longer-term risks were the most recognized; the risk management actions have occurred on the likelyhood or on the effects of the risks; and the communication difficulties between the supplier and the customer team was a common element to the risks incurred in the cases. The research aimed to contribute to the risk management topic, analysing how this activity is performed in IS projects. The results invite both, academy and professionals, to reflect upon the role of industry standards in the area, since they do not point the best decision to make about a problem and the necessary skills for an effective risk management.
149

Características da cooperação da Universidade Federal de São Carlos com a Sociedade no período de 2008 a 2012

Villela, Tatiane da Cunha 28 November 2014 (has links)
Made available in DSpace on 2016-06-02T19:52:09Z (GMT). No. of bitstreams: 1 6498.pdf: 1841095 bytes, checksum: 7c706a65ce9f91eadfda37ba6d2acecd (MD5) Previous issue date: 2014-11-28 / The knowledge generated in academia is of paramount importance to technological advances and increasing competitiveness. Technology transfer university-business refers to the different forms of partnerships between these two domains. The result of this process innovation is a prerequisite for survival in competitive environments. However, despite the ever closer links between universities and firms, cooperation is "far" from being a smooth process, mainly due to structural differences between agents and goals and can create conflicting expectations and perceptions. Against this backdrop, this paper aims to present and analyze the characteristics of the profile UFSCAR cooperation with the company today, and see if there was any change in the characteristics of the UFSCAR cooperation with the company, using as an object of analysis projects established between the university and its external partners in the last five years (2008-2012), which are managed by the Foundation for Institutional Support of Scientific and Technological Development (FAI). Among the results, it is emphasized that the cooperation projects of UFSCAR with the external environment characterized, in most cases, by low ranges of duration. Regarding the type of financing, private companies, the main activities developed with the university in the study were the activities of Consultancy / Project Consultancy and Research and Development. Another important factor was that 88% of partnerships with private companies took place at the Center of Exact Sciences and Technology (CCET) and the Departments of Civil Engineering and Materials Engineering, both in number of projects and volume of resources. Furthermore, it was possible to note the growth potential of cooperative activity between the company and UFSCAR. / O conhecimento gerado na academia é de suma importância para o avanço tecnológico e para o aumento da competitividade. A transferência de tecnologia universidade-empresa refere-se às distintas formas de parcerias entre estes dois domínios. A inovação resultante desse processo é um pré-requisito para a sobrevivência em ambientes concorrenciais. No entanto, apesar da articulação cada vez mais próxima entre as universidades e as empresas, a cooperação está longe de ser um processo tranquilo, principalmente, devido às diferenças estruturais e objetivos entre os agentes, podendo gerar expectativas e percepções contraditórias. Diante deste cenário, este trabalho teve como objetivo apresentar e analisar as características do perfil de cooperação da UFSCar com a empresa atualmente, e verificar se houve alguma mudança nas características da cooperação da UFSCar com a empresa, utilizando como objeto de análise os projetos estabelecidos entre a universidade e seus parceiros externos, nos últimos cinco anos (2008-2012), que são gerenciados pela Fundação de Apoio Institucional ao Desenvolvimento Científico e Tecnológico (FAI). Dentre os resultados obtidos, destaca-se que os projetos de cooperação da UFSCar com o meio externo caracterizaram-se, na grande maioria, por baixos intervalos de duração. Em relação ao tipo de financiador, empresas privadas, as principais atividades desenvolvidas com a universidade em estudo foram as atividades de Consultoria/Assessoria e Projetos de Pesquisa e Desenvolvimento. Outro fator importante foi o de que a maior parte das parcerias com as empresas privadas ocorreram no Centro de Ciências Exatas e Tecnológicas (CCET) e nos Departamentos de Engenharia Civil e de Engenharia de Materiais, tanto em número de projetos quanto em volume de recursos. Além disso, foi possível notar o potencial de crescimento da atividade de cooperação entre a UFSCar e a empresa.
150

Modelagem de um adaptive neuro fuzzy inference system para análise de risco em projetos.

França, Daniel cruz de 22 February 2016 (has links)
Submitted by Maike Costa (maiksebas@gmail.com) on 2016-04-29T13:48:06Z No. of bitstreams: 1 arquivo total.pdf: 1906817 bytes, checksum: 6bf3c54782cfdea75b86311d9bc28cb9 (MD5) / Made available in DSpace on 2016-04-29T13:48:06Z (GMT). No. of bitstreams: 1 arquivo total.pdf: 1906817 bytes, checksum: 6bf3c54782cfdea75b86311d9bc28cb9 (MD5) Previous issue date: 2016-02-22 / Several researches highlight the importance of risk management in project management. Many authors propose traditional models with statistical and deterministic methods, though some risk project management issues are based on conceptual frameworks, expert opinion and human experience. This kind of problem makes difficult the use of classical models, but can be mathematically treated using fuzzy logic. In addition, historical data of projects can provide information about the organization's risk analysis experience and be modelled by a learning mechanism. The method used in this work is the Adaptive Neuro-fuzzy Inference System (ANFIS), which is capable of aggregating the mathematical treatment capacity of conceptual models with a hybrid learning algorithm. Thus, the aim of this study is to model an ANFIS that is able to analyze the risks of projects. A set of projects was analyzed by means of a risk management checklist with factors arranged in a risk breakdown structure (RBS). Estimates were made using probability and impact matrix, and expert opinion. The risk of each project was defined as an integer between 1 and 10. To select the best model among 32 different ANFIS settings, 84% of the data were used in 10-fold cross-validation. The model with the best results in validation process was selected and tested with the remaining data. The results attained in the evaluation were: mean squared error (MSE) of 0.2207, mean absolute error (MAE) of 0.3084, coefficient of determination (R²) of 0.9733 and 80% of accuracy. These results indicate that the project risk management can be successfully performed by ANFIS. This enables the modeling of knowledge and human experience and can reduce costs of skilled labor and improve the speed of analysis. / Diversas pesquisas ressaltam a importância do gerenciamento de risco na gestão de projetos. Muitos autores propõem modelos tradicionais com métodos estatísticos ou determinísticos, entretanto alguns problemas de gerenciamento de risco em projetos são baseados em estruturas conceituais, na opinião especializada e na experiência humana. Esse tipo de problema dificulta a utilização de modelos clássicos, mas pode ser tratado matematicamente por meio da lógica fuzzy. Além disso, dados históricos de projetos podem fornecer informações sobre a experiência de analise de risco da organização e ser modelados por mecanismo de aprendizagem. O mecanismo utilizado nesse trabalho é o Adaptive Neuro-fuzzy Inferece System (ANFIS), que é capaz de agregar a capacidade de tratamento matemático de modelos conceituais com um algoritmo de aprendizagem híbrido. Desse modo, o objetivo desse trabalho é modelar um Adaptive Neuro-fuzzy Inferece System capaz de analisar os riscos de projetos. Um conjunto de projetos foi analisado por meio de uma lista de verificação com fatores de risco organizados em uma estrutura analítica de risco (EAR). As estimativas foram realizadas por meio de matrizes de probabilidade e impacto e opinião especializada. O risco de cada projeto foi definido como um número inteiro entre 1 e 10. Foram utilizados 84% dados na validação cruzada 10-fold para seleção do melhor modelo entre 32 diferentes configurações de ANFIS. O modelo com os melhores resultados de validação foi selecionado e testado com os dados restantes. Os resultados alcançados na avaliação foram: erro quadrático médio (MSE) de 0,2207, erro absoluto médio de 0,3084, coeficiente de determinação (R²) de 0,9733 e acurácia de 80%. Esses resultados indicam que o gerenciamento de riscos em projetos pode ser realizado com sucesso através do ANFIS. Isso possibilita a modelagem de conhecimento e experiências humanas e pode diminuir custos com mão de obra especializada e aumentar a velocidade das análises.

Page generated in 0.06 seconds