Spelling suggestions: "subject:"förlossning"" "subject:"förlossning""
1 |
Ett värdeskapande arbete : En studie om armerares arbetsmiljö samt om lastning och lossning av armering till vindkraftsfundament / A value adding work : A study of the working environment as well as the loading and unloading of reinforcement for wind turbine foundationsMoström, Henrik January 2015 (has links)
Inom byggnadsindustrin visas det att 30-35% av ett byggprojekts totala kostnad består av slöserier på grund av att resurser används på onödiga sätt såsom att felkostnader uppstår av diverse olika skäl, spill av material, väntetider på bland annat material eller maskiner samt arbetsskador. Cirka 5% av de allvarliga arbetsolyckorna år 2009-2010 inträffade när personen lastade, lossade, bar eller flyttade något och cirka 20% av de som drabbades tillhörde bygg- och anläggningsarbetare samt metallarbetare. Många av dessa skador skulle nog kunna förhindras genom att se över arbetsmiljön på arbetsplatsen. Armeringen som arbetarna använder är ofta tunga, långa och besvärlig att hantera och detta gör att det finns ett flertal risker som en armerare utsätts för dagligen. Dessa är bland annat: tunga lyft, ohälsosamma arbetsställningar, risken att snubbla samt halka över material. I nuläget finns det en mängd olika armeringslittera (olika typer av armering) inom byggnadsindustrin. Celsa Steel Service (Celsa) har utvecklat ett flertal mervärdestjänster som underlättar armerarnas arbete. Syftet med denna rapport var att kartlägga vilken arbetsmiljö som råder för berörda parter (armerare, lastbilschaufför och traversförare) vid armeringsförfarandet av vindkraftsfundament. Samt vilken leveransmodell som genererar största tidsbesparing och hur mycket av armerarnas arbetstid som utgör faktiskt produktivt arbete. Projektet bestod av frekvensstudier gällande monteringsprocessen av armeringen till ett vindkraftverksfundament som uppfördes av Stenger & Ibsen Construction AB på Rammeldalsberget, tidsstudier vid lastning och lossning samt löpande samtal med de berörda parterna. Frekvensstudien ger en god uppfattning om hur arbetstiden fördelas och är jämförbar med resultatet från de tidigare utförda studierna från Josephson, Eriksson och Frödell (2011). Cirka 30% av arbetstiden befinner sig armeraren i en dålig arbetsställning. Författaren har i detta projekt studerat arbetsmiljön för armerare, vilken består av ett flertal risker som kan leda till arbetsskador samt arbetssjukdom. Det finns en brist på hjälpmedel som kan användas och en stor del av forskningen inom ämnet är föråldrad. Det framkom även att mervärdestjänsten färglossning inte uppnår önskad effekt på just detta projektet som innehåller ett väldigt litet antal olika armeringslitteran. / In the construction industry, it appears that about 30-35% of the total cost of a constructionproject consists of wastage due to the fact that resources are spent on unnecessary ways suchas error costs incurred by various reasons, waste of materials, waiting times for materials ormachinery as well as work-related injuries. About 5% of the serious accidents in 2009-2010occurred when the person loaded, unloaded, carried or moved something and about 20% ofthose who were hit were construction workers and metalworkers. Many of these injurieswould be prevented by reviewing the working environment at the workplace. Thereinforcement of workers uses is often heavy, long and difficult to manage, and this meansthat there are a number of risks that a reinforcement fitter are exposed to on a daily basis.Some of the risks included are: heavy lifting, unhealthy working postures, the risk of trippingand slipping over the material.At present, there are a variety of different cut and bended rebar types in the constructionindustry. Celsa Steel Service (Celsa) has developed a number of value-adding services thatfacilitate the reinforcement fitters work. The purpose of this report was to identify theworking conditions for the involved parties (reinforcement fitters, truck driver and craneoperator) at the reinforcement procedure of wind turbine foundations. As well as the deliverymodel that generates the biggest time savings and how much of the reinforcement fittersworking hours that is productive work.The project consisted of frequency studies of the assembly process of the reinforcement to awind turbine foundation built by Stenger & Ibsen Construction AB on Rammeldalsberget,time studies during loading and unloading as well as ongoing discussions with the involvedparties. The Frequency study gives a good idea of how working hours are distributed and arecomparable with results of previous studies conducted by the Josephson, Eriksson andFrödell (2011). The reinforcement fitter is in a bad working posture approximately 30% of thetime they are working.The author has in this project studied the working environment for reinforcement fitterswhich consists of a number of risks which can lead to work-related injuries and occupationaldiseases. There is a lack of tools that can be used as aid and a large part of the research aboutthe topic is outdated. It also emerged that the value-adding service, color unloading, do notachieve the desired effect on this particular project, which contains a very small number ofdifferent cut and bended rebars.iii
|
2 |
Mikrobiologisk diagnostik vid misstänkt implantatrelaterade infektioner / Microbiological Diagnosis of suspected Implant-related InfectionsMohammed, Hamse Ali January 2012 (has links)
No description available.
|
3 |
Säkerhetskulturen i byggbranschen : En studie av Skanskas säkerhetsarbete med tyngdpunkt på lossningJacobsson, Lina, Skerfe, Carl-Johan January 2020 (has links)
Safety culture are the common beliefs, values and attitudes that a company have for safety and the working environment. A good safety culture is characterized by a management that has a high priority on security issues and the issues are addressed at all levels. The purpose of the study is to investigate how to develop a good safety culture further from todays relatively high level. We have conducted qualitative interviews at three different levels in a company and visit a construction site to observe the unloading of building material. We chose to look at unloading as the company we partnered with focuses on increasing safety at that operation. The study shows that work isn’t always carried out as planned due to a lack of custom solutions, wrong attitude, perceived stress and the desire to be effective. In order to create a better safety culture, it’s important to involve and motivate the workers. Safety must permeate all processes and the leaders has an important role in this work. In order to improve attitudes and behaviour towards safer work, it’s important to be consistent. By learning and discussing from your own and others experiences, you can avoid making the same mistake. Communication should be clear and it is important to follow up what you communicate. An openness in the workplace makes everyone comfortable to stop risky moments.
|
4 |
Materialhandling, A study on common problems at the construction site / Materialhantering, En studie inom bygglogistik på byggarbetsplatsenMunter, John, Pålsson, Erik January 2017 (has links)
Kostnaderna för byggnadsprojekt ökar varje år, detta beror på ett flertal faktorer såsom nya standarder, synen på att bygga miljövänligt samt hårdare krav från byggherrar som vill få projekten klara på kortare tid. För att kunna möta kraven måste byggföretagen hitta nya sätt för att bygga mer effektivt och lönsamt. Ett område med potential för utveckling är logistiken runt om och på arbetsplatsen. Arbetet utgår från bygglogistik, mer specifikt materialhantering samt lossning på arbetsplatsen. Studien har utförts på två olika byggarbetsplatser i Linköping för att kunna analysera likheter och skillnader mellan arbetsplatserna då de har olika förutsättningar. Studien undersöker och belyser de mest kritiska momenten på arbetsplatserna, identifierar hur problemen uppstår och möjliga lösningar till dessa. Data som studien bygger på har samlats in genom intervjuer och observationer. Studien visar på att en stor del utav de problemen som observerades hade kopplingar till planeringen i form utav APD-planer, bristfällig kommunikation samt platsbrist på bygget.
|
Page generated in 0.0422 seconds