• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 9
  • 8
  • 5
  • 5
  • 5
  • 1
  • 1
  • 1
  • Tagged with
  • 39
  • 9
  • 9
  • 7
  • 7
  • 6
  • 5
  • 5
  • 5
  • 5
  • 4
  • 4
  • 4
  • 3
  • 3
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
11

Purely top-down software rebuilding

Grosskurth, Alan January 2007 (has links)
Software rebuilding is the process of deriving a deployable software system from its primitive source objects. A build tool helps maintain consistency between the derived objects and source objects by ensuring that all necessary build steps are re-executed in the correct order after a set of changes is made to the source objects. It is imperative that derived objects accurately represent the source objects from which they were supposedly constructed; otherwise, subsequent testing and quality assurance is invalidated. This thesis aims to advance the state-of-the-art in tool support for automated software rebuilding. It surveys the body of background work, lays out a set of design considerations for build tools, and examines areas where current tools are limited. It examines the properties of a next-generation tool concept, redo, conceived by D. J. Bernstein; redo is novel because it employs a purely top-down approach to software rebuilding that promises to be simpler, more flexible, and more reliable than current approaches. The details of a redo prototype written by the author of this thesis are explained including the central algorithms and data structures. Lastly, the redo prototype is evaluated on some sample software systems with respect to migration effort between build tools as well as size, complexity, and performances aspects of the resulting build systems.
12

Purely top-down software rebuilding

Grosskurth, Alan January 2007 (has links)
Software rebuilding is the process of deriving a deployable software system from its primitive source objects. A build tool helps maintain consistency between the derived objects and source objects by ensuring that all necessary build steps are re-executed in the correct order after a set of changes is made to the source objects. It is imperative that derived objects accurately represent the source objects from which they were supposedly constructed; otherwise, subsequent testing and quality assurance is invalidated. This thesis aims to advance the state-of-the-art in tool support for automated software rebuilding. It surveys the body of background work, lays out a set of design considerations for build tools, and examines areas where current tools are limited. It examines the properties of a next-generation tool concept, redo, conceived by D. J. Bernstein; redo is novel because it employs a purely top-down approach to software rebuilding that promises to be simpler, more flexible, and more reliable than current approaches. The details of a redo prototype written by the author of this thesis are explained including the central algorithms and data structures. Lastly, the redo prototype is evaluated on some sample software systems with respect to migration effort between build tools as well as size, complexity, and performances aspects of the resulting build systems.
13

Ombyggnad av skolbyggnad för nya verksamheter : En visionsstudie för Wenströmska skolan och dess närområde

Ekoutsidou, Caroline January 2014 (has links)
New production is not the only thing that is important for the city’s growth. It is also crucial to recover existing buildings in order to create attractive areas. There is a school in Västerås city called Wenströmska skolan which consists of six high schools that provide different professional specializations and which has an area of about 35000 square meters. Due to many different reasons the city has decided to close the school down and any decisions on what to do with the remaining buildings have not yet been made. The aim of this thesis is to develop a proposal on Wenströmska skolan future. The proposal illustrates a vision towards adaptive reuse of school’s buildings based on the district’s needs and the city’s visions for the future. The proposal can be used as inspiration in the larger context or as idea for upcoming decisions regarding Wenströmska skolan. The theoretical part is an overview and compilation of general requirements and rules on availability and technical aspects regarding school buildings design. The pre-study investigates the best alternative which is based on the needs in the district that provides support making the choice of activities. SWOT-analysis helps to define strengths, weaknesses, opportunities and threats which affect the choice of activities too. New drawings are created in order to illustrate the proposal. Both the buildings and the plot of Wenströmska skolan are used to develop the proposal. The buildings can be adapted to a secondary school in combination with other operations such as sports and health, cultural, music and theater, rooms and areas for children activities, a restaurant with food from different cultures, offices spaces for companies and new residents. The buildings and the plot can also be used as a gathering place. The proposal shows that adoption of the vision may help to raise social values, sustainability and quality of life in the district. The residents would be connected in a way they haven’t been before. / Nyproduktion är inte det enda som är viktigt i en stad som växer utan även befintlig byggnation måste tillvaratags för att skapa attraktiva områden. I stadsdelen Vallby i Västerås är Wenströmska skolan belägen. Skolan har en yta på cirka 35 000 kvadratmeter och bedriver gymnasieverksamheter som består av sex mindre gymnasieskolor med olika yrkesinriktningar. Av olika skäl har kommunen bestämt att lägga ned skolan där utflyttningen fortfarande är under process sedan år 2013 och beräknas vara klar år 2017; något beslut om vad som ska göras med den kvarstående byggnaden har ännu inte fattats. Syftet med detta arbete är att ta fram ett förslag på möjligheter för ändrad verksamhet för Wenströmska skolan där en anpassning till en högstadieskola i kombination med övriga verksamheter ska göras. Förslaget illustrerar en vision över de möjligheter som finns för byggnadens framtid utifrån stadsdelens behov och stadens framtidsvisioner. Förslaget kan användas som inspirationskälla i större sammanhang vid ett beslut om byggnadens framtid och användningsmöjligheter. Arbetet består av bland annat en litteraturstudie som handlar om skolbyggnaders utformning och var till hjälp vid planering av en ny skolverksamhet. Utifrån den grundläggande litteraturstudien skapades förståelse vid uppbyggnad av en skolverksamhet med hänsyn till skolbyggnaders funktioner och utrymmen, tillgänglighet och tekniska aspekter som ljud, ljus, luft samt brand och säkerhet. För skolbyggnader handlar det mest om hur anpassningen för tillgänglighet och användbarhet för personer med nedsatt rörelse- och orienteringsförmåga ska utvecklas. Skolbyggnader ses som arbetslokaler och här ska både elever och anställda som vistas i lokalen ha rätt till god arbetsmiljö där trivsel, tillgänglighet och användbarhet är tre viktiga begrepp. Arbetet består även av en förstudie som gick ut på att göra ett platsbesök i skolbyggnaden, utföra studier och analyser samt en materialinsamling hos Stadsbyggnadskontoret i Västerås för tillgång av bland annat ritningar. Platsbesöket gav en uppfattning av dagsläget som skapade en vision till nya utformningsmöjligheter. Behovsstudien belyser stadsdelens olika behov och utgör ett beslutsunderlag vid val av verksamheter. Objektet behandlas i dagsläget och med hjälp av en nulägesanalys i form av SWOT-analyser analyseras både skolbyggnaden och omkringliggande områden där dess styrkor, svagheter, möjligheter och hot tags fram. Denna analys skapar en överblick över nuläget och ligger som underlag för arbetet. De befintliga ritningarna över skolbyggnaden låg som grund vid framtagande av nya skisser på alternativa planlösningar med hänsyn till fastställda förutsättningar. En lång skissprocess resulterade slutligen i färdiga förslagsritningar. Arbetet studerar hur skolbyggnader bör utformas och hur den befintliga byggnaden kan anpassas till en ny högstadieskola samt vilka förutsättningar som finns för att uppnå detta. Den nya utformningen av byggnaden ska gynna stadsdelsborna efter de behov som finns samt koppla samman omgivande stadsdelar genom en naturlig samlingsplats för social integration och livskraft. Utifrån de möjligheter och tillgångar som behövs för att skapa en hållbar och livskraftig stadsdelsmiljö studeras omgivningen och närområdet för att ta fram de behov som finns. De mötespunkter som skapas ska främja utbyte och mångfald både kulturellt och socialt. A-byggnaden uppfyller de krav som krävs för att en skolverksamhet och därför kan en del av byggnaden anpassas till en ny grundskola med årskurserna sex till nio. A-byggnaden innehåller de viktigaste delarna en skola behöver såsom idrottshall, aula och matsal; resterande yta går enkelt att anpassa till klassrumsbehovet och övriga utrymmen för en elevmängd på cirka 500 till 600 elever. En skolbyggnad ska utformas med hänsyn till själva skolverksamheten eftersom undervisningsämnena skiljer sig mellan olika skolverksamheter. En ytterligare viktig punkt i hur en skolbyggnad bör utformas är tillgängligheten och användbarheten för personer med nedsatt rörelse- och orienteringsförmåga. Det är viktigt att skolbyggnadens alla utrymmen och funktioner är utformade efter de minimikrav som gäller så att alla elever och lärare kan röra sig i byggnaden utan hinder och problem. Även god arbetsmiljö måste råda för både elever och lärare; vid utformning av skolbyggnader måste hänsyn tags till tekniska aspekter som påverkar välbefinnandet, undervisningen och inlärningsförmågan. För att byggnaden ska bidra de omgivande stadsdelarna en naturlig samlingsplats för social integration och livskraft måste de omgivande mångkulturella stadsdelarna kopplas samman och förenas med gemensamma intressen. Byggnadens olika funktioner kommer även att skapa mötespunkter som främjar utbyte och mångfald både kulturellt och socialt; omgivningen är mångkulturell med olika målgrupper där studenter och ungdomar, barnfamiljer och äldre är bosatta. En viktig utgångspunkt för de möjligheter och tillgångar som behövs för att skapa en hållbar och livskraftig stadsdelsmiljö är stadsdelens behov. Stadsdelens behov är bland annat skola, idrott och hälsa, mat, boenden av olika slag, kultur- och föreningsliv samt möjligheter för verksamheter i form av kontorsytor och lokaler. Omgivningen består av blandad bebyggelse och kultur med närområden som består av mångkulturella stadsdelar vilket innebär en anpassning till olika målgrupper som i sin tur bidrar till många möjligheter. Området har en stor del odefinierade ytor utan funktion vilket gör att området har stor potential att utvecklas och förtätas.
14

Bygga för ombyggnad : Från parkeringshus till studentbostäder / Building for rebuilding : From a parking garage to student housing

Heimonen, Antonio, Malmsten, Sofia January 2013 (has links)
Detta examensarbete bygger på ett förslag från vår näringslivskontakt Sara Eriksdotter som är anställd på Haninge kommun. Förslaget bygger på konverterbara byggnader. Målet är att bygga ett parkeringshus som går att byggas om till ett flerbostadshus i framtiden. Idén grundar sig på Haninge kommuns plan att arbeta för ett minskat bilanvändande i centrala Haninge, vilket på sikt kommer medföra ett minskat behov av parkeringsplatser jämfört med idag. Samtidigt vill Haninge kommun ta hänsyn till det bestående behovet av bostäder. Vår målsättning med examensarbetet har varit att ta fram ritningar och illustrationer som visualiserar vårt förslag på en konverterbar byggnad; i detta fall avser projektförslaget en byggnad som ska klara av ombyggnaden från parkeringshus till flerbostadshus avsedd för studenter. Arbetsgången för att nå målet började med en litteraturstudie i form av böcker, elektroniska källor och intervjuer med relevanta personer. Litteraturstudien sammanställdes till kravlistor över absoluta krav för de båda funktionerna som lagts som grund för hur projektet skulle påbörjas. Kravlistorna bygger även på en tomt- och områdesanalys vilken gjordes dels för att få en känsla för helhetsbilden som byggnaden kommer att skapa och dels för att kunna skapa en förenklad situationsplan över området då en sådan inte funnits att tillgå. Med kravlistorna som grund gjordes en 3D-modell av byggnadsverket för att visualisera resultatet. 3D-modellen fungerar som en hjälp för att redovisa den vision som finns med projektet samt att den ger en ökad förståelse för hur byggnaden ser ut in i sin tänkta miljö. Programmen som använts för att ta fram och bearbeta 3D-modellen är Revit, Sketchup och Photoshop. Resultatet av arbetet presenteras genom ett typexempel av den konverterbara byggnadens funktioner, parkeringshus och flerbostadshus, konstruktionsritningar över husstommen samt en förenklad byggnadsbeskrivning. Utöver detta har möbleringsförslag tagits fram för samtliga lägenhetstyper för flerbostadshusets lägenheter och renderingar av 3D-modellen i sin tänkta miljö. Vi hoppas att konverterbara byggnader ska bli ett erkänt begrepp där man förbereder nybyggnationer på ett sådant sätt att de enkelt kan fylla andra funktioner i framtiden. / This examination paper is based on a suggestion from our business world contact Sara Eriksdotter who is employed by Haninge Municipality. The project proposal is based on convertible buildings. The goal is to build a multi-storey car park which in the future can be rebuilt into an apartment block. The idea is based upon Haninge Municipality’s plan on working for the reduction of automobile usage, which in the long term will lead to a decreased need of parking spaces for cars than what it is today. At the same time, Haninge Municipality wants to take the lasting need of housing into account. Our objective with this degree project has been to produce drawings and illustrations that visualize our project proposal of a convertible building; in this case the project proposal concerns a building that will manage the conversion from a multi-storey car park into an apartment block destined for students. The work process to achieve the goal started with a study of literature in books, internet and an interview. The literature was consolidated into a list of absolute requirements which is needed to achieve the functions of the buildings in the project. The list is also based on an analysis of the area which was done partly to create a feeling of the total impression that the building will create and partly to create a simple site plan of the area, because there was none available. With the help of the lists a 3D-model was created of the building to visualize the results. The 3D-model works as an aid to present the vision of the project and it provides a greater understanding for the building in its intended environment. The modelling programs used to create and refine the 3D-model are: Revit, Sketchup and Photoshop. The results are presented as drawings of the multi-storey car park and the student housing, drawings of the construction and a simplified building description. Additionally we have included furnishing suggestions for three types of apartments along with illustrations of the 3D-model in its intended environment. We hope that convertible buildings will become an accepted and recognized concept where new buildings in the future will be prepared to fulfil functions other than its original function.
15

Avaliação de estimativas de evapotranspiração dos métodos baseados na flutuação diária do nível piezométrico comparando com o método de balanço de energia - Razão de Bowen em zona ripária / Evaluation of evapotranspiration estimates of the methods based on the daily fluctuation of the piezometric level comparing with the energy balance method - Bowen ratio in riparian zone

Carvajalino, Jean Carlos Duarte 04 June 2019 (has links)
No ciclo hidrológico, o processo de evapotranspiração (ET) representa a maior percentagem do total de precipitação. As maiores percentagens de ET são encontradas nas zonas ripárias visto a alta disponibilidade hídrica. Embora existam métodos acessíveis para estimativa da ET em zona ripária, como os baseados na flutuação diária do nível piezométrico, poucos estudos têm sido desenvolvidos devido à complexidade teórica da variável, ao elevado custo de equipamentos, e à reduzida largura dessas áreas. Desta forma, o objetivo deste trabalho foi avaliar 10 métodos baseados na flutuação diária do nível piezométrico usando o método de balanço de energia &#8211; Razão de Bowen. Para tal fim, foram construídos cinco poços e uma torre de monitoramento em uma área de zona ripária da bacia hidrográfica do Ribeirão da Onça (Brotas, São Paulo). Os dados dos poços e da torre de monitoramento foram coletados, a cada 15 minutos, no período de, respectivamente, abril de 2018 e junho de 2018, a janeiro de 2019. Para o processamento dos dados, foi feito um programa em linguagem Python. Nos dados do método de balanço de energia Razão de Bowen foram utilizados o critério de propagação de erros para a rejeição de estimativas, e o método de amostragem direta para a posterior reconstrução da série temporal. No período seco e chuvoso, as taxas médias de ET obtidas pelo método de balanço de energia &#8211; Razão de Bowen foram, respectivamente, de 3,62 &#177; 0,93 mm/dia e 5,09 &#177; 2,34 mm/dia. Entre os métodos baseados na flutuação diária do nível piezométrico, o método de Gribovski apresentou as melhores métricas na avaliação (<font style=\"text-decoration: overline;\"> &#961; = 0.69, <font style=\"text-decoration: overline;\"> &#964;s = 0.55, <font style=\"text-decoration: overline;\"> MAE = 1.77 mm/dia, <font style=\"text-decoration: overline;\"> RMSE = 2.07 mm/dia e <font style=\"text-decoration: overline;\"> MBE = 1.63 mm/dia), o qual mostra o potencial desse tipo de métodos para estimar a ET em zonas ripárias. / Evapotranspiration rate (ET) represents a significant percentage of precipitation in the water balance. At the riparian zones, ET slightly increases due to high water availability. Although there are available methods to ET estimation, such as the based on groundwater level variation, few studies have developed because of theorical complexity, high equipment cost and narrow band of the riparian zones. Thus, this work aims to evaluate 10 groundwater level variation methods using the energy balance &#8211; Bowen ratio method. For that, five wells and one monitoring tower were installed in a riparian zone of the Onça Creek basin (Brotas, São Paulo, Brazil). Data from wells and monitoring tower were collected at each 15 minutes from, respectively, April/2018 and June/2018 to January/2019. For data processing, a Python languague programme was developed. Error propagation method was applied to reject unreliable estimation of ET. Also, direct sampling was used to temporal serie rebuilding. The ET estimations from Bowen ration method range from 3,62 &#177; 0,93 mm/day and 5,09 &#177; 2,34 mm/day (dry and wet period, respectively). Among the groundwater level variation methods, the Gribovski method reached the smallest error (<font style=\"text-decoration: overline;\"> &#961; = 0.69, <font style=\"text-decoration: overline;\"> &#964; s = 0.55, <font style=\"text-decoration: overline;\"> MAE = 1.77 mm/day, <font style=\"text-decoration: overline;\"> RMSE = 2.07 mm/day e <font style=\"text-decoration: overline;\"> MBE = 1.63 mm/day). Then, the Griboski method may be used to ET estimation in riparian zones.
16

Estimativa do investimento necessário para a recomposição da cobertura florestal nas APPs da bacia do Ribeirão Itaim em Taubaté - SP / Estimative of the investiment required to the rearrangement from cover forest on the APP from hydrographic basin of the large creek Itaim, in Taubaté SP

Tereza Pinto Vieira 24 April 2008 (has links)
Recuperar as Áreas de Preservação Permanente (APPs) das bacias hidrográficas constitui-se numa necessidade urgente para que a água não venha a tornar-se mais escassa nos próximos anos. Este trabalho buscou, por meio de métodos, estimar o montante de investimento necessário para o repovoamento florestal das áreas de preservação permanente (APPs) da bacia hidrográfica do ribeirão Itaim, no município de Taubaté, SP. Foram utilizadas técnicas de geoprocessamento para a estimativa das APPs da bacia em atendimento ao Código Florestal (Lei 4771/65 e suas alterações). No plano cartográfico, este trabalho teve como base de dados o projeto Una, que por meio de técnicas de geoprocessamento, no programa SPRING, possibilitou o recorte dos mapas de APPs e de Uso e Ocupação do Solo da bacia do Itaim, cujo cruzamento gerou o mapa de áreas a serem reflorestadas na bacia. A quantificação dos custos de reposição florestal foi baseada em valores provenientes de projetos públicos e privados. Os resultados demonstram a necessidade de um investimento anual da ordem de R$ 846.637,80 (oitocentos e quarenta e seis mil seiscentos e trinta e sete reais e oitenta centavos) para o reflorestamento em um prazo de 30 anos. Concluiu-se que o custo para a reposição florestal da bacia hidrográfica do ribeirão Itaim é de aproximadamente R$ 25,6 milhões e que o uso de técnicas de geoprocessamento permite uma estimativa bastante realista das áreas de preservação permanentes a serem reflorestadas, na bacia hidrográfica do ribeirão Itaim, a qual foi estimada em 1947 ha. / Recover Permanent Preservation Areas (APP) of hydrographic basin is an urgent need to ensure that water will not become more scarce in the coming years. This study aimed to estimate the amount of investment needed for the forestation areas of permanent preservation (APP) in the hydrographic basin of ribeirão Itaim in the city of Taubaté, Brazil. Geoprocessing techniques were used to estimate the APPs for the basin, in response to the Forestry Code (Law 4771; 65 and its amendments). On the map, this work was based on data from the project Una, which, through techniques of geoprocessing in the program SPRING, allowed the statements clipping of APP and Use of Soil and occupation on the Itaim basin, whose cross led the map of areas to be reforested in the basin. The quantification of the costs of replacement forest was based on figures from public and private projects. The results demonstrate the need for an annual investment turns around R$ 846637.80 (eight hundred and forty six thousand, six hundred and thirty-seven reais and eighty cents) for reforestation in a period of 30 years. It was concluded that the cost for the basin forest restoration of Ribeirão Itaim is approximately R$ 25.6 million and that the use of techniques for geoprocessing allows a fairly realistic estimate of permanent preservation areas to be reforested in the basin that region, which was estimated in 1947 ha.
17

New York, 11 septembre 2001 : la fiction étasunienne à l'épreuve du choc / New York, September 11th, 2001 : novelistic response to the shock

Davo, Yves 09 December 2013 (has links)
Les attaques du 11 septembre 2001 sur le sol américain ont eu un impact incontestable dans les sphères politique, religieuse, sociale mais aussi culturelle de ce début de siècle. Elles ont mis à l'épreuve les positions idéologiques d'une certaine idée américaniste née avec les États-Unis et encore largement partagée. Si les images de l'effondrement des deux tours du World Trade Center ont symbolisé une rupture jugée historique, la catastrophe nationale a nourri depuis lors un grand nombre de représentations fictionnelles. À travers l'étude de dix-huit œuvres publiées dans la décennie qui a suivi - diverses dans leur nature mais emblématiques par leur impact sur la culture étasunienne -, notre travail prétend mettre au jour une logique temporelle opératoire, une typologie égrenant les différentes étapes du travail de deuil, de la sidération à l'éventuelle reconstruction. L'analyse diachronique de ce corpus, tourné vers la culture étasunienne dans son rapport à l'histoire des idées politiques, entend ainsi mettre en perspective le rôle de la fiction face au choc du 11 septembre. Ceci dans le but de saisir les évolutions et les limites de la fiction, lorsque celle ci se met à l'épreuve du réel. / The attacks of September 11th, 2001 on the American soil had an undeniable impact in the political, religious and social fields of this new century, but also in the cultural one. They put to the test the very foundations of what is known as “americanism”, an ideology born with the United States and still mostly prevalent to this day. While the images of the two collapsing World Trade Center towers symbolized a historical breaking point, the national catastrophe has since then nourished a large amount of fictions. Through the study of eighteen works of fiction published in the following decade - various by forms but noteworthy by their impact on the US culture -, our work claims to unveil an operative typology through time which follows the various stages of the mourning process, from denial to possible rebuilding. Thus, the diachronic analysis of this corpus, in close relationship with the American culture and history of political ideas, intends to question the role of fiction towards the shock resulting from September 11th, in order to seize the evolutions and limits of it, when the real puts it to the test.
18

Utveckling av Jönköpings Sportdansklubbs webbplats / DEVELOPMENT OF JÖNKÖPING SPORT DANCE CLUB WEBSITE

Krondahl, Andreas January 2011 (has links)
It has become more important how to communicate via the Internet. It is necessary to highlight interesting features and to capture the visitors interest. Members of Jönköping Sport dance club (JSDK) were not quite satisfied with their website. The purpose of this study was therefore to create a design for a website which met the demands made by the members and also appealed to other visitors.
19

"Building Relationships: Community, Rebuilding, and Architectural Succession After the 2016 Gatlinburg Fire"

Varajon, Sydney Kae January 2021 (has links)
No description available.
20

Frågeställningar vid ombyggnation av kontorslokaler till bostäder : Håltagning i plastgjuten betong / Questions regarding reconstruction of office buildings to residential buildings : New openings in situ concrete

Hilton, Leo, Dawod, Muostafa January 2014 (has links)
Det råder bostadsbrist i Stockholm, en lösning är att bygga nya bostäder. En annan lösning är att nyttja befintliga byggnader som inte används som bostäder, genom att bygga om kontor- och industrilokaler till bostäder. Det som händer är att industriområden flyttas längre ut från de attraktiva bostadsområdena. Ombyggnationer av byggnader med olika lokalkategorier kräver omfattande bearbetning och samarbete mellan flera aktörer såsom stadsplanerare, byggherrar, arkitekter, konstruktörer med flera. Det finns många aspekter att ta hänsyn till vid ombyggnationsprojekt och vårt mål är att belysa några av dessa. Den här rapporten studerar först och främst konstruktörens roll, vad en konstruktör ska tänka på vid en ombyggnation. Författarna har huvudsakligen tittat närmare på platsgjutna betongstommar och då mer specifikt på hur håltagningar i bärande konstruktioner går till. Vidare hur stommen påverkas av nya öppningar för exempelvis fönster, dörrar eller installationsschakt och vilka risker som skall beaktas. För att få svar på dessa frågor har författarna tagit hjälp av sakkunniga i branschen och litteraturstudier. Även ett referensobjekt i pågående produktion har studerats. Rapporten är tänkt att hjälpa kommande studenter, nyutexaminerade byggnadsingenjörer och konstruktörer att få en bättre förståelse för de viktiga delar inom ombyggnationsprocessen. Förhoppningen är att checklistorna som framställs i rapporten skall vara till hjälp att strukturera arbetet för konstruktörer vid planering av håltagningar. Företaget kan med hjälp av dessa listor spara tid då de inte behöver ägna lika mycket tid åt vägledning när de tar in nyanställda konstruktörer som saknar erfarenhet inom ombyggnationer. / There is currently a shortage of residences in Stockholm, one solution is to build new residences. Another solution is to rebuilding office- and industrial buildings into residential units. Industrial areas are moving away from the city center and out to the suburbs. Reconstruct of old offices to new residences requires extensive teamwork between multiple actors. Such as urban planners, developers, architects, constructors and others. There are many aspects to consider when it comes to the remodeling of buildings. This report studies what a constructor should consider in the case of reconstruction. The authors will mainly study the concrete structures, more specifically the process of how new openings in bearing structures are done. Furthermore, how the construction is affected by the new openings for windows, doors or pipe- and elevator shafts and what risks there are to consider. To find answers for these questions the authors will interview several constructors and read relevant literature. The purpose of this report is to help future students, recent graduated engineers and constructors to get a better understanding of the important parts of the rebuilding process. The purpose of this report is to ease the work for companies when employing recent graduated engineers or constructors who do not have experience in the field. This will hopefully save them some time as they do not require as much guidance.

Page generated in 0.0716 seconds