1

Framtidens monteringssystem för produkter med inbyggd intelligens

Svensson, Michelle January 2019 (has links)
Detta arbete har gjorts i samband med ett företag som säljer sina produkter på en global nivå. Företaget och dess produkter kommer inte att namnges i detta arbete på grund av sekretesskäl. Detta företag håller på att utveckla en ny produktgrupp med åtta olika produkter och då dess produkter delar vissa komponenter och monteringssteg vill företaget veta om det är möjligt att montera dessa produkter på en och samma monteringslinje. Företaget vill också få ett förslag på hur monteringslinjen skulle kunna se ut. Syftet med arbetet är att analysera hur ett monteringsupplägg kan se ut för den nya produktgruppen. Arbetet har strukturerats efter Design Thinking Processen. Metoder som har använts i arbetet är bland annat intervjuer, observationer, litteraturstudie, brainstorming och peer review. De resultat som har erhållits är ett förslag på hur en monteringslinje för sex av de åtta produkterna kan se ut. Förslaget inkluderar även ett förslag på hur materialförsörjningen till en av linjens stationer kan se ut. Två av produkterna exkluderades ur den tänkta produktgruppen på grund av att dessa produkter skiljde sig för mycket komponentsmässigt gentemot de andra. För en av produkterna var det inte rimligt att innefatta denna i produktgruppen av orsaker som ekonomi och bemanning. Den andra produkten som exkluderades ur produktgruppen uteslöts på grund av ett felaktigt antagande hade gjorts angående produktens montering. Då det felaktiga antagandet upptäcktes i ett väldigt sent skede av projektet fanns inte möjlighet att hinna åtgärda felet; således valdes det att exkludera produkten ur produktgruppen.  En slutsats som kan dras från detta arbete är att produkter som ska monteras på en och samma taktad monteringslinje måste vara väldigt lika i fråga om monteringssekvens, antalet ingående komponenter och monteringstid. Ytterligare en slutsats är att det behövs åtminstone två olika materielförsörjningsprocesser för att få en effektiv materialförsörjning till taktade linjer där olika produkter monteras. Den tredje slutsatsen som kan dras är förmontage bör användas till produkter som består av komplexa komponenter ifall de ska monteras med andra mindre komplicerade produkter på en taktad linje.  Andra slutsatser för detta projekt är att supermarkets och kittning är bra metoder att använda för att minska material som måste ligga i direkt anslutning till monteringslinjen.
2

Produktionsplanering och lagernivåer : En undersökning gällande utjämnad produktion på Jonsson & Paulsson Industri AB

Lundberg, John, Blomström, Victoria January 2016 (has links)
Jonsson & Paulsson Industri AB (JP) är ett företag beläget i Östersund som tillverkar plåtbaserade delsystem och produkter. JP står inför ett större projekt som syftar till att reducera ledtiden, minska fabriksytorna och höja företagets leveransprecision. Examensarbetet är ett underprojekt till detta projekt med det huvudsakliga syftet att på sikt höja företagets leveransprecision genom att undersöka alternativa sätt att planera produktionen.   Projektgruppens uppgift var att undersöka och presentera förslag till en produktionsplanering som var både taktad och flödesutjämnad, med hänsyn till lagernivåer och kapitalbindning. Syftet med produktionsplanen var att minska artiklarnas flödesvariation och öka möjligheten för JP att få direkt återkoppling på hur de ligger till gentemot dagens produktionsplan. Projektgruppen gjorde även en känslighetsanalys av de framtagna produktionsschemana, med syfte att utvärdera vilka maskiner och produktionsscheman som är extra känsliga för störningar. Tillsammans med produktionsplaneringen skulle även lämpliga nivåer för säkerhetslager för respektive artikel undersökas, för att företaget bättre ska kunna möta prognosfel och störningar i produktionen. Genom att formulera en matematisk modell som sedan implementerades i en lösare för linjära heltalsprogram kunde produktionsscheman tas fram. Känslighetsanalysen baserades på produktionsschemana där dess robusthet testades och olika förbättringsförslag identifierades. Projektgruppen samlade in data för att bestämma nivåer för säkerhetslagret. Vi valde därefter att inte gå vidare med utredningen av flera anledningar, bland annat på grund av att datan var otillräcklig. Vår rekommendation till företaget är därför att samla in den information som krävs för att ta fram nivåer för säkerhetslager, för att i framtiden ha möjligheten att göra detta. Projektgruppen har tagit fram tre olika typer av utjämnade produktionsscheman till de flesta svetsrobotar, vilka produktionsschemana är skapade för. Det har även skapats en typ av produktionsschema som inte är utjämnat för att använda som referens. De utjämnade produktionsschemana är taktade med veckotakt. Två av dessa är en kombination av flexibla och helt utjämnade, då de svarar mot trender i efterfrågan för att inte bygga orimligt stora lagernivåer. En typ av produktionsschema är utjämnat med avseende på partistorlekar. Vi anser att JP kan förbättra sin leveransprecision om de utjämnar och taktar sina flöden, då det hjälper företaget att se om de är i fas och om så inte är fallet snabbt kunna sätta in åtgärder. De anställda får även en jämnare arbetstakt och vet vad som förväntas produceras varje dag. Ett utjämnat flöde bygger större lagernivåer än en flexibel produktion, men sparar in kostnader på övertid och undersysselsättning. Känslighetsanalysen visade att svetsrobot 304, 302 och 305 är mest känsliga för störningar. Svetsrobot 307 och 303 är mindre känsliga och har produktionstid över till förfogande. Känsligheten hos svetsrobot 303, 304, 305 och 307 kan minskas om bruttokapaciteten höjs. Projektgruppen ser ett behov av att jämna ut beläggningen mellan svetsrobotarna genom att flytta någon artikel från svetsrobot 302 till 303 eller 307. / Jonsson & Paulsson Industri AB (JP) is a company located in Östersund that manufactures steel-based sub-systems and products. JP is facing a large project that aims to reduce the lead time, reduce the factory floor area and improve their delivery dependability. The master thesis is a subproject of this project with the main objective to eventually raise the company’s delivery dependability by investigating alternative methods to plan JP’s production.   The project group’s assignment was to investigate and present proposals for a production plan that was both rate based and leveled, with respect to inventory levels and tied up capital. The purpose of the production plan was to reduce the variation in the flow of the articles. It also increases the possibility of direct feedback concerning whether they follow the production plan of the day or not. The project group also made a sensitivity analysis of the production schedules with the purpose to evaluate which machines and schedules that are most sensitive for disruptions.  Appropriate levels of safety stock were also investigated, so that JP could improve their ability to meet forecasting errors and disruptions in the production.  By formulating a mathematical model, and implement it in an integer linear programming solver we were able to produce production schedules. The project group then analyzed the sensitivity of these schedules based on their robustness and sensitivity to reduction in capacity. The sensitivity analyses produced different proposals for improvements. The project group collected data of forecasting errors to determine levels for the safety stock. We chose not to proceed with the simulation of multiple reasons. One of them was insufficient data. We therefore recommend JP to collect the missing data that is required for determine the levels of the safety stock, to be able to do this in the future.   The project group has developed three different types of production schedules for most welding machines that are leveled and rate based. We have also developed a type of production schedule that is not leveled or rate based, which has been used as a reference. The leveled production schedules are rate based with a weekly production rate. Two of the leveled types of production schedules are a combination of flexible and completely leveled, as they respond to trends in demand to avoid building excessive inventory levels. The third type of leveled production schedule is leveled with respect to batch sizes. JP is likely to improve their delivery dependability if they level and rate base their flows. It helps them to see if the production is in time and act quickly if it is not. The employees’ gets to produce in a more even working pace and knows what is expected to be produced every day. A leveled flow builds higher inventory levels then a flexible production, but costs are also saved since overtime and underemployment is avoided. The sensitivity analyses showed that welding machine 304, 302 and 305 are most sensitive to disruptions. Welding machine 303 and 307 can dispose capacity for other, more pressed, welding machines since they are least sensitive. By heightening the gross capacity of welding machine 303, 304, 305 and 307 their sensitivity will be reduced. We have seen a need to level the stress of the welding machines, preferably by shifting an article from machine 302 to 303 or 307.
3

Linjebalansering vid Kabe AB:s husvagnsfabrik i Tenhult : En modell för ett taktat flöde av en förmontering / Linebalancing at Kabe AB:s caravan factory in Tenhult

Oberer, Rasmus, Hedlund, Tobias January 2018 (has links)
Kabe AB är beläget i samhället Tenhult utanför Jönköping och kan ses som Sveriges ledande tillverkare av husvagnar och husbilar. Företaget består av en husvagnsfabrik, en husbilsfabrik samt en snickerifabrik. Denna studie är utförd på husvagnsfabriken, vilken har en produktionslina på rullande band som består av ett tjugotal tillhörande förmonteringar. Dessa förmonteringar är placerade längs med produktionslinan där det monteras moduler av inrede, som sedan lyfts in i husvagnarna för slutmontering.   Problemet som studeras i detta arbete är avgränsat till en förmontering, vilken monterar moduler av ett specifikt barskåp för en viss variant av husvagnar. I nuläget tar monteringen av detta barskåp för lång tid, vilket bidrar till övertid eftersom montörerna inte hinner montera i produktionslinans takt. För att studera problemet närmare har rådata samlats in från de 2 involverade montörer som arbetar med monteringen av barskåpet. Rådata som har samlats in har skett i form av tidsstudier som sedan har analyserats i programvaran AviX. Med hjälp av AviX kunde sedan cykeltider för ingående arbetsmoment på förmonteringen sammanställas och kategoriseras för vidare effektiviseringsarbete.   I diskussion med företaget ansågs det lämpligt att arbeta vidare med en linjebalansering som en eventuell lösning på problemet. Genom att beräkna en önskvärd cykeltid och en verklig cykeltid av nuläget kunde det bevisas att denna förmonteringen inte var synkroniserad med produktionslinans takt. I och med det lades det grund för åtgärdsförslag för att nå en verklig cykeltid som understiger den önskade cykeltiden och därmed ett taktat flöde. Det slutgiltiga åtgärdsförslaget resulterade i att överföra en del av arbetsuppgifterna från montör 1 till montör 2. På så sätt fås en mer balanserad arbetsfördelning, som är mer tidseffektiv och minskar den verkliga cykeltiden. Efter att linjebalanseringsberäkningarna var genomförda kunde ett resultat i form av en minskad balanseringsförlust med 50% tas fram.   Denna studies resultat angående en förminskad balanseringsförlust på 50% skulle kunna ligga till grund för ett vidare arbete inom företaget, där denna metod testas på fler förmonteringar längs produktionslinan som anses ha liknande problem. På så sätt skulle Kabes produktion bli mer effektiv och därmed kunna producera fler husvagnar.
4

INCREASED EFFICIENCY BY PLANNING AN ASSEMBLY LINE WITH SPECIFIC REQUIREMENTS / Ökad effektivitet genom planering av monteringslina med särskilda krav

Nilsson, Alexander, Sollander, Kristina January 2015 (has links)
Purpose – The purpose with this study is to investigate how an assembly line for products with long cycle time, high product variation and operators who follow the products through the flow can be planned for a high resource utilization as well as the challenges that can arise when planning an assembly line with an increasing demand and how these can be handled. Method – To fulfill the purpose of this study a case study was conducted at Mastec Components AB in Vaggeryd. The empirical data gathered from the case study was obtained through interviews, observations and document studies. The empirical data was then analysed against theory, which means that pattern matching was used and the analyse led to the studies results. Findings – This study illustrates how an assembly line with special demands can be planned to gain high resource utilization. When the products cycle times are multiple they can be sorted into product families to simplify the planning and it also enables a tacted planning method to be used. The study also presents how the usage of time buffers can facilitate the planning of an assembly line. Moreover the study illuminates the importance of controlling tact, both from the customer and the own production. When demand increases it is important that the production line is capable to keep up, therefore some arrangements can be done to reduce waste and increase capacity. Possible alternatives can be buffers, allocating resources and parallel assembly lines. Implications – The study investigates a type of assembly line where the operators follow the products through the flow. This type of assembly line is unexplored in theory and thereby a knowledge gap has been identified which partly have been covered by this study. Further on, the study contributed to an increased understanding of the consequences that occur when operators follow the flow and when products have long varying cycle times. The study also shows the value of calculating tact and use the advantages from it to easier handle variation in demand. Limitations – The case study was performed as one case study which means that only one unit has been analysed. This was due to the lack of resources to do several case studies, both regarding time and ability to find more facilities with similar conditions. If it were possible to conduct more case studies the results could have been more general. Keywords – Tact, tact time, tacted planning, assembly line, planning, operators, buffer.