• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 1
  • Tagged with
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Effektivisering av materialhantering gällande plåtrullar i SSAB:s Stålhamn : En fallstudie på Oxelösunds Hamn AB / Streamlining of the flow of the Coil at SSAB steel port : A case study at Oxelösund Harbor

Almudhari, Haider January 2018 (has links)
Idag befinner sig produktionsföretag under konkurrenskraftiga och snabba förändringar i en global marknad. Det utmanar företag som jobbar med materialtillverkning och distributionsnät på en global nivå till att ständigt förbättra deras verksamhet. Aktörerna som verkar inom en och samma supply chain bör enas för att kunna bli konkurrenskraftiga och flexibla, som respons på globaliseringen. Genom att företag skapar gemensamma mål, delar information, risker och vinster kan alla aktörer inom kedjan gynnas. Denna fallstudie har genomförts på en av Oxelösunds Hamns verksamheter, nämligen SSAB:s Stålhamn, som de driver åt SSAB i Oxelösund kommun. Stålhamnen har en viktig roll i SSAB:s supply chain eftersom den agerar som SSAB:s skeppningshamn där material som kommer från SSAB i Borlänge och Oxelösund lagras tills de ska skeppas vidare till andra hamnar i världen. Idag upplever Oxelösunds Hamn ineffektiv information- och materialflöde inom Stålhamnens verksamhet. Syftet med studien är att undersöka materialhantering i form av vilka transport- och lagringsmetoder som sker inne i en av Stålhamnens verksamheter, Coilsterminalen. Därefter klargörs vilka slöserier som finns samt hitta förbättringar för att effektivisera information- och materialflödet vid hanteringar av plåtrullar i Coilsterminalen. Studien har primärt genomförts genom observationer, ostrukturerade och några strukturerade intervjuer samt strukturerade mejlkonversationer och insamling av data. Fokuset låg på att hitta de möjliga effektiviseringsområden i praktiken för att sedan hitta teori och litteratur som belyser de upphittade bristerna. Några teorier som kommer att betonas på grund av deras relevans är Lean, lager- och supply chain teori. Studiens resultat och analys visar att utmaningarna som hindrar effektivisering i Coilsterminalen är baserad på interna och externa faktorer. Interna faktorer består av onödig förflyttning av material, omarbetning i kontor och outnyttjat arbetsskift. Externa faktorer orsakas på grund av leverantörer i form av osäkerhet av informationsinput samt material input/output. Studien resulterar i att den optimala lösningen är att samarbetet mellan aktörerna i kedjan förbättras så att flöde av information blir bättre och förminska osäkerheten i leverans och utleverans. Vidare uppmuntrar studien Oxelösund Hamn att samla in data, i form av statistik, om dagliga händelser i Stålhamnen så att de belyser problem och kostnader som är dolda. Oxelösund Hamn uppmuntras också införa det outnyttjade arbetsskiftet under natten och förminskning av lagret. / Today, manufacturing companies are under competitive and rapid changes in the global market. It challenges companies working with material manufacturing and distribution networks at a global level to continually improve their business. The actors operating within a single supply chain should unite to increase their ability to compete and remain flexible, as a response to the effects of globalization. By creating business goals, sharing information, risks, and profits, all operators in the chain can benefit. This case study has been carried out in one of Oxelösund Harbor's operations, namely SSAB's Steel Port, which they operate for SSAB in Oxelösund municipality. The steel harbor has an important role in SSAB's supply chain because it acts as SSAB's port of shipment where materials coming from SSAB in Borlänge and Oxelösund are stored until they are shipped to other ports in the world. Today, Oxelösund Harbor is experiencing inefficient information and material flow within the Steel Harbor's operations. The purpose of the study is to investigate material handling in terms of which transport and storage methods are carried out in one of the steel ports operations, the coil terminal. Thereafter, the study will clarify what kind of waste there is and find improvements to streamline information and material flow when handling coils in the coil terminal. The study was primarily conducted through observations, unstructured and to a lesser extent structured interviews, structured email conversations and data collection. The focus was on finding the possible areas that could become more efficient in practice and then finding the theory and literature that highlight the shortcomings found. Some theories that will be emphasized, because of their relevance, are Lean, inventory and supply chain theory. The study's results and analysis show that the challenges that hinder the efficiency of the coil terminal are based on internal and external factors. Internal factors consist of unnecessary movement of materials, reworking in office and unused work shifts. External factors are caused by vendors in the form of information insufficiency and material input/output. The results of the study conclude that the optimal solution is that the cooperation between the operators in the chain is improved so that flow of information becomes better and reduce uncertainty in delivery and shipping. Furthermore, the study encourages Oxelösund Harbor to collect data, in the form of statistics, concerning daily events in Stålhamnen, highlighting problems and costs that are hidden and start utilizing the unused work shift during the night, as well as reducing the stock.

Page generated in 0.0396 seconds