• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 46
  • 2
  • Tagged with
  • 48
  • 26
  • 13
  • 12
  • 10
  • 10
  • 9
  • 8
  • 8
  • 6
  • 6
  • 5
  • 5
  • 5
  • 5
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
11

Ombyggnad av 1950-talets kontorshus till flerbostadshus / Refurbishment of a 1950´s office block to living apartments

Kamara, Richard January 2012 (has links)
This thesis aims to increase understanding and knowledge of issues affecting the redevelopment of older office buildings to housing. The rising demand for housing in recent years has resulted in a need and an increase in cost housing projects. The need has led property owners wanting to build old office buildings to apartments. The case study is carried out in Lycksele town and in close contact with consultancy TM (Technician Mercantile) – consulting, which has operations in the area. Rebuilding usually involves a combination of old and new ideas to satisfy a need. This is a broad topic within building design where the physical building characteristics are of important. This work investigates ways to rebuild and modernize a house from the 1950s with regard to: accessibility, noise, fire and energy. The methodology used in the work consists of scientific literature and a case study that includes interviews and sketch work of an office building in Lycksele. These methods are used to answer to questions that are generally asked and may be used for other office buildings being converted into housing. In the case study are different options presented with possible solutions to the redevelopment of the property Mobacka 2 to residential. The property Mobacka 2 has a character and design typical which are typical of the 1950s, giving the understanding and knowledge of the issues arising from the conversion of older office building to apartment building. It's a big project to convert a former office building into flats and there is much to think about in a reconstruction project, the conclusions of the report is to Internal accessibility of each plan can be managed. Accessibility to the second floor get as a consequence more difficult to handle in terms of placement of the elevator. Technical changes needed to meet today´s building requirements for sound; fire and energy require complementation on the inside and outside of the construction. Complementation for noise, remedy and results are difficult to judge.                   Keywords Fire, energy, noise, refurbishment, accessibility / Detta examensarbete syftar till att öka förståelsen och kunskapen kring frågor som har betydelse vid ombyggnation av äldre kontorsfastigheter till bostäder. Den stigande efterfrågan på bostäder har under de senaste åren resulterat i ett behov och en ökning av kostnadseffektiva bostadsprojekt. Behovet har lett till att fastighetsägare vill bygga om gamla kontorshus till flerbostadshus. Fallstudien i Lycksele genomfördes i nära kontakt med konsultföretaget TM (Teknisk Merkantil)- Konsult, vilka har verksamhet på orten. Ombyggnation innebär vanligtvis en kombination av gamla och nya idéer för att tillfredsställa ett behov och är ett brett ämne inom byggnadsutformning där de fysiska byggnadsegenskaperna är betydelsefulla. Det här arbetet utreder olika möjligheter att bygga om och modernisera hus från 1950-talet med hänsyn till tillgänglighet, ljud, brand och energi. Tillämpade metoder i arbetet utgörs av vetenskapliga litteraturstudier samt en fallstudie som innehåller intervjuer och skissarbete på en kontorsbyggnad i Lycksele. Metoderna används för att svara på frågeställningar som är generellt ställda och kan användas vid andra kontorsfastigheter som byggs om till bostäder. I fallstudien tas olika alternativ fram med möjliga lösningar till ombyggnation av fastigheten Mobacka 2 till bostadshus. Fastigheten Mobacka 2 har en karaktär och konstruktion som är tidstypisk för 1950-talet vilket ger förståelse och kunskap om de frågor som uppstår vid ombyggnad av äldre kontorsfastighet till flerbostadshus. Det är ett stort projekt att omvandla en f.d. kontorsbyggnad till flerbostadshus och det finns mycket att tänka på vid en ombyggnation, slutsatserna av rapporten är att: Den inre tillgängligheten på respektive plan kan hanteras. Tillgänglighet till andra plan får som konsekvens mer svårhanterade åtgärder beträffande hissars placering. De tekniska förändringar, som behövs för att tillgodose dagens krav för ljud, brand och energi kräver kompletteringar i och på konstruktionen. Vid kompletteringar för ljud är åtgärder och resultat svårbedömbara.   Nyckelord Brand, energi, ljud, ombyggnation, tillgänglighet,
12

Ombyggnation av nedlagd affärslokal till familjebostad / Rebuilding of a former grocer´s shop to a family residence

Holsten, Linda, Tolff, Lina January 2004 (has links)
I samhället Hults Bruk ligger en nedlagd brukshandel, från 1951, som idag fungerar som samlingslokal för de boende i området. Holmen Skog, som äger alla fastigheter i området, planerar nu för en ombyggnation av den gamla brukshandeln till familjebostad. Vår uppgift var att utforma ett planlösninsförslag anpassat till en tvåbarnsfamilj för den aktuella byggnaden. Utöver detta skulle vi även upprätta rumsbeskrivning och köksuppställning samt ge förslag på ledningsdragningar, tomtutformning och källarplanlösning. Holmen hade vissa krav och önskemål för ombyggnationen. Dessa innebar huvudsakligen att eftersträva en rimlig kostdandsnivå och att hålla ner arbetsinsatserna genom att bevara många av de befintliga väggarna. Dessutom var det viktigt att inte göra för stora ingrepp i byggnadens fasad eftersom Holmen vill bevara det ursprungliga utseendet. Vi har även följt krav och anvisningar i BBR, SBN1980 och BÄR. Vi har vid framtagandet av denna rapport tillämpat lärdom och litteratur från kurserna Byggnads och samhällsplanering och Installationsteknik. Vi har haft kontinuerlig konsultation med vår handledare på Byggrosen som har hjälpt oss med diverse byggnadstekniska frågor. Samtliga ritningar har upprättats med hjälp av AutoCad. Vårt slutgiltiga förslag omfattar en bostad om fem rum och kök. Vi har prioriterat en öppen planlösning för att erhålla stora fri ytor och stora gemensamma ytrymmen. Många nya väggar måste resas då flera rum ska byggas. Dessutom behövs det sättas in nya fönster i de nya rummen. Vi har planerat för nya rördragningar och installationer då dessa är i originalmodell och behöver bytas ut. Nya vattenledningar samt ett nytt ventilationssystem bör installeras. Bostadens tillhörande tomt, som utgör en yta på ca 250 kvm, har vi utformat med bland annat en stenbelagd uteplats och nya planteringsytor. Resultatet av vår bostadsutformning innebär rimliga kostnader och arbetsinsatser samt att vi i stor utsträckning har lyckats bevara byggnadens yttre utseende.
13

Ombyggnation av Rotskärsskolan : Förslag till ändring av hus F

Rönning, Karolina, Lindkvist, Karin January 2008 (has links)
Rotskärsskolan is located in Skutskär, Älvkarleby municipality and the school conducted today consists of lower secondary. The school was built in the early 1960s and contains three buildings. Today there is a great need for reconstruction of Rotskärsskolan, when the premises are worn out and not suitable for today's education. It must therefore be a phased change involving all the school buildings, starting in the winter of 2008/2009. Our degree project involves one of these buildings, called house F. This building will, by a recent decision, be adjusted for classes from preschool up to grade five, special school and leisure activities when some of the municipality's schools will consolidate. The purpose of this work is to present a proposal of a change for this building. The proposal will include a layout and design of facades, created on the basis of the users’ wishes as well as the social requirements and regulations. Some of the laws and regulations relating to a change in the building which was incorporated in the work process were the BVL, BVF, BÄR and BBR. In order to demarcate us some, we have chosen to only focus on the technical requirements relating to accessibility for people with impaired movement and orientation, safety in the event of a fire and safety in use. Inspiration and the lessons were taken by a literature review concerning school buildings and its premises. A pre-study of the building's conditions and the users’ wishes and requirements, were carried out during the programme stage. By using this information the results were reported in forms of flowcharts and a local programme. The next stage in the process, the layout design, the proposal is presented in form of hand sketches and drawings in AutoCAD. An extension was required in order to create spaces for the various activities in the building. To create a safer school yard for the younger students the extension was placed on the west side of house F. The entrances were developed to show more clearly where they are located as well as provide a more welcoming impression. In order to achieve the goal of creating pleasant and functional facilities, the layout was designed with a greater openness and more common surfaces such as study rooms and meeting points for the students. / Rotskärsskolan är belägen i Skutskär, Älvkarleby kommun och den skolverksamhet som bedrivs idag består av högstadium. Skolan byggdes i början av 1960-talet och utgörs av tre huskroppar. Det finns idag ett stort behov av ombyggnation av Rotskärsskolan, då lokalerna är slitna och inte lämpade för dagens undervisningsform. Det skall därför ske en etappvis ändring som omfattar alla skolans byggnader, med start under vintern 2008/2009. Detta arbete omfattar en utav dessa byggnader, hus F. Denna byggnad skall, genom ett nytaget beslut, anpassas för förskoleklass till årskurs fem, särskolans klasser och en fritidsverksamhet då några av kommunens skolor slås samman. Syftet med detta arbete är att redogöra för ett förslag på ändring av denna byggnad. Förslaget skall innehålla en utformning av planlösning och fasader, skapade utifrån beställarens och brukarens önskemål samt samhällets krav och bestämmelser. Några av de lagar och föreskrifter angående en ändring av byggnad som beaktades under arbetets gång var BVL, BVF, BÄR och BBR. För att avgränsa oss något har vi endast valt att inrikta oss på de tekniska egenskapskraven som rör tillgänglighet för personer med nedsatt rörelse- och orienteringsförmåga, säkerhet i händelse av brand och säkerhet vid användning. Inspiration och lärdom togs genom en litteraturstudie angående skolbyggnader och dess lokaler. I programskedet genomfördes en förstudie om byggnadens förutsättningar samt brukarnas önskemål och krav. Utifrån denna information redovisas resultatet bland annat i form av flödesscheman och lokalprogram. I nästa skede i processen, projekteringen, redovisas det tänkta förslaget i form av handgjorda skisser och ritningar i AutoCAD. För att de olika verksamheterna i byggnaden skulle få plats krävdes en utbyggnad och den placerades på västra sidan av hus F, för att skapa en tryggare skolgård för de yngre eleverna. Även entréerna byggdes ut både för att tydligare visa vart de är belägna och ge ett mer inbjudande intryck. För att kunna uppnå målet om att skapa trivsamma och funktionella lokaler, utformades planlösningen med större öppenhet och fler gemensamma ytor såsom grupprum och samlingspunkter för eleverna.
14

En studie om boendeinflytandets möjligheter och svårigheter

Ekblad, Joel January 2008 (has links)
Syftet med studien var att analysera och undersöka de möjligheter och svårigheter som kan finnas med en boendeinflytandeprocess vid ombyggnation av utemiljön i ett bostadsområde. Utifrån detta ställdes tre frågeställningar: Vilka faktorer kan sägas främja ett aktivt deltagande i den här formen av boendeinflytandeprocess? Vilka faktorer kan sägas motverka ett aktivt deltagande i den här formen av boendeinflytandeprocess? Vilka aspekter kan sägas ligga till grund för att skapa så bra förutsättningar som möjligt för ett lyckat genomförande av en boendeinflytandeprocess? Studien omfattar de boendeinflytandemöten som genomförts under 2006 och 2007, i regi av det allmännyttiga bostadsföretaget ÖBO, på gatorna Diktargatan och Författargatan i stadsdelen Vivalla i Örebro. För att samla in data har metoden kvalitativa intervjuer använts. Analysförfarandet har grundat sig på tidigare forskning, bestående av forskning runt ämnet, samt Lennart Lundquist syn på begreppet ”Medborgardemokrati”. Ett resultat som denna studie har kommit fram till är vikten av att använda olika mötesformer för att nå så många grupper och individer som möjligt.
15

Flexible building / Att bygga flexibelt

Isdalen, Olga, Taufik, Hamsa January 2017 (has links)
Städer i Sverige växer ständigt. Folk flyttar från ett område till ett annat område och detta leder till att byggnader i vissa distrikt börjar sakna sin betydelse. Till exempel om en räjong i staden bosätt med många barnfamiljer finns det behov för stort antal förskoleplatser och i sin tur byggnader som är anpassad för förskoleverksamhet. När räjongens befolkning mognar och barnen flyttar ut så minskar behovet av förskoleplatser och omvandlas istället till ett behov av stort antal lägenhetshus i området. Detta examensarbete har syftet att utreda möjligheten att konvertera bostadshus till förskolor i samband med den ökande befolkningsmängden och vice versa, d.v.s. att konvertera en förskola till ett lägenhetshus. Arbete berör både sociala aspekter vad gäller förskolan samt arkitektoniska perspektivet och lösningar angående hur ett flexibelt hus kan designas. Enkätundersökningen och litteraturstudier är metoder för att få fram resultatet av detta arbete. Resultatet visas i form av skisser, diagram, ritningar och renderingar.
16

Beredning av landsbygdsnät i Hassle, Mariestad / Preparation of a rural network in Hassle, Mariestad

Börjesson, Erik January 2017 (has links)
Examensarbetet handlar om hur ett beredningsarbete i landsbygdsnät går till, genom fältarbete, markägarkontakt, avtal och tillståndssökande. Den beskrivna beredningen ligger till grund för genomförandet av ett projekt för Ellevio AB. Ombyggnationen genomförs främst för att spännings- och vädersäkra, men även för att få en föryngring av nätet. Examensarbetet är utfört hos PSN Kraftkonsult Eldistribution AB i Vedum och utfört med hjälp deras arbetssätt och metoder. Beredningen på ledningsnätet utförs i området Hassle, norr om Mariestad. Projektet är indelat i två stycken etappdelar. Del ett är Hassle ställverk – Källtorp och del två Fåleberg – Nolhassle. Dessa ingår i ett större ombyggnadsprojekt som Ellevio AB har planerat att göra i sitt distributionsnät i området. På grund av att det ska utföras ett större ombyggnadsprojekt av E20 i det berörda området, fick projektörens tänkta kabelförläggning planeras om och den blev då 1,1 km längre. Det totala resultatet av beredningen omfattar 2st nya 10/0,4 kV nätstationer, ett nytt kabelskåp, 5850 m ny HSP-kabel och ca 500 m ny LSP-kabel. All kabel kommer att förläggas i mark och kommer i största mån att plöjas ner. Nätstationer och kabelskåp är utplacerade strategiskt för att skapa en så bra nätstruktur som möjligt och vara lättillgängliga för framtida underhåll. / The thesis deals with how preparation work is accomplished in rural networks, by field work, landowner contact, contracts and permit applications. The described preparation work is the basis for the implementation of the project from Ellevio AB.  The reconstruction is performed in order to secure the voltage and get a more weatherproofed network, but also to get rejuvenation of the network. The preparation work is done for PSN Kraftkonsult Eldistribution AB in Vedum and performed using their working methods. The preparation work is performed in the area of Hassle north of the town Mariestad. The project is divided into two interim stages. Stage one is called Hassle sub-station – Källtorp and the second one is Fåleberg – Nolhassle. These two stages are parts of one large reconstruction of the distribution network in the area by Ellevio AB in the near time. Due to the fact that a major rebuilding project of the E20 in the affected area the projector’s intended rout for the cable had to be changed. And it became 1100 m further. The result of the preparation work includes two new 10/04 kV substations, one new cable cabinet, 5850 meters of high-voltage cable and 500 meters low-voltage cable. All the cables will be placed in the ground and for the most they will be plowed down. Substations and cable cabinets will be placed strategically to create the strongest network as possible and for good availability for future maintenance.
17

Återkommande problem vid om- och tillbyggnationsprojekt : En kvalitativ studie / Reccurring issues in construction remodeling projects : A qualitative research studie

Tellman, Erik, Spetsare, Johan January 2018 (has links)
Det råder en växande bostadsbrist och urbanisering på Sveriges bostadsmarknad och ytor harblivit hårdvaluta i tätbebyggda områden. I huvudsak efterfrågas det mindre och billigarehyresrätter. Detta har lett till att man i dagsläget bygger om mycket befintliga fastigheter för attutnyttja dessa effektivare. Denna studie är en kartläggning av problematik och möjligheter vidom- och tillbyggnationer av befintliga fastigheter med utgångspunkt i entreprenad &upphandling formens inverkan genom hela byggprocessen. Rapporten har syftet att lyfta återkommande problem och ge en bättre förståelse kring omtillbyggnationer. Rapporten grundar sig i en kvalitativ studie med sammanlagt 8 intervjuer medpersoner med erfarenhet från om- och tillbyggnationer både av större karaktär och mindre.Dessa personer är utvalda sett utifrån deras erfarenhet och kunskap inom området.Osäkerhetsfaktorn är hög vid om- tillbyggnationer och bör därför genomföras med eftertankeoch omsorg. Studien innefattar tre områden, där en litteraturstudie ger en beskrivning avombyggnation processen, lagar och regler vid ändring samt entreprenadformer. Insamlade datafrån intervjuer är sammanställda och litteraturstudie analyseras. Studien har visat på en mängd olika återkommande problem och svårigheter som förekommervid ombyggnationsprojekt. Det tydligaste och mest specifikt återkommande svårigheternaligger i osäkerheten kring hur det befintliga huset egentligen ser ut. Detta leder till att projektvarierar väldigt mycket och rutin och effektivitet kring om- och tillbyggnationsprojekt inte ärlika upparbetade som vid nybyggen. Valet av entreprenad och upphandlingsform, specifiktsamverkansentreprenader, har här visat sig vara av stor betydelse för hur effektivt man hanteraroch löser dessa stora osäkerhetsfaktorer. / There is an increasing shortage of living space in Sweden. In combination with an ongoingurbanization this has led to residential areas becoming very valuable and the request for smallerand cheaper rental apartments is bigger than ever. This has led to an increased redevelopmentof already existing estate. This study maps problems and improvement possibilities inredevelopment projects with regard to the contractual arrangements. The purpose of the study is to create a better understanding of the redevelopment business byreviewing the recurrent issues. The study is based on a theoretical study in the subject and 8 qualitative interviews. The persons interviewed for the study had been chosen on the premisesthat they all have experience from redevelopment projects from a project manager, or similar,role. The theoretical study consists of three main sections, the redevelopment process,regulations and contract forms. Many different problems and difficulties that frequently appear in redevelopment projects couldbe found and presented. The most obvious difficulty revolves around the uncertainties circlingaround the existing properties. Routines and efficiency is because of this not as developed andstraight forward compared to building from scratch. Findings show that the contract form canbe of big significance in how efficient these questions are handled and resolved. Morespecifically the form of procurement. The study investigates further into this and how the useof partnering can lead to more efficient workflows.
18

Osäkerheten i ombyggnationsprojekt : Case Study av ombyggnation av Praktikertjänst huvudkontor

Lindh, Ulrika January 2013 (has links)
No description available.
19

Miljöstyrning i Riksbyggens ombyggnadsprocess med hjälp av Miljöbyggnad / Procedures for sustainable renovation projects in the organization Riksbyggen using the swedish certification Miljöbyggnad

Mirjolet, Claire January 2014 (has links)
How the renovation of the vast Swedish existing building stock with renovation needs will be performed is considered as decisive in order to achieve the target set by the Swedish government of reducing the energy use by 20 percent by 2020. Consequently, the challenge of the building sector consists in reducing the energy use in the existing building stock but at the same time ensuring that the indoor environmental quality is improved and the cultural values are maintained. So far, there have been a few renovation projects which strongly have reduced the energy use and at the same time have taken into account the environmental aspects and the cultural values. The main reasons are that there have been few incentives and a lack of routines in order to steer efficiently a “sustainable renovation”. The participants in a Nordic project on sustainable renovation thought that it would be a strong advantage to link the concept of sustainable renovation to the Miljöbyggnad certification system. Indeed it is trusted by the Swedish building and construction sectors and can provide sustainability targets in order to steer renovation processes. The objective of the master thesis is to show how the Miljöbyggnad certification system could be integrated in practice in the renovation process of Riksbyggen, an organization which administers housing associations (Bostadsrättsföreningar) and build houses. The method used consists in interviewing different employees who work with renovation and studying the management system of Riksbyggen in order to be able to suggest appropriate steps in their process which enable the integration of the Miljöbyggnad certification system. These steps were discussed within Riksbyggen and with researchers. Finally, the master thesis results in a procedure which step by step describes how the Miljöbyggnad certification system could be integrated in the early stages of the current renovation process of Riksbyggen. The proposal focuses on the early stages and is composed of different steps including carrying out a survey in order to investigate how the residents perceive their indoor environment and selecting targets for the project. The master thesis appreciates the extra time and the extra competences which would be required by such integration. Moreover, the report indicates how Riksbyggen could work further in order to apply in practice these steps and suggests how the Miljöbyggnad certification system could be integrated in the other stages. As opposed to new production, where the certification in itself is often the main driving force for using the Miljöbyggnad certification system, the official certification after a renovation is optional. The proposal focuses rather on supporting the environmental management during a renovation project thanks to the Miljöbyggnad certification system. The main advantages which appear are that the certification gives a framework in order to steer the whole renovation process and that it provides a good support in order to assess an existing building. Nevertheless, the master thesis shows that there are also some difficulties in order to integrate the certification. Therefore, the report indicates how these difficulties could be overcome and in which direction the Miljöbyggnad certification system could be developed further in order to meet the needs of the housing companies. Indeed, it could be difficult to select a package of renovation measures which aims to reach a better rating according to the certification because it sometimes might not be reasonable. However, it is possible to plan the renovation project in order to improve the rating for the three following categories: energy, indoor environment and materials or for some indicators. Moreover, the survey which investigates how the residents perceive their indoor environment should become an important part of the process and the results of the survey could be used in order to communicate about successful renovation projects. / Hur det svenska byggnadsbeståndet som står inför ett stort ombyggnationsbehov ska byggas om betraktas som avgörande för att uppnå svenska regeringens mål att minska energianvändningen med 20 procent 2020. Fastighetsbranschens utmaning är följaktligen att minska energianvändningen i de befintliga byggnaderna och samtidigt att säkerställa att inomhuskomforten förbättras och att de kulturella värdena säkras. Hittills har få ombyggnationsprojekt funnits som har minskat energianvändningen kraftigt och som samtidigt har beaktat de miljömässiga aspekterna och de kulturella värdena. De främsta anledningarna är att det finns få incitament och att rutiner saknas för att styra ombyggnationsprojekten på ett hållbart sätt. För att göra ombyggnationsprojekten mer hållbara, föreslog deltagarna i projektet MERCOREN (Methods and concepts for sustainable renovation) att det svenska miljöbedömningsverktyget Miljöbyggnad skulle integreras i ombyggnationsprojekten i Sverige. Verktyget är välkänt inom den svenska marknaden och det skulle hjälpa att upprätta miljömål för att styra ombyggnadsprocessen.  Examensarbetets ämne är att föreslå hur det skulle kunna fungera i praktiken inom Riksbyggen, en organisation som förvaltar och bygger bostadsrätter. Metoden som används består i att göra intervjuer och att studera Riksbyggens ledningssystem för att kunna föreslå nya steg i ombyggnadsprocessen som möjliggör att integrera Miljöbyggnad. De föreslagna stegen diskuterades inom Riksbyggen samt med erfarna forskare.  Resultatet blir ett slutgiltigt förslag som stegvis presenterar hur Miljöbyggnad skulle kunna integreras i de tidiga skedena av Riksbyggens nuvarande ombyggnadsprocess. Förslaget fokuserar på de tidiga skedena och består av olika steg inklusive att genomföra en enkät för att undersöka de boendes upplevelser och att ta fram en miljöplan. Arbetet utredde vilken extra arbetstid och vilka nya kunskaper som krävs för en sådan integrering. Dessutom anges hur Riksbyggen bör fortsätta att arbeta för att få in de föreslagna stegen och hur Miljöbyggnad skulle kunna integreras i de andra skedena. I motsats till nyproduktion där certifieringen i sig ofta är huvuddrivkraften för att använda Miljöbyggnad, betraktas den officiella certifieringen efter en ombyggnad som valfri. Förslaget fokuserar snarare på att understödja miljöstyrning under en ombyggnad med hjälp av Miljöbyggnad.  Huvudfördelarna som syntes tack vare integrering av Miljöbyggnad är att det ger en bra röd tråd för att miljöstyra hela ombyggnadsprocessen och att det bidrar med ett bra underlag för att undersöka en befintlig byggnad.  Däremot visar arbetet att några hinder ligger i vägen för att integrera Miljöbyggnad. Därför föreslår examensarbetet hur dessa svårigheter skulle kunna övervinnas och i vilken riktning Miljöbyggnad borde utvecklas för att motsvara de behov som finns inom bostadsrättsföreningarna. Det är nämligen svårt att välja ut ett åtgärdspaket med Miljöbyggnad när man fokuserar på betyget för hela byggnaden eftersom det ibland inte är rimligt att ha som mål att höja betyget. Däremot är det möjligt att projektera för att höja betyget för de tre områdena energi, innemiljö och material eller för vissa indikatorer. Dessutom ses enkäten angående de boendes upplevelser som viktig att integrera i processen och också att den bör användas för att kommunicera om en framgångsrik ombyggnad.
20

Transport Logistik : Projekt Slussen / Transport Logistic : Project slussen

Weldai, Michael January 2014 (has links)
Slussen är Stockholms andra största mötespunkt efter T-centralen. För den omfattande ombyggnation som Slussen står inför är projektets prioritering att minimera störningar i kollektivtrafik, gång – och cykeltrafik samt biltrafik då detta är en knutpunkt för såväl bilar, båtar kollektivtrafik samt fotgängare och cyklister. Här passerar 300 000 resenärer dagligen. För att ta reda på hur andra stora projekt har löst sina logistiska problem utfördes intervjuer på personer med insikt på logistik i deras verksamhet. Enkäter delades även ut till de olika delområdena i projekts Slussens byggledning för att få bättre förståelse för hur projektet vill arbeta. För att få en bra översikt över hur många transporter som kommer behöva passera ut och in genom entreprenadernas gränser utfördes beräkningar. Resultatet av undersökningarna visar att det viktigaste är att produkter levereras i rätt tid till rätt plats utan mellanlagring. För att kunna uppnå detta krävs god kommunikation. Detta erhålls med hjälp av IT-lösningar/webbplattformar där entreprenören lägger in sina transporter. Detta gör att så väl beställaren som entreprenören och de olika delprojekten har koll på när leveranser sker i ett tidigt ska / Slussen Stockholm's second largest meeting point for Central Station. For the major reconstruction that slussen is facing is the project's priority is to minimize the disruption to public transport, walking - and bicycling and pedestrian as this is a major hub for cars, boats, public transport and pedestrians and cyclists. Here passes 300,000 travelers daily. To find out how other large projects have solved their logistics problems, interviews were conducted in person, with knowledge of logistics in their business. Questionnaires were also distributed to the different strands of the project slussens construction management to get a better understanding of how the project would work. To get a good overview of how many shipments will need to pass in and out through the construction limits was performed calculations. The results of the surveys show that the most important thing is that the products are delivered at the right time at the right place without intermediate storage. To achieve this requires good communication. This is obtained by using IT-solutions/web platforms where the entrepreneur puts into their shipments. This allows the client as well as contractor and the different subprojects have an eye on when deliveries are made at an early stage.

Page generated in 0.12 seconds