• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 972
  • 745
  • 11
  • 11
  • 11
  • 10
  • 7
  • 6
  • 6
  • 6
  • 6
  • 6
  • 5
  • 5
  • 3
  • Tagged with
  • 1757
  • 792
  • 755
  • 643
  • 386
  • 375
  • 375
  • 375
  • 375
  • 326
  • 302
  • 298
  • 209
  • 208
  • 199
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
551

Caracterización de la falla Cariño Botado (32°30'S) y su relación al West Andean Thrust System (Wats)

Medina Ríos, Javiera Elena January 2018 (has links)
Geóloga / El estudio de la neotectónica ha sido relevante debido al impacto que tienen los sismos en la sociedad, debido a esto ya se han llevado a cabo estudios de peligro sísmico. Por ejemplo, la Falla San Ramón ubicada dentro de la parte oriental de la ciudad de Santiago, a la cual además se le ha atribuido una importancia de primer orden para la tectónica andina, forma parte del West Andean Thrust System (WATS). El WATS se encuentra en la parte occidental de la Cordillera Principal y se cree que controla el alzamiento de los Andes. Hacia el norte, siguiendo aproximadamente el mismo rumbo de la Falla San Ramón, se encuentra la Falla Cariño Botado que corresponde a una falla inversa de vergencia oeste ubicada al este de la ciudad de Los Andes y tiene evidencia de movimiento Cuaternario. El objetivo de este trabajo es la caracterización y mapeo de la Falla Cariño Botado y la relación que tiene esta estructura con el WATS. Para lograr el objetivo se realizaron las tareas de mapeo y descripción de estructuras en campañas de terreno, análisis de imágenes satélites y modelos de elevación digital (DEMs) en busca de marcadores morfológicos y escarpes como también un análisis de los sismos de la zona. Con estos nuevos datos se redefinió el mapeo de la falla en relación con otras estructuras de la zona. Los resultados indican que la Falla Cariño Botado es una estructura de carácter inverso, de vergencia oeste, formada por segmentos principalmente de orientación norte-sur y que presenta movimiento Cuaternario. Demostrado con afloramientos de fallas donde la Formación Abanico se ubica sobre abanicos aluviales Cuaternarios. Esta evidencia permite que el WATS se extienda hacia el norte. Además, se obtuvo un peligro sísmico asociado a la Falla Cariño Botado del orden de Mw ~ 6,3 7,1 y es una importante fuente de peligro sísmico en Chile Central.
552

Efectos de expansión de capacidad vial en congestión y su interacción con otras políticas urbanas

Riquelme Carrasco, Ignacio Tomás January 2016 (has links)
Magíster en Ciencias de la Ingeniería, Mención Transporte / Ingeniero Civil / El prop ósito de este trabajo es el estudio de los efectos de una inversi ón en capacidad vial analizando en detalle dos relevantes aristas. En primer lugar, estudiar las consecuencias en los costos generalizados asociados a los modos disponibles. Un importante objetivo de esta primera parte es el an álisis de la veracidad de la paradoja de Downs-Thomson y la b úsqueda de las variables principales que determinan la existencia de esta hip ótesis. En segundo lugar, estudiar el benefi cio social de aumentar la capacidad vial, tanto en ausencia como en presencia de otras pol íticas urbanas para combatir la congesti ón. El objetivo principal de esta tesis es obtener conclusiones que permitan entregar recomendaciones sobre pol íticas de transporte. Para esto, se utiliza un modelo donde la demanda de viajes totales es sensible a cambios en los precios y tiempos de viajes. Específi camente el modelo es caracterizado por dos per íodos de viaje, el transporte p úblico y privado son sustitutos y existe congesti ón cruzada entre ambos modos. El estudio se basa en la extensi ón del modelo microecon ómico de equilibrio parcial de Basso y Silva [2014], quienes modelan las decisiones de los usuarios junto con las decisiones de los operadores del servicio p úblico y pol íticas urbanas en decisi ón del plani ficador. En este estudio se simula escenarios tomando datos de la ciudad de Londres y con esto se analiza la efi ciencia de invertir en capacidad vial en condiciones normales de tr áfico mixto. Adem ás se compara su efi ciencia con otras pol íticas como dedicaci ón exclusiva de buses, tari ficaci ón por congesti ón, subvención al transporte p úblico y combinaciones entre estas. De este estudio se desprenden dos resultados principales. Una primera conclusión es que en la mayor ía de los escenarios analizados la paradoja de Downs-Thomson no se cumple debido a la consideraci ón de un modelo de demanda con sustitutos imperfectos (hip ótesis expuesta en Basso y Jara-D az [2012]) y a la congesti ón presente la cual genera que la curva de costo generalizado del transporte p úblico no sea siempre decreciente. Un segundo resultado principal es que en t érminos de e ficiencia los resultados muestran que en una situaci ón urbana altamente congestionada (tráfico mixto), la capacidad del sistema de transporte público, en particular de su cuello de botella, los paraderos de buses, son fundamentales. La mejora gradual de este sistema abrir á el camino a utilizar polí ticas de gesti ón (ví as exclusivas) y de precios (subsidios y tarifi cación por congesti ón) en lugar de grandes expansiones de capacidad vial para reducir la congesti ón. Esto se traduce en que en un marco de an álisis de costo-bene ficio estricto para solucionar la congesti ón, se debe tomar en cuenta las consecuencias en nivel de congesti ón de la polí tica a implementar y no el grado de congesti ón presente.
553

Diseño de un modelo de costos para las MYPES del sector hotelero de Lima Metropolitana

Arboleda Romero, Arturo 30 May 2018 (has links)
El presente trabajo de investigación es un modelo de costos para las para las MYPES del sector hotelero de Lima Metropolitana, la cual será un apoyo para los microempresarios de los hoteles de 2 y 3 estrellas que poseen escasos conocimientos en temas de costos. Mediante este modelo se obtendrá mejores resultados monetarios. Además, la metodología planteada en el trabajo de investigación se realizará bajo la gestión de procesos y validada por expertos para que sea viable. / The present research work is a cost model for the MYPES of hotel sector of Metropolitan Lima, which it will be a support for the micro-entrepreneurs of hotels to 2 and 3 starts that it have less knowlegde on costs issues. By means of this model will get better monetary results. In addition, the methodology propused in the research will be carried out under process management and validated by experts to be possible. / Tesis
554

Estudio de música Visual Music Media / Music studio Visual Music Media

Fucay Monthedoro, Edith Elizabeth, Manrique Hoyos, Sadith Rosana, Rodriguez Cachuan, Anne Katherine, Verástegui Noriega, Edgar 15 July 2019 (has links)
El presente proyecto sobre el estudio de grabación, nos muestra la viabilidad de la ejecución, basándonos en una investigación y validación de mercado que se realizó en la ciudad de Lima Metropolitana a personas del NSE B, C y D, que nos permitió identificar una demanda insatisfecha debido a la falta de oportunidades de poder demostrar su talento musical, en un estudio de música implementado con un nivel profesional, con instrumentos y equipos profesionales y que, además, les ofrezcan oportunidades de presentaciones en eventos. Actualmente, las personas interesadas en el arte de la música buscan estudios en donde puedan mejorar o perfeccionar su talento, y se preocupan por encontrar un lugar que les ofrezcan todas las alternativas posibles, y considerando que hoy en día hay una gran tendencia, vemos que hay una oportunidad de negocio para poder atender esta necesidad. Para la puesta en marcha de este estudio de música, se requerirá una inversión inicial de S/231,815 soles, financiado en un 40% con la aportación de un inversionista y un 60% con los aportes de los accionistas. La inversión que realizarán los accionistas (60%) se estima recuperar en 5.77 años de la operación. El proyecto resulta viable porque cumple las expectativas de los inversionistas y accionistas al tener una TIRE (61.31%) superior al WACC (15.84%), y para el accionista de un COK de 17% obteniendo un TIRF de 56.00%. anual. / This project on the recording studio shows us the feasibility of the execution, based on a market research and validation that was carried out in the city of Lima Metropolitana to people of NSE B, C and D, which allowed us to identify a demand dissatisfied due to the lack of opportunities to demonstrate their musical talent, in a music studio implemented with a professional level, with professional instruments and teams and that also offer them opportunities for presentations at events. Today, people interested in the art of music look for studies where they can improve or perfect their talent, and they worry about finding a place that offers them all the possible alternatives, and considering that today there is a great trend, we see that there is a business opportunity to meet this need. For the start-up of this music studio, an initial investment of S/231,815 soles will be required, financed by 40% with the contribution of an investor and 60% with the contributions of the shareholders. The investment that shareholders will make (60%) it is estimated to recover within 5.77 years of the operation. The project is viable because it meets the expectations of investors and shareholders by having a TIRE (61.31%) WACC (15.84%), and for the shareholder of a COK of 17% obtaining a TIRF of 56.00%. per year. / Trabajo de investigación
555

Guardería y hotel canino - Wasi Dogs / Day care & canine hotel – Wasi Dogs

Cochrane Parra, George Benjamín, Flores Rojas, Carlos Javier, La Serna Felices, Jorge Daniel, Perez Sanchez, Darcy Luz 15 July 2019 (has links)
Nuestro proyecto está dirigido a clientes “Dog lovers” que han desarrollado un vínculo afectivo con sus perros. La creciente demanda de familias con los “hijos de cuatro patas”, se encuentran en la necesidad de invertir en ellos. En el estudio del entorno encontramos que en Lima el 41% de los hogares cuentan un perro como mínimo en casa. Las personas de los sectores A y B, son los más propensos a invertir en emprendimientos como el nuestro, por ello nos enfocaremos en los distritos de San Isidro, San Borja y Miraflores. Para conocer la opinión del segmento se implementó entrevistas a profundidad e identificamos que un porcentaje del mercado se encuentra desatendido y que existen necesidades por cubrir. El plan de operaciones establece un local 5,000 mts2. Inicialmente sólo el 40% será implementado con infraestructura para el entretenimiento y cuidado de los canes. El 60% se implementará en el transcurso de los 3 años de actividad. La viabilidad del proyecto se sustenta en que se ha obtenido un VPN del Flujo de caja de Libre disponibilidad S/ 448.703,18 a una tasa WACC 13.83%, un VPN del flujo de caja del inversionista de S/ 398.661,46 a una tasa COK del 16 %. Finalmente el periodo de recuperación descontado resulta 3.29 En base a los resultados mostrados, se concluye que el presente emprendimiento proyecta ser rentable debido a que ha generado mayor al retorno esperado por los accionistas e inversionistas. / Our project targets are the "Dog Lovers", people who have developed an affective bond with their dogs. The growing demand of families with their "four legged kids", resides in the need to invest in them. The research of environment showed us that just in Lima city, 41% of homes have at least, one dog at home. The people from sectors A and B are willing to invest in ventures like ours, so we decided to focus on San Isidro, San Borja and Miraflores districts. In-depth interviews were necessary in order to obtain greater clarity and knowledge about concerns and opinions of the segment. We identified that a significant percentage of the market is unattended and there are needs and opportunities to cover. The operational plan establishes a site of 5,000 m2. According to this, initially just the 40% will be implemented with infrastructure for the entertainment and caring of dogs. The remaining 60% will be implemented later, along the 3 years of activity. The viability of the project is based on the fact that a Free Availability Cash Flow NPV of S / 448,703.18 has been obtained at a WACC rate of 13.83%, an NPV of the investor's cash flow of S / 398,661.46 at a COK rate of 16%. Finally, the discounted recovery period results 3.29. Based on the results shown, it is concluded that the present venture is projected to be profitable because it has generated a higher return expected by shareholders and investors. / Trabajo de investigación
556

Dream Waves Peru: Laguna de olas artificiales para la práctica del surf

Aguilar Espinoza, Walter Alberto, Ochoa Quispe, Diana Marisol, Villanueva Salas, Elizabeth Estela 01 August 2018 (has links)
La presente tesis tiene por objetivo el desarrollo de un proyecto de inversión, el cual consta de un centro de esparcimiento con un principal atractivo, una laguna con olas artificiales para la práctica del surf en cualquier época del año, desarrollado por un innovador sistema tecnológico, fabricado por una empresa europea con años de experiencia en este tipo de actividades. El análisis del macro entorno en el que se desarrollará el proyecto muestra condiciones favorables, que representan una oportunidad de negocio. Por otro lado, el análisis del micro entorno, nos indica que se tiene un mercado atractivo para la inversión. Se desarrollará un estudio de mercado para conocer la oferta y la demanda actuales. La ventaja competitiva sostenible de la empresa se basará en la cultura de la organización con enfoque en la innovación por la tecnología empleada y orientación al público objetivo. A largo plazo el negocio pretende ser sostenible en el tiempo, logrando incremento de ventas anuales para un periodo de 10 años. Se presentará una alternativa de inversión que busca satisfacer las necesidades del inversionista. Cada capítulo desarrollará el plan de implementación de la empresa de servicios. Finalmente, se muestra los escenarios de financiamiento, rentabilidad y retorno del proyecto, siendo ellos favorables para la inversión. / This thesis has to develop an investment project, which consists of a recreation center with a main attraction, a lagoon with artificial waves for surfing at any time of the year, developed by an innovative technological system, manufactured for an expert European, in this type of activities. The analysis of the macro around in which project will be developed shows favorable conditions, which represent a business opportunity. On the other hand, the analysis of the micro around, indicates that there is an attractive market for investment. A market study will be developed to know the current supply and demand. The sustainable competitive advantage of the company will be based on the culture of the organization with a focus on innovation for the technology used and orientation to the target audience. In the long term, the business pretend to be sustainable over time, achieving an increase in annual sales for a period of 10 years. An investment alternative that seeks to satisfy the needs of the investor will be presented. Each chapter will develop the implementation plan of the service company. Finally, it will show to finance scenery of the project, VAN and Payback, being favorable for the investment. / Tesis
557

Alimento saludable para deportistas (Natural Parfait)

Arias Flores, Eveling Paola, García Falen, Renzo Leonardo, Huatuco Vellugas, Mary Carmen, Mancha Paredes, Silvia Patricia 13 July 2018 (has links)
El presente trabajo de investigación tiene por objetivo el análisis de factibilidad de un proyecto con un producto innovador dentro del rubro de comida saludable, y entregar a los deportistas la mejor opción para incluir en su dieta. El crecimiento de la tendencia de comida saludable, la tendencia del cuidado personal y aspecto físico es actualmente un escenario que da oportunidad de incursionar nuevos mercados. Además, las características del consumidor peruano también han cambiado, actualmente les interesa la búsqueda de información, la mayoría no solo lee la fecha de vencimiento, también el listado de los ingredientes y propiedades del producto. El saber lo que uno consume y el comer bien van de la mano y beneficia el estilo de vida, salud y bienestar. En los primeros capítulos del uno al cinco se desarrollan los aspectos generales del negocio presentando la idea del negocio y la oportunidad encontrada de crecimiento en el sector, posterior a ello se analiza la planeación estratégica evaluando las fortalezas y oportunidades de la idea, la validación del mercado a través del método experimental y el plan de marketing a utilizar para la promoción del producto. En los capítulos seis y siete se valida las operaciones y procesos a implementar y la estructura organizacional de la empresa. Finalmente, en el capítulo ocho presentamos la explicación del plan económico financiero en donde vemos los resultados de factibilidad que hacen viable el proyecto. / The objective of this research is to analyze the feasibility of a project with an innovative product in the healthy food category, and offer the athletes the best option to include in their diet. The growth of the trend of healthy foods, the trend of personal care and physical appearance is currently a view that give the opportunity to get into new markets. Also, the characteristics of the Peruvian consumer also changed, currently they are interested in searching information, most of them not only read the expiration date, also the list of ingredients and properties of the product. Knowing what eats and eating healthy is very important because benefits lifestyle, health and well-being. In the first chapters from one to five, the general aspects of the business are developed by presenting the business idea and the opportunity found for growth in the sector. After that, the strategic planning is analyzed, evaluating the strengths and opportunities of the idea, the market validation through the experimental method and the marketing plan to be used for the promotion of the product. Chapters six and seven validate the operations and processes to be implemented and the organizational structure of the company. Finally, in chapter eight we present the explanation of the financial economic plan where we see the feasibility results that make the project viable. / Trabajo de investigación
558

Clean Shoes

Bautista Salirrosas, Sara Noemi, Cherres Medina, Debora Clotilde, Corpuna Apaza, Evelin Yanet, Paredes Enco, Haydee Elizabeth, Peña Zanabria, Juan de Dios 13 July 2019 (has links)
El presente trabajo de investigación tiene la finalidad de sustentar la puesta en marcha de un modelo de negocio basado en el lavado de zapatillas a vapor en tiempo exprés y con servicio delivery que está dirigido a personas de 25-39 años de los distritos de Miraflores, San Isidro y San Borja ubicados en Lima Metropolitana del NSE A y B. La idea de este negocio nace ante las nuevas tendencias por el cuidado y la apariencia estética, identificando de esta manera una oportunidad de negocio para este público. Esto nos llevó a crear un nuevo sistema de negocio enfocado en brindar un servicio que no solo es innovador, también es un servicio especializado el cual superará las expectativas del público previamente segmentado, este proyecto tiene como ventaja competitiva dar un servicio diferenciado. La estructura del trabajo incluye planeamiento estratégico, investigación de mercado, plan de marketing, plan de operaciones, estructura organizacional y recursos humanos, así como el plan económico financiero, todo dirigido a un horizonte de 5 años. A través del análisis de cada punto mencionado se determinó la viabilidad del proyecto por la rentabilidad presentada, el periodo de recuperación de 3 años y una tasa interna de recuperación mayor al costo de oportunidad. / This research work has the purpose to supports the star-up of a business model based on steam wash of sneakers, done in an express time with delivery service, it is directed to people from 25 to 39 years, who are located at Miraflores, San Isidro and San Borja districts from A and B socioeconomic level. The business idea comes from the new trends about care and appearance, so we identified a business opportunity for these kind of people. This lead us to the creation of a new business system focus on to offer a service that is not only innovative, but also is a specialized service that will overcome our users expectations previously identified and segmented, the competitive advantage of this project is to offer a differentiated service. The structure of this work includes planning strategy, market research, marketing plan, operations plan, organizational structure, human resources and the economic financial plan, all of this is focus on 5 years horizon. Through the analysis of each mentioned point it was determined the project viability by the profitability found, the recovery period is 3 years and the internal recovery rate more than the opportunity cost. / Trabajo de investigación
559

Aplicativo de belleza infantil Funny Style / Funny Style Children's Beauty App

Apolinario Cerhuayo, Valia, Garay Neyra, Giulliana Esther, Huaman Cruz, Miryan, Kuga Alva, Julio Cesar Alexander 13 July 2019 (has links)
El presente trabajo tiene por finalidad presentar y demostrar la viabilidad técnica, económica y financiera del proyecto de negocio llamado “Funny Style”, con un horizonte de evaluación de 5 años. Funny Style será la primera aplicación para teléfonos móviles que permitirá brindar el servicio de estética infantil a domicilio, facilitando a los usuarios escoger el lugar, el estilista y el horario según sus necesidades. El público objetivo estará conformado por 438 mil hogares aproximadamente de las zonas 6 y 7 de Lima Metropolitana del nivel socioeconómico B, C con niños menores de 12 años de edad. La difusión de la propuesta de negocio será a través de diversas plataformas digitales como Facebook e Instagram, página web, las cuales permitirán una mejor interacción con los clientes y exposición de los servicios a ofrecer. Para la implementación del proyecto se estima una inversión de S/ 319,867 soles, la cual será financiada en un 68.74% con aporte de los 4 accionistas. La diferencia del 31.26% se realizará mediante un crédito. Finalmente, el análisis financiero nos arroja un Valor Actual Neto Económico (VANE) de S/ 242,352 soles y una Tasa Interna de Retorno Económico TIRE de 41.45% con un periodo de recuperación de 3.55 años. Además, se obtuvo un Valor Actual Neto Financiero (VANF) de S/ 246,918 soles y una Tasa Interna de Retorno Financiero (TIRF) de 47.53% con un periodo de recuperación de 3.49 años, estos resultados respaldan la viabilidad del proyecto. / The purpose of this work is to present and demonstrate the technical, economic and financial project viability called “Funny Style” with a five years evaluation horizon. Funny Style will be the first app for mobile phones which allows the esthetic infant at home, which will facilitate users to choose the place, stylist and schedule upon their needs. The target will be formed by 438 000 homes approximately from the 6th and 7th zone of the metropolis of Lima from the “B” and “C” socioeconomical level with children below 12 years old. The propagation of this business proposal will be through different digital platforms like Facebook, Instagram, and website, which will allow a better interaction between users and the offered services promotion. For the project implementation, we will have an investment of S/ 319,867, which will be 68.74 % financed by 4 shareholders. The 31.26% will be made with a credit with solidarity guarantee. Finally, the financial analysis gives us a Current Economic Net Value (VANE) of S/ 242,352 and an Internal Economic Return Rate (TIRE) is 41.45% with a recovery time of 3.55 years. Also, we have a Current Financial Net Value (VANF) of S/ 246,918 and an Internal Financial Return Rate (TIRF) of 47.53% with a recovery time of 3.49 years, these results support the project viability. / Trabajo de investigación
560

Propuesta de diseño estructural de un edificio comercial de 4 pisos con estructuras de concreto industrializado y placas de concreto in situ en la ciudad de Lima Metropolitana – 2014 / Structural design proposal for a 4-story commercial building with industrialized concrete structures and concrete walls in situ in the city of Metropolitan Lima - 2014

Calsin Ascurra, Jhon Andy, Veliz Francia, Gisel Noemí 12 December 2018 (has links)
La industrialización de la construcción mediante la prefabricación de elementos de concreto surgió en los países desarrollados en la posguerra, debido a la necesidad de reducir costos y plazos de construcción y, ante el incremento del costo de materia prima, en particular del acero de construcción. La aplicación de tecnología en la construcción permitió el empleo del pretensado en concreto para reducir los volúmenes de materia a emplearse, ganando terreno con el paso de los años y expandiéndose hacia Latinoamérica, con características de sismicidad similares a las del Perú. La presente investigación se enmarca en demostrar la aplicabilidad del sistema industrializado de concreto como alternativa de estructuración en un edificio comercial de cuatro niveles. Los primeros capítulos presentan la problemática a resolver en función a objetivos específicos desarrollados, y el estado del arte referente a los sistemas utilizados. Posteriormente, en el tercer capítulo se analiza un caso de estudio desarrollado bajo los lineamientos de la NTP E.060, criterios estructurales y sísmicos presentados en la NTP E.030 vigente. La modelación numérica nos permitirá evidenciar que es posible aplicar la industrialización de concreto para las características y solicitaciones de un edificio comercial con las ventajas del prefabricado. El cuarto capítulo describe el diseño estructural de los elementos principales que conforman el sistema tradicional e industrializado; el quinto capítulo desarrolla el análisis comparativo referencial entre el sistema tradicional vs el sistema industrializado destacando las ventajas del sistema industrializado como son mayores luces, menores tiempos de ejecución y reducción de costos a mediano plazo. / The industrialization of construction through the prefabrication of concrete elements arose in developed countries in the postwar period, due to the need to reduce construction costs and deadlines and, given the increase in the cost of raw materials, particularly construction steel. The application of technology in construction allowed the use of concrete prestressing to reduce the volumes of material to be used, gaining ground over the years and expanding into Latin America, with seismic characteristics similar to those of Peru. The present investigation is framed in demonstrating the applicability of the industrialized system of concrete as an alternative of structuring in a commercial building of four levels. The first chapters present the problem to be solved according to specific developed objectives, and the state of the art regarding the systems used. Later, in the third chapter, a case study developed under the guidelines of NTP E.060, structural and seismic criteria presented in current N.0 E.030 is analyzed. The numerical modeling will allow us to show that it is possible to apply the industrialization of concrete for the characteristics and demands of a commercial building with the advantages of prefabrication. The fourth chapter describes the structural design of the main elements that make up the traditional and industrialized system; The fifth chapter develops the benchmark comparative analysis between the traditional system and the industrialized system, highlighting the advantages of the industrialized system, such as greater lighting, shorter execution times and a reduction in medium-term costs. / Tesis

Page generated in 0.3578 seconds